REQUEST FOR QUOTATION DOCUMENT for

Lin Cooper Soccer Lights, Crookwell

July 2019

RFQ Document – Lin Cooper Soccer Lights Page 2 of 10

1. INTRODUCTION

Council has received funding from the NSW Government’s Stronger Country Communities Fund

Round 2 for design, supply and installation of game level lighting on the main soccer field at Lin

Cooper Recreation Area, Crookwell.

Under the scope of this quotation, Council is seeking quotes from appropriately licensed Contractors

to undertake the works identified in accordance with the scope of works. Council is seeking fully

functioning, Australian Standards, game level lighting for the soccer oval.

Scope of Works

A summary of the works is as follows, but not limited to;

Design (please supply as attachment), supply and installation of game level lighting (100lux) which will include: excavation for the trenches and footings, completing concrete, installation of the poles and LED lighting elements.

Install power supply to poles from main switchboard located at the soccer amenities building. A new three phase electricity meter will need to be installed and security will be required for the switching of this unit.

Price to include all plant, labour, materials, dial before you dig investigations.

Repairs to the soccer field playing surface and reinstating and replanting of the disturbed ground (eg: grass or gravel).

Installation of bollards to protect the poles in areas of traffic access.

Extra pricing outside of the lump sum needs to be projected for upgrading of the aerial power supply across the Goulburn Road to CePole 58442 to the point of attachment bracket on the amenities block to 95mm aluminium bundled cable if Essential Energy deems these cables to be unable to take the additional load (Fee/Price Schedule Part 2)

General Construction Notes

The soccer field is approximately 64m wide and 92m in length.

Design, materials and installation must meet relevant Australian Standards for lighting, structure, security and other applicable areas.

All relevant documentation (including design) to be supplied by the contractor unless noted otherwise.

All services are to be located safely by the contractor.

Depending on availability of structures, work will be scheduled to be undertaken after the soccer season has completed – September/October 2019

Work shall not interrupt traffic on Goulburn Road.

All work areas must be fenced off to prevent public access. Any areas where this is not possible will need to be made safe for public access/egress and warning/advisory signage erected.

All work shall comply with applicable legislations.

All electrical works are to be carried out by a suitably licenced person(s).

RFQ Document – Lin Cooper Soccer Lights Page 3 of 10

All work associated with this project is to be completed after the 8th September and before 1 November 2019.

An Avdata Access Control System is not required. The lights will be switched from a single, secure meter with at least two banks of switches.

Exemptions must be stated in the ‘Comments’ area.

Work Program

• The successful company is to supply a work program outlining the key items and delivery

time for each item, including handover date.

2. DOCUMENTATION

The documentation to be supplied to Upper Lachlan Shire Council under this project comprises, but not limited to the following components;

• Prior to engagement;

- Completed Price Schedule (attachment 1) - Insurance details as per section 3. - Business ABN - Company/Contractor Licence details

• Prior to associated works commencing;

- Dial-Before-You-Dig report

- Trades licence details

• At completion of works;

- Electrical certification

- Commissioning documents/Instructions/Warranties

NOTE: All business and trades accreditations/licences must be relevant and in date. A “stop work

order” may be implemented by Upper Lachlan Shire Council where documentation has not been

provided prior to the work commencing.

3. INSURANCES

Insurances required for this engagement are Public Liability ($20m), Professional Indemnity ($5m)

and Workers Compensation. Certificates of currency for these will be required from the successful

contractor.

4. QUOTATIONS – CLOSING DATE AND TIME

Quotations will be received up to 4.00pm on Friday 2 August 2019. Quotations will be accepted by

mail (PO Box 42, GUNNING NSW 2580) or email [email protected] . Email

attachment should not be more than 10 MB.

5. ENQUIRIES

Enquiries are to be emailed to Linus Nesbitt-Hawes – Grants/ Project Delivery Officer

[email protected]

6. Attachments

• Attachment 1 – Price Schedule

• Attachment 2 – Location map and photos

RFQ Document – Lin Cooper Soccer Lights Page 4 of 10

Attachment 1

Please complete the following Pricing Schedule. This engagement will be for all-inclusive hourly

rates of staff, plant and equipment. Materials costs will be to supply all materials with a margin

for handling and administration. Completed Price Schedule to be returned to Council by 4pm

Friday 2nd August 2019.

Fee/Price Schedule

Project Resources (staff, plant, materials) Amount (excl.GST)

Lighting Design

Purchase and Delivery of Poles

Installation of poles

Purchase and delivery of Lights

Installation of lights

Power supply from main switchboard to poles

Upgrade consumer mains from point of attachment bracket to MSB

NMI Metering

Footing holes/trenching/excavation

Concrete and fixings

Plant

Reinstating disturbed ground with appropriate surface e.g. grass or gravel

Supply and installation of protective bollards

All other work and obligations NOT INCLUDED ELSEWHERE in this Schedule

All other work and obligations NOT INCLUDED ELSEWHERE in this Schedule

All other work and obligations NOT INCLUDED ELSEWHERE in this Schedule

Subtotal:

GST:

Total:

All pricing shall remain fixed for the period of the engagement, is not subject to rise and fall and is inclusive of GST.

RFQ Document – Lin Cooper Soccer Lights Page 5 of 10

Attachment 1 continued:

Fee/Price Schedule (Part 2)

Project Resources (staff, plant, materials) Amount (excl.GST)

Upgrading of the aerial power supply across Goulburn Road

GST:

Total:

Lights/Poles Specification Information:

Comments:

Company Name:

Contact Details:

Date:

Price Hold

Based on the contents of this RFQ, advise the timeframe the nominated Price Schedule will

remain valid following the closing date:

__________ days.

(Please attach Design)

RFQ Document – Lin Cooper Soccer Lights Page 6 of 10

Attachment 2 – Location Map and Site Photos

RFQ Document – Lin Cooper Soccer Lights Page 7 of 10

Lin Cooper Soccer Field 1

Goulburn Road Crookwell

Soccer Field

RFQ Document – Lin Cooper Soccer Lights Page 8 of 10

Canteen/Toilet Block and power box

RFQ Document – Lin Cooper Soccer Lights Page 9 of 10

Lin Cooper Soccer Field (from opposite side next to Golf Club car park above and looking across field

at Golf Club below)

RFQ Document – Lin Cooper Soccer Lights Page 10 of 10

Lin Cooper Soccer Field – car park next to Canteen