require onsite handling 24 july 2015

4
Cell Bad event Request da 319120A CDR/CSSR 9-Jun-15 216047A CSSR 16-Jun-15 302056B 20-Jun-15 319053B CDR/CSSR/HOSR 24-Jun-15 236081B CDR/CSSR/HOSR 24-Jun-15 216044a CDR 24-Jun-15 319109A CDR/HOSR 8-Jul-15 311040A CDR/HOSR 8-Jul-15 216047A CDR 8-Jul-15 216047B CDR 8-Jul-15 319080A CDR/HOSR 9-Jul-15 343043B CDR 13-Jul-15 319053C CDR/HOSR 13-Jul-15 343014A CDR/HOSR 13-Jul-15 319026B CDR 13-Jul-15 311005B HOSR 13-Jul-15 232038C HOSR 13-Jul-15 302057B HOSR/CDR/CSSR 21-Jul-15 232067A CDR/CSSR 22-Jul-15 311040A CDR/CSSR 22-Jul-15 310043B CDR/bad incoming 23-Jul-15 319031C CDR/CSSR 24-Jul-15 302017B CDR/CSSR 24-Jul-15 319018C CDR 24-Jul-15 SDCCH assign failed call attempt decrease

Upload: huong

Post on 05-Sep-2015

213 views

Category:

Documents


1 download

TRANSCRIPT

Sheet1CellBad eventRequest dateRequire Onsite actionRequesterResultRemarkH.T.E feedback319120ACDR/CSSR9-Jun-15replace DRFUHuongdoneclear since 08 Jul by replace DRFU216047ACSSR16-Jun-15check, swap DRFUHuongdonecleared since 18 Jun, swap302056BSDCCH assign failedcall attempt decrease20-Jun-15replace DRFUHuongdonecleared since 26 Jun but depot still replace new DRFU on 4 Jul319053BCDR/CSSR/HOSR24-Jun-15replace DRFUHuongdoneclear since 13 Julbefore, bad KPI at 319053A, swap DRFU then 319053B bad, 3 times Swap DRFU and 3 times replace DRFUreplace 13 Jul236081BCDR/CSSR/HOSR24-Jun-15replace DRFUHuongdonecleared since 26 Jun but depot still replace new DRFU on 4 Jul216044aCDR24-Jun-15replace DRFUHuongdonecleared since 26 Jun, replaced319109ACDR/HOSR8-Jul-15check, swap DRFU with cell BLamdoneCheck jumper, connector, Swap DRFU 10 Jul311040ACDR/HOSR8-Jul-15check, swap DRFU with cell BLamdoneCheck jumper, connector, Swap DRFU 10 Jul216047ACDR8-Jul-15check jumper, connector, remove DRFU and reinstallLamdoneclearcross-CPRI, fixed on 09 Jul216047BCDR8-Jul-15check jumper, connector, remove DRFU and reinstallLamdoneclearcross-CPRI, fixed on 09 Jul319080ACDR/HOSR9-Jul-15check, swap DRFU with cell CLamdoneTRX # 1 of 1st DRFUbad again since 14 JulCheck jumper, connector, Swap DRFU 10 Jul343043BCDR13-Jul-15check, swap DRFU with cell ALamdoneTRX # 9Check jumper, connector, Swap DRFU 14 Jul319053CCDR/HOSR13-Jul-15check connector, cross, swap with cell ALamdoneTRX # 9Check jumper, connector, Swap DRFU 14 Jul343014ACDR/HOSR13-Jul-15check connector, cross, swap with cell BLamdoneCheck jumper, connector, Swap DRFU 14 Jul319026BCDR13-Jul-15check connector, cross, swap with cell ALammonitorCheck jumper, connector, Swap DRFU 14 Jul311005BHOSR13-Jul-15down M-tilt from 0->3TramonitorDown M-tilt from 0->2232038CHOSR13-Jul-15check, swap DRFU with cell BTramonitorbad HOSR from 232021Bdone on 16 Jul302057BHOSR/CDR/CSSR21-Jul-15check, swap DRFU with cell ATra/Huongmonitorbad HOSR from 302001C and 302030C. Almost calls dropped due to bad quality23-Jul: Kim tra u conector, Jumper, Swap DRFU cell B vi cell A 232067ACDR/CSSR22-Jul-15check hardware, swap DRFU with cell BHuongmonitorTRX #1. Almost calls drop due to bad quality. CDR cua cell B kem di.Da hoan thanh ngay 22 July311040ACDR/CSSR22-Jul-15check hardware, swap DRFU with cell BHuongmonitorTRX #1. Almost calls drop due to bad quality10-Jul: Kim tra u conector, Jumper, Swap DRFU cell A vi cell B23-July: Lm li u connector cell A310043BCDR/bad incoming23-Jul-15check hardware, swap DRFU with cell CtranewAlmost calls drop due to bad quality319031CCDR/CSSR24-Jul-15check hardware, swap DRFU with 1/2 DRFU of cell AHuongnew302017BCDR/CSSR24-Jul-15check hardware, swap DRFU with cell AHuongnew319018CCDR24-Jul-15check hardware, swap DRFU with 1/2 DRFU of cell AHuongnew