request for qualification and proposal sal iii - schedule of requirements.pdf · request for...

47
Request for Qualification and Proposal for Installation of LED based Route Display System in Standard Floor Buses on BOT basis in lieu of Advertising Rights Part III Schedule of Requirements April 20, 2010 For and on behalf of Delhi Transport Corporation (Government of NCT of Delhi) IP Estate, New Delhi 110002 Issued by Delhi Integrated Multi-Modal Transit System Limited (A Joint Venture of Government of Delhi & IDFC Ltd.) 1 st floor, Maharana Pratap Inter State Bus Terminus, Kashmere Gate, Delhi 110006 Phone: +91-11-43090100; Fax: +91-11-23860966 E-mail: [email protected] ; Website: www.dimts.in Cost of RFQP Document: INR 20,000 RFQP Number: DTC/SH/PUB/2010 REQUEST FOR QUALIFICATION AND PROPOSAL

Upload: others

Post on 28-Oct-2019

13 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Request for Qualification and

Proposal

for

Installation of LED based Route Display System

in Standard Floor Buses on BOT basis in lieu of

Advertising Rights

Part III – Schedule of Requirements

April 20, 2010

For and on behalf of

Delhi Transport Corporation

(Government of NCT of Delhi)

IP Estate, New Delhi – 110002

IIssssuueedd bbyy

Delhi Integrated Multi-Modal Transit System Limited

(A Joint Venture of Government of Delhi & IDFC Ltd.)

1st floor, Maharana Pratap Inter State Bus Terminus,

Kashmere Gate, Delhi – 110006 Phone: +91-11-43090100; Fax: +91-11-23860966

E-mail: [email protected]; Website: www.dimts.in

Cost of RFQP Document: INR 20,000 RFQP Number: DTC/SH/PUB/2010

R

EQ

UE

ST

FO

R Q

UA

LIF

ICA

TIO

N A

ND

PR

OP

OS

AL

Page 2: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

2 | P a g e

Part I Instructions to Bidders

Part II Draft Concession Agreement

Part III Schedule of Requirements

Part III – Schedule of Requirements

1. Scope of Work ................................................................................................................................... 3

2. List of Buses ....................................................................................................................................... 4

3. Technical Specification for LED based Route Display System ................................................... 42

3.1. LED Boards General Specification ................................................................................................... 42

3.2. Front Destination Board .................................................................................................................... 42

3.3. Side Destination Board ..................................................................................................................... 42

3.4. Rear Destination Board ..................................................................................................................... 43

3.5. Control Panels ................................................................................................................................... 43

3.6. General Requirements ....................................................................................................................... 44

4. Specification of the Designated Advertisement Space for Standard Floor Buses ..................... 46

4.1. Interior Measurements of Standard Floor Buses: .............................................................................. 46

4.2. Exterior Measurements of Standard Floor Buses: ............................................................................. 46

Page 3: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

3 | P a g e

1. Scope of Work

Item No. Description of Work

Tendered

Quantity

(in Nos.)

Period of

Completion

1.

Design, Manufacture, Supply,

installation, Testing, Commissioning1

and Maintenance of LED based

Route Display System (One LED

board at Front, one at rear and one at

side) in Standard Floor DTC buses as

per the Specification given in RFQP

Document.

1500

04 (Four) Months

from the Date of

Issue of Letter of

Acceptance.

NOTES:

1. Total delivery of tendered/ordered quantity of installation and commissioning of LED

based Route Display System in standard floor DTC buses is to be completed within 4

months from the date of Letter of Acceptance. The prototype installation in one bus

should be completed within one month from the date of Letter of Acceptance and

thereafter roll out should be at least @500 bus per month.

2. The Bidders shall quote as per the Technical Specification complete in all respects.

1 The installation includes modification/fabrication work in existing bus body for mounting LED boards at

designated locations.

Page 4: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

2. List of Buses

Sr.

No. Bus No. Depot

Date of

put on

road

Make Location for the

refurbishment

1 DL-1P-B 1341 IPD Jul-01 TATA CNG IPD

2 DL-1P-B 1342 IPD Jul-01 TATA CNG IPD

3 DL-1P-B 1343 IPD Jul-01 TATA CNG IPD

4 DL-1P-B 1371 IPD Jul-01 TATA CNG IPD

5 DL-1P-B 1372 RHD-III Jul-01 TATA CNG CWS-I

6 DL-1P-B 1373 IPD Jul-01 TATA CNG IPD

7 DL-1P-B 1374 RHD-III Jul-01 TATA CNG CWS-I

8 DL-1P-B 1394 RHD-III Jul-01 TATA CNG CWS-I

9 DL-1P-B 1395 RHD-III Jul-01 TATA CNG CWS-I

10 DL-1P-B 1396 RHD-III Jul-01 TATA CNG CWS-I

11 DL-1P-B 1397 RHD-II Jul-01 TATA CNG CWS-I

12 DL-1P-B 1398 RHD-II Jul-01 TATA CNG CWS-I

13 DL-1P-B 1399 KJD Jul-01 TATA CNG CWS-II

14 DL-1P-B 1401 IPD Jul-01 TATA CNG IPD

15 DL-1P-B 1402 PGD Jul-01 TATA CNG IPD

16 DL-1P-B 1403 RHD-II Jul-01 TATA CNG CWS-I

17 DL-1P-B 1404 RHD-II Jul-01 TATA CNG CWS-I

18 DL-1P-B 1405 RHD-II Jul-01 TATA CNG CWS-I

19 DL-1P-B 1413 BBM-I Jul-01 TATA CNG CWS-I

20 DL-1P-B 1428 BBM-I Jul-01 TATA CNG CWS-I

21 DL-1P-B 1429 BBM-I Jul-01 TATA CNG CWS-I

22 DL-1P-B 1430 BBM-I Jul-01 TATA CNG CWS-I

23 DL-1P-B 1431 BBM-I Jul-01 TATA CNG CWS-I

24 DL-1P-B 1434 BBM-I Jul-01 TATA CNG CWS-I

25 DL-1P-B 1435 IPD Jul-01 TATA CNG IPD

26 DL-1P-B 1436 PGD Jul-01 TATA CNG IPD

27 DL-1P-B 1437 IPD Jul-01 TATA CNG IPD

28 DL-1P-B 1438 PGD Jul-01 TATA CNG IPD

29 DL-1P-B 1458 PGD Jul-01 TATA CNG IPD

30 DL-1P-B 1502 HND-II Aug-01 TATA CNG IPD

31 DL-1P-B 1503 HND-II Aug-01 TATA CNG IPD

32 DL-1P-B 1504 HND-II Aug-01 TATA CNG IPD

33 DL-1P-B 1505 IPD Aug-01 TATA CNG IPD

34 DL-1P-B 1506 IPD Aug-01 TATA CNG IPD

35 DL-1P-B 1507 IPD Aug-01 TATA CNG IPD

36 DL-1P-B 1508 KJD Aug-01 TATA CNG CWS-II

37 DL-1P-B 1509 KJD Aug-01 TATA CNG CWS-II

38 DL-1P-B 1510 KJD Aug-01 TATA CNG CWS-II

Page 5: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

5 | P a g e

Sr.

No. Bus No. Depot

Date of

put on

road

Make Location for the

refurbishment

39 DL-1P-B 1511 IPD Aug-01 TATA CNG IPD

40 DL-1P-B 1513 IPD Aug-01 TATA CNG IPD

41 DL-1P-B 1555 IPD Aug-01 TATA CNG IPD

42 DL-1P-B 1557 PGD Aug-01 TATA CNG IPD

43 DL-1P-B 1558 PGD Aug-01 TATA CNG IPD

44 DL-1P-B 1559 IPD Aug-01 TATA CNG IPD

45 DL-1P-B 1560 IPD Aug-01 TATA CNG IPD

46 DL-1P-B 1561 IPD Aug-01 TATA CNG IPD

47 DL-1P-B 1562 RHD-II Aug-01 TATA CNG CWS-I

48 DL-1P-B 1563 RHD-II Aug-01 TATA CNG CWS-I

49 DL-1P-B 1564 RHD-II Aug-01 TATA CNG CWS-I

50 DL-1P-B 1565 BBM-I Aug-01 TATA CNG CWS-I

51 DL-1P-B 1566 BBM-I Aug-01 TATA CNG CWS-I

52 DL-1P-B 1567 BBM-I Aug-01 TATA CNG CWS-I

53 DL-1P-B 1579 IPD Aug-01 TATA CNG IPD

54 DL-1P-B 1580 IPD Aug-01 TATA CNG IPD

55 DL-1P-B 1581 IPD Aug-01 TATA CNG IPD

56 DL-1P-B 1582 BBM-I Aug-01 TATA CNG CWS-I

57 DL-1P-B 1583 BBM-I Aug-01 TATA CNG CWS-I

58 DL-1P-B 1584 BBM-I Aug-01 TATA CNG CWS-I

59 DL-1P-B 1609 RHD-II Aug-01 TATA CNG CWS-I

60 DL-1P-B 1610 RHD-II Aug-01 TATA CNG CWS-I

61 DL-1P-B 1611 RHD-II Aug-01 TATA CNG CWS-I

62 DL-1P-B 1618 PGD Aug-01 TATA CNG IPD

63 DL-1P-B 1637 PGD Aug-01 TATA CNG IPD

64 DL-1P-B 1639 PGD Aug-01 TATA CNG IPD

65 DL-1P-B 1640 PGD Aug-01 TATA CNG IPD

66 DL-1P-B 1641 PGD Aug-01 TATA CNG IPD

67 DL-1P-B 1642 PGD Aug-01 TATA CNG IPD

68 DL-1P-B 1666 BBM-I Aug-01 TATA CNG CWS-I

69 DL-1P-B 1667 BBM-I Aug-01 TATA CNG CWS-I

70 DL-1P-B 1669 RHD-II Aug-01 TATA CNG CWS-I

71 DL-1P-B 1670 RHD-II Aug-01 TATA CNG CWS-I

72 DL-1P-B 1672 RHD-II Aug-01 TATA CNG CWS-I

73 DL-1P-B 1673 PGD Aug-01 TATA CNG IPD

74 DL-1P-B 1674 PGD Aug-01 TATA CNG IPD

75 DL-1P-B 1675 PGD Aug-01 TATA CNG IPD

76 DL-1P-B 1700 PGD Aug-01 TATA CNG IPD

77 DL-1P-B 1701 PGD Aug-01 TATA CNG IPD

78 DL-1P-B 1702 PGD Aug-01 TATA CNG IPD

79 DL-1P-B 1703 PGD Aug-01 TATA CNG IPD

Page 6: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

6 | P a g e

Sr.

No. Bus No. Depot

Date of

put on

road

Make Location for the

refurbishment

80 DL-1P-B 1704 RHD-II Aug-01 TATA CNG CWS-I

81 DL-1P-B 1705 RHD-II Aug-01 TATA CNG CWS-I

82 DL-1P-B 1706 RHD-II Aug-01 TATA CNG CWS-I

83 DL-1P-B 1707 RHD-II Aug-01 TATA CNG CWS-I

84 DL-1P-B 1708 BBM-I Aug-01 TATA CNG CWS-I

85 DL-1P-B 1709 BBM-I Aug-01 TATA CNG CWS-I

86 DL-1P-B 1710 BBM-I Aug-01 TATA CNG CWS-I

87 DL-1P-B 1711 BBM-I Aug-01 TATA CNG CWS-I

88 DL-1P-B 1712 PGD Aug-01 TATA CNG IPD

89 DL-1P-B 1762 BBM-I Aug-01 TATA CNG CWS-I

90 DL-1P-B 1763 BBM-I Aug-01 TATA CNG CWS-I

91 DL-1P-B 1764 BBM-I Aug-01 TATA CNG CWS-I

92 DL-1P-B 1765 BBM-I Aug-01 TATA CNG CWS-I

93 DL-1P-B 1766 BBM-I Aug-01 TATA CNG CWS-I

94 DL-1P-B 1774 HND-III Aug-01 TATA CNG CWS-II

95 DL-1P-B 1775 HND-III Aug-01 TATA CNG CWS-II

96 DL-1P-B 1776 HND-III Aug-01 TATA CNG CWS-II

97 DL-1P-B 1797 HND-III Aug-01 TATA CNG CWS-II

98 DL-1P-B 1798 HND-III Aug-01 TATA CNG CWS-II

99 DL-1P-B 1912 HND-II Aug-01 TATA CNG IPD

100 DL-1P-B 2043 HND-III Sep-01 TATA CNG CWS-II

101 DL-1P-B 2083 RHD-II Sep-01 TATA CNG CWS-I

102 DL-1P-B 2084 RHD-II Sep-01 TATA CNG CWS-I

103 DL-1P-B 2085 RHD-II Sep-01 TATA CNG CWS-I

104 DL-1P-B 2086 RHD-II Sep-01 TATA CNG CWS-I

105 DL-1P-B 2087 RHD-II Sep-01 TATA CNG CWS-I

106 DL-1P-B 2088 RHD-II Sep-01 TATA CNG CWS-I

107 DL-1P-B 2089 RHD-II Sep-01 TATA CNG CWS-I

108 DL-1P-B 2090 HND-II Sep-01 TATA CNG IPD

109 DL-1P-B 2091 HND-II Sep-01 TATA CNG IPD

110 DL-1P-B 2092 HND-II Sep-01 TATA CNG IPD

111 DL-1P-B 2093 HND-II Sep-01 TATA CNG IPD

112 DL-1P-B 2094 HND-II Sep-01 TATA CNG IPD

113 DL-1P-B 2095 HND-II Sep-01 TATA CNG IPD

114 DL-1P-B 2096 HND-II Sep-01 TATA CNG IPD

115 DL-1P-B 2097 HND-II Sep-01 TATA CNG IPD

116 DL-1P-B 2098 HND-II Sep-01 TATA CNG IPD

117 DL-1P-B 2099 HND-II Sep-01 TATA CNG IPD

118 DL-1P-B 2100 HND-II Sep-01 TATA CNG IPD

119 DL-1P-B 2101 HND-II Sep-01 TATA CNG IPD

120 DL-1P-B 2102 HND-II Sep-01 TATA CNG IPD

Page 7: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

7 | P a g e

Sr.

No. Bus No. Depot

Date of

put on

road

Make Location for the

refurbishment

121 DL-1P-B 2103 HND-II Sep-01 TATA CNG IPD

122 DL-1P-B 2123 RHD-II Sep-01 TATA CNG CWS-I

123 DL-1P-B 2124 RHD-II Sep-01 TATA CNG CWS-I

124 DL-1P-B 2125 KJD Sep-01 TATA CNG CWS-II

125 DL-1P-B 2126 KJD Sep-01 TATA CNG CWS-II

126 DL-1P-B 2127 HND-II Sep-01 TATA CNG IPD

127 DL-1P-B 2128 HND-II Sep-01 TATA CNG IPD

128 DL-1P-B 2129 HND-II Sep-01 TATA CNG IPD

129 DL-1P-B 2130 HND-II Sep-01 TATA CNG IPD

130 DL-1P-B 2131 BBM-I Sep-01 TATA CNG CWS-I

131 DL-1P-B 2132 BBM-I Sep-01 TATA CNG CWS-I

132 DL-1P-B 2133 RHD-II Sep-01 TATA CNG CWS-I

133 DL-1P-B 2134 HND-II Sep-01 TATA CNG IPD

134 DL-1P-B 2135 HND-II Sep-01 TATA CNG IPD

135 DL-1P-B 2136 HND-II Sep-01 TATA CNG IPD

136 DL-1P-B 2137 RHD-II Sep-01 TATA CNG CWS-I

137 DL-1P-B 2138 RHD-II Sep-01 TATA CNG CWS-I

138 DL-1P-B 2139 HND-II Sep-01 TATA CNG IPD

139 DL-1P-B 2140 HND-II Sep-01 TATA CNG IPD

140 DL-1P-B 2141 HND-II Sep-01 TATA CNG IPD

141 DL-1P-B 2142 HND-II Sep-01 TATA CNG IPD

142 DL-1P-B 2143 HND-II Sep-01 TATA CNG IPD

143 DL-1P-B 2144 HND-II Sep-01 TATA CNG IPD

144 DL-1P-B 2145 HND-II Sep-01 TATA CNG IPD

145 DL-1P-B 2165 HND-II Sep-01 TATA CNG IPD

146 DL-1P-B 2224 BBM-I Sep-01 TATA CNG CWS-I

147 DL-1P-B 2226 HND-II Sep-01 TATA CNG IPD

148 DL-1P-B 2227 BBM-I Sep-01 TATA CNG CWS-I

149 DL-1P-B 2228 HND-II Sep-01 TATA CNG IPD

150 DL-1P-B 2229 PGD Sep-01 TATA CNG IPD

151 DL-1P-B 2230 HND-II Sep-01 TATA CNG IPD

152 DL-1P-B 2231 HND-II Sep-01 TATA CNG IPD

153 DL-1P-B 2232 RHD-II Sep-01 TATA CNG CWS-I

154 DL-1P-B 2233 RHD-II Sep-01 TATA CNG CWS-I

155 DL-1P-B 2234 RHD-II Sep-01 TATA CNG CWS-I

156 DL-1P-B 2239 RHD-II Sep-01 TATA CNG CWS-I

157 DL-1P-B 2240 RHD-II Sep-01 TATA CNG CWS-I

158 DL-1P-B 2241 RHD-II Sep-01 TATA CNG CWS-I

159 DL-1P-B 2242 RHD-II Sep-01 TATA CNG CWS-I

160 DL-1P-B 2243 RHD-II Sep-01 TATA CNG CWS-I

161 DL-1P-B 2244 RHD-II Sep-01 TATA CNG CWS-I

Page 8: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

8 | P a g e

Sr.

No. Bus No. Depot

Date of

put on

road

Make Location for the

refurbishment

162 DL-1P-B 2245 RHD-II Sep-01 TATA CNG CWS-I

163 DL-1P-B 2246 RHD-II Sep-01 TATA CNG CWS-I

164 DL-1P-B 2253 HND-II Sep-01 TATA CNG IPD

165 DL-1P-B 2254 HND-II Sep-01 TATA CNG IPD

166 DL-1P-B 2255 HND-II Sep-01 TATA CNG IPD

167 DL-1P-B 2256 KJD Sep-01 TATA CNG CWS-II

168 DL-1P-B 2257 KJD Sep-01 TATA CNG CWS-II

169 DL-1P-B 2258 KJD Sep-01 TATA CNG CWS-II

170 DL-1P-B 2282 HND-II Sep-01 TATA CNG IPD

171 DL-1P-B 2283 PGD Sep-01 TATA CNG IPD

172 DL-1P-B 2284 PGD Sep-01 TATA CNG IPD

173 DL-1P-B 2285 PGD Sep-01 TATA CNG IPD

174 DL-1P-B 2286 IPD Sep-01 TATA CNG IPD

175 DL-1P-B 2287 IPD Sep-01 TATA CNG IPD

176 DL-1P-B 2288 IPD Sep-01 TATA CNG IPD

177 DL-1P-B 2289 RHD-II Sep-01 TATA CNG CWS-I

178 DL-1P-B 2290 IPD Sep-01 TATA CNG IPD

179 DL-1P-B 2291 IPD Sep-01 TATA CNG IPD

180 DL-1P-B 2292 RHD-II Sep-01 TATA CNG CWS-I

181 DL-1P-B 2293 IPD Sep-01 TATA CNG IPD

182 DL-1P-B 2294 IPD Sep-01 TATA CNG IPD

183 DL-1P-B 2295 KJD Sep-01 TATA CNG CWS-II

184 DL-1P-B 2297 HND-II Sep-01 TATA CNG IPD

185 DL-1P-B 2298 HND-II Sep-01 TATA CNG IPD

186 DL-1P-B 2299 HND-II Sep-01 TATA CNG IPD

187 DL-1P-B 2300 HND-II Sep-01 TATA CNG IPD

188 DL-1P-B 2301 HND-II Sep-01 TATA CNG IPD

189 DL-1P-B 2329 HND-II Sep-01 TATA CNG IPD

190 DL-1P-B 2330 HND-II Sep-01 TATA CNG IPD

191 DL-1P-B 2331 HND-II Sep-01 TATA CNG IPD

192 DL-1P-B 2332 PGD Sep-01 TATA CNG IPD

193 DL-1P-B 2333 PGD Sep-01 TATA CNG IPD

194 DL-1P-B 2334 PGD Sep-01 TATA CNG IPD

195 DL-1P-B 2335 PGD Sep-01 TATA CNG IPD

196 DL-1P-B 2345 BBM-I Oct-01 TATA CNG CWS-I

197 DL-1P-B 2346 BBM-I Sep-01 TATA CNG CWS-I

198 DL-1P-B 2347 BBM-I Sep-01 TATA CNG CWS-I

199 DL-1P-B 2348 BBM-I Sep-01 TATA CNG CWS-I

200 DL-1P-B 2349 BBM-I Sep-01 TATA CNG CWS-I

201 DL-1P-B 2390 BBM-I Oct-01 TATA CNG CWS-I

202 DL-1P-B 2391 BBM-I Oct-01 TATA CNG CWS-I

Page 9: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

9 | P a g e

Sr.

No. Bus No. Depot

Date of

put on

road

Make Location for the

refurbishment

203 DL-1P-B 2392 BBM-I Oct-01 TATA CNG CWS-I

204 DL-1P-B 2393 BBM-I Oct-01 TATA CNG CWS-I

205 DL-1P-B 2394 BBM-I Oct-01 TATA CNG CWS-I

206 DL-1P-B 2396 BBM-I Oct-01 TATA CNG CWS-I

207 DL-1P-B 2397 BBM-I Oct-01 TATA CNG CWS-I

208 DL-1P-B 2398 BBM-I Oct-01 TATA CNG CWS-I

209 DL-1P-B 2399 PGD Oct-01 TATA CNG IPD

210 DL-1P-B 2400 PGD Oct-01 TATA CNG IPD

211 DL-1P-B 2402 KJD Oct-01 TATA CNG CWS-II

212 DL-1P-B 2403 KJD Oct-01 TATA CNG CWS-II

213 DL-1P-B 2404 RHD-II Oct-01 TATA CNG CWS-I

214 DL-1P-B 2409 KJD Oct-01 TATA CNG CWS-II

215 DL-1P-B 2430 KJD Oct-01 TATA CNG CWS-II

216 DL-1P-B 2431 KJD Oct-01 TATA CNG CWS-II

217 DL-1P-B 2432 KJD Oct-01 TATA CNG CWS-II

218 DL-1P-B 2433 KJD Oct-01 TATA CNG CWS-II

219 DL-1P-B 2434 KJD Oct-01 TATA CNG CWS-II

220 DL-1P-B 2435 KJD Oct-01 TATA CNG CWS-II

221 DL-1P-B 2436 HND-II Oct-01 TATA CNG IPD

222 DL-1P-B 2437 HND-II Oct-01 TATA CNG IPD

223 DL-1P-B 2438 HND-II Oct-01 TATA CNG IPD

224 DL-1P-B 2439 HND-II Oct-01 TATA CNG IPD

225 DL-1P-B 2441 HND-II Oct-01 TATA CNG IPD

226 DL-1P-B 2442 KJD Oct-01 TATA CNG CWS-II

227 DL-1P-B 2443 KJD Oct-01 TATA CNG CWS-II

228 DL-1P-B 2444 KJD Oct-01 TATA CNG CWS-II

229 DL-1P-B 2445 HND-II Oct-01 TATA CNG IPD

230 DL-1P-B 2446 HND-II Oct-01 TATA CNG IPD

231 DL-1P-B 2464 HND-II Oct-01 TATA CNG IPD

232 DL-1P-B 2465 HND-II Oct-01 TATA CNG IPD

233 DL-1P-B 2466 HND-II Oct-01 TATA CNG IPD

234 DL-1P-B 2467 HND-II Oct-01 TATA CNG IPD

235 DL-1P-B 2468 HND-II Oct-01 TATA CNG IPD

236 DL-1P-B 2469 HND-II Oct-01 TATA CNG IPD

237 DL-1P-B 2470 HND-II Oct-01 TATA CNG IPD

238 DL-1P-B 2471 HND-II Oct-01 TATA CNG IPD

239 DL-1P-B 2472 HND-II Oct-01 TATA CNG IPD

240 DL-1P-B 2473 HND-II Oct-01 TATA CNG IPD

241 DL-1P-B 2474 HND-II Oct-01 TATA CNG IPD

242 DL-1P-B 2475 BBM-I Oct-01 TATA CNG CWS-I

243 DL-1P-B 2476 RHD-II Oct-01 TATA CNG CWS-I

Page 10: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

10 | P a g e

Sr.

No. Bus No. Depot

Date of

put on

road

Make Location for the

refurbishment

244 DL-1P-B 2477 HND-II Oct-01 TATA CNG IPD

245 DL-1P-B 2478 HND-III Oct-01 TATA CNG CWS-II

246 DL-1P-B 2487 HND-III Oct-01 TATA CNG CWS-II

247 DL-1P-B 2488 HND-III Oct-01 TATA CNG CWS-II

248 DL-1P-B 2489 HND-II Oct-01 TATA CNG IPD

249 DL-1P-B 2490 HND-II Oct-01 TATA CNG IPD

250 DL-1P-B 2491 BBM-I Oct-01 TATA CNG CWS-I

251 DL-1P-B 2492 BBM-I Oct-01 TATA CNG CWS-I

252 DL-1P-B 2493 IPD Oct-01 TATA CNG IPD

253 DL-1P-B 2494 IPD Oct-01 TATA CNG IPD

254 DL-1P-B 2495 IPD Oct-01 TATA CNG IPD

255 DL-1P-B 2498 HND-II Oct-01 TATA CNG IPD

256 DL-1P-B 2499 HND-II Oct-01 TATA CNG IPD

257 DL-1P-B 2500 HND-II Oct-01 TATA CNG IPD

258 DL-1P-B 2501 HND-II Oct-01 TATA CNG IPD

259 DL-1P-B 2506 RHD-II Oct-01 TATA CNG CWS-I

260 DL-1P-B 2507 PGD Oct-01 TATA CNG IPD

261 DL-1P-B 2508 HND-II Oct-01 TATA CNG IPD

262 DL-1P-B 2509 HND-II Oct-01 TATA CNG IPD

263 DL-1P-B 2510 HND-II Oct-01 TATA CNG IPD

264 DL-1P-B 2511 HND-II Oct-01 TATA CNG IPD

265 DL-1P-B 2512 HND-II Oct-01 TATA CNG IPD

266 DL-1P-B 2513 HND-II Oct-01 TATA CNG IPD

267 DL-1P-B 2523 PGD Oct-01 TATA CNG IPD

268 DL-1P-B 2524 PGD Oct-01 TATA CNG IPD

269 DL-1P-B 2528 IPD Oct-01 TATA CNG IPD

270 DL-1P-B 2530 IPD Oct-01 TATA CNG IPD

271 DL-1P-B 2531 IPD Oct-01 TATA CNG IPD

272 DL-1P-B 2532 IPD Oct-01 TATA CNG IPD

273 DL-1P-B 2533 IPD Oct-01 TATA CNG IPD

274 DL-1P-B 2559 IPD Oct-01 TATA CNG IPD

275 DL-1P-B 2560 IPD Oct-01 TATA CNG IPD

276 DL-1P-B 2561 IPD Oct-01 TATA CNG IPD

277 DL-1P-B 2562 IPD Oct-01 TATA CNG IPD

278 DL-1P-B 2563 GUHD Oct-01 TATA CNG CWS-I

279 DL-1P-B 2564 GUHD Oct-01 TATA CNG CWS-I

280 DL-1P-B 2565 GUHD Oct-01 TATA CNG CWS-I

281 DL-1P-B 2567 GUHD Oct-01 TATA CNG CWS-I

282 DL-1P-B 2568 GUHD Oct-01 TATA CNG CWS-I

283 DL-1P-B 2570 HND-III Oct-01 TATA CNG CWS-II

284 DL-1P-B 2571 HND-III Oct-01 TATA CNG CWS-II

Page 11: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

11 | P a g e

Sr.

No. Bus No. Depot

Date of

put on

road

Make Location for the

refurbishment

285 DL-1P-B 2572 HND-III Oct-01 TATA CNG CWS-II

286 DL-1P-B 2573 HND-III Oct-01 TATA CNG CWS-II

287 DL-1P-B 2574 HND-III Oct-01 TATA CNG CWS-II

288 DL-1P-B 2577 HND-III Oct-01 TATA CNG CWS-II

289 DL-1P-B 2578 HND-III Oct-01 TATA CNG CWS-II

290 DL-1P-B 2580 HND-III Oct-01 TATA CNG CWS-II

291 DL-1P-B 2581 HND-III Oct-01 TATA CNG CWS-II

292 DL-1P-B 2582 HND-III Oct-01 TATA CNG CWS-II

293 DL-1P-B 2583 IPD Oct-01 TATA CNG IPD

294 DL-1P-B 2584 IPD Oct-01 TATA CNG IPD

295 DL-1P-B 2585 IPD Oct-01 TATA CNG IPD

296 DL-1P-B 2586 IPD Oct-01 TATA CNG IPD

297 DL-1P-B 2587 RHD-II Oct-01 TATA CNG CWS-I

298 DL-1P-B 2588 KJD Oct-01 TATA CNG CWS-II

299 DL-1P-B 2593 KJD Oct-01 TATA CNG CWS-II

300 DL-1P-B 2611 RHD-II Oct-01 TATA CNG CWS-I

301 DL-1P-B 2612 RHD-II Oct-01 TATA CNG CWS-I

302 DL-1P-B 2613 RHD-II Oct-01 TATA CNG CWS-I

303 DL-1P-B 2614 RHD-II Oct-01 TATA CNG CWS-I

304 DL-1P-B 2615 RHD-II Oct-01 TATA CNG CWS-I

305 DL-1P-B 2616 RHD-II Oct-01 TATA CNG CWS-I

306 DL-1P-B 2617 RHD-II Oct-01 TATA CNG CWS-I

307 DL-1P-B 2619 IPD Oct-01 TATA CNG IPD

308 DL-1P-B 2620 IPD Oct-01 TATA CNG IPD

309 DL-1P-B 2621 IPD Oct-01 TATA CNG IPD

310 DL-1P-B 2622 IPD Oct-01 TATA CNG IPD

311 DL-1P-B 2623 IPD Oct-01 TATA CNG IPD

312 DL-1P-B 2624 KJD Oct-01 TATA CNG CWS-II

313 DL-1P-B 2633 HND-III Oct-01 TATA CNG CWS-II

314 DL-1P-B 2634 HND-III Oct-01 TATA CNG CWS-II

315 DL-1P-B 2635 HND-III Oct-01 TATA CNG CWS-II

316 DL-1P-B 2642 HND-III Oct-01 TATA CNG CWS-II

317 DL-1P-B 2672 HND-III Oct-01 TATA CNG CWS-II

318 DL-1P-B 2673 HND-III Oct-01 TATA CNG CWS-II

319 DL-1P-B 2674 HND-III Oct-01 TATA CNG CWS-II

320 DL-1P-B 2675 HND-III Oct-01 TATA CNG CWS-II

321 DL-1P-B 2676 HND-III Oct-01 TATA CNG CWS-II

322 DL-1P-B 2677 HND-III Oct-01 TATA CNG CWS-II

323 DL-1P-B 2679 BBM-I Oct-01 TATA CNG CWS-I

324 DL-1P-B 2680 BBM-I Oct-01 TATA CNG CWS-I

325 DL-1P-B 2681 BBM-I Oct-01 TATA CNG CWS-I

Page 12: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

12 | P a g e

Sr.

No. Bus No. Depot

Date of

put on

road

Make Location for the

refurbishment

326 DL-1P-B 2682 BBM-I Oct-01 TATA CNG CWS-I

327 DL-1P-B 2683 BBM-I Oct-01 TATA CNG CWS-I

328 DL-1P-B 2684 BBM-I Oct-01 TATA CNG CWS-I

329 DL-1P-B 2685 VVD Oct-01 TATA CNG CWS-II

330 DL-1P-B 2686 VVD Oct-01 TATA CNG CWS-II

331 DL-1P-B 2687 VVD Oct-01 TATA CNG CWS-II

332 DL-1P-B 2688 VVD Oct-01 TATA CNG CWS-II

333 DL-1P-B 2689 VVD Oct-01 TATA CNG CWS-II

334 DL-1P-B 2690 VVD Oct-01 TATA CNG CWS-II

335 DL-1P-B 2691 VVD Oct-01 TATA CNG CWS-II

336 DL-1P-B 2706 RHD-II Nov-01 TATA CNG CWS-I

337 DL-1P-B 2707 RHD-II Nov-01 TATA CNG CWS-I

338 DL-1P-B 2708 RHD-II Nov-01 TATA CNG CWS-I

339 DL-1P-B 2710 RHD-II Nov-01 TATA CNG CWS-I

340 DL-1P-B 2711 RHD-II Nov-01 TATA CNG CWS-I

341 DL-1P-B 2712 RHD-II Nov-01 TATA CNG CWS-I

342 DL-1P-B 2713 RHD-II Nov-01 TATA CNG CWS-I

343 DL-1P-B 2714 RHD-II Nov-01 TATA CNG CWS-I

344 DL-1P-B 2715 RHD-II Nov-01 TATA CNG CWS-I

345 DL-1P-B 2716 RHD-II Nov-01 TATA CNG CWS-I

346 DL-1P-B 2718 GUHD Nov-01 TATA CNG CWS-I

347 DL-1P-B 2719 GUHD Nov-01 TATA CNG CWS-I

348 DL-1P-B 2720 VVD Nov-01 TATA CNG CWS-II

349 DL-1P-B 2721 GUHD Nov-01 TATA CNG CWS-I

350 DL-1P-B 2722 GUHD Nov-01 TATA CNG CWS-I

351 DL-1P-B 2723 HND-III Nov-01 TATA CNG CWS-II

352 DL-1P-B 2724 HND-III Nov-01 TATA CNG CWS-II

353 DL-1P-B 2725 HND-III Nov-01 TATA CNG CWS-II

354 DL-1P-B 2726 HND-III Nov-01 TATA CNG CWS-II

355 DL-1P-B 2727 GUHD Nov-01 TATA CNG CWS-I

356 DL-1P-B 2728 GUHD Nov-01 TATA CNG CWS-I

357 DL-1P-B 2729 GUHD Nov-01 TATA CNG CWS-I

358 DL-1P-B 2730 GUHD Nov-01 TATA CNG CWS-I

359 DL-1P-B 2731 HND-III Nov-01 TATA CNG CWS-II

360 DL-1P-B 2732 HND-III Nov-01 TATA CNG CWS-II

361 DL-1P-B 2733 HND-III Nov-01 TATA CNG CWS-II

362 DL-1P-B 2738 HND-III Nov-01 TATA CNG CWS-II

363 DL-1P-B 2739 HND-III Nov-01 TATA CNG CWS-II

364 DL-1P-B 2740 HND-III Nov-01 TATA CNG CWS-II

365 DL-1P-B 2741 HND-III Nov-01 TATA CNG CWS-II

366 DL-1P-B 2742 GUHD Nov-01 TATA CNG CWS-I

Page 13: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

13 | P a g e

Sr.

No. Bus No. Depot

Date of

put on

road

Make Location for the

refurbishment

367 DL-1P-B 2743 GUHD Nov-01 TATA CNG CWS-I

368 DL-1P-B 2748 VVD Nov-01 TATA CNG CWS-II

369 DL-1P-B 2753 GUHD Nov-01 TATA CNG CWS-I

370 DL-1P-B 2754 GUHD Nov-01 TATA CNG CWS-I

371 DL-1P-B 2755 GUHD Nov-01 TATA CNG CWS-I

372 DL-1P-B 2756 GUHD Nov-01 TATA CNG CWS-I

373 DL-1P-B 2757 GUHD Nov-01 TATA CNG CWS-I

374 DL-1P-B 2774 RHD-II Nov-01 TATA CNG CWS-I

375 DL-1P-B 2775 RHD-II Nov-01 TATA CNG CWS-I

376 DL-1P-B 2776 RHD-II Nov-01 TATA CNG CWS-I

377 DL-1P-B 2777 RHD-II Nov-01 TATA CNG CWS-I

378 DL-1P-B 2778 PGD Nov-01 TATA CNG IPD

379 DL-1P-B 2779 RHD-III Nov-01 TATA CNG CWS-I

380 DL-1P-B 2780 HND-II Nov-01 TATA CNG IPD

381 DL-1P-B 2781 HND-II Nov-01 TATA CNG IPD

382 DL-1P-B 2782 HND-II Nov-01 TATA CNG IPD

383 DL-1P-B 2783 VVD Nov-01 TATA CNG CWS-II

384 DL-1P-B 2784 VVD Nov-01 TATA CNG CWS-II

385 DL-1P-B 2785 GUHD Nov-01 TATA CNG CWS-I

386 DL-1P-B 2786 GUHD Nov-01 TATA CNG CWS-I

387 DL-1P-B 2787 GUHD Nov-01 TATA CNG CWS-I

388 DL-1P-B 2789 HND-III Nov-01 TATA CNG CWS-II

389 DL-1P-B 2791 HND-III Nov-01 TATA CNG CWS-II

390 DL-1P-B 2792 HND-III Nov-01 TATA CNG CWS-II

391 DL-1P-B 2793 HND-III Nov-01 TATA CNG CWS-II

392 DL-1P-B 2794 KJD Nov-01 TATA CNG CWS-II

393 DL-1P-B 2795 RHD-III Nov-01 TATA CNG CWS-I

394 DL-1P-B 2796 PGD Nov-01 TATA CNG IPD

395 DL-1P-B 2797 HND-II Nov-01 TATA CNG IPD

396 DL-1P-B 2798 HND-II Nov-01 TATA CNG IPD

397 DL-1P-B 2802 GUHD Nov-01 TATA CNG CWS-I

398 DL-1P-B 2803 GUHD Nov-01 TATA CNG CWS-I

399 DL-1P-B 2804 GUHD Nov-01 TATA CNG CWS-I

400 DL-1P-B 2805 VVD Nov-01 TATA CNG CWS-II

401 DL-1P-B 2806 VVD Nov-01 TATA CNG CWS-II

402 DL-1P-B 2807 VVD Nov-01 TATA CNG CWS-II

403 DL-1P-B 2810 VVD Nov-01 TATA CNG CWS-II

404 DL-1P-B 2811 VVD Nov-01 TATA CNG CWS-II

405 DL-1P-B 2812 VVD Nov-01 TATA CNG CWS-II

406 DL-1P-B 2813 HND-II Nov-01 TATA CNG IPD

407 DL-1P-B 2814 HND-II Nov-01 TATA CNG IPD

Page 14: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

14 | P a g e

Sr.

No. Bus No. Depot

Date of

put on

road

Make Location for the

refurbishment

408 DL-1P-B 2815 HND-II Nov-01 TATA CNG IPD

409 DL-1P-B 2845 RHD-III Nov-01 TATA CNG CWS-I

410 DL-1P-B 2846 VVD Nov-01 TATA CNG CWS-II

411 DL-1P-B 2847 VVD Nov-01 TATA CNG CWS-II

412 DL-1P-B 2848 VVD Nov-01 TATA CNG CWS-II

413 DL-1P-B 2849 KJD Nov-01 TATA CNG CWS-II

414 DL-1P-B 2850 KJD Nov-01 TATA CNG CWS-II

415 DL-1P-B 2851 HND-II Nov-01 TATA CNG IPD

416 DL-1P-B 2852 HND-II Nov-01 TATA CNG IPD

417 DL-1P-B 2853 HND-II Nov-01 TATA CNG IPD

418 DL-1P-B 2854 GUHD Nov-01 TATA CNG CWS-I

419 DL-1P-B 2855 KJD Nov-01 TATA CNG CWS-II

420 DL-1P-B 2856 KJD Nov-01 TATA CNG CWS-II

421 DL-1P-B 2857 KJD Nov-01 TATA CNG CWS-II

422 DL-1P-B 2858 RHD-III Nov-01 TATA CNG CWS-I

423 DL-1P-B 2859 RHD-III Nov-01 TATA CNG CWS-I

424 DL-1P-B 2860 RHD-III Nov-01 TATA CNG CWS-I

425 DL-1P-B 2861 RHD-III Nov-01 TATA CNG CWS-I

426 DL-1P-B 2862 RHD-III Nov-01 TATA CNG CWS-I

427 DL-1P-B 2863 RHD-III Nov-01 TATA CNG CWS-I

428 DL-1P-B 2864 RHD-III Nov-01 TATA CNG CWS-I

429 DL-1P-B 2865 RHD-III Nov-01 TATA CNG CWS-I

430 DL-1P-B 2870 RHD-III Nov-01 TATA CNG CWS-I

431 DL-1P-B 2872 GUHD Nov-01 TATA CNG CWS-I

432 DL-1P-B 2873 GUHD Nov-01 TATA CNG CWS-I

433 DL-1P-B 2874 GUHD Nov-01 TATA CNG CWS-I

434 DL-1P-B 2875 GUHD Nov-01 TATA CNG CWS-I

435 DL-1P-B 2876 GUHD Nov-01 TATA CNG CWS-I

436 DL-1P-B 2877 GUHD Nov-01 TATA CNG CWS-I

437 DL-1P-B 2878 GUHD Nov-01 TATA CNG CWS-I

438 DL-1P-B 2879 GUHD Nov-01 TATA CNG CWS-I

439 DL-1P-B 2880 GUHD Nov-01 TATA CNG CWS-I

440 DL-1P-B 2881 GUHD Nov-01 TATA CNG CWS-I

441 DL-1P-B 2889 GUHD Nov-01 TATA CNG CWS-I

442 DL-1P-B 2890 GUHD Nov-01 TATA CNG CWS-I

443 DL-1P-B 2891 GUHD Nov-01 TATA CNG CWS-I

444 DL-1P-B 2892 GUHD Nov-01 TATA CNG CWS-I

445 DL-1P-B 2900 VVD Dec-01 TATA CNG CWS-II

446 DL-1P-B 2901 VVD Dec-01 TATA CNG CWS-II

447 DL-1P-B 2902 RHD-III Dec-01 TATA CNG CWS-I

448 DL-1P-B 2903 VVD Dec-01 TATA CNG CWS-II

Page 15: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

15 | P a g e

Sr.

No. Bus No. Depot

Date of

put on

road

Make Location for the

refurbishment

449 DL-1P-B 2904 VVD Dec-01 TATA CNG CWS-II

450 DL-1P-B 2906 VVD Dec-01 TATA CNG CWS-II

451 DL-1P-B 2907 VVD Dec-01 TATA CNG CWS-II

452 DL-1P-B 2908 VVD Dec-01 TATA CNG CWS-II

453 DL-1P-B 2910 VVD Dec-01 TATA CNG CWS-II

454 DL-1P-B 2911 VVD Dec-01 TATA CNG CWS-II

455 DL-1P-B 2912 VVD Dec-01 TATA CNG CWS-II

456 DL-1P-B 2913 VVD Dec-01 TATA CNG CWS-II

457 DL-1P-B 2914 VVD Dec-01 TATA CNG CWS-II

458 DL-1P-B 2915 VVD Dec-01 TATA CNG CWS-II

459 DL-1P-B 2916 VVD Dec-01 TATA CNG CWS-II

460 DL-1P-B 2919 VVD Dec-01 TATA CNG CWS-II

461 DL-1P-B 2920 VVD Dec-01 TATA CNG CWS-II

462 DL-1P-B 2921 VVD Dec-01 TATA CNG CWS-II

463 DL-1P-B 2922 VVD Dec-01 TATA CNG CWS-II

464 DL-1P-B 2923 VVD Dec-01 TATA CNG CWS-II

465 DL-1P-B 2924 VVD Dec-01 TATA CNG CWS-II

466 DL-1P-B 2925 VVD Dec-01 TATA CNG CWS-II

467 DL-1P-B 2926 VVD Dec-01 TATA CNG CWS-II

468 DL-1P-B 2927 VVD Dec-01 TATA CNG CWS-II

469 DL-1P-B 2928 VVD Dec-01 TATA CNG CWS-II

470 DL-1P-B 2939 VVD Dec-01 TATA CNG CWS-II

471 DL-1P-B 2940 VVD Dec-01 TATA CNG CWS-II

472 DL-1P-B 2941 VVD Dec-01 TATA CNG CWS-II

473 DL-1P-B 2942 VVD Dec-01 TATA CNG CWS-II

474 DL-1P-B 2943 VVD Dec-01 TATA CNG CWS-II

475 DL-1P-B 2944 VVD Dec-01 TATA CNG CWS-II

476 DL-1P-B 2945 VVD Dec-01 TATA CNG CWS-II

477 DL-1P-B 2946 VVD Dec-01 TATA CNG CWS-II

478 DL-1P-B 2947 VVD Dec-01 TATA CNG CWS-II

479 DL-1P-B 2960 VVD Dec-01 TATA CNG CWS-II

480 DL-1P-B 2962 VVD Dec-01 TATA CNG CWS-II

481 DL-1P-B 2963 VVD Dec-01 TATA CNG CWS-II

482 DL-1P-B 2964 VVD Dec-01 TATA CNG CWS-II

483 DL-1P-B 2970 GUHD Dec-01 TATA CNG CWS-I

484 DL-1P-B 2971 GUHD Dec-01 TATA CNG CWS-I

485 DL-1P-B 2972 GUHD Dec-01 TATA CNG CWS-I

486 DL-1P-B 2973 GUHD Dec-01 TATA CNG CWS-I

487 DL-1P-B 2974 GUHD Dec-01 TATA CNG CWS-I

488 DL-1P-B 3018 VVD Dec-01 TATA CNG CWS-II

489 DL-1P-B 3019 VVD Dec-01 TATA CNG CWS-II

Page 16: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

16 | P a g e

Sr.

No. Bus No. Depot

Date of

put on

road

Make Location for the

refurbishment

490 DL-1P-B 3020 HND-III Dec-01 TATA CNG CWS-II

491 DL-1P-B 3021 HND-III Dec-01 TATA CNG CWS-II

492 DL-1P-B 3022 HND-III Dec-01 TATA CNG CWS-II

493 DL-1P-B 3023 HND-III Dec-01 TATA CNG CWS-II

494 DL-1P-B 3024 HND-III Dec-01 TATA CNG CWS-II

495 DL-1P-B 3025 HND-III Dec-01 TATA CNG CWS-II

496 DL-1P-B 3050 SNPD Dec-01 TATA CNG CWS-II

497 DL-1P-B 3055 SNPD Dec-01 TATA CNG CWS-II

498 DL-1P-B 3056 SNPD Dec-01 TATA CNG CWS-II

499 DL-1P-B 3057 SNPD Dec-01 TATA CNG CWS-II

500 DL-1P-B 3058 SNPD Dec-01 TATA CNG CWS-II

501 DL-1P-B 3066 SNPD Dec-01 TATA CNG CWS-II

502 DL-1P-B 3068 SNPD Dec-01 TATA CNG CWS-II

503 DL-1P-B 3071 SNPD Dec-01 TATA CNG CWS-II

504 DL-1P-B 3072 SNPD Dec-01 TATA CNG CWS-II

505 DL-1P-B 3073 SNPD Dec-01 TATA CNG CWS-II

506 DL-1P-B 3074 SNPD Dec-01 TATA CNG CWS-II

507 DL-1P-B 3087 SNPD Dec-01 TATA CNG CWS-II

508 DL-1P-B 3088 SNPD Dec-01 TATA CNG CWS-II

509 DL-1P-B 3106 NLD Dec-01 LLV CNG CWS-I

510 DL-1P-B 3108 SNPD Dec-01 TATA CNG CWS-II

511 DL-1P-B 3110 SNPD Dec-01 TATA CNG CWS-II

512 DL-1P-B 3112 GUHD Dec-01 TATA CNG CWS-I

513 DL-1P-B 3113 SNPD Dec-01 TATA CNG CWS-II

514 DL-1P-B 3118 PGD Dec-01 TATA CNG IPD

515 DL-1P-B 3119 IPD Dec-01 TATA CNG IPD

516 DL-1P-B 3120 PGD Dec-01 TATA CNG IPD

517 DL-1P-B 3177 IPD Jan-02 TATA CNG IPD

518 DL-1P-B 3178 IPD Jan-02 TATA CNG IPD

519 DL-1P-B 3179 PGD Jan-02 TATA CNG IPD

520 DL-1P-B 3180 IPD Jan-02 TATA CNG IPD

521 DL-1P-B 3181 GUHD Jan-02 TATA CNG CWS-I

522 DL-1P-B 3182 SNPD Jan-02 TATA CNG CWS-II

523 DL-1P-B 3183 SNPD Jan-02 TATA CNG CWS-II

524 DL-1P-B 3184 IPD Jan-02 TATA CNG IPD

525 DL-1P-B 3185 IPD Jan-02 TATA CNG IPD

526 DL-1P-B 3442 BD May-02 LLV CNG CWS-I

527 DL-1P-B 3445 BD May-02 LLV CNG CWS-I

528 DL-1P-B 3474 SMPD May-02 LLV CNG IPD

529 DL-1P-B 3475 SMPD May-02 LLV CNG IPD

530 DL-1P-B 3971 BD Jun-02 LLV CNG CWS-I

Page 17: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

17 | P a g e

Sr.

No. Bus No. Depot

Date of

put on

road

Make Location for the

refurbishment

531 DL-1P-B 3972 GTK Jun-02 LLV CNG CWS-I

532 DL-1P-B 4778 GTK Nov-02 LLV CNG CWS-I

533 DL-1P-B 4871 GTK Dec-02 LLV CNG CWS-I

534 DL-1P-B 4873 GTK Dec-02 LLV CNG CWS-I

535 DL-1P-B 4874 GTK Dec-02 LLV CNG CWS-I

536 DL-1P-B 4875 NLD Dec-02 LLV CNG CWS-I

537 DL-1P-B 4878 NLD Dec-02 LLV CNG CWS-I

538 DL-1P-B 4880 NLD Dec-02 LLV CNG CWS-I

539 DL-1P-B 4881 NLD Dec-02 LLV CNG CWS-I

540 DL-1P-B 4883 NLD Dec-02 LLV CNG CWS-I

541 DL-1P-B 4885 NLD Dec-02 LLV CNG CWS-I

542 DL-1P-B 4887 NLD Dec-02 LLV CNG CWS-I

543 DL-1P-B 4893 NLD Dec-02 LLV CNG CWS-I

544 DL-1P-B 4894 NLD Dec-02 LLV CNG CWS-I

545 DL-1P-B 4895 NLD Dec-02 LLV CNG CWS-I

546 DL-1P-B 4898 NLD Dec-02 LLV CNG CWS-I

547 DL-1P-B 4899 NLD Dec-02 LLV CNG CWS-I

548 DL-1P-B 4900 NLD Dec-02 LLV CNG CWS-I

549 DL-1P-B 4901 NLD Dec-02 LLV CNG CWS-I

550 DL-1P-B 4902 NLD Dec-02 LLV CNG CWS-I

551 DL-1P-B 4903 NLD Dec-02 LLV CNG CWS-I

552 DL-1P-B 4904 NLD Dec-02 LLV CNG CWS-I

553 DL-1P-B 4905 NLD Dec-02 LLV CNG CWS-I

554 DL-1P-B 4906 NLD Dec-02 LLV CNG CWS-I

555 DL-1P-B 4907 NLD Dec-02 LLV CNG CWS-I

556 DL-1P-B 4915 NLD Jan-03 LLV CNG CWS-I

557 DL-1P-B 4919 SMPD Jan-03 LLV CNG CWS-I

558 DL-1P-B 4920 SMPD Jan-03 LLV CNG CWS-I

559 DL-1P-B 4921 SMPD Jan-03 LLV CNG CWS-I

560 DL-1P-B 4923 SMPD Jan-03 LLV CNG CWS-I

561 DL-1P-B 4924 SMPD Jan-03 LLV CNG CWS-I

562 DL-1P-B 4925 SMPD Jan-03 LLV CNG CWS-I

563 DL-1P-B 4926 SMPD Jan-03 LLV CNG CWS-I

564 DL-1P-B 4927 DGD Jan-03 LLV CNG CWS-I

565 DL-1P-B 4928 DGD Jan-03 LLV CNG CWS-I

566 DL-1P-B 4929 DGD Jan-03 LLV CNG CWS-I

567 DL-1P-B 4930 DGD Jan-03 LLV CNG CWS-I

568 DL-1P-B 4931 DGD Jan-03 LLV CNG CWS-I

569 DL-1P-B 4932 DGD Jan-03 LLV CNG CWS-I

570 DL-1P-B 4935 DGD Jan-03 LLV CNG CWS-I

571 DL-1P-B 4965 DGD Jan-03 LLV CNG CWS-I

Page 18: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

18 | P a g e

Sr.

No. Bus No. Depot

Date of

put on

road

Make Location for the

refurbishment

572 DL-1P-B 4966 DGD Jan-03 LLV CNG CWS-I

573 DL-1P-B 4968 DGD Jan-03 LLV CNG CWS-I

574 DL-1P-B 4969 DGD Jan-03 LLV CNG CWS-I

575 DL-1P-B 4970 DGD Jan-03 LLV CNG CWS-I

576 DL-1P-B 4971 DGD Jan-03 LLV CNG CWS-I

577 DL-1P-B 4972 DGD Jan-03 LLV CNG CWS-I

578 DL-1P-B 4973 DGD Jan-03 LLV CNG CWS-I

579 DL-1P-B 4974 DGD Jan-03 LLV CNG CWS-I

580 DL-1P-B 4975 DGD Jan-03 LLV CNG CWS-I

581 DL-1P-B 4976 DGD Jan-03 LLV CNG CWS-I

582 DL-1P-B 4977 DGD Jan-03 LLV CNG CWS-I

583 DL-1P-B 4978 SMPD Jan-03 LLV CNG IPD

584 DL-1P-B 4980 SMPD Jan-03 LLV CNG IPD

585 DL-1P-B 4981 SMPD Jan-03 LLV CNG IPD

586 DL-1P-B 4982 SMPD Jan-03 LLV CNG IPD

587 DL-1P-B 4983 SMPD Jan-03 LLV CNG IPD

588 DL-1P-B 4984 SMPD Jan-03 LLV CNG IPD

589 DL-1P-B 4985 SMPD Jan-03 LLV CNG IPD

590 DL-1P-B 4986 SMPD Jan-03 LLV CNG IPD

591 DL-1P-B 4987 SMPD Jan-03 LLV CNG IPD

592 DL-1P-B 4988 SMPD Jan-03 LLV CNG IPD

593 DL-1P-B 4990 NLD Jan-03 LLV CNG CWS-I

594 DL-1P-B 4991 NLD Jan-03 LLV CNG CWS-I

595 DL-1P-B 4992 NLD Jan-03 LLV CNG CWS-I

596 DL-1P-B 4995 NLD Jan-03 LLV CNG CWS-I

597 DL-1P-B 5005 NLD Jan-03 LLV CNG CWS-I

598 DL-1P-B 5006 NLD Jan-03 LLV CNG CWS-I

599 DL-1P-B 5007 BD Jan-03 LLV CNG CWS-I

600 DL-1P-B 5030 BD Jan-03 LLV CNG CWS-I

601 DL-1P-B 5034 BD Jan-03 LLV CNG CWS-I

602 DL-1P-B 5036 BD Jan-03 LLV CNG CWS-I

603 DL-1P-B 5037 BD Jan-03 LLV CNG CWS-I

604 DL-1P-B 5038 BD Jan-03 LLV CNG CWS-I

605 DL-1P-B 5039 BD Jan-03 LLV CNG CWS-I

606 DL-1P-B 5040 BD Jan-03 LLV CNG CWS-I

607 DL-1P-B 5041 BD Jan-03 LLV CNG CWS-I

608 DL-1P-B 5042 BD Jan-03 LLV CNG CWS-I

609 DL-1P-B 5043 BD Jan-03 LLV CNG CWS-I

610 DL-1P-B 5044 BD Jan-03 LLV CNG CWS-I

611 DL-1P-B 5045 BD Jan-03 LLV CNG CWS-I

612 DL-1P-B 5046 BD Jan-03 LLV CNG CWS-I

Page 19: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

19 | P a g e

Sr.

No. Bus No. Depot

Date of

put on

road

Make Location for the

refurbishment

613 DL-1P-B 5047 BD Jan-03 LLV CNG CWS-I

614 DL-1P-B 5048 BD Jan-03 LLV CNG CWS-I

615 DL-1P-B 5049 BD Jan-03 LLV CNG CWS-I

616 DL-1P-B 5050 NLD Jan-03 LLV CNG CWS-I

617 DL-1P-B 5051 DLGD Jan-03 LLV CNG IPD

618 DL-1P-B 5052 DLGD Jan-03 LLV CNG IPD

619 DL-1P-B 5056 DLGD Jan-03 LLV CNG IPD

620 DL-1P-B 5057 DLGD Jan-03 LLV CNG IPD

621 DL-1P-B 5058 DLGD Jan-03 LLV CNG IPD

622 DL-1P-B 5059 ND Jan-03 LLV CNG CWS-II

623 DL-1P-B 5060 ND Jan-03 LLV CNG CWS-II

624 DL-1P-B 5068 ND Jan-03 LLV CNG CWS-II

625 DL-1P-B 5069 ND Jan-03 LLV CNG CWS-II

626 DL-1P-B 5070 ND Jan-03 LLV CNG CWS-II

627 DL-1P-B 5071 ND Jan-03 LLV CNG CWS-II

628 DL-1P-B 5081 ND Jan-03 LLV CNG CWS-II

629 DL-1P-B 5094 ND Jan-03 LLV CNG CWS-II

630 DL-1P-B 5095 ND Jan-03 LLV CNG CWS-II

631 DL-1P-B 5096 ND Jan-03 LLV CNG CWS-II

632 DL-1P-B 5106 ND Jan-03 LLV CNG CWS-II

633 DL-1P-B 5107 ND Jan-03 LLV CNG CWS-II

634 DL-1P-B 5119 ND Jan-03 LLV CNG CWS-II

635 DL-1P-B 5120 DLGD Jan-03 LLV CNG IPD

636 DL-1P-B 5121 DLGD Jan-03 LLV CNG IPD

637 DL-1P-B 5138 DLGD Jan-03 LLV CNG IPD

638 DL-1P-B 5139 GTK Jan-03 LLV CNG CWS-I

639 DL-1P-B 5140 GTK Jan-03 LLV CNG CWS-I

640 DL-1P-B 5141 GTK Jan-03 LLV CNG CWS-I

641 DL-1P-B 5142 GTK Jan-03 LLV CNG CWS-I

642 DL-1P-B 5169 GTK Jan-03 LLV CNG CWS-I

643 DL-1P-B 5170 GTK Jan-03 LLV CNG CWS-I

644 DL-1P-B 5171 GTK Jan-03 LLV CNG CWS-I

645 DL-1P-B 5172 GTK Jan-03 LLV CNG CWS-I

646 DL-1P-B 5181 GTK Jan-03 LLV CNG CWS-I

647 DL-1P-B 5182 SMPD Jan-03 LLV CNG IPD

648 DL-1P-B 5189 SMPD Jan-03 LLV CNG IPD

649 DL-1P-B 5195 YVD Jan-03 LLV CNG IPD

650 DL-1P-B 5196 YVD Jan-03 LLV CNG IPD

651 DL-1P-B 5200 YVD Jan-03 LLV CNG IPD

652 DL-1P-B 5201 YVD Jan-03 LLV CNG IPD

653 DL-1P-B 5202 YVD Jan-03 LLV CNG IPD

Page 20: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

20 | P a g e

Sr.

No. Bus No. Depot

Date of

put on

road

Make Location for the

refurbishment

654 DL-1P-B 5214 SPD Jan-03 LLV CNG CWS-II

655 DL-1P-B 5215 SPD Jan-03 LLV CNG CWS-II

656 DL-1P-B 5216 SPD Jan-03 LLV CNG CWS-II

657 DL-1P-B 5218 SPD Jan-03 LLV CNG CWS-II

658 DL-1P-B 5232 SPD Jan-03 LLV CNG CWS-II

659 DL-1P-B 5250 SPD Jan-03 LLV CNG CWS-II

660 DL-1P-B 5251 SPD Jan-03 LLV CNG CWS-II

661 DL-1P-B 5256 SPD Jan-03 LLV CNG CWS-II

662 DL-1P-B 5257 SPD Jan-03 LLV CNG CWS-II

663 DL-1P-B 5258 SPD Jan-03 LLV CNG CWS-II

664 DL-1P-B 5259 SPD Jan-03 LLV CNG CWS-II

665 DL-1P-B 5260 SPD Jan-03 LLV CNG CWS-II

666 DL-1P-B 5262 SPD Jan-03 LLV CNG CWS-II

667 DL-1P-B 5264 SPD Jan-03 LLV CNG CWS-II

668 DL-1P-B 5271 SPD Jan-03 LLV CNG CWS-II

669 DL-1P-B 5272 SPD Jan-03 LLV CNG CWS-II

670 DL-1P-B 5276 SPD Jan-03 LLV CNG CWS-II

671 DL-1P-B 5279 SPD Jan-03 LLV CNG CWS-II

672 DL-1P-B 5280 SPD Jan-03 LLV CNG CWS-II

673 DL-1P-B 5281 SPD Jan-03 LLV CNG CWS-II

674 DL-1P-B 5282 SPD Jan-03 LLV CNG CWS-II

675 DL-1P-B 5283 SPD Jan-03 LLV CNG CWS-II

676 DL-1P-B 5284 SPD Jan-03 LLV CNG CWS-II

677 DL-1P-B 5285 SPD Jan-03 LLV CNG CWS-II

678 DL-1P-B 5286 SPD Jan-03 LLV CNG CWS-II

679 DL-1P-B 5318 SPD Feb-03 LLV CNG CWS-II

680 DL-1P-B 5328 SPD Feb-03 LLV CNG CWS-II

681 DL-1P-B 5329 SPD Feb-03 LLV CNG CWS-II

682 DL-1P-B 5330 SPD Feb-03 LLV CNG CWS-II

683 DL-1P-B 5331 SPD Feb-03 LLV CNG CWS-II

684 DL-1P-B 5332 SPD Feb-03 LLV CNG CWS-II

685 DL-1P-B 5333 SPD Feb-03 LLV CNG CWS-II

686 DL-1P-B 5334 SPD Feb-03 LLV CNG CWS-II

687 DL-1P-B 5335 SPD Feb-03 LLV CNG CWS-II

688 DL-1P-B 5336 SPD Feb-03 LLV CNG CWS-II

689 DL-1P-B 5337 SPD Feb-03 LLV CNG CWS-II

690 DL-1P-B 5338 SPD Feb-03 LLV CNG CWS-II

691 DL-1P-B 5339 SPD Feb-03 LLV CNG CWS-II

692 DL-1P-B 5340 SPD Feb-03 LLV CNG CWS-II

693 DL-1P-B 5346 SPD Feb-03 LLV CNG CWS-II

694 DL-1P-B 5347 SPD Feb-03 LLV CNG CWS-II

Page 21: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

21 | P a g e

Sr.

No. Bus No. Depot

Date of

put on

road

Make Location for the

refurbishment

695 DL-1P-B 5348 SPD Feb-03 LLV CNG CWS-II

696 DL-1P-B 5349 SPD Feb-03 LLV CNG CWS-II

697 DL-1P-B 5350 SPD Feb-03 LLV CNG CWS-II

698 DL-1P-B 5351 SPD Feb-03 LLV CNG CWS-II

699 DL-1P-B 5357 SPD Feb-03 LLV CNG CWS-II

700 DL-1P-B 5358 SPD Feb-03 LLV CNG CWS-II

701 DL-1P-B 5361 SPD Feb-03 LLV CNG CWS-II

702 DL-1P-B 5362 YVD Feb-03 LLV CNG IPD

703 DL-1P-B 5396 SPD Feb-03 LLV CNG CWS-II

704 DL-1P-B 5398 SPD Feb-03 LLV CNG CWS-II

705 DL-1P-B 5399 SPD Feb-03 LLV CNG CWS-II

706 DL-1P-B 5401 SPD Feb-03 LLV CNG CWS-II

707 DL-1P-B 5403 SPD Feb-03 LLV CNG CWS-II

708 DL-1P-B 5404 SPD Feb-03 LLV CNG CWS-II

709 DL-1P-B 5405 SPD Feb-03 LLV CNG CWS-II

710 DL-1P-B 5406 SPD Feb-03 LLV CNG CWS-II

711 DL-1P-B 5407 SPD Feb-03 LLV CNG CWS-II

712 DL-1P-B 5408 SPD Feb-03 LLV CNG CWS-II

713 DL-1P-B 5411 SPD Feb-03 LLV CNG CWS-II

714 DL-1P-B 5412 SPD Feb-03 LLV CNG CWS-II

715 DL-1P-B 5413 SPD Feb-03 LLV CNG CWS-II

716 DL-1P-B 5414 DGD Feb-03 LLV CNG CWS-I

717 DL-1P-B 5415 DGD Feb-03 LLV CNG CWS-I

718 DL-1P-B 5423 SPD Feb-03 LLV CNG CWS-II

719 DL-1P-B 5424 SPD Feb-03 LLV CNG CWS-II

720 DL-1P-B 5425 SPD Feb-03 LLV CNG CWS-II

721 DL-1P-B 5426 SPD Feb-03 LLV CNG CWS-II

722 DL-1P-B 5427 BD Feb-03 LLV CNG CWS-I

723 DL-1P-B 5430 BD Feb-03 LLV CNG CWS-I

724 DL-1P-B 5431 BD Feb-03 LLV CNG CWS-I

725 DL-1P-B 5432 DGD Feb-03 LLV CNG CWS-I

726 DL-1P-B 5433 DGD Feb-03 LLV CNG CWS-I

727 DL-1P-B 5434 DGD Feb-03 LLV CNG CWS-I

728 DL-1P-B 5435 DGD Feb-03 LLV CNG CWS-I

729 DL-1P-B 5436 DGD Feb-03 LLV CNG CWS-I

730 DL-1P-B 5437 DLGD Feb-03 LLV CNG IPD

731 DL-1P-B 5438 DLGD Feb-03 LLV CNG IPD

732 DL-1P-B 5439 DLGD Feb-03 LLV CNG IPD

733 DL-1P-B 5440 DLGD Feb-03 LLV CNG IPD

734 DL-1P-B 5441 DLGD Feb-03 LLV CNG IPD

735 DL-1P-B 5442 DLGD Feb-03 LLV CNG IPD

Page 22: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

22 | P a g e

Sr.

No. Bus No. Depot

Date of

put on

road

Make Location for the

refurbishment

736 DL-1P-B 5443 DLGD Feb-03 LLV CNG IPD

737 DL-1P-B 5444 DLGD Feb-03 LLV CNG IPD

738 DL-1P-B 5445 DLGD Feb-03 LLV CNG IPD

739 DL-1P-B 5446 DLGD Feb-03 LLV CNG IPD

740 DL-1P-B 5447 DLGD Feb-03 LLV CNG IPD

741 DL-1P-B 5448 DLGD Feb-03 LLV CNG IPD

742 DL-1P-B 5449 DLGD Feb-03 LLV CNG IPD

743 DL-1P-B 5450 DLGD Feb-03 LLV CNG IPD

744 DL-1P-B 5451 DLGD Feb-03 LLV CNG IPD

745 DL-1P-B 5452 DLGD Feb-03 LLV CNG IPD

746 DL-1P-B 5453 DLGD Feb-03 LLV CNG IPD

747 DL-1P-B 5455 DLGD Feb-03 LLV CNG IPD

748 DL-1P-B 5456 DKD Feb-03 LLV CNG CWS-II

749 DL-1P-B 5457 DKD Feb-03 LLV CNG CWS-II

750 DL-1P-B 5458 DKD Feb-03 LLV CNG CWS-II

751 DL-1P-B 5461 DKD Feb-03 LLV CNG CWS-II

752 DL-1P-B 5462 DKD Feb-03 LLV CNG CWS-II

753 DL-1P-B 5464 DKD Feb-03 LLV CNG CWS-II

754 DL-1P-B 5465 DKD Feb-03 LLV CNG CWS-II

755 DL-1P-B 5466 DKD Feb-03 LLV CNG CWS-II

756 DL-1P-B 5467 DKD Feb-03 LLV CNG CWS-II

757 DL-1P-B 5473 DKD Feb-03 LLV CNG CWS-II

758 DL-1P-B 5474 DKD Feb-03 LLV CNG CWS-II

759 DL-1P-B 5480 DKD Feb-03 LLV CNG CWS-II

760 DL-1P-B 5482 DKD Feb-03 LLV CNG CWS-II

761 DL-1P-B 5483 DKD Feb-03 LLV CNG CWS-II

762 DL-1P-B 5484 DKD Feb-03 LLV CNG CWS-II

763 DL-1P-B 5485 YVD Feb-03 LLV CNG IPD

764 DL-1P-B 5487 YVD Feb-03 LLV CNG IPD

765 DL-1P-B 5488 YVD Feb-03 LLV CNG IPD

766 DL-1P-B 5498 YVD Feb-03 LLV CNG IPD

767 DL-1P-B 5499 YVD Feb-03 LLV CNG IPD

768 DL-1P-B 5502 YVD Feb-03 LLV CNG IPD

769 DL-1P-B 5503 YVD Feb-03 LLV CNG IPD

770 DL-1P-B 5504 SMPD Feb-03 LLV CNG IPD

771 DL-1P-B 5506 SMPD Feb-03 LLV CNG IPD

772 DL-1P-B 5507 SMPD Feb-03 LLV CNG IPD

773 DL-1P-B 5509 SMPD Feb-03 LLV CNG IPD

774 DL-1P-B 5510 SMPD Feb-03 LLV CNG IPD

775 DL-1P-B 5511 SMPD Feb-03 LLV CNG IPD

776 DL-1P-B 5512 SMPD Feb-03 LLV CNG IPD

Page 23: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

23 | P a g e

Sr.

No. Bus No. Depot

Date of

put on

road

Make Location for the

refurbishment

777 DL-1P-B 5513 SMPD Feb-03 LLV CNG IPD

778 DL-1P-B 5514 SMPD Feb-03 LLV CNG IPD

779 DL-1P-B 5515 SMPD Feb-03 LLV CNG IPD

780 DL-1P-B 5516 SPD Feb-03 LLV CNG CWS-II

781 DL-1P-B 5517 SPD Feb-03 LLV CNG CWS-II

782 DL-1P-B 5518 DLGD Feb-03 LLV CNG IPD

783 DL-1P-B 5519 DLGD Feb-03 LLV CNG IPD

784 DL-1P-B 5520 DLGD Feb-03 LLV CNG IPD

785 DL-1P-B 5521 DLGD Feb-03 LLV CNG IPD

786 DL-1P-B 5522 DLGD Feb-03 LLV CNG IPD

787 DL-1P-B 5523 DLGD Feb-03 LLV CNG IPD

788 DL-1P-B 5526 BD Feb-03 LLV CNG CWS-I

789 DL-1P-B 5527 BD Feb-03 LLV CNG CWS-I

790 DL-1P-B 5528 BD Feb-03 LLV CNG CWS-I

791 DL-1P-B 5529 BD Feb-03 LLV CNG CWS-I

792 DL-1P-B 5530 BD Feb-03 LLV CNG CWS-I

793 DL-1P-B 5531 BD Feb-03 LLV CNG CWS-I

794 DL-1P-B 5532 DKD Feb-03 LLV CNG CWS-II

795 DL-1P-B 5533 DKD Feb-03 LLV CNG CWS-II

796 DL-1P-B 5534 DKD Feb-03 LLV CNG CWS-II

797 DL-1P-B 5536 DKD Feb-03 LLV CNG CWS-II

798 DL-1P-B 5539 DKD Feb-03 LLV CNG CWS-II

799 DL-1P-B 5540 DKD Feb-03 LLV CNG CWS-II

800 DL-1P-B 5541 DKD Feb-03 LLV CNG CWS-II

801 DL-1P-B 5542 DKD Feb-03 LLV CNG CWS-II

802 DL-1P-B 5543 DKD Feb-03 LLV CNG CWS-II

803 DL-1P-B 5545 DKD Feb-03 LLV CNG CWS-II

804 DL-1P-B 5546 DKD Feb-03 LLV CNG CWS-II

805 DL-1P-B 5547 DKD Feb-03 LLV CNG CWS-II

806 DL-1P-B 5548 DKD Feb-03 LLV CNG CWS-II

807 DL-1P-B 5549 DKD Feb-03 LLV CNG CWS-II

808 DL-1P-B 5550 GTK Feb-03 LLV CNG CWS-I

809 DL-1P-B 5551 GTK Feb-03 LLV CNG CWS-I

810 DL-1P-B 5552 GTK Feb-03 LLV CNG CWS-I

811 DL-1P-B 5553 GTK Feb-03 LLV CNG CWS-I

812 DL-1P-B 5554 DLGD Feb-03 LLV CNG IPD

813 DL-1P-B 5556 DLGD Feb-03 LLV CNG IPD

814 DL-1P-B 5557 DLGD Feb-03 LLV CNG IPD

815 DL-1P-B 5558 DLGD Feb-03 LLV CNG IPD

816 DL-1P-B 5559 DLGD Feb-03 LLV CNG IPD

817 DL-1P-B 5560 DLGD Feb-03 LLV CNG IPD

Page 24: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

24 | P a g e

Sr.

No. Bus No. Depot

Date of

put on

road

Make Location for the

refurbishment

818 DL-1P-B 5561 DLGD Feb-03 LLV CNG IPD

819 DL-1P-B 5562 EVND Mar-03 LLV CNG CWS-II

820 DL-1P-B 5563 EVND Mar-03 LLV CNG CWS-II

821 DL-1P-B 5564 SMPD Mar-03 LLV CNG IPD

822 DL-1P-B 5566 SMPD Mar-03 LLV CNG IPD

823 DL-1P-B 5568 SMPD Mar-03 LLV CNG IPD

824 DL-1P-B 5569 NND Mar-03 LLV CNG IPD

825 DL-1P-B 5570 NND Mar-03 LLV CNG IPD

826 DL-1P-B 5572 NND Mar-03 LLV CNG IPD

827 DL-1P-B 5573 NND Mar-03 LLV CNG IPD

828 DL-1P-B 5574 NND Mar-03 LLV CNG IPD

829 DL-1P-B 5576 GTK Mar-03 LLV CNG CWS-I

830 DL-1P-B 5577 GTK Mar-03 LLV CNG CWS-I

831 DL-1P-B 5578 GTK Mar-03 LLV CNG CWS-I

832 DL-1P-B 5579 GTK Mar-03 LLV CNG CWS-I

833 DL-1P-B 5580 GTK Mar-03 LLV CNG CWS-I

834 DL-1P-B 5581 GTK Mar-03 LLV CNG CWS-I

835 DL-1P-B 5582 GTK Mar-03 LLV CNG CWS-I

836 DL-1P-B 5583 EVND Mar-03 LLV CNG CWS-II

837 DL-1P-B 5584 EVND Mar-03 LLV CNG CWS-II

838 DL-1P-B 5585 EVND Mar-03 LLV CNG CWS-II

839 DL-1P-B 5586 EVND Mar-03 LLV CNG CWS-II

840 DL-1P-B 5587 EVND Mar-03 LLV CNG CWS-II

841 DL-1P-B 5588 EVND Mar-03 LLV CNG CWS-II

842 DL-1P-B 5589 EVND Mar-03 LLV CNG CWS-II

843 DL-1P-B 5590 EVND Mar-03 LLV CNG CWS-II

844 DL-1P-B 5591 EVND Mar-03 LLV CNG CWS-II

845 DL-1P-B 5592 EVND Mar-03 LLV CNG CWS-II

846 DL-1P-B 5594 EVND Mar-03 LLV CNG CWS-II

847 DL-1P-B 5596 EVND Mar-03 LLV CNG CWS-II

848 DL-1P-B 5597 EVND Mar-03 LLV CNG CWS-II

849 DL-1P-B 5598 EVND Mar-03 LLV CNG CWS-II

850 DL-1P-B 5599 EVND Mar-03 LLV CNG CWS-II

851 DL-1P-B 5602 EVND Mar-03 LLV CNG CWS-II

852 DL-1P-B 5603 EVND Mar-03 LLV CNG CWS-II

853 DL-1P-B 5604 YVD Mar-03 LLV CNG IPD

854 DL-1P-B 5605 EVND Mar-03 LLV CNG CWS-II

855 DL-1P-B 5606 EVND Mar-03 LLV CNG CWS-II

856 DL-1P-B 5607 YVD Mar-03 LLV CNG IPD

857 DL-1P-B 5608 EVND Mar-03 LLV CNG CWS-II

858 DL-1P-B 5609 YVD Mar-03 LLV CNG IPD

Page 25: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

25 | P a g e

Sr.

No. Bus No. Depot

Date of

put on

road

Make Location for the

refurbishment

859 DL-1P-B 5610 YVD Mar-03 LLV CNG IPD

860 DL-1P-B 5611 YVD Mar-03 LLV CNG IPD

861 DL-1P-B 5613 YVD Mar-03 LLV CNG IPD

862 DL-1P-B 5614 YVD Mar-03 LLV CNG IPD

863 DL-1P-B 5616 YVD Mar-03 LLV CNG IPD

864 DL-1P-B 5617 YVD Mar-03 LLV CNG IPD

865 DL-1P-B 5618 NLD Mar-03 LLV CNG CWS-I

866 DL-1P-B 5619 NLD Mar-03 LLV CNG CWS-I

867 DL-1P-B 5620 NLD Mar-03 LLV CNG CWS-I

868 DL-1P-B 5621 NLD Mar-03 LLV CNG CWS-I

869 DL-1P-B 5622 NLD Mar-03 LLV CNG CWS-I

870 DL-1P-B 5623 NLD Mar-03 LLV CNG CWS-I

871 DL-1P-B 5624 NLD Mar-03 LLV CNG CWS-I

872 DL-1P-B 5625 NLD Mar-03 LLV CNG CWS-I

873 DL-1P-B 5626 NLD Mar-03 LLV CNG CWS-I

874 DL-1P-B 5627 NLD Mar-03 LLV CNG CWS-I

875 DL-1P-B 5628 NLD Mar-03 LLV CNG CWS-I

876 DL-1P-B 5629 NLD Mar-03 LLV CNG CWS-I

877 DL-1P-B 5631 NLD Mar-03 LLV CNG CWS-I

878 DL-1P-B 5632 NLD Mar-03 LLV CNG CWS-I

879 DL-1P-B 5633 NLD Mar-03 LLV CNG CWS-I

880 DL-1P-B 5634 NLD Mar-03 LLV CNG CWS-I

881 DL-1P-B 5635 NLD Mar-03 LLV CNG CWS-I

882 DL-1P-B 5638 NLD Mar-03 LLV CNG CWS-I

883 DL-1P-B 5639 NLD Mar-03 LLV CNG CWS-I

884 DL-1P-B 5640 NLD Mar-03 LLV CNG CWS-I

885 DL-1P-B 5641 NLD Mar-03 LLV CNG CWS-I

886 DL-1P-B 5642 EVND Mar-03 LLV CNG CWS-II

887 DL-1P-B 5643 SMPD Mar-03 LLV CNG IPD

888 DL-1P-B 5647 EVND Mar-03 LLV CNG CWS-II

889 DL-1P-B 5702 BD Apr-03 LLV CNG CWS-I

890 DL-1P-B 5703 BD Apr-03 LLV CNG CWS-I

891 DL-1P-B 5704 BD Apr-03 LLV CNG CWS-I

892 DL-1P-B 5705 BD Apr-03 LLV CNG CWS-I

893 DL-1P-B 5706 BD Apr-03 LLV CNG CWS-I

894 DL-1P-B 5707 GTK Apr-03 LLV CNG CWS-I

895 DL-1P-B 5708 GTK Apr-03 LLV CNG CWS-I

896 DL-1P-B 5709 GTK Apr-03 LLV CNG CWS-I

897 DL-1P-B 5710 GTK Apr-03 LLV CNG CWS-I

898 DL-1P-B 5717 GTK Apr-03 LLV CNG CWS-I

899 DL-1P-B 5718 SMPD Apr-03 LLV CNG IPD

Page 26: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

26 | P a g e

Sr.

No. Bus No. Depot

Date of

put on

road

Make Location for the

refurbishment

900 DL-1P-B 5719 SMPD Apr-03 LLV CNG IPD

901 DL-1P-B 5721 SMPD Apr-03 LLV CNG CWS-II

902 DL-1P-B 5722 SMPD Apr-03 LLV CNG CWS-II

903 DL-1P-B 5723 SMPD Apr-03 LLV CNG CWS-II

904 DL-1P-B 5724 SMPD Apr-03 LLV CNG CWS-II

905 DL-1P-B 5725 SMPD Apr-03 LLV CNG CWS-II

906 DL-1P-B 5726 SMPD Apr-03 LLV CNG CWS-II

907 DL-1P-B 5727 DLGD Apr-03 LLV CNG IPD

908 DL-1P-B 5728 DLGD Apr-03 LLV CNG IPD

909 DL-1P-B 5729 EVND Apr-03 LLV CNG CWS-II

910 DL-1P-B 5730 EVND Apr-03 LLV CNG CWS-II

911 DL-1P-B 5731 EVND Apr-03 LLV CNG CWS-II

912 DL-1P-B 5737 DLGD Apr-03 LLV CNG IPD

913 DL-1P-B 5742 DLGD Apr-03 LLV CNG IPD

914 DL-1P-B 5743 DLGD Apr-03 LLV CNG IPD

915 DL-1P-B 5744 DLGD Apr-03 LLV CNG IPD

916 DL-1P-B 5746 EVND Apr-03 LLV CNG CWS-II

917 DL-1P-B 5747 EVND Apr-03 LLV CNG CWS-II

918 DL-1P-B 5786 EVND Apr-03 LLV CNG CWS-II

919 DL-1P-B 5787 EVND Apr-03 LLV CNG CWS-II

920 DL-1P-B 5788 EVND Apr-03 LLV CNG CWS-II

921 DL-1P-B 5789 EVND Apr-03 LLV CNG CWS-II

922 DL-1P-B 5790 EVND Apr-03 LLV CNG CWS-II

923 DL-1P-B 5793 DLGD Apr-03 LLV CNG IPD

924 DL-1P-B 5794 DLGD Apr-03 LLV CNG IPD

925 DL-1P-B 5796 DLGD Apr-03 LLV CNG IPD

926 DL-1P-B 5798 DLGD Apr-03 LLV CNG IPD

927 DL-1P-B 5799 DLGD Apr-03 LLV CNG IPD

928 DL-1P-B 5800 DLGD Apr-03 LLV CNG IPD

929 DL-1P-B 5801 DLGD Apr-03 LLV CNG IPD

930 DL-1P-B 5802 EVND Apr-03 LLV CNG CWS-II

931 DL-1P-B 5803 DLGD Apr-03 LLV CNG IPD

932 DL-1P-B 5804 DLGD Apr-03 LLV CNG IPD

933 DL-1P-B 5805 EVND Apr-03 LLV CNG CWS-II

934 DL-1P-B 5806 DLGD Apr-03 LLV CNG IPD

935 DL-1P-B 5807 EVND Apr-03 LLV CNG CWS-II

936 DL-1P-B 5809 DLGD Apr-03 LLV CNG IPD

937 DL-1P-B 5811 DLGD Apr-03 LLV CNG IPD

938 DL-1P-B 5819 DLGD May-03 LLV CNG IPD

939 DL-1P-B 5821 DLGD May-03 LLV CNG IPD

940 DL-1P-B 5823 GTK May-03 LLV CNG CWS-I

Page 27: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

27 | P a g e

Sr.

No. Bus No. Depot

Date of

put on

road

Make Location for the

refurbishment

941 DL-1P-B 5834 GTK May-03 LLV CNG CWS-I

942 DL-1P-B 5836 GTK May-03 LLV CNG CWS-I

943 DL-1P-B 5837 DLGD May-03 LLV CNG IPD

944 DL-1P-B 5838 DLGD May-03 LLV CNG IPD

945 DL-1P-B 5839 DLGD May-03 LLV CNG IPD

946 DL-1P-B 5840 DLGD May-03 LLV CNG IPD

947 DL-1P-B 5842 DLGD May-03 LLV CNG IPD

948 DL-1P-B 5844 DLGD May-03 LLV CNG IPD

949 DL-1P-B 5847 DLGD May-03 LLV CNG IPD

950 DL-1P-B 5848 DLGD May-03 LLV CNG IPD

951 DL-1P-B 5852 DLGD May-03 LLV CNG IPD

952 DL-1P-B 5853 DLGD May-03 LLV CNG IPD

953 DL-1P-B 5854 DLGD May-03 LLV CNG IPD

954 DL-1P-B 5863 DLGD May-03 LLV CNG IPD

955 DL-1P-B 5864 DLGD May-03 LLV CNG IPD

956 DL-1P-B 5866 GTK May-03 LLV CNG CWS-I

957 DL-1P-B 5867 DLGD May-03 LLV CNG IPD

958 DL-1P-B 5868 NND May-03 LLV CNG IPD

959 DL-1P-B 5870 NND May-03 LLV CNG IPD

960 DL-1P-B 5871 NND May-03 LLV CNG IPD

961 DL-1P-B 5872 NND May-03 LLV CNG IPD

962 DL-1P-B 5877 NND May-03 LLV CNG IPD

963 DL-1P-B 5889 NND May-03 LLV CNG IPD

964 DL-1P-B 5890 NND May-03 LLV CNG IPD

965 DL-1P-B 5892 NND May-03 LLV CNG IPD

966 DL-1P-B 5897 NND May-03 LLV CNG IPD

967 DL-1P-B 5898 NND May-03 LLV CNG IPD

968 DL-1P-B 5908 NND May-03 LLV CNG IPD

969 DL-1P-B 5909 NND May-03 LLV CNG IPD

970 DL-1P-B 5910 NND May-03 LLV CNG IPD

971 DL-1P-B 5911 NND May-03 LLV CNG IPD

972 DL-1P-B 5923 NND May-03 LLV CNG IPD

973 DL-1P-B 5924 NND May-03 LLV CNG IPD

974 DL-1P-B 5926 NND May-03 LLV CNG IPD

975 DL-1P-B 5945 NND Jun-03 LLV CNG IPD

976 DL-1P-B 5946 NND Jun-03 LLV CNG IPD

977 DL-1P-B 5956 NND Jun-03 LLV CNG IPD

978 DL-1P-B 5957 NND Jun-03 LLV CNG IPD

979 DL-1P-B 5958 NND Jun-03 LLV CNG IPD

980 DL-1P-B 5961 NND Jun-03 LLV CNG IPD

981 DL-1P-B 5981 NND Jun-03 LLV CNG IPD

Page 28: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

28 | P a g e

Sr.

No. Bus No. Depot

Date of

put on

road

Make Location for the

refurbishment

982 DL-1P-B 5991 NND Jun-03 LLV CNG IPD

983 DL-1P-B 5992 NLD Jun-03 LLV CNG CWS-I

984 DL-1P-B 5993 NND Jun-03 LLV CNG IPD

985 DL-1P-B 5994 NND Jun-03 LLV CNG IPD

986 DL-1P-B 6005 NND Jun-03 LLV CNG IPD

987 DL-1P-B 6008 DLGD Jun-03 LLV CNG IPD

988 DL-1P-B 6016 BD Jun-03 LLV CNG CWS-I

989 DL-1P-B 6017 BD Jun-03 LLV CNG CWS-I

990 DL-1P-B 6019 DLGD Jun-03 LLV CNG IPD

991 DL-1P-B 6046 DLGD Jul-03 LLV CNG IPD

992 DL-1P-B 6047 DLGD Jul-03 LLV CNG IPD

993 DL-1P-B 6049 DLGD Jul-03 LLV CNG IPD

994 DL-1P-B 6051 DLGD Jul-03 LLV CNG IPD

995 DL-1P-B 6052 DLGD Jul-03 LLV CNG IPD

996 DL-1P-B 6057 DKD Jul-03 LLV CNG CWS-II

997 DL-1P-B 6059 DLGD Jul-03 LLV CNG IPD

998 DL-1P-B 6078 DLGD Jul-03 LLV CNG IPD

999 DL-1P-B 6089 DLGD Jul-03 LLV CNG IPD

1000 DL-1P-B 6090 DLGD Jul-03 LLV CNG IPD

1001 DL-1P-B 6096 IPD Jul-03 TATA CNG IPD

1002 DL-1P-B 6097 IPD Jul-03 TATA CNG IPD

1003 DL-1P-B 6102 RHD-II Jul-03 TATA CNG CWS-I

1004 DL-1P-B 6103 RHD-II Jul-03 TATA CNG CWS-I

1005 DL-1P-B 6104 RHD-II Jul-03 TATA CNG CWS-I

1006 DL-1P-B 6105 IPD Jul-03 TATA CNG IPD

1007 DL-1P-B 6106 RHD-II Jul-03 TATA CNG CWS-I

1008 DL-1P-B 6107 RHD-II Jul-03 TATA CNG CWS-I

1009 DL-1P-B 6108 RHD-II Jul-03 TATA CNG CWS-I

1010 DL-1P-B 6115 RHD-II Jul-03 TATA CNG CWS-I

1011 DL-1P-B 6116 RHD-II Jul-03 TATA CNG CWS-I

1012 DL-1P-B 6118 RHD-II Jul-03 TATA CNG CWS-I

1013 DL-1P-B 6119 IPD Jul-03 TATA CNG IPD

1014 DL-1P-B 6122 VVD Jul-03 TATA CNG CWS-II

1015 DL-1P-B 6123 VVD Jul-03 TATA CNG CWS-II

1016 DL-1P-B 6127 IPD Jul-03 TATA CNG IPD

1017 DL-1P-B 6128 VVD Jul-03 TATA CNG CWS-II

1018 DL-1P-B 6129 VVD Jul-03 TATA CNG CWS-II

1019 DL-1P-B 6130 IPD Jul-03 TATA CNG IPD

1020 DL-1P-B 6131 IPD Jul-03 TATA CNG IPD

1021 DL-1P-B 6132 IPD Jul-03 TATA CNG IPD

1022 DL-1P-B 6133 VVD Jul-03 TATA CNG CWS-II

Page 29: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

29 | P a g e

Sr.

No. Bus No. Depot

Date of

put on

road

Make Location for the

refurbishment

1023 DL-1P-B 6137 GUHD Aug-03 TATA CNG CWS-I

1024 DL-1P-B 6139 GUHD Aug-03 TATA CNG CWS-I

1025 DL-1P-B 6140 GUHD Aug-03 TATA CNG CWS-I

1026 DL-1P-B 6142 GUHD Aug-03 TATA CNG CWS-I

1027 DL-1P-B 6143 GUHD Aug-03 TATA CNG CWS-I

1028 DL-1P-B 6144 GUHD Aug-03 TATA CNG CWS-I

1029 DL-1P-B 6145 GUHD Aug-03 TATA CNG CWS-I

1030 DL-1P-B 6146 GUHD Aug-03 TATA CNG CWS-I

1031 DL-1P-B 6149 GUHD Aug-03 TATA CNG CWS-I

1032 DL-1P-B 6150 GUHD Aug-03 TATA CNG CWS-I

1033 DL-1P-B 6151 GUHD Aug-03 TATA CNG CWS-I

1034 DL-1P-B 6152 RHD-III Aug-03 TATA CNG CWS-I

1035 DL-1P-B 6153 RHD-III Aug-03 TATA CNG CWS-I

1036 DL-1P-B 6154 RHD-III Aug-03 TATA CNG CWS-I

1037 DL-1P-B 6155 RHD-III Aug-03 TATA CNG CWS-I

1038 DL-1P-B 6158 HND-II Aug-03 TATA CNG IPD

1039 DL-1P-B 6159 HND-II Aug-03 TATA CNG IPD

1040 DL-1P-B 6160 HND-II Aug-03 TATA CNG IPD

1041 DL-1P-B 6163 HND-II Aug-03 TATA CNG IPD

1042 DL-1P-B 6164 HND-II Aug-03 TATA CNG IPD

1043 DL-1P-B 6165 HND-II Aug-03 TATA CNG IPD

1044 DL-1P-B 6166 HND-II Aug-03 TATA CNG IPD

1045 DL-1P-B 6167 HND-II Aug-03 TATA CNG IPD

1046 DL-1P-B 6193 HND-III Aug-03 TATA CNG CWS-II

1047 DL-1P-B 6194 HND-III Aug-03 TATA CNG CWS-II

1048 DL-1P-B 6196 HND-III Aug-03 TATA CNG CWS-II

1049 DL-1P-B 6197 HND-III Aug-03 TATA CNG CWS-II

1050 DL-1P-B 6198 HND-III Aug-03 TATA CNG CWS-II

1051 DL-1P-B 6199 HND-III Aug-03 TATA CNG CWS-II

1052 DL-1P-B 6202 HND-III Aug-03 TATA CNG CWS-II

1053 DL-1P-B 6203 GUHD Aug-03 TATA CNG CWS-I

1054 DL-1P-B 6204 GUHD Aug-03 TATA CNG CWS-I

1055 DL-1P-B 6205 RHD-III Aug-03 TATA CNG CWS-I

1056 DL-1P-B 6206 GUHD Aug-03 TATA CNG CWS-I

1057 DL-1P-B 6207 GUHD Aug-03 TATA CNG CWS-I

1058 DL-1P-B 6208 GUHD Aug-03 TATA CNG CWS-I

1059 DL-1P-B 6209 HND-III Aug-03 TATA CNG CWS-II

1060 DL-1P-B 6210 HND-III Aug-03 TATA CNG CWS-II

1061 DL-1P-B 6212 IPD Aug-03 TATA CNG IPD

1062 DL-1P-B 6213 RHD-III Aug-03 TATA CNG CWS-I

1063 DL-1P-B 6216 GUHD Aug-03 TATA CNG CWS-I

Page 30: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

30 | P a g e

Sr.

No. Bus No. Depot

Date of

put on

road

Make Location for the

refurbishment

1064 DL-1P-B 6217 GUHD Aug-03 TATA CNG CWS-I

1065 DL-1P-B 6218 GUHD Aug-03 TATA CNG CWS-I

1066 DL-1P-B 6219 IPD Aug-03 TATA CNG IPD

1067 DL-1P-B 6220 GUHD Aug-03 TATA CNG CWS-I

1068 DL-1P-B 6221 VVD Aug-03 TATA CNG CWS-II

1069 DL-1P-B 6222 GUHD Aug-03 TATA CNG CWS-I

1070 DL-1P-B 6223 VVD Aug-03 TATA CNG CWS-II

1071 DL-1P-B 6225 IPD Aug-03 TATA CNG IPD

1072 DL-1P-B 6226 IPD Aug-03 TATA CNG IPD

1073 DL-1P-B 6227 VVD Aug-03 TATA CNG CWS-II

1074 DL-1P-B 6228 IPD Aug-03 TATA CNG IPD

1075 DL-1P-B 6229 KJD Aug-03 TATA CNG CWS-II

1076 DL-1P-B 6237 KJD Sep-03 TATA CNG CWS-II

1077 DL-1P-B 6239 KJD Sep-03 TATA CNG CWS-II

1078 DL-1P-B 6240 KJD Sep-03 TATA CNG CWS-II

1079 DL-1P-B 6241 KJD Sep-03 TATA CNG CWS-II

1080 DL-1P-B 6242 KJD Sep-03 TATA CNG CWS-II

1081 DL-1P-B 6243 KJD Sep-03 TATA CNG CWS-II

1082 DL-1P-B 6244 KJD Sep-03 TATA CNG CWS-II

1083 DL-1P-B 6245 KJD Sep-03 TATA CNG CWS-II

1084 DL-1P-B 6246 KJD Sep-03 TATA CNG CWS-II

1085 DL-1P-B 6247 KJD Sep-03 TATA CNG CWS-II

1086 DL-1P-B 6248 KJD Sep-03 TATA CNG CWS-II

1087 DL-1P-B 6249 KJD Sep-03 TATA CNG CWS-II

1088 DL-1P-B 6250 KJD Sep-03 TATA CNG CWS-II

1089 DL-1P-B 6251 KJD Sep-03 TATA CNG CWS-II

1090 DL-1P-B 6254 RHD-III Sep-03 TATA CNG CWS-I

1091 DL-1P-B 6255 KJD Sep-03 TATA CNG CWS-II

1092 DL-1P-B 6256 RHD-III Sep-03 TATA CNG CWS-I

1093 DL-1P-B 6257 KJD Sep-03 TATA CNG CWS-II

1094 DL-1P-B 6258 KJD Sep-03 TATA CNG CWS-II

1095 DL-1P-B 6259 RHD-III Sep-03 TATA CNG CWS-I

1096 DL-1P-B 6260 RHD-III Sep-03 TATA CNG CWS-I

1097 DL-1P-B 6261 RHD-III Sep-03 TATA CNG CWS-I

1098 DL-1P-B 6262 KJD Sep-03 TATA CNG CWS-II

1099 DL-1P-B 6279 DLGD Sep-03 LLV CNG IPD

1100 DL-1P-B 6280 DLGD Sep-03 LLV CNG IPD

1101 DL-1P-B 6281 EVND Sep-03 LLV CNG CWS-II

1102 DL-1P-B 6283 EVND Sep-03 LLV CNG CWS-II

1103 DL-1P-B 6284 GTK Sep-03 LLV CNG CWS-I

1104 DL-1P-B 6285 EVND Sep-03 LLV CNG CWS-II

Page 31: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

31 | P a g e

Sr.

No. Bus No. Depot

Date of

put on

road

Make Location for the

refurbishment

1105 DL-1P-B 6286 KJD Sep-03 TATA CNG CWS-II

1106 DL-1P-B 6287 KJD Sep-03 TATA CNG CWS-II

1107 DL-1P-B 6289 KJD Sep-03 TATA CNG CWS-II

1108 DL-1P-B 6290 KJD Sep-03 TATA CNG CWS-II

1109 DL-1P-B 6291 KJD Sep-03 TATA CNG CWS-II

1110 DL-1P-B 6292 VVD Sep-03 TATA CNG CWS-II

1111 DL-1P-B 6293 VVD Sep-03 TATA CNG CWS-II

1112 DL-1P-B 6296 EVND Sep-03 LLV CNG CWS-II

1113 DL-1P-B 6297 DLGD Sep-03 LLV CNG IPD

1114 DL-1P-B 6298 DLGD Sep-03 LLV CNG IPD

1115 DL-1P-B 6299 DLGD Sep-03 LLV CNG IPD

1116 DL-1P-B 6300 DLGD Sep-03 LLV CNG IPD

1117 DL-1P-B 6301 DLGD Sep-03 LLV CNG IPD

1118 DL-1P-B 6302 RHD-III Sep-03 TATA CNG CWS-I

1119 DL-1P-B 6303 RHD-III Sep-03 TATA CNG CWS-I

1120 DL-1P-B 6304 RHD-III Sep-03 TATA CNG CWS-I

1121 DL-1P-B 6305 DLGD Sep-03 LLV CNG IPD

1122 DL-1P-B 6306 DLGD Sep-03 LLV CNG IPD

1123 DL-1P-B 6307 RHD-III Sep-03 TATA CNG CWS-I

1124 DL-1P-B 6308 RHD-III Sep-03 TATA CNG CWS-I

1125 DL-1P-B 6309 RHD-III Sep-03 TATA CNG CWS-I

1126 DL-1P-B 6310 RHD-III Sep-03 TATA CNG CWS-I

1127 DL-1P-B 6311 RHD-III Sep-03 TATA CNG CWS-I

1128 DL-1P-B 6312 RHD-III Sep-03 TATA CNG CWS-I

1129 DL-1P-B 6313 RHD-III Sep-03 TATA CNG CWS-I

1130 DL-1P-B 6314 RHD-III Sep-03 TATA CNG CWS-I

1131 DL-1P-B 6315 RHD-III Sep-03 TATA CNG CWS-I

1132 DL-1P-B 6316 RHD-III Sep-03 TATA CNG CWS-I

1133 DL-1P-B 6317 DLGD Sep-03 LLV CNG IPD

1134 DL-1P-B 6321 VVD Sep-03 TATA CNG CWS-II

1135 DL-1P-B 6322 VVD Sep-03 TATA CNG CWS-II

1136 DL-1P-B 6324 VVD Sep-03 TATA CNG CWS-II

1137 DL-1P-B 6325 VVD Sep-03 TATA CNG CWS-II

1138 DL-1P-B 6326 VVD Sep-03 TATA CNG CWS-II

1139 DL-1P-B 6327 VVD Sep-03 TATA CNG CWS-II

1140 DL-1P-B 6328 VVD Sep-03 TATA CNG CWS-II

1141 DL-1P-B 6329 VVD Sep-03 TATA CNG CWS-II

1142 DL-1P-B 6330 RHD-II Sep-03 TATA CNG CWS-I

1143 DL-1P-B 6331 RHD-II Sep-03 TATA CNG CWS-I

1144 DL-1P-B 6332 RHD-II Sep-03 TATA CNG CWS-I

1145 DL-1P-B 6333 RHD-II Sep-03 TATA CNG CWS-I

Page 32: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

32 | P a g e

Sr.

No. Bus No. Depot

Date of

put on

road

Make Location for the

refurbishment

1146 DL-1P-B 6334 RHD-II Sep-03 TATA CNG CWS-I

1147 DL-1P-B 6335 GTK Sep-03 LLV CNG IPD

1148 DL-1P-B 6336 RHD-II Sep-03 TATA CNG CWS-I

1149 DL-1P-B 6337 RHD-II Sep-03 TATA CNG CWS-I

1150 DL-1P-B 6338 RHD-II Sep-03 TATA CNG CWS-I

1151 DL-1P-B 6339 RHD-II Sep-03 TATA CNG CWS-I

1152 DL-1P-B 6340 RHD-II Sep-03 TATA CNG CWS-I

1153 DL-1P-B 6341 RHD-III Sep-03 TATA CNG CWS-I

1154 DL-1P-B 6342 RHD-III Sep-03 TATA CNG CWS-I

1155 DL-1P-B 6343 RHD-III Sep-03 TATA CNG CWS-I

1156 DL-1P-B 6344 RHD-III Sep-03 TATA CNG CWS-I

1157 DL-1P-B 6345 RHD-III Sep-03 TATA CNG CWS-I

1158 DL-1P-B 6346 RHD-III Sep-03 TATA CNG CWS-I

1159 DL-1P-B 6347 GUHD Sep-03 TATA CNG CWS-I

1160 DL-1P-B 6348 GUHD Sep-03 TATA CNG CWS-I

1161 DL-1P-B 6349 GUHD Sep-03 TATA CNG CWS-I

1162 DL-1P-B 6350 GUHD Sep-03 TATA CNG CWS-I

1163 DL-1P-B 6351 RHD-III Sep-03 TATA CNG CWS-I

1164 DL-1P-B 6352 RHD-III Sep-03 TATA CNG CWS-I

1165 DL-1P-B 6353 RHD-III Sep-03 TATA CNG CWS-I

1166 DL-1P-B 6354 RHD-III Sep-03 TATA CNG CWS-I

1167 DL-1P-B 6356 RHD-III Sep-03 TATA CNG CWS-I

1168 DL-1P-B 6357 RHD-III Sep-03 TATA CNG CWS-I

1169 DL-1P-B 6358 RHD-III Sep-03 TATA CNG CWS-I

1170 DL-1P-B 6359 RHD-III Sep-03 TATA CNG CWS-I

1171 DL-1P-B 6360 RHD-III Sep-03 TATA CNG CWS-I

1172 DL-1P-B 6361 RHD-III Sep-03 TATA CNG CWS-I

1173 DL-1P-B 6362 KJD Sep-03 TATA CNG CWS-II

1174 DL-1P-B 6363 KJD Sep-03 TATA CNG CWS-II

1175 DL-1P-B 6364 KJD Sep-03 TATA CNG CWS-II

1176 DL-1P-B 6365 GUHD Sep-03 TATA CNG CWS-I

1177 DL-1P-B 6366 GUHD Sep-03 TATA CNG CWS-I

1178 DL-1P-B 6367 GUHD Sep-03 TATA CNG CWS-I

1179 DL-1P-B 6368 GUHD Sep-03 TATA CNG CWS-I

1180 DL-1P-B 6369 GUHD Sep-03 TATA CNG CWS-I

1181 DL-1P-B 6370 VVD Sep-03 TATA CNG CWS-II

1182 DL-1P-B 6371 KJD Sep-03 TATA CNG CWS-II

1183 DL-1P-B 6372 VVD Sep-03 TATA CNG CWS-II

1184 DL-1P-B 6373 KJD Sep-03 TATA CNG CWS-II

1185 DL-1P-B 6374 VVD Sep-03 TATA CNG CWS-II

1186 DL-1P-B 6375 VVD Sep-03 TATA CNG CWS-II

Page 33: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

33 | P a g e

Sr.

No. Bus No. Depot

Date of

put on

road

Make Location for the

refurbishment

1187 DL-1P-B 6376 KJD Sep-03 TATA CNG CWS-II

1188 DL-1P-B 6377 KJD Sep-03 TATA CNG CWS-II

1189 DL-1P-B 6378 SNPD Sep-03 TATA CNG CWS-II

1190 DL-1P-B 6379 KJD Sep-03 TATA CNG CWS-II

1191 DL-1P-B 6380 VVD Sep-03 TATA CNG CWS-II

1192 DL-1P-B 6381 KJD Sep-03 TATA CNG CWS-II

1193 DL-1P-B 6382 KJD Sep-03 TATA CNG CWS-II

1194 DL-1P-B 6386 SNPD Sep-03 TATA CNG CWS-II

1195 DL-1P-B 6387 VVD Sep-03 TATA CNG CWS-II

1196 DL-1P-B 6388 VVD Sep-03 TATA CNG CWS-II

1197 DL-1P-B 6389 RHD-III Sep-03 TATA CNG CWS-I

1198 DL-1P-B 6390 RHD-III Sep-03 TATA CNG CWS-I

1199 DL-1P-B 6391 RHD-III Sep-03 TATA CNG CWS-I

1200 DL-1P-B 6392 RHD-III Sep-03 TATA CNG CWS-I

1201 DL-1P-B 6393 RHD-III Sep-03 TATA CNG CWS-I

1202 DL-1P-B 6394 RHD-III Sep-03 TATA CNG CWS-I

1203 DL-1P-B 6395 RHD-III Sep-03 TATA CNG CWS-I

1204 DL-1P-B 6396 RHD-III Sep-03 TATA CNG CWS-I

1205 DL-1P-B 6397 RHD-III Sep-03 TATA CNG CWS-I

1206 DL-1P-B 6398 RHD-III Sep-03 TATA CNG CWS-I

1207 DL-1P-B 6399 RHD-III Sep-03 TATA CNG CWS-I

1208 DL-1P-B 6401 RHD-III Sep-03 TATA CNG CWS-I

1209 DL-1P-B 6402 RHD-III Sep-03 TATA CNG CWS-I

1210 DL-1P-B 6403 RHD-III Sep-03 TATA CNG CWS-I

1211 DL-1P-B 6404 RHD-III Sep-03 TATA CNG CWS-I

1212 DL-1P-B 6405 SNPD Sep-03 TATA CNG CWS-II

1213 DL-1P-B 6406 SNPD Sep-03 TATA CNG CWS-II

1214 DL-1P-B 6407 RHD-III Sep-03 TATA CNG CWS-I

1215 DL-1P-B 6408 RHD-III Sep-03 TATA CNG CWS-I

1216 DL-1P-B 6413 RHD-III Sep-03 TATA CNG CWS-I

1217 DL-1P-B 6416 RHD-III Sep-03 TATA CNG CWS-I

1218 DL-1P-B 6417 RHD-III Sep-03 TATA CNG CWS-I

1219 DL-1P-B 6418 RHD-III Sep-03 TATA CNG CWS-I

1220 DL-1P-B 6419 SNPD Sep-03 TATA CNG CWS-II

1221 DL-1P-B 6420 RHD-III Sep-03 TATA CNG CWS-I

1222 DL-1P-B 6421 SNPD Sep-03 TATA CNG CWS-II

1223 DL-1P-B 6422 SNPD Sep-03 TATA CNG CWS-II

1224 DL-1P-B 6423 RHD-III Sep-03 TATA CNG CWS-I

1225 DL-1P-B 6424 RHD-III Sep-03 TATA CNG CWS-I

1226 DL-1P-B 6425 RHD-III Sep-03 TATA CNG CWS-I

1227 DL-1P-B 6426 SNPD Sep-03 TATA CNG CWS-II

Page 34: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

34 | P a g e

Sr.

No. Bus No. Depot

Date of

put on

road

Make Location for the

refurbishment

1228 DL-1P-B 6427 RHD-III Sep-03 TATA CNG CWS-I

1229 DL-1P-B 6428 SNPD Sep-03 TATA CNG CWS-II

1230 DL-1P-B 6429 RHD-III Sep-03 TATA CNG CWS-I

1231 DL-1P-B 6430 RHD-III Sep-03 TATA CNG CWS-I

1232 DL-1P-B 6443 SNPD Oct-03 TATA CNG CWS-II

1233 DL-1P-B 6445 SNPD Oct-03 TATA CNG CWS-II

1234 DL-1P-B 6446 SNPD Oct-03 TATA CNG CWS-II

1235 DL-1P-B 6448 RHD-III Oct-03 TATA CNG CWS-I

1236 DL-1P-B 6449 RHD-III Oct-03 TATA CNG CWS-I

1237 DL-1P-B 6470 RHD-III Oct-03 TATA CNG CWS-I

1238 DL-1P-B 6471 RHD-III Oct-03 TATA CNG CWS-I

1239 DL-1P-B 6473 ND Oct-03 LLV CNG CWS-II

1240 DL-1P-B 6474 ND Oct-03 LLV CNG CWS-II

1241 DL-1P-B 6475 RHD-III Oct-03 TATA CNG CWS-I

1242 DL-1P-B 6481 RHD-III Oct-03 TATA CNG CWS-I

1243 DL-1P-B 6482 RHD-III Oct-03 TATA CNG CWS-I

1244 DL-1P-B 6483 ND Oct-03 LLV CNG CWS-II

1245 DL-1P-B 6484 RHD-III Oct-03 TATA CNG CWS-I

1246 DL-1P-B 6485 RHD-III Oct-03 TATA CNG CWS-I

1247 DL-1P-B 6486 PGD Oct-03 TATA CNG IPD

1248 DL-1P-B 6488 DLGD Oct-03 LLV CNG IPD

1249 DL-1P-B 6489 SPD Oct-03 LLV CNG CWS-II

1250 DL-1P-B 6490 PGD Oct-03 TATA CNG IPD

1251 DL-1P-B 6491 PGD Oct-03 TATA CNG IPD

1252 DL-1P-B 6492 PGD Oct-03 TATA CNG IPD

1253 DL-1P-B 6493 PGD Oct-03 TATA CNG IPD

1254 DL-1P-B 6494 PGD Oct-03 TATA CNG IPD

1255 DL-1P-B 6495 PGD Oct-03 TATA CNG IPD

1256 DL-1P-B 6496 GUHD Oct-03 TATA CNG CWS-I

1257 DL-1P-B 6497 GUHD Oct-03 TATA CNG CWS-I

1258 DL-1P-B 6498 HND-III Oct-03 TATA CNG CWS-II

1259 DL-1P-B 6499 RHD-III Oct-03 TATA CNG CWS-I

1260 DL-1P-B 6502 PGD Oct-03 TATA CNG IPD

1261 DL-1P-B 6503 RHD-III Oct-03 TATA CNG CWS-I

1262 DL-1P-B 6504 PGD Oct-03 TATA CNG IPD

1263 DL-1P-B 6505 PGD Oct-03 TATA CNG IPD

1264 DL-1P-B 6506 PGD Oct-03 TATA CNG IPD

1265 DL-1P-B 6507 RHD-III Oct-03 TATA CNG CWS-I

1266 DL-1P-B 6508 PGD Oct-03 TATA CNG IPD

1267 DL-1P-B 6509 PGD Oct-03 TATA CNG IPD

1268 DL-1P-B 6510 PGD Oct-03 TATA CNG IPD

Page 35: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

35 | P a g e

Sr.

No. Bus No. Depot

Date of

put on

road

Make Location for the

refurbishment

1269 DL-1P-B 6511 PGD Oct-03 TATA CNG IPD

1270 DL-1P-B 6512 PGD Oct-03 TATA CNG IPD

1271 DL-1P-B 6513 RHD-III Oct-03 TATA CNG CWS-I

1272 DL-1P-B 6514 PGD Oct-03 TATA CNG IPD

1273 DL-1P-B 6515 RHD-III Oct-03 TATA CNG CWS-I

1274 DL-1P-B 6516 PGD Oct-03 TATA CNG IPD

1275 DL-1P-B 6517 PGD Oct-03 TATA CNG IPD

1276 DL-1P-B 6518 PGD Oct-03 TATA CNG IPD

1277 DL-1P-B 6519 PGD Oct-03 TATA CNG IPD

1278 DL-1P-B 6520 PGD Oct-03 TATA CNG IPD

1279 DL-1P-B 6521 PGD Oct-03 TATA CNG IPD

1280 DL-1P-B 6522 PGD Oct-03 TATA CNG IPD

1281 DL-1P-B 6524 PGD Oct-03 TATA CNG IPD

1282 DL-1P-B 6525 PGD Oct-03 TATA CNG IPD

1283 DL-1P-B 6526 PGD Oct-03 TATA CNG IPD

1284 DL-1P-B 6527 PGD Oct-03 TATA CNG IPD

1285 DL-1P-B 6528 PGD Oct-03 TATA CNG IPD

1286 DL-1P-B 6529 PGD Oct-03 TATA CNG IPD

1287 DL-1P-B 6531 PGD Oct-03 TATA CNG IPD

1288 DL-1P-B 6532 PGD Oct-03 TATA CNG IPD

1289 DL-1P-B 6533 PGD Oct-03 TATA CNG IPD

1290 DL-1P-B 6536 PGD Oct-03 TATA CNG IPD

1291 DL-1P-B 6537 PGD Oct-03 TATA CNG IPD

1292 DL-1P-B 6538 PGD Oct-03 TATA CNG IPD

1293 DL-1P-B 6539 PGD Oct-03 TATA CNG IPD

1294 DL-1P-B 6540 PGD Oct-03 TATA CNG IPD

1295 DL-1P-B 6541 PGD Oct-03 TATA CNG IPD

1296 DL-1P-B 6542 PGD Oct-03 TATA CNG IPD

1297 DL-1P-B 6544 PGD Oct-03 TATA CNG IPD

1298 DL-1P-B 6545 PGD Oct-03 TATA CNG IPD

1299 DL-1P-B 6546 PGD Oct-03 TATA CNG IPD

1300 DL-1P-B 6547 PGD Oct-03 TATA CNG IPD

1301 DL-1P-B 6549 PGD Oct-03 TATA CNG IPD

1302 DL-1P-B 6550 PGD Oct-03 TATA CNG IPD

1303 DL-1P-B 6552 PGD Oct-03 TATA CNG IPD

1304 DL-1P-B 6553 PGD Oct-03 TATA CNG IPD

1305 DL-1P-B 6555 PGD Oct-03 TATA CNG IPD

1306 DL-1P-B 6556 PGD Oct-03 TATA CNG IPD

1307 DL-1P-B 6560 PGD Oct-03 TATA CNG IPD

1308 DL-1P-B 6561 PGD Oct-03 TATA CNG IPD

1309 DL-1P-B 6562 PGD Oct-03 TATA CNG IPD

Page 36: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

36 | P a g e

Sr.

No. Bus No. Depot

Date of

put on

road

Make Location for the

refurbishment

1310 DL-1P-B 6563 PGD Oct-03 TATA CNG IPD

1311 DL-1P-B 6564 SPD Oct-03 LLV CNG CWS-II

1312 DL-1P-B 6566 ND Oct-03 LLV CNG CWS-II

1313 DL-1P-B 6567 SPD Oct-03 LLV CNG CWS-II

1314 DL-1P-B 6568 PGD Oct-03 TATA CNG IPD

1315 DL-1P-B 6569 PGD Oct-03 TATA CNG IPD

1316 DL-1P-B 6570 PGD Oct-03 TATA CNG IPD

1317 DL-1P-B 6571 PGD Oct-03 TATA CNG IPD

1318 DL-1P-B 6572 PGD Oct-03 TATA CNG IPD

1319 DL-1P-B 6573 PGD Oct-03 TATA CNG IPD

1320 DL-1P-B 6574 PGD Oct-03 TATA CNG IPD

1321 DL-1P-B 6575 PGD Oct-03 TATA CNG IPD

1322 DL-1P-B 6576 PGD Oct-03 TATA CNG IPD

1323 DL-1P-B 6577 PGD Oct-03 TATA CNG IPD

1324 DL-1P-B 6578 PGD Oct-03 TATA CNG IPD

1325 DL-1P-B 6579 PGD Oct-03 TATA CNG IPD

1326 DL-1P-B 6584 PGD Oct-03 TATA CNG IPD

1327 DL-1P-B 6585 PGD Oct-03 TATA CNG IPD

1328 DL-1P-B 6599 SNPD Nov-03 TATA CNG CWS-II

1329 DL-1P-B 6600 SNPD Nov-03 TATA CNG CWS-II

1330 DL-1P-B 6601 SNPD Nov-03 TATA CNG CWS-II

1331 DL-1P-B 6602 SNPD Nov-03 TATA CNG CWS-II

1332 DL-1P-B 6603 SNPD Nov-03 TATA CNG CWS-II

1333 DL-1P-B 6604 SNPD Nov-03 TATA CNG CWS-II

1334 DL-1P-B 6605 SNPD Nov-03 TATA CNG CWS-II

1335 DL-1P-B 6607 SNPD Nov-03 TATA CNG CWS-II

1336 DL-1P-B 6608 SNPD Nov-03 TATA CNG CWS-II

1337 DL-1P-B 6613 PGD Nov-03 TATA CNG IPD

1338 DL-1P-B 6614 PGD Nov-03 TATA CNG IPD

1339 DL-1P-B 6615 PGD Nov-03 TATA CNG IPD

1340 DL-1P-B 6616 PGD Nov-03 TATA CNG IPD

1341 DL-1P-B 6617 PGD Nov-03 TATA CNG IPD

1342 DL-1P-B 6619 PGD Nov-03 TATA CNG IPD

1343 DL-1P-B 6620 PGD Nov-03 TATA CNG IPD

1344 DL-1P-B 6621 IPD Nov-03 TATA CNG IPD

1345 DL-1P-B 6622 PGD Nov-03 TATA CNG IPD

1346 DL-1P-B 6623 PGD Nov-03 TATA CNG IPD

1347 DL-1P-B 6624 IPD Nov-03 TATA CNG IPD

1348 DL-1P-B 6625 SNPD Nov-03 TATA CNG CWS-II

1349 DL-1P-B 6632 SNPD Nov-03 TATA CNG CWS-II

1350 DL-1P-B 6642 PGD Nov-03 TATA CNG IPD

Page 37: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

37 | P a g e

Sr.

No. Bus No. Depot

Date of

put on

road

Make Location for the

refurbishment

1351 DL-1P-B 6643 SNPD Nov-03 TATA CNG CWS-II

1352 DL-1P-B 6644 PGD Nov-03 TATA CNG IPD

1353 DL-1P-B 6645 SNPD Nov-03 TATA CNG CWS-II

1354 DL-1P-B 6646 SNPD Nov-03 TATA CNG CWS-II

1355 DL-1P-B 6648 SNPD Nov-03 TATA CNG CWS-II

1356 DL-1P-B 6649 SNPD Nov-03 TATA CNG CWS-II

1357 DL-1P-B 6650 PGD Nov-03 TATA CNG IPD

1358 DL-1P-B 6651 SNPD Nov-03 TATA CNG CWS-II

1359 DL-1P-B 6652 PGD Nov-03 TATA CNG IPD

1360 DL-1P-B 6653 PGD Nov-03 TATA CNG IPD

1361 DL-1P-B 6654 SNPD Nov-03 TATA CNG CWS-II

1362 DL-1P-B 6655 IPD Nov-03 TATA CNG IPD

1363 DL-1P-B 6656 SNPD Nov-03 TATA CNG CWS-II

1364 DL-1P-B 6657 SNPD Nov-03 TATA CNG CWS-II

1365 DL-1P-B 6658 SNPD Nov-03 TATA CNG CWS-II

1366 DL-1P-B 6659 SNPD Nov-03 TATA CNG CWS-II

1367 DL-1P-B 6660 VVD Nov-03 TATA CNG CWS-II

1368 DL-1P-B 6661 IPD Nov-03 TATA CNG IPD

1369 DL-1P-B 6662 SNPD Nov-03 TATA CNG CWS-II

1370 DL-1P-B 6663 SNPD Nov-03 TATA CNG CWS-II

1371 DL-1P-B 6664 SNPD Nov-03 TATA CNG CWS-II

1372 DL-1P-B 6665 SNPD Nov-03 TATA CNG CWS-II

1373 DL-1P-B 6666 SNPD Nov-03 TATA CNG CWS-II

1374 DL-1P-B 6667 SNPD Nov-03 TATA CNG CWS-II

1375 DL-1P-B 6668 IPD Nov-03 TATA CNG IPD

1376 DL-1P-B 6669 SNPD Nov-03 TATA CNG CWS-II

1377 DL-1P-B 6670 SNPD Nov-03 TATA CNG CWS-II

1378 DL-1P-B 6671 IPD Nov-03 TATA CNG IPD

1379 DL-1P-B 6672 IPD Nov-03 TATA CNG IPD

1380 DL-1P-B 6673 VVD Nov-03 TATA CNG CWS-II

1381 DL-1P-B 6674 IPD Nov-03 TATA CNG IPD

1382 DL-1P-B 6675 IPD Nov-03 TATA CNG IPD

1383 DL-1P-B 6676 IPD Nov-03 TATA CNG IPD

1384 DL-1P-B 6685 SNPD Nov-03 TATA CNG CWS-II

1385 DL-1P-B 6686 SNPD Nov-03 TATA CNG CWS-II

1386 DL-1P-B 6687 SNPD Nov-03 TATA CNG CWS-II

1387 DL-1P-B 6690 SNPD Nov-03 TATA CNG CWS-II

1388 DL-1P-B 6691 SNPD Nov-03 TATA CNG CWS-II

1389 DL-1P-B 6692 SNPD Nov-03 TATA CNG CWS-II

1390 DL-1P-B 6693 SNPD Nov-03 TATA CNG CWS-II

1391 DL-1P-B 6694 SNPD Nov-03 TATA CNG CWS-II

Page 38: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

38 | P a g e

Sr.

No. Bus No. Depot

Date of

put on

road

Make Location for the

refurbishment

1392 DL-1P-B 6698 SNPD Nov-03 TATA CNG CWS-II

1393 DL-1P-B 6699 SNPD Nov-03 TATA CNG CWS-II

1394 DL-1P-B 6700 SNPD Nov-03 TATA CNG CWS-II

1395 DL-1P-B 6701 SNPD Nov-03 TATA CNG CWS-II

1396 DL-1P-B 6702 SNPD Nov-03 TATA CNG CWS-II

1397 DL-1P-B 6703 SNPD Nov-03 TATA CNG CWS-II

1398 DL-1P-B 6704 SNPD Nov-03 TATA CNG CWS-II

1399 DL-1P-B 6705 SNPD Nov-03 TATA CNG CWS-II

1400 DL-1P-B 6712 SNPD Nov-03 TATA CNG CWS-II

1401 DL-1P-B 6721 SNPD Nov-03 TATA CNG CWS-II

1402 DL-1P-B 6722 SNPD Nov-03 TATA CNG CWS-II

1403 DL-1P-B 6723 SNPD Nov-03 TATA CNG CWS-II

1404 DL-1P-B 6724 SNPD Nov-03 TATA CNG CWS-II

1405 DL-1P-B 6725 SNPD Nov-03 TATA CNG CWS-II

1406 DL-1P-B 6726 SNPD Nov-03 TATA CNG CWS-II

1407 DL-1P-B 6728 SNPD Nov-03 TATA CNG CWS-II

1408 DL-1P-B 6729 SNPD Nov-03 TATA CNG CWS-II

1409 DL-1P-B 6730 SNPD Nov-03 TATA CNG CWS-II

1410 DL-1P-B 6731 SNPD Nov-03 TATA CNG CWS-II

1411 DL-1P-B 6732 SNPD Nov-03 TATA CNG CWS-II

1412 DL-1P-B 6733 SNPD Nov-03 TATA CNG CWS-II

1413 DL-1P-B 6734 SNPD Nov-03 TATA CNG CWS-II

1414 DL-1P-B 6735 SNPD Nov-03 TATA CNG CWS-II

1415 DL-1P-B 6736 SNPD Nov-03 TATA CNG CWS-II

1416 DL-1P-B 6738 SNPD Nov-03 TATA CNG CWS-II

1417 DL-1P-B 6739 SNPD Nov-03 TATA CNG CWS-II

1418 DL-1P-B 6740 SNPD Nov-03 TATA CNG CWS-II

1419 DL-1P-B 6741 SNPD Nov-03 TATA CNG CWS-II

1420 DL-1P-B 6742 SNPD Nov-03 TATA CNG CWS-II

1421 DL-1P-B 6743 SNPD Nov-03 TATA CNG CWS-II

1422 DL-1P-B 6744 SNPD Nov-03 TATA CNG CWS-II

1423 DL-1P-B 6745 SNPD Nov-03 TATA CNG CWS-II

1424 DL-1P-B 6746 SNPD Dec-03 TATA CNG CWS-II

1425 DL-1P-B 6747 SNPD Dec-03 TATA CNG CWS-II

1426 DL-1P-B 6748 SNPD Dec-03 TATA CNG CWS-II

1427 DL-1P-B 6763 SNPD Dec-03 TATA CNG CWS-II

1428 DL-1P-B 6764 SNPD Dec-03 TATA CNG CWS-II

1429 DL-1P-B 6765 SNPD Dec-03 TATA CNG CWS-II

1430 DL-1P-B 6766 SNPD Dec-03 TATA CNG CWS-II

1431 DL-1P-B 6767 SNPD Dec-03 TATA CNG CWS-II

1432 DL-1P-B 6768 SNPD Dec-03 TATA CNG CWS-II

Page 39: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

39 | P a g e

Sr.

No. Bus No. Depot

Date of

put on

road

Make Location for the

refurbishment

1433 DL-1P-B 6769 SNPD Dec-03 TATA CNG CWS-II

1434 DL-1P-B 6770 SNPD Dec-03 TATA CNG CWS-II

1435 DL-1P-B 6771 SNPD Dec-03 TATA CNG CWS-II

1436 DL-1P-B 6772 SNPD Dec-03 TATA CNG CWS-II

1437 DL-1P-B 6773 SNPD Dec-03 TATA CNG CWS-II

1438 DL-1P-B 6781 SNPD Dec-03 TATA CNG CWS-II

1439 DL-1P-B 6782 SNPD Dec-03 TATA CNG CWS-II

1440 DL-1P-B 6783 SNPD Dec-03 TATA CNG CWS-II

1441 DL-1P-B 6784 SNPD Dec-03 TATA CNG CWS-II

1442 DL-1P-B 6785 SNPD Jan-04 TATA CNG CWS-II

1443 DL-1P-B 6786 SNPD Jan-04 TATA CNG CWS-II

1444 DL-1P-B 6787 SNPD Jan-04 TATA CNG CWS-II

1445 DL-1P-B 6788 SNPD Jan-04 TATA CNG CWS-II

1446 DL-1P-B 6789 SNPD Jan-04 TATA CNG CWS-II

1447 DL-1P-B 6790 SNPD Jan-04 TATA CNG CWS-II

1448 DL-1P-B 6793 PGD Jan-04 TATA CNG IPD

1449 DL-1P-B 6794 SNPD Jan-04 TATA CNG CWS-II

1450 DL-1P-B 6798 PGD Jan-04 TATA CNG IPD

1451 DL-1P-B 6799 PGD Jan-04 TATA CNG IPD

1452 DL-1P-B 6807 PGD Jan-04 TATA CNG IPD

1453 DL-1P-B 6823 PGD Feb-04 TATA CNG IPD

1454 DL-1P-B 6824 PGD Feb-04 TATA CNG IPD

1455 DL-1P-B 6826 PGD Feb-04 TATA CNG IPD

1456 DL-1P-B 6827 PGD Feb-04 TATA CNG IPD

1457 DL-1P-B 6836 PGD Feb-04 TATA CNG IPD

1458 DL-1P-B 6837 PGD Feb-04 TATA CNG IPD

1459 DL-1P-B 6838 PGD Feb-04 TATA CNG IPD

1460 DL-1P-B 6839 BBM-I Feb-04 TATA CNG CWS-I

1461 DL-1P-B 6840 PGD Feb-04 TATA CNG IPD

1462 DL-1P-B 6857 RHD-III Feb-04 TATA CNG CWS-I

1463 DL-1P-B 6864 RHD-III Mar-04 TATA CNG CWS-I

1464 DL-1P-B 6880 PGD Mar-04 TATA CNG IPD

1465 DL-1P-B 6884 IPD Mar-04 TATA CNG IPD

1466 DL-1P-B 6899 IPD Mar-04 TATA CNG IPD

1467 DL-1P-B 6906 IPD Mar-04 TATA CNG IPD

1468 DL-1P-B 6908 IPD Mar-04 TATA CNG IPD

1469 DL-1P-B 6925 BBM-I Mar-04 TATA CNG CWS-I

1470 DL-1P-B 6926 BBM-I Mar-04 TATA CNG CWS-I

1471 DL-1P-B 6954 BBM-I Apr-04 TATA CNG CWS-I

1472 DL-1P-B 6957 BBM-I Apr-04 TATA CNG CWS-I

1473 DL-1P-B 6959 BBM-I Apr-04 TATA CNG CWS-I

Page 40: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

40 | P a g e

Sr.

No. Bus No. Depot

Date of

put on

road

Make Location for the

refurbishment

1474 DL-1P-B 6960 BBM-I Apr-04 TATA CNG CWS-I

1475 DL-1P-B 6973 BBM-I Apr-04 TATA CNG CWS-I

1476 DL-1P-B 6974 BBM-I Apr-04 TATA CNG CWS-I

1477 DL-1P-B 6997 RHD-III Apr-04 TATA CNG CWS-I

1478 DL-1P-B 7018 BBM-I May-04 TATA CNG CWS-I

1479 DL-1P-B 7036 RHD-III May-04 TATA CNG CWS-I

1480 DL-1P-B 7037 RHD-III May-04 TATA CNG CWS-I

1481 DL-1P-B 7069 RHD-III May-04 TATA CNG CWS-I

1482 DL-1P-B 7083 RHD-III Jun-04 TATA CNG CWS-I

1483 DL-1P-B 7090 RHD-III Jun-04 TATA CNG CWS-I

1484 DL-1P-B 7115 RHD-III Jun-04 TATA CNG CWS-I

1485 DL-1P-B 7130 RHD-III Jul-04 TATA CNG CWS-I

1486 DL-1P-B 7152 RHD-III Jul-04 TATA CNG CWS-I

1487 DL-1P-B 7176 RHD-III Jul-04 TATA CNG CWS-I

1488 DL-1P-B 7212 RHD-III Aug-04 TATA CNG CWS-I

1489 DL-1P-B 7228 RHD-III Sep-04 TATA CNG CWS-I

1490 DL-1P-B 7259 RHD-III Sep-04 TATA CNG CWS-I

1491 DL-1P-B 7341 RHD-III Oct-04 TATA CNG CWS-I

1492 DL-1P-B 7357 RHD-III Nov-04 TATA CNG CWS-I

1493 DL-1P-B 7396 RHD-III Nov-04 TATA CNG CWS-I

1494 DL-1P-B 7401 RHD-III Nov-04 TATA CNG CWS-I

1495 DL-1P-B 8031 IPD Nov-05 TATA CNG IPD

1496 DL-IPB 8032 IPD Nov-05 TATA CNG IPD

1497 DL-1P-B 8033 IPD Nov-05 TATA CNG IPD

1498 DL-1P-B 8034 IPD Nov-05 TATA CNG IPD

1499 DL-1P-B 8035 IPD Nov-05 TATA CNG IPD

1500 DL-1P-B 8430 IPD May-06 TATA CNG IPD

Page 41: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

41 | P a g e

Name of the Depot Number of Vehicles Location for the

refurbishment

BBM-I 59 CWS-I

BD 36 CWS-I

DGD 26 CWS-I

DKD 30 CWS-II

DLGD 95 IPD

ENVD 41 CWS-II

GTK 36 CWS-I

GUHD 80 CWS-I

HND-II 99 IPD

HND-III 60 CWS-II

IPD 87 IPD

KJD 65 CWS-II

ND 17 CWS-II

NLD 51 CWS-I

NND 33 IPD

PGD 133 IPD

RHD-II 87 CWS-I

RHD-III 119 CWS-I

SMPD 43 CWS-I, CWS-II and IPD

SNPD 125 CWS-II

SPD 70 CWS-II

VVD 86 CWS-II

YVD 22 IPD

Page 42: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

42 | P a g e

3. Technical Specification for LED

based Route Display System

3.1. LED Boards General Specification

Alphanumeric Dual Display Technology Amber coloured LED based electronic route

display system of high intensity illumination with automatic brightness control (minimum

50 steps) along with display system in English and Hindi languages using Windows

based software package shall be installed at the front, rear and side of bus as per the

details given in the following Sub-clauses.

The Sign Boards shall be Non- Multiplexed design, Amber colored (Dominant

wavelength between 590 to 595 mm), Diffused type for Better Visibility, UV Resistant

Type with viewing angle of 120 degree Horizontal/ 60 degree vertical. The system shall

be of rugged construction, vibration proof and shall be able to operate efficiently at

ambient temperatures of approximately 0 deg to 50 deg C, humidity level of 5% to 100%.

The other specifications of LED boards at the front, rear and side of bus shall meet the

following:

3.2. Front Destination Board

The display of text should be possible with option in Hindi and English along with fixed

route number in Indo numerals. The display system be accommodated in the size

specified in the bus code i.e. Minimum display width of 1800 mm (minimum 1600 mm in

case of Tata Buses) and minimum height of Destination Board should be 220 mm &

Minimum height of character should be 200 mm. The display of text should be possible

in fixed, scroll & alternate mode type. The pitch of the LED shall be max H 13.4 mm x V

14.1 mm optimized to cover the maximum possible area along the length for displaying

maximum number of letters. Front Sign display shall be clearly visible in all weathers at a

distance of 50 meters.

3.3. Side Destination Board

The display of text should be possible in fixed, scroll & alternate mode type in Hindi &

English alternatively along with fixed route number in Indo-Arabic numerals. The system

shall be operated with inbuilt software for above purpose to enable the driver to change

the destination at each bus stop. The display system be accommodated as per the

minimum size specified in the bus code i.e. minimum display width of 900 mm and

Page 43: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

43 | P a g e

minimum height of Destination Board should be 220 mm & Minimum height of character

should be 200 mm. The pitch of the LED shall be max H 13.4 x V 14.1 mm optimized to

cover the maximum possible area along the length for displaying maximum number of

letters. The display shall be clearly visible in all weathers at a distance of 15 meters.

3.4. Rear Destination Board

The display of text should be possible with option in Hindi and English along with fixed

route number in Arabic numerals. The display system shall be accommodated within the

minimum size specified in the bus code i.e. minimum display width of 900 mm and

minimum height of Destination Board should be 220 mm & Minimum height of character

should be 200 mm. The display of Text shall be fixed, scroll & alternate mode type. The

pitch of the LED shall be max H 13.4 x V 14.1 mm optimized to cover the maximum

possible area along the length for displaying maximum number of letters. The display

shall be clearly visible in all weathers at a distance of 15 meters.

3.5. Control Panels

3.5.1 Control Panels shall have the following features –

i. Easily operable, robust, water & dust proof, control switches/keys within easy reach

of driver.

ii. Control Panel layout and content shall be simple and easily comprehensible by crew

who is not highly educated.

iii. The displays should have all weather visibility.

iv. Crew access to the requisite information by operating least no. of robust buttons /

switches / keys.

v. Console to have over-riding provision to jump the information operation sequence

like skipping a particular stop, etc.

vi. Mechanism/port etc. be provided to load/amend/upgrade on-board stored data from

PC at the workshop office complete with any related software interfacing hardware

required.

vii. Shall have a LCD Display to show the Various Messages stored in the Controller.

viii. The LCD Display and Buttons shall be Back lit and have Light Sensor for

automatic Brightness Control of LCD Panel to enable proper readability in all

lighting conditions Minimum Memory capacity of 64 MB.

ix. The Control Unit shall have an alpha numerical keyboard.

x. Data Communication ports required: RS485/ RS232 (at least 2 ports) and USB host.

xi. The operation of the system by the drivers shall be made on the dashboard or near

to it. There shall be single point near dashboard for changing programme.

Page 44: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

44 | P a g e

xii. The controller should be able to give digital feed to digital device of selected route

number through provision of RS485/RS232 port.

3.5.2 Memory storage, retrieval, amendments, additions, deletions etc.

i. A microprocessor / controller with adequate memory to store minimum 150

numbers of routes (alphanumeric characters) and 300 numbers of destinations with

150 stops each on an average.

ii. Easy and quick retrievability of the all the memory whenever required.

iii. Easy accessibility to microprocessor / controller by driver / conductor from his seat

inside the bus.

iv. Provision for upgrading / modifying the existing information as well as additions

and deletions.

v. The size, quality, robustness etc. of the microprocessor / controller be such as to

accommodate the entire information required for this system.

vi. All information pre-programmable and loaded on to the micro-controller through

PC.

vii. Ability to retain the entire data in memory in the event of power failure or any other

kind of failure in the system required.

3.6. General Requirements

i. The system should have facility for displaying any route number of single digit, two

(2) digits, three (3) digits, (+) or (-) signs for Mudrika Services, GL and RL besides

display of name of destination in English/Hindi in same row.

ii. The LEDs must be of high intensity illumination type for clear day, twilight and

night visibility in all weather conditions. The system should also have suitable

sensing arrangement for automatic adjustment of brightness with respect to the

ambient brightness.

iii. The system should have provision of easy access from the backside for convenience

of Repair & maintenance.

iv. The system be designed such that data can be fed onboard using add on devices like

pen drive etc.

v. The system hardware should be able to withstand the fluctuations in all weathers,

battery power, noise and vehicle vibrations, etc.

vi. All the items / sub-systems be lead proof and shall have water / dust ingress

protection as per IP Protection No. 55/65 duly Certified by ARAI, Pune.

vii. Mounting on the system should be robust and vibration absorbing type.

Page 45: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

45 | P a g e

viii. The system hardware should be durable and vandal-proof form inside as well as

outside the bus.

ix. Excellent visibility for all sides during day, twilight ad light in all weathers.

x. Ability to withstand acceleration up to 10G.

xi. Ability to withstand variation in natural frequencies in the range of 5 to 50 Hz.

xii. Operable on 24 Volt DC Power (150 AH) obtained from vehicle battery. The

system shall have adequate measured to ensure appropriate quality of power supply

even during battery output fluctuations.

xiii. All components, circuitry, cards, microprocessors, switches / keys should have ISI.

xiv. The wiring shall be flame proof, ISI marked conforming to BIS: 2465-1984 or

latest.

Note:

The bidder may note that the system is required to be mounted in the front and rear

destination box of DTC standard floor CNG buses. The size of each Destination Box is

1,060 mm (L) X 300 mm (H) X 170 mm (Depth). The housing of the system should be of

size which can easily be accommodated in this destination box.

Page 46: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

46 | P a g e

4. Specification of the Designated

Advertisement Space for Standard

Floor Buses

4.1. Interior Measurements of Standard Floor Buses:

Sr.

No. Particulars

Width

(Ft)

Height

(Ft) Remark

1. LHS side Panel 33’ 1.2’

2. RHS side Panel 30’ 1.2’

3. Seat back panel (22 No.) 2.29’ 1.65’

4. Drivers Seat back panel 1.66’ 2.33’

5. front and Back Display board panel 7.37’ 1.08’

6. Polycarbonate Type Hand Holds 40 Nos can be provided by

the Concessionaire.

4.2. Exterior Measurements of Standard Floor Buses:

Sr.

No. Particulars

Width

(Ft)

Height

(Ft) Remark

1. LHS Panel (Green Strip)* 12’ 1.75’

2. RHS Panel (Green Strip)* 12’ 1.75’

3. Back Side Bottom Panel 8’ 3’

* Below Window Glasses

Page 47: Request for Qualification and Proposal SAL III - Schedule of Requirements.pdf · Request for Qualification and Proposal for Installation of LED based Route Display System in Standard

Delhi Transport Corporation RFQP Document for the Installation of LED based Route Display System in Standard Floor Buses on

BOT basis in lieu of Advertising Rights LED based Route Display System

47 | P a g e

Note: The sample boxes shown in above pics are indicative only and are not to scale.

Advertising

Space

Advertising Space