RES-H Policy Background and Objectives of the Project 1. Project Meeting Freiburg, 21 October 2008 Veit Bürger ([email protected])

Upload: luis-griff

Post on 01-Apr-2015

216 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: RES-H Policy Background and Objectives of the Project 1. Project Meeting Freiburg, 21 October 2008 Veit Bürger (v.buerger@oeko.de)

RES-H Policy

Background and Objectives of the Project

1. Project MeetingFreiburg, 21 October 2008

Veit Bürger ([email protected])

Page 2: RES-H Policy Background and Objectives of the Project 1. Project Meeting Freiburg, 21 October 2008 Veit Bürger (v.buerger@oeko.de)

2

Overview

• Overview of RES-Directive• Objectives of the RES-H Policy project• Working plan• Performance indicators• Project schedule

Page 3: RES-H Policy Background and Objectives of the Project 1. Project Meeting Freiburg, 21 October 2008 Veit Bürger (v.buerger@oeko.de)

3

RES-Directive

Page 4: RES-H Policy Background and Objectives of the Project 1. Project Meeting Freiburg, 21 October 2008 Veit Bürger (v.buerger@oeko.de)

4

RES-Directive

Page 5: RES-H Policy Background and Objectives of the Project 1. Project Meeting Freiburg, 21 October 2008 Veit Bürger (v.buerger@oeko.de)

5

RES-Directive

Page 6: RES-H Policy Background and Objectives of the Project 1. Project Meeting Freiburg, 21 October 2008 Veit Bürger (v.buerger@oeko.de)

6

RES-Directive

• Directive sets mandatory national targets for renewable energy shares related to gross final energy consumption+ indicative interim targets+ specific RES target for transport sector

• Target compliance based on statistical data• Flexibility mechanism: statistical transfers between MS + joint

projects• Directive will require MS to adopt National Action Plans, including

- sector specific 2020 targets- measures/policies to be taken to achieve these targets

• MS shall notify their NAPs to the Commission by [31 March 2010] the latest

Page 7: RES-H Policy Background and Objectives of the Project 1. Project Meeting Freiburg, 21 October 2008 Veit Bürger (v.buerger@oeko.de)

7

• Directive will keep subsidiarity of support schemes• Directive will set sustainability standards for liquid biofuels

(and biogas?)• As regards RES-H/C there might be specific regulations for

- multi-fuel plants- heat pumps- Guarantees of Origin (Member States may arrange for

guarantees for origin to be issued in response to a request from producers of heating and cooling from renewable energy sources. Such an arrangement may be made subject to a minimum capacity limit)

• Timetable of adopting the Directive ???

Page 8: RES-H Policy Background and Objectives of the Project 1. Project Meeting Freiburg, 21 October 2008 Veit Bürger (v.buerger@oeko.de)

8

Objectives of the RES-H Policy project

• to develop a concise policy background for the implementation of RES-H/C support instruments at Member State level.

• to assist selected Member State governments in setting up national sector specific RES-H/C targets as required by the proposed RES Directive

• to initiate participatory National Policy Processes in which selected policy options to support RES-H/C will be assessed; development of tailor made country specific policy recommendations as well as policy implementation guidelines (AT, GR, LT, NL, PL, UK).

• to investigate options of coordination and harmonisation of national RES-H/C policy approaches.

• to communicate and disseminate the project results to relevant stakeholder groups across the EU

Page 9: RES-H Policy Background and Objectives of the Project 1. Project Meeting Freiburg, 21 October 2008 Veit Bürger (v.buerger@oeko.de)

9

Target countries/regions

• Austria- Styria (EEG)- Upper Austria (ESV)

• Greece: CRES• Lithuania: LEI• The Netherlands: ECN• Poland: KAPE• UK: UNEXE• Additional countries involved: Sweden and Germany

Page 10: RES-H Policy Background and Objectives of the Project 1. Project Meeting Freiburg, 21 October 2008 Veit Bürger (v.buerger@oeko.de)

10

Working Plan

• WP1: Project Management

• WP2: Development of the Policy Background

• WP3: Fixing RES-H/C targets

• WP4: Assessment of national RES-H/C policy options

• WP5: Options for policy harmonisation

• WP6: Communication and dissemination

• WP7: Common dissemination activities

Page 11: RES-H Policy Background and Objectives of the Project 1. Project Meeting Freiburg, 21 October 2008 Veit Bürger (v.buerger@oeko.de)

11

WP

2D

evel

opm

ent

of

the

Pol

icy

Bac

kgro

und

National/Regional Policy Processes

GR LT

UK

AT

PL

WP3Fixing RES-H/C targets

WP1 Project Management

WP6 Communication and Dissemination

WP7 Common Dissemination Activities

NL

WP

5 P

olic

y H

arm

onis

atio

n

WP4Assessment of national

RES-H/C Policy Options

WP

2D

evel

opm

ent

of

the

Pol

icy

Bac

kgro

und

National/Regional Policy Processes

GR LT

UK

AT

PL

WP3Fixing RES-H/C targets

WP1 Project Management

WP6 Communication and Dissemination

WP7 Common Dissemination Activities

NL

WP

5 P

olic

y H

arm

onis

atio

n

WP4Assessment of national

RES-H/C Policy Options

Page 12: RES-H Policy Background and Objectives of the Project 1. Project Meeting Freiburg, 21 October 2008 Veit Bürger (v.buerger@oeko.de)

12

Performance Indicators

Specific Objectives Result Indicators: Quantification of success:

1. Assisting selected Member State governments in setting up sector specific RES-H/C targets for 2020 (and 2030) as required by the proposed RES Directive

Integration of the project results in the process of setting national sector specific RES-H/C targets in the target countries/regions

2020 RES-H/C targets notified to the Commission with the National Action Plans under the proposed RES Directive reflect the discussions about target setting carried out throughout the project (evidence of interaction with the team drafting the NAPs in the target countries)

Page 13: RES-H Policy Background and Objectives of the Project 1. Project Meeting Freiburg, 21 October 2008 Veit Bürger (v.buerger@oeko.de)

13

Specific Objectives Result Indicators: Quantification of success:

2. Providing selected Member State governments with detailed, scientifically-based input on diverse support policy options for RES-H/C; in this respect assisting Member State governments in developing sound policies to foster RES-H/C market penetration as required by the proposed RES Directive.

Integration of the policy recommendations in the RES-H/C policy formulation processes in the target countries/regions

RES-H/C support policies/measures notified to the Commission with the National Action Plans under the proposed RES Directive reflect the policy recommendations developed in the scope of the project

Page 14: RES-H Policy Background and Objectives of the Project 1. Project Meeting Freiburg, 21 October 2008 Veit Bürger (v.buerger@oeko.de)

14

Specific Objectives Result Indicators: Quantification of success:

3. Initiation of National Policy Processes which offer a meeting platform for key stakeholders aiming at discussing RES-H/C targets as well as options to improve national policies to foster RES-H/C market penetration.

Number of national policy-makers participating in the Advisory CommitteeParticipation of the different target groups in national/regional stakeholder consultations and consultation workshops on RES-H/C target setting (WP3) and policy development in WP4 (qualitative assessment of selected support options, effectiveness and economic efficiency of selected support options)

At least one policy maker per target country/region joining the Advisory CommitteeAt least 20 responses from national stakeholders to each one of the two web based stakeholder consultations in WP3 and WP4 per countryAt least 15 external participants attending each one of the three national consultations workshops per target country/region: 5 participants representing the policy sector (ministry and governmental agency staff, national/regional parliamentarians), 1 participant representing a regulatory body for the heating and cooling market, 5 RES-H/C market players (e.g. manufacturers and installers of RES-H/C devices, renewable fuel suppliers, district heating companies supplying renewable heat)

Page 15: RES-H Policy Background and Objectives of the Project 1. Project Meeting Freiburg, 21 October 2008 Veit Bürger (v.buerger@oeko.de)

15

Specific Objectives Result Indicators: Quantification of success:

4. Development of tailor made policy recommendations and implementation strategies against the background of specific national market framework conditions and governance structures in the target countries/regions.

Integration of the policy recommendations in the RES-H/C policy formulation processes in the target countries/regions

RES-H/C support policies/measures notified to the Commission with the National Action Plans under the proposed RES Directive reflect the policy recommendations developed in the scope of the project

Page 16: RES-H Policy Background and Objectives of the Project 1. Project Meeting Freiburg, 21 October 2008 Veit Bürger (v.buerger@oeko.de)

16

Specific Objectives Result Indicators: Quantification of success:

5. Assessing options to coordinate or even gradually harmonise national RES-H/C policy approaches

Participation of the different target groups in consultation workshops on RES-H/C policy harmonisation/coordination

At least 20 external participants per consultation workshop: 7 participants representing the European policy sector (e.g. EP, Commission), 5 participants representing the RES-H/C business sector (e.g. RES-H/C associations)

Page 17: RES-H Policy Background and Objectives of the Project 1. Project Meeting Freiburg, 21 October 2008 Veit Bürger (v.buerger@oeko.de)

17

Project scheduleOct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

Project phase / Duration of the project (in months)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

WP 1: Management

WP2: Development of the Policy Background

WP 3: Fixing RES-H/C targets

WP 4: Assessment of national RES-H/C Policy Options

WP 5: Policy Harmonisation

WP 6: Communication and Dissemination

WP 7: Common Dissemination Activities

Project meetings x x x x x x

Advisory Committee x x x

WP3 Stakeholder Consultation x

WP3 Consultation Workshops

WP4 Stakeholder Consultation x

WP4 Consultation Workshops

WP5 Consultation WS (Policy Harmonisation) x x

WP6 National Dissemination Conferences

European Dissemination Conference x

Dissemination Workshops in non-target countries

Project Reports to EACI PR IR FRa)

Project Information Sheet to EACI x x x x

Webpage/site creation and update x