requirements within egi

13
EGEE-III INFSO-RI- 222667 Enabling Grids for E- sciencE www.eu-egee.org EGEE and gLite are registered Steven Newhouse Requirements within EGI

Upload: louise

Post on 25-Feb-2016

45 views

Category:

Documents


1 download

DESCRIPTION

Requirements within EGI. Steven Newhouse. The Project. Not a project rather an ‘ecosystem’ European Commission funds a ‘lot of stuff’ Wants to see there is some ‘ joinedupness ’ Where are the project participants from? Primarily Europe, but international collaborators The primary actors - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Requirements within EGI

EGEE-III INFSO-RI-222667

Enabling Grids for E-sciencE

www.eu-egee.org

EGEE and gLite are registered trademarks

Steven Newhouse

Requirements within EGI

Page 2: Requirements within EGI

Enabling Grids for E-sciencE

EGEE-III INFSO-RI-222667

The Project• Not a project rather an ‘ecosystem’

– European Commission funds a ‘lot of stuff’– Wants to see there is some ‘joinedupness’

• Where are the project participants from?– Primarily Europe, but international collaborators

• The primary actors– Users: ESFRI projects– Infrastructure: EGI

Steven Newhouse - OGF 27 - Requirements 2

Page 3: Requirements within EGI

Enabling Grids for E-sciencE

EGEE-III INFSO-RI-222667

Goal: Long-term sustainability of grid infrastructures in Europe

Approach: Establish a federated model bringing together National Grid Infrastructures (NGIs) to build the European Grid Infrastructure (EGI)

EGI Organisation: Coordination and operation of a common multi-national, multi-disciplinary Grid infrastructure

To enable and support international Grid-based collaborationTo provide support and added value to NGIsTo liaise with corresponding infrastructures outside Europe

European Grid Infrastructure

3Steven Newhouse - OGF 27 - Requirements

Page 4: Requirements within EGI

Enabling Grids for E-sciencE

EGEE-III INFSO-RI-222667

The ESFRI Roadmap• First edition 2006 and updated in 2008 with 44 projects• Preparatory phase funding for most with second round

soon• About 10 will fly by 2010• European X-FEL first to go real – civil construction

started in 2009 and International convention agreed in September days ago.

ESFRI: European Strategy Forum on Research Infrastructures

4Steven Newhouse - OGF 27 - Requirements

Page 5: Requirements within EGI

Enabling Grids for E-sciencE

EGEE-III INFSO-RI-222667

The Centrality of Research Infrastructures for Innovation

5Steven Newhouse - OGF 27 - Requirements

Page 6: Requirements within EGI

Enabling Grids for E-sciencE

EGEE-III INFSO-RI-222667 Steven Newhouse - OGF 27 - Requirements 6

ESFRI @ EGEE09

Cherenkov Telescope Array

Page 7: Requirements within EGI

Enabling Grids for E-sciencE

EGEE-III INFSO-RI-222667

ESFRI Projects for Env. Sciences

LIFEWATCH

EMSO

IAGOS-ERI

AURORA BOREALIS

EUFAR-COPAL

ICOS

EURO-ARGO

EPOS

EISCAT-3D

SIOS

Status 2009

7Steven Newhouse - OGF 27 - Requirements

Page 8: Requirements within EGI

Enabling Grids for E-sciencE

EGEE-III INFSO-RI-222667

X-ray Free Electron Laser

X-ray generation

12Steven Newhouse - OGF 27 - Requirements

Page 9: Requirements within EGI

Enabling Grids for E-sciencE

EGEE-III INFSO-RI-222667

XFEL Length ca. 3.3 kmPETRA

HERA

phase I

phase II

European XFEL Facility - Hamburg

13Steven Newhouse - OGF 27 - Requirements

Page 10: Requirements within EGI

Enabling Grids for E-sciencE

EGEE-III INFSO-RI-222667

Technology Forecast @ DESYYear Rate Capability

[Gbyte/sec]Storage Space

[Petabyte]

2009 1 3

2012 5 26

2016 40 200

• not a technology problem• money and manpower issues• to be determined:

• user behaviour• compression and accept/reject algorithms

• potentially critical: access to data!

14Steven Newhouse - OGF 27 - Requirements

Page 11: Requirements within EGI

Enabling Grids for E-sciencE

EGEE-III INFSO-RI-222667

Some common features• Multi-year investment in research infrastructures

– Planning phase– Construction phase– Running phase

• These are big, expensive, data intensive experiments– The data analysis component of each project is non-trivial!– An opportunity to leverage a common infrastructure

Steven Newhouse - OGF 27 - Requirements 15

Page 12: Requirements within EGI

Enabling Grids for E-sciencE

EGEE-III INFSO-RI-222667

Interoperability Requirements

Steven Newhouse - OGF 27 - Requirements 16

requirement CLARIN DARIAH/CESSDA

EISCAT3D EPOS LIFEWATCH ELIXIR XFEL CTA FAIR SKA

Singlesign-on

Persistent storage

Global

Workflows

Virt ualOrganisation

Standards

INITIALDRAFT

Page 13: Requirements within EGI

Enabling Grids for E-sciencE

EGEE-III INFSO-RI-222667

Next Steps• Collaboration between ESFRI projects• What can e-Infrastructures projects offer ESFRI

– EGEE EGI– DEISA PRACE– GEANT (Network)

• Confirm requirements and identify technical opportunities• How to leverage existing investments and expereinces?

Steven Newhouse - OGF 27 - Requirements 17