restoration preservation masonry, inc. v. grove europe, ltd

47
Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd.

Upload: kory-malone

Post on 18-Dec-2015

219 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

Restoration Preservation Masonry, Inc. V.

Grove Europe, Ltd.

Page 2: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

Accident Site - Longwood Towers20 Chapel Street, Brookline, MA

Page 3: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

Building B

Accident Site - Longwood Towers20 Chapel Street, Brookline, MA

Page 4: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

Building B

Accident work area in southeast corner

Page 5: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

Building B

Accident work area in southeast corner

Page 6: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

Building B

Accident work area in southeast corner

Page 7: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

Accident work area in southeast corner - Perspective View

Page 8: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

Construction project involved removal of bricks and bull-nose water stone because of water infiltration and leakage issues.

Page 9: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

Work area is approx.80’ above the ground

80 feet

Page 10: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

Southeast corner perspective

Work area

Page 11: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

Access Satellite scaffolding set-up

Page 12: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

Access Satellite scaffolding set-upChassis assembly

Main platform

Outriggers

Page 13: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

Mast goes up in sections

Access Satellite scaffolding set-up

Mast attached to building with wall ties

Page 14: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

Access Satellite scaffolding set-up

platform extension 1

platform extension 4

Page 15: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

Access Satellite scaffolding set-up

platform extension 5

platform extension 2

Page 16: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

Access Satellite scaffolding set-up

platform extension 3

platform extension 6

Page 17: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

Cantilever extensions (5)

cantilever extensions (5)

Access Satellite scaffolding set-up

Page 18: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

Cantilever extensions - left side

Page 19: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

Three different cantilever extension designs used on left side

Page 20: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

Three different cantilever extension designs

7’ 8.75”

4’ 11.4”

8’ 2.2”

sliding extensions

Page 21: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

Access Satellite scaffolding set-up

Planks set on top of cantilever extensions

Page 22: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

Access Satellite scaffolding set-up

plywood sheets set on top of planks

Page 23: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

Planks and plywood

Planks and plywood

Access Satellite scaffolding set-up

Page 24: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

Guard railings

Guard railings

Access Satellite scaffolding set-up

Page 25: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

Scaffolding rides up mast

Page 26: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

Scaffolding rides up mast

Page 27: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

Scaffolding rides up mast

Page 28: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

Scaffolding rides up mast

Page 29: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

View from below

Page 30: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

View from above

wall ties

Page 31: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

View from above

Page 32: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

View from above

Page 33: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

View from above

Page 34: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd
Page 35: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

Area represented by scale model

Page 36: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

Accident Sequence

Page 37: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

Areas where bull-nose water stone was previously removed

Page 38: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

Pieces are cut from bull-nose water stone

approx. 5 feetfrom top ofwall to plywood

Page 39: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

Cut stone is moved to platform extension #1

Page 40: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

Scaffolding collapses

Page 41: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

Post-accident photos

Page 42: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

Right side of Access Satellite platform post-accident

platform extensions 4, 5 & 6

main platform

Cantilever extensions covered with planks and plywood

mast

Page 43: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

Post-accident photo

Page 44: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

Post-accident photo

Page 45: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

Post-accident photo

Page 46: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

Post-accident photo

Page 47: Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd

END