Page 1: RESOURCE ROAD CALL PROCEDURES. There is a need to develop a radio call standard for single and multiple users to operate and communicate safely on Resource

RESOURCE ROAD CALL PROCEDURES

Page 2: RESOURCE ROAD CALL PROCEDURES. There is a need to develop a radio call standard for single and multiple users to operate and communicate safely on Resource

• There is a need to develop a radio call standard for single and multiple users to operate and communicate safely on Resource Roads.

Page 3: RESOURCE ROAD CALL PROCEDURES. There is a need to develop a radio call standard for single and multiple users to operate and communicate safely on Resource

• To this end the MOF/BCTS is currently in the process of obtaining radio frequencies which will be available to provide effective coverage to all users while operating on Forest Service Roads (FSRs).

Page 4: RESOURCE ROAD CALL PROCEDURES. There is a need to develop a radio call standard for single and multiple users to operate and communicate safely on Resource

FSR Radio Mapping Procedures• The Road Manager will establish the

names and numbers for “Main” roads and Branch roads.

• The Road Manager will select the Point of Commencement (PoC) of each road.

• The PoC will normally be the log dump, highway connection or other FS road.

• The kilometre numbering for each branch road off of the main will recommence at Km 0 and be spatially established.

Page 5: RESOURCE ROAD CALL PROCEDURES. There is a need to develop a radio call standard for single and multiple users to operate and communicate safely on Resource

Road Signage

• At the PoC of the “main FSR” an identification sign, and the Resource Road (RR) channel (and frequency and tone) sign will be posted

Page 6: RESOURCE ROAD CALL PROCEDURES. There is a need to develop a radio call standard for single and multiple users to operate and communicate safely on Resource
Page 7: RESOURCE ROAD CALL PROCEDURES. There is a need to develop a radio call standard for single and multiple users to operate and communicate safely on Resource

Branch Roads

• Each driveable branch road will have an identification sign posted at the PoC

Page 8: RESOURCE ROAD CALL PROCEDURES. There is a need to develop a radio call standard for single and multiple users to operate and communicate safely on Resource

Eve 1200

0 km

Up

Page 9: RESOURCE ROAD CALL PROCEDURES. There is a need to develop a radio call standard for single and multiple users to operate and communicate safely on Resource

Kilometre Signage

• Kilometre signs will be installed every kilometre.

• Signs will indicate road name, road mark and direction of travel.

• Following example would be radio call procedure;– “Fuel truck, --Eve River --12 km– Up”

Page 10: RESOURCE ROAD CALL PROCEDURES. There is a need to develop a radio call standard for single and multiple users to operate and communicate safely on Resource

Eve River Mainline

12 km

Up

Page 11: RESOURCE ROAD CALL PROCEDURES. There is a need to develop a radio call standard for single and multiple users to operate and communicate safely on Resource

Eve River Mainline

12 km

Down

Page 12: RESOURCE ROAD CALL PROCEDURES. There is a need to develop a radio call standard for single and multiple users to operate and communicate safely on Resource

Kilometre Signage at Road T-Junctions

• Kilometre signs will be installed both ways on the through road, to cover travel in either direction

• Road mark may indicate a distance other than a whole kilometre (e.g., 8.7 km)

Page 13: RESOURCE ROAD CALL PROCEDURES. There is a need to develop a radio call standard for single and multiple users to operate and communicate safely on Resource

Eve River Mainline

8.7 km

Up

Page 14: RESOURCE ROAD CALL PROCEDURES. There is a need to develop a radio call standard for single and multiple users to operate and communicate safely on Resource

Eve River Mainline

8.7 km

Down

Page 15: RESOURCE ROAD CALL PROCEDURES. There is a need to develop a radio call standard for single and multiple users to operate and communicate safely on Resource

Loading Channels

• The loading channels are intended to be utilized for communications between truck drivers and loader operators, during loading and unloading situations. They are not to be used while travelling on roads

• Upon entering a cut block, landing or sort yard the radio channel to be used will be posted along with the worksite operator’s company name.

Page 16: RESOURCE ROAD CALL PROCEDURES. There is a need to develop a radio call standard for single and multiple users to operate and communicate safely on Resource

Loading Channels Signage

Page 17: RESOURCE ROAD CALL PROCEDURES. There is a need to develop a radio call standard for single and multiple users to operate and communicate safely on Resource