request for proposal (rfp) document for photo copier machine...
TRANSCRIPT
e-tender Consumable 2017-18 | 1
Request for Proposal (RFP) Document for Photo Copier
Machine Through e-Bidding Procedure
NIB Reference No. 10/2017-18
Reference No.: F—18( ) CAG/Store/Gen/2017-18/ 1848 Dated 23-02-2018
Mode of Bid Submission Online through e-Procurement/ e-Tendering
system at http://eproc.rajasthan.gov.in
Procuring Authority Commissioner, Agriculture, GoR
Upload of Final Bid Document (Start of
Bid) 26-02-2018 at 02.00 PM
Last Date & Time of Submission of Bid 06-03-2018 at 06.00 PM
Date & Time of Opening of Technical Bid 07-03-2018 at 03.00 PM
Bidding Document Fee: Rs. 1000 (Rupees One Thousand only)
Name of the Bidding Company/ Firm:
Contact Person(Authorised Bid Signatory):
Correspondence Address:
Mobile No. Telephone & Fax Nos.:
Website & E-Mail:
Department of Agriculture
Room No. 184, Pant Krishi Bhawan, Jan Path, Jaipur (Rajasthan), 302005
Phone: 0141-2227088
Web: http://krishi.rajasthan.gov.in, Email: [email protected]
e-tender Consumable 2017-18 | 2
Commissioner of Agriculture
Pant Krishi Bhawan Room No.184, Pant Krishi Bhawan, Jaipur
F18 ( )/CAg/Store/Gen/Photo Copyer/2017-18/ Date
BID DOCUMENT
Photo Copier machine of Pant Krishi Bhawan, Janpath Jaipur.
Cost of Work : Rs. 7.00 Lacs
Mode of Bid Submission : Open competitive Bidding through
Procurement/
e-Bidding system at http://eproc: rajasthan.gov.in
Start Date : 26-02-2018 , 2.00 PM
Last Date of downloading of bid : 06-03-2018 upto 5 : 00 pm
Last Date of Uploading of bid : 06-03-2018 upto 06: 00 pm
Last date of submission of bid Fee : 07-03-2018 upto 11 : 00 am Bid Security & RISL Fee
Opening of Technical bid : 07-03-2018 at 3 : 00 pm
at
Pant Krishi Bhawan, DOA
Pant Krishi Bhawan, Janpath, Jaipur (Rajasthan)
Room No. 184
Phone: 0141-2227088
Web: http://Agriculture.rajasthan.gov.in, Email: [email protected]
Cost: Rs. 1000/-
e-tender Consumable 2017-18 | 3
Commissioner of Agriculture
Pant Krishi Bhawan Room No184, Pant Krishi Bhawan, Jaipur
F18 ( )/CAg/Store/Gen/Photo Copyer/2017-18/ Date
INVITATION FOR BID (IFB) & NOTICE INVITING BID (NIB)
NIB Ref. No. 10/2017-18
Name & Address of the Procuring
Entity
Name: Commissioner Agriculture, Agriculture Department
Address: Pant Krishi Bhawan, Janpath, Jaipur (Rajasthan)
Name & Address of the OIC (Procurement Cell)
Name: Dr. P.K.Singh
Designation: Dy. Director Agriculture(Q.C.)
Address: Room No 184, Pant Krishi Bhawan, Janpath, Jaipur (Rajasthan)
Email: [email protected]
Subject Matter of Procurement Providing Photo Six Copier machine of Pant Krishi Bhawan, Janpath Jaipur.
Bid Procedure Single-stage: two part (envelop) national open competitive Bidding procedure at
http://eproc.rajasthan.gov.in
Bid Evaluation Criteria (Selection Method)
Least Cost Based Selection (LCBS)-L1
Websites for downloading Bidding Document, Corrigendum’s, Addendums etc.
Website http://sppp.rajasthan.gov.in http://eproc.rajasthan.gov.in
Websites:http://www.agriculture.rajasthan.gov.in
Bidding document fee: Rs. 1000/- (Rupees one thousand only) in Cash/ Demand
Draft in favour of “Commissioner Agriculture, Agriculture Department " payable at
“Jaipur”.
RISL Processing Fee: Rs. 500/- (Rupees Five Thousand only) in Demand Draft in
favour of Managing Director, RISL" payable at "Jaipur"
Estimated Procurement Value Rs.7.00. Lacs (Rupees Seven One Lacks only)
Bid Security
Amount (INR): 14,000.00 (Rupees fourteen Thousand only)
For small scale industry of Rajasthan Bid Security amount will be 0.5% and for sick
industry other than the small scale industry amount will be 1 % of the estimated cost
of quoted item.
Mode of Payment: Banker’s Cheque or Demand Draft or Bank guarantee deposit
through eGRAS(http://egras.raj.nic.in/) in favour of " Commissioner Agriculture,
Agriculture Department " payable at “Jaipur”
Period of Downloading of Bidding Document (Start/ End Date)
from 26-02-2018 From 10:00 AM to 06-03-2018 upto 5:00 pm
Manner, Start/ End Date for the
submission of Bids
Manner: Online at eProc website (http://eproc.rajasthan.gov.in)
Start Date: from 26-02-2018 From 11:00 AM
End Date 06-03-2018 upto 5:00 PM
Submission of Bid Fee, Bid Security & RISL Fee.
At R.NO.184,Pant Krishi Bhawan Janpath Jaipur upto 11 : 00 am on dated 07-03-2018
Date/ Time/ Place of Technical Bid
Opening
Date: 07-03-2018
Time: 3 : 00 pm
Place: Pant Krishi Bhawan, Committee Room, First Floor, Jaipur (Raj.)
Date/ Time/ Place of Financial Bid Opening
Will be intimated later to the Technically qualified bidders
Bid Validity 90 days from opening of bid.
e-tender Consumable 2017-18 | 4
Note:
1) Bidder (authorised signatory) shall submit their offer online in Electronic formats both for technical and
financial proposal. however, Bid Fees, RISL Processing Fees and Bid Security should be submitted physically at
the office of Bidding Authority as prescribed in NIB and scanned copy of same should also be uploaded along
with the technical Bid/cover.
2) * In case, any of the bidders fails to physically submit the Bid Fee, Bid Security and RISL Processing Fee as per
the time schedule mentioned above, its Bid shall not be accepted. The Banker's Cheque/ Demand Draft for
Bidding document fee and Bid Security should be drawn in favour of “Commissioner Agriculture, Agriculture
Department and the RISL Processing Fee in favour of "Managing Director. Raj comp info Services Ltd. "payable
at Jaipur" from any Scheduled Commercial Bank.
3) To participate in online bidding process, Bidders must procure a Digital Signature certificate (Type III) as per
information technology Act-2000 using which they can digitally sign their electronic bids . Bidders can procure
the same from any CCA approved certifying agency. i.e. TCS Safe crypt, Node etc. Bidders who already have a
valid Digital Signature certificate (DSC) need not procure a new DSC. Also, bidders must register on
http://eproc.rajasthan.gov.in (bidders already registered on http://eproc.rajasthan.gov.inbefore 30.03.2011
must register again).
4) PKBSSVS will not be responsible for delay in online submission due to any reason. For this bidders are
requested to upload the complete bid well advance in time so as to avoid 11th hour issues like show speed.
Choking of web site due to heavy load or any other unforeseen problems.
5) Bidders are also advised to refer "Bidders Manual Kit" available at eProc website for further details about the
e-bidding process.
6) The procuring entity reserves the complete right to cancel the bid process and reject any or all of the Bids.
7) No contractual obligation whatsoever shall arise from the bidding document/ bidding process unless and until
a formal contract is signed and executed between the procuring entity and the successful bidder.
8) Procurement entity disclaims any factual/ or other errors in the bidding document (the onus is purely on the
individual bidders to verify such information) and the information provided therein are intended only to help
the bidders to prepare a logical bid-proposal.
9) The provisions of RTPP Act 2012 and RTTP Rules 2013 thereto shall be applicable for this procurement.
Furthermore, in case of any inconsistency in any of the provisions of this bidding document with the RTPP Act
2012 and RTTP Rules 2013 thereto, the later shall prevail.
e-tender Consumable 2017-18 | 5
jktLFkku ljdkj
d`f"k vk;qDrky;] jktLFkku] t;iqj
rduhdh cksyh izi=
cksyh izi= ‘'kqYd & 1000@&
1- 6 ux QksVks dkWih;j dz; gsrq cksyhA
2 cksyh izLrqr djus okyh QeZ dk uke o Mkd dk irk-------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------------------------
3 fdldks lEcksf/kr fd;k x;k & vk;qDr d`f"k] jktLFkku] t;iqj
4 lanHkZ dzekad % ------------------------------------------------------------------------------------------------------------------------------
5 cksyh izi= dk ewY; :Ik;s 1000@& cksyhnkrk }kjk i`Fkd ls cSad Mªk¶V@cSadlZ pSd u0------------------------
fnukd-------------------- vk;qDr d`f"k] jktLFkku] t;iqj ds uke ls rFkk :- 500@& dk cSad Mªk¶V@cSadlZ
pSd u0-----------------------------fnukad------------------- Managing Director, RISL, Jaipur ds uke ls cksyh ds lkFk
layXu dj fn;k x;k gSA
6- eS@ge vk;qDr d`f"k jktLFkku t;iqj }kjk tkjh dh xbZ cksyh lwpuk la[;k -------------- fnukad ----------------
esa of.kZr lHkh 'krksZ ls rFkk layXu cksyh lwpuk dh 'krksZ ds ck/; gksuk Lohdkj djrk gWw@djrs gSA
¼buds lHkh i`"Bks ij mues mYysf[kr 'krksZ dks esjs@gekjs }kjk Lohdkj fd;s tkus ds izek.k esa geus
gLrk{kj dj fn;s gSA½
7- QksVks dkWih;j e’khu dh vkiwrhZ fn;s x;s vkns’kkuqlkj fu/kkZfjr le; es dh tkosxhA
8- ¼d½ rduhdh cksyh gsrq fuEu nLrkostks dh Lo% }kjk izekf.kr izfr;kW viyksM dj nh x;h gS %&
¼1½ rduhdh cksyh izi= Hkjk gqvk o gLrk{kfjrA
¼2½ cksyh izfrHkwfr jkf’k dk Mh-Mh-@cSadlZ pSd tks vk;qDr d`f"k] jktLFkku] t;iqj ds uke ls ns; gksA
¼3½ RISL dh izkslsflax Qhl dk M+h-M+h@cSdlZ pSdA
¼4½ iSu uEcj dh izekf.kr izfr ,oa vU; nLrkost tks izLrqr djus gksA
¼5½ QksVks dkWih e’khu ds LisflfQds’ku] ekWMy esd okjWVh@xkjWVh vof/k vkfn ls lEcfU/kr czks’kj
¼Brochure½
cksyhnkrk dk uke
Mkd dk irk ---------------------------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------------------------------------------------------
VsyhQksu u0 ¼nqdku½ -------------------------------------------- ¼?kj½ --------------------------------------------
fnukad
cksyhnkrk ds gLrk{kj e; lhy
e-tender Consumable 2017-18 | 6
Commissioner of Agriculture
Pant Krishi Bhawan, Room No.184, Jaipur
F18 ( )/CAg/Store/Gen/Photo Copier/2017-18/ Date
Finiacial Bid Form
1. Bid for Six Photo Copier machine of Pant Krishi Bhawan, Janpath Jaipur, Rajasthan.
2. Name and postal address of the firm submitting the Bid
……………………….....……………………………………………………………….…………………………………………………
………………………...........................................................................................
3. Address to: Commissioner of Agriculture, Agriculture Department, Pant Krishi Bhawan,
Janpath Jaipur. Reference: NIB No. F18 ( )/CAg/Store/Gen/2017-18/…………….dated....
The Bid fee amounting Rs. 1000 /- has been deposited vide DD /BC No. …………….. Dated ……
4. We agree to abide by all the conditions mentioned in Agreement / Bid Notice published in
the news paper Dated ……………….. issued by the Pant Krishi Bhawan, Jaipur and also the
further conditions of the said Bid Notice given in the attached sheets (all the pages of which
have been signed by us in token of our acceptance of the term mentioned therein).
5. The rates for the supply of following items are as per the H-Schedule enclosed in Annexure-B
(BOQ)
6. Dully filled Bid document is enclosed.
Signature of Bidder
Name of Bidder
Firm....................................
Address..............................
…………………………………………
………………………………………
Mobile
No……………………………..
e-tender Consumable 2017-18 | 7
Annexure (A)
Commissioner of Agriculture, Jaipur
Technical Specification for Photo State Machine
Memory (RAM) 512 MB
Minimum Speed per Minute in A4 Size 25CPM
Tray Capacity 250 Number Sheets
Paper Size (Original/Image) A3/A3
Document Feeder DADF
Type Photo State Machine
Duplexing Feature Availability Yes
Network feature Availability Yes
Warranty Min. 1 Year is Essential
Location of installation may be as per order Yes
USB to Print Yes
USB to Scan Yes
Sky Short Features Yes
Zoom 25% to 400%
Linux Support Yes
Signature of Bidder
e-tender Consumable 2017-18 | 8
Annexure-B (BOQ)
Govt of Rajasthan Commissioner of Agriculture,
Pant Krishi Bhawan, Jaipur
Financial Bid
Rate proposals for the supply of Photo copiers Machine.
Sr .No Machine Model No or Make Konica Minolta, Ricoh, Canon
Basic price Per unit
G.S.T Total Cost per unit
1 2 3 4 5
1 Rate for one year Warranty /guarantee 2 Rate for Two year Warranty /guarantee
Note:- Bidder Should mention the model no & make of photo copier machine in column No 2.
Signature of Bidder
e-tender Consumable 2017-18 | 9
jktLFkku ljdkj
d`f"k vk;qDrky;] jktLFkku] t;iqj
dzekad% ,Q 18 ¼ ½vk0d`[email protected]@rduhdh@[kq0fu0@2017&18@ fnukad%
cksyh dh 'krsZ
cksyh dh ’krsZ %&
1 ;g cksyh ,usDlj **A** esa vsfdr Lisf’kfQds’kUl ds vuqlkj N% ux QksVks dkWih;j dz; ds fy,
vkaefU=r dh tk jgh gSA
2 cksyh izfrHkwfr jkf’k ds vHkko esa izkIr cksyh ij dksbZ fopkj ugha fd;k tkosxkA
3- cksyh izi= foHkkxh; osc lkbZV www.agriculture.rajasthan.gov.in ;k
http://sppp.rajasthan.gov.in ls Hkh Mkmu yksM fd;k tk ldrk gSA Mkmu yksM fd;s x;s
cksyh izi= dk ewY; :i;s 1000@& cksyhnkrk }kjk izFkd ls cSad Mªk¶V@cSdlZ pSd vk;qDr df"k
jktLFkku t;iqj ds uke ls rFkk :0 500@& dk cSad Mªk¶V@cSdlZ pSd Manging Director
RISL Jaipur ds uke cksyh ds lkFk layXu djuk gksxkA cksyh fu/kkZfjr izi= esa gh Lohdkj dh
tkosaxhA
4- fnukad 07-03-2018 dks rduhdh cksyh vijkUg 3-00 cts mifLFkr cksyhnkrkvksa ;k muds
izfrfuf/k;ksa dh mifLFkfr esa [kksyh tkosxhA
5 vk;dj foHkkx }kjk tkjh iSu uEcj dh Loa; }kjk izekf.kr izfrfyfi izLrqr fd;k tkuk vfuok;Z gS]
vU;Fkk cksyh ij fopkj ugha fd;k tkosxkA
6- fu/kkZfjr frfFk o le; ds i'pkr izkIr cksyh Lohdkj ugha dh tkosaxhA
7- foHkkx U;wure nj okyh cksyh dks Lohdkj fd;s tkus ds fy;s ck/; ugha gS rFkk fdlh Hkh
cksyh8dks vkaf'kd ;k iw.kZ :i ls Lohdkj@vLohdkj djus dk iw.kZ vf/kdkj vk;qDr] d`f"k foHkkx]
t;iqj dks gksxkA
8- dqVhj rFkk y?kq m|ksx bdkbZ;ks ds fy, cksyh izi= ’kqYd fu/kkfjZr jkf’k ds 50 izfr’kr dher ij
fn;k tkosxkA
9- cksyh izfrHkwfr jktLFkku ds y?kq m|ksxks dh n’kk esa ;g iznk; ds fy, iznRr ek=k dh 0-5 izfr’kr
gksxh vkSj y?kq m|ksxks ls fHkUu :X.k m|ksxks dh n’kk esa ftus ekeys vkS/kkSxdh ,oa foRr
iqu%fuekZ.k cksMZ ds le{k yfEcr gS] ogk cksyh ds ewY; dk 1 izfr’kr gksxhA
10- cksyh izfrHkwfr@dk;Z lEiknu izfrHkwfr jkf’k esa NwV ds fy;s vk;qDr] m|ksx foHkkx] jktLFkku
t;iqj ds ikl jftLV~~hd`r dqVhj ,oa y?kq m|ksx foHkkx mu enksa ds lEcU/k esa ftlds fy, osa
bl :i esa jftLVªhdr gS] lkeku dk dz; ¼jktLFkku dss m/kksx ds vf/keku½ fu;e 1995 ds
fu;e&8 ds vuqlkj visf{kr dk;Zokgh tks foRr ¼th,Q ,.M ,vkj½ foHkkx ds vkns’k dzekad %
i1¼1½foRr@lk-fu-ys-fu-@2007@fnuakd 19-10-2010 ifji= la[;k 24@2010 esa of.kZr gS ds
e-tender Consumable 2017-18 | 10
vuqlkj izLrqr fd;k tkuk vfuok;Z gSA vU;Fkk cksyh izfrHkwfr@dk;Z lEiknu izfrHkwfr jkf’k esa NwV
ns; ugha gksxhA
11- cksyhnkrk QeZ dk xr rhu foRrh; o"kZ ¼2014&15] 2015&16 rFkk 2016&17½ esa vkSlr jk’kh :
18-00 @VuZvksoj gksuk vko’;d gSA bl gsrq cksyhnkrk }kjk lh-,- }kjk izekf.kr izek.k i=
,usDlj ^^th^^ esa izLrqr fd;k tkuk vko’;d gSA
12- fuEu nLrkost rduhdh cksyh ds lkFk layXu fd;k tkuk vko';d gSA buds vk/kkj ij gh
miiku lfefr }kjk rduhdh ewY;kadu fd;k tk;sxk %&
¼1½ fu/kkZfjr cksyh izfrHkwfr jkf’kA
¼2½ cksyh ds lkFk cksyh izi= ’kqYd #- 1000@& dk cSad Mªk¶V@cSdlZ pSdA
¼3½ cksyh ds lkFk RISL dk izksflflx ’kqYd :0 500@& dk cSad Mªk¶V@cSdlZ pSdA
¼4½ th-,l-Vh- iath;u izek.k i= dh Lo;a }kjk izekf.kr izfrA
¼5½ vk;dj foHkkx }kjk tkjh iSu uEcj Loa; }kjk izekf.kr izfrA
¼6½ rduhdh cksyh izi= Hkjk gqvk rFkk lacaf/kr lHkh ifjf’k"V o lHkh nLrkost Lo;a}kjk
izekf.kr fd;s gksus pkfg;sA
¼7½ ,usDlj B,D,S, H ,o¡ izi= ,l-vkj-AA esa ?kks"k.kkA
¼8½ QeZ dk VuZ vkWoj gksus lcaU/kh izek.k i= ,usDlj&G esa lunh ys[kkdkj ls izekf.krA
13- rduhdh nf"V ls mi;qDr ik;s tkus ij gh cksyhnkrk dh foRrh; cksyh [kksyh tkosxhA
14- cksyh izfrHkwfr @dk;Z lEiknu izfrHkwfr jkf’k esa NwV fd fy;s vk;qDr m|ksx foHkkx] jktLFkku]
t;iqj ds ikl jftLVªhd`r dqVhj ,oa y?kq foHkkx mu enksa ds laca/k esa ftlds fy;s osaa bl #i
essa jftLVªhd`r gS] lkeku dk dz; ¼jktLFkku ds m|ksx ds vf/keku½ fu;e 1995 ds fu;e &8 ds
vuqlkj visf{kr dk;Zokgh tks foRr ¼th,Q ,.M vkj½ foHkkx ds vkns’k dzekad % i1¼1½
foRr@lk-fu-ysfu-@2007 fnukad 19-10-2010 ifji= la[;k 24@2010 esa of.kZr gS ds vuqlkj
izLrqr fd;k tkuk vfuok;Z gS vU;Fkk cksyh izfrHkwfr@dk;ZlEiknu izfrHkwfr jkf’k esa NwV ns; ughs
gksxkA
15- lkeku@oLrq dh ek=k vuqekfur gSA nj vuqcU/k vof/k ds nkSjku dz; lkexzh dh dqy dz;
vuqekfur ek=k ls de@vf/kd gks ldrh gSA dz; jkt- yksd mikiu esa ikjnf’kZrk fu;e 2013
ds mifu;e 73 ds vuqlj.k esa fuEukuqlkj gksxh %&
1- vuqca/k ds vf/kfu.kZ; ds le;] cksyh nLrkostks ewyr% fufofnZ"V eky] ladeksZ ;k lsokvkssa ds
ifj.kke esa c<ksrjh dh tk ldsxh] fdUrq ,slh c<ksrjh cksyh nLrkostksa esa fufofnZ"V ifjek.k ds
ipkl izfr’kr ls vf/kd ugha gksxhA ;g cksyh vkSj cksyh nLrkostksa ds bdkbZ ewY;ksa ;k vU;
fucU/kuksa vkSj ’krksZ esa fdlh ifjorZu ds fcuk gksxhA
2- ;fn mikiu laLFkk ifjfLFkfr;ksa esa ifjorZu ds dkj.k mikiu dh dksbZ fo"k;oLrq izkIr ugha
djrh gS ;k cksyh nLrkostksa esa fofufnZ"V ifjek.k ls de izkIr djrh gS rks cksyh yxkus okyk
cksyh nLrkostksa esa vU;Fkk micaf/kr ds flok;] fdlh nkos ;k izfrdj dk gdnkj ugha gksxkA
e-tender Consumable 2017-18 | 11
3- vfrfjDr enksa ;k vfrfjDr ifjek.ksa ds fy, iqujkns’k ;fn ;g cksyh nLrkostksa esa micaf/kr gks
lafonk esa nh njksa vkSj ’krksZ ij fn;s tk ldsxsa ;fn ewy vkns’k [kqyh izfr;ksxh cksfy;ka
vkefU=r djus ds i’pkr~ fn;k x;k FkkA iznk; ;k iw.kZ gksus dh dkykof/k Hkh vkuqikfrd #i
ls c<k;h tk ldsxhA iqujkns’k dh lhek,a jktLFkku yksd mikiu esa ikjnf'kZrk vf/kfu;e 2012
,oa fu;e 2013 ds vuqlkj gksxhA
16- fo’ks"k ifjfLFkfr;ksa esa jkt- yksd miiku esa ikjn’khZrk fu;e 2013 ds fu;e 74 ds vuqlkj dk;Z
Fair, Transparent & equitable manner ls foHkkftr fd;k tk ldsxkA
17- jkT; esa fnukad 26-01-2013 ls jkt- yksd miiku esa ikjn’khZrk fu;e 2012 o fu;e 2013
izHkko’khy gSA vr% mDr cksyh ij mDr vf/kfu;e o fu;e ds lHkh izko/kku izHkko’khy gksxsA
18- okLrfod Mhyjksa }kjk cksyh;k%& cksyh;k ekyksa ds okLrfod Mhyjksa }kjk gh nh tk;sxhA vr% ;s
,l-vkj- iz#i 11 esa ,d ?kks"k.kk izLrqr djsaxsA
19- QeZ ds xBu vkfn esa fdlh Hkh ifjorZu dh lwpuk Øsrk vf/kdkjh dks fyf[kr esa lQy
cksyhnkrk }kjk nh tk;sxh rFkk bl ifjorZu ls lafonk ds v/khu fdlh Hkh nkf;Ro ls] QeZ ds
igys lnL; dks eqDr ugha fd;k tk,xkA
20- lafonk ds lEcU/k esa QeZ esa fdlh Hkh u, Hkkxhnkj@ Hkkxhnkjksa ds lQy cksyhnkrk }kjk QeZ esa
rc rd Lohdkj ugha fd;k tk,xk tc rd fd og bldh leLr 'krksaZ dks ekuus ds fy, ck/;
ugha gks tkrs ,oa Øsrk vf/kdkjh dks bl lEcU/k esa fyf[kr bdjkjukek izLrqr ugha dj nsrsA
izkfIr Lohdfr ds fy, lQy cksyhnkrk dh jlhn ;k ckn esa mijksDr #i ls Lohdkj dh xbZ
fdlh Hkkxhnkjh dh jlhn mu lc dks ck/; djsaxh rFkk og lafonk ds fdlh iz;kstu ds fy,
i;kZIr #i ls mUeqfDr ¼fMLpktZ½ gksxhA
21 th-,l-Vh- iath;u izek.k&i= %& dksbZ Hkh Mhyj ;fn ml jkT; esa] izpfyr tgkWa mldk
O;olk; fLFkr gS] th-,l-Vh- vf/kfu;e ds vUrxZr iathd`r ugha gS rks og cksyh ugha nsxkA th-
,l-Vh- iath;u la[;k dk mYys[k fd;k tkuk pkfg,A
22 cksyhnkrk cksyh ds izR;sd i`"B ij gLrk{kj djsxk rFkk vUr esa cksyh ds leLr fuca/kuksa ,oa
'krksZa dks Lohdkj djus ds izek.k esa gLrk{kj djsxkA
23 njksa esa th-,l-Vh- dh jkf'k i`Fkd ls fn[kkuk pkfg,A
24 njsa xUrO; LFkku ij ,Q- vks- vkj- m)`r dh tkuh pkfg, rFkk muesa lHkh vkuq"kkafxd izHkkjksa
dks 'kkfey djuk pkfg,A of.kZr njs d`f"k foHkkx] jktLFkku ds eq[;ky; vkiwfrZ gsrq ykxw gksaxh
ftues fMtkbfuax] iSfdax] izs"k.k] Hkjko ifjogu chek] [kkyh djuk] LFkkfir djuk rFkk lHkh
rjg ds vkuq"kkafxd O;; ,oa th-,l-Vh- 'kkfey gSA
25 ewY; vf/keku jkT; ljdkj }kjk le; le; ij tkjh vf/klwpuk@ifji=@vkns’k ds vuqlkj
;fn ns; gS rks fn;k tk,xkA
26 fof/kekU;rk%& cksyh esa vkeaf=r njsa muds vuqeksnu dh fnukad ls ,d o"kZ rd dh vof/k ds
fy, fof/kekU; gksaxhA njksa dks vkilh lgefr ls jktLFkku yksd mikiu esa ikjnf'kZrk vf/kfu;e
2012 ,oa fu;e 2013 ds vuqlkj vof/k c<kbZ tk ldsxhA
27 vuqeksfnr iznk;drkZ ds fy, ;g le>k tk,xk fd mlus iznk; fd;s tkus okys eky dh 'krksZa]
fofunsZ'kksa] vkdkj esd vkfn dh lko/kkuhiwoZd tkWp dj yh gSA
28 lQy cksyhnkrk viuh lafonk dks ;k mlds fdlh lkjoku Hkkx dks fdlh vU; ,tsUlh dks
ugha lkSaisxk ;k mi&HkkM+s ¼lc ySV½ ij ugha nsxkA
29 fofunsZ'k%&
¼1½ iznk; dh xbZ lHkh oLrq,W cksyh esa fu/kkZfjr fofunsZ'k] VªsMekdZ ds iw.kZr;k vuq#i gksxh rFkk tgakaW
ij oLrqvksa dh vkbZ-,l-vkbZ- fofunsZ'k ds vuqlkj vis{kk dh xbZ gks] ogkW mu enksa dks iw.kZ#i ls
mu fofunsZ'kksa ds vuq#i gksuk pkfg, rFkk mu ij ekdZ gksuk pkfg,A iznk; dh xbZ oLrq
e-tender Consumable 2017-18 | 12
uohure iSfdax dh gksuh pkfg;sA ;fn fdlh oLrq ds lkFk dEiuh }kjk Qzh vkbZVe fn;k tk
jgk gS rks og vkbZVe Hkh oLrq ds lkFk nsuk gksxkA
¼2½ okjaVh@ xkjaVh [k.M%& cksyhnkrk ;g xkjaVh nsxk fd eky@ lkeku@ oLrq,W [kjhns tkus okys
mDr eky@ lkeku@ oLrqvksa dh xq.koRrk ;Fkk fofufnZ"V fooj.k ds vuq#i cuh jgsxh rFkk
bl rF; ds ckotwn dh Øsrk us mDr ekyksa@ lkekuksa@ oLrqvksa dk fujh{k.k dj fy;k gS
,oa@ ;k mUgsa vuqeksfnr dj fn;k gS] mDr ekyksa@ lkekuksa@ oLrqvksa dks mijksDr fooj.k ,oa
xq.koRrk ds vuq#i ugha ik;k x;k ;k os lekIr gks x, gSa ¼rFkk ml lEcU/k esa Øsrk vf/kdkjh
dk fu.kZ; vfUre o fu.kkZ;d gksxk½] rks Øsrk mDr ekyksa@ lkekuksa@ oLrqvksa dks ;k muds ml
Hkkx dks tks mDr fooj.k ,oa xq.koRrk ds vuq#i ugha ik;k tk,] jn~n djus dk gdnkj gksxkA
,sls jn~n fd;s tkus ij eky@ lkeku@ oLrq,W foØsrk dh tksf[ke ij gksaxh rFkk eky vkfn
dks jn~n djus ls lEcfU/kr leLr mica/k ykxw gksaxsA cksyhnkrk ;fn mls ,slk djus ds fy,
dgk tk; rks og ml eky vkfn dks ;k mlds Hkkx dks ftls Øsrk vf/kdkjh }kjk jn~n dj
fn;k x;k gS] cny nsxk] vU;Fkk cksyhnkrk ,slh uqdlkuh ds fy, Hkqxrku djsxk tks blesa nh
xbZ 'krZ ds mYy?kau ds dkj.k mRiUu gksxh blesa nh xbZ dksbZ Hkh ckr ls bl lafonk ds v/khu
;k vU;Fkk ml lEcU/k esa Øsrk vf/kdkjh ds fdlh vU; vf/kdkj ij izfrdwy izHkko ugh
MkysxhA
30 jn~n djuk%&
;fn ljdkjh dk;Z dh rkRdkfyd vko';drk ds dkj.k] mu oLrqvksa dks iw.kZ ;k vkaf'kd #i esa
cnyuk lk/; (Feasible) ugha le>k tk, rks Øsrk vf/kdkjh cksyhnknkrk dks lquokbZ fd,
tkus dk ,d mfpr volj nsdj] ,sls dkj.kksa ls tks vfHkfyf[kr fd, tk,axs] vuqeksfnr njksa esa
ls mi;qDr jkf'k dh dVkSfr djsxkA bl izdkj dh xbZ dVkSfr vafre gksxhA
31 jn~n dh xbZ oLrqvksa dks cksyhnknkrk mUgsa jn~n djus dh lwpuk izkIr djus ls 15 fnu ds
Hkhrj gVk ysxk] blds ckn mikiu laLFkk fdlh Hkh izdkj dh gkfu] deh ;k uqdlku ds fy,
mRrjnk;h ugha gksxk rFkk mls cksyhnkrk dh tksf[ke ij mlds en~s mu oLrqvksa dks ftUgsa og
mfpr le>s] cspus dk vf/kdkjh gksxkA
32 cksyhnkrk mfpr iSfdax djus ds fy, mRrjnk;h gksxk rkfd leqnz] jsy] lM+d ;k ok;q;ku }kjk
ifjogu dh lkekU; fLFkfr esa muesa dksbZ uqdlku u gks rFkk xUrO; LFky ij eky izkIrdrkZ
dks eky dh lqiqnZxh vPNh n'kk esa izkIr gks ldsA fdlh izdkj dh gkfu] uqdlku] VwV&QwV ;k
fjlko ¼yhdst½ ;k fdlh deh ds gksus ds ekeys esa] cksyhnkrk eky izkIrdrkZ }kjk mu
lkefxz;ksa dh tkWp@ fujh{k.k fd, tkus ij ikbZ xbZ ,slh gkfu ,oa deh dh iwfrZ djus ds fy,
mRrjnk;h gksxkA blds fy, dksbZ vfrfjDr ykxr vuqKs; ugha gksxhA
33 iznk; gsrq lafonk dks] ;fn eky dk iznk; mikiu laLFkk dh larqf"V ds vuqlkj ugha fd;k tkrk
gS rks cksyhnkrk dks lquokbZ dk ,d ;qfDr;qDr volj nsus ds ckn Øsrk vf/kdkjh fdlh Hkh
le; fujkdr (repudiate) dj ldrk gSA og bl izdkj fujkdr djus ds dkj.kksa dks
vfHkfyf[kr djsxkA
34 cksyhnkrk ;k mlds izfrfuf/k dh vksj ls izR;{k ;k vizR;{k #i ls viuk leFkZu djkuk ,d
izdkj dh vugZrk (disqualification) gksxhA
e-tender Consumable 2017-18 | 13
35 ¼A½ lqiqnZxh vof/k%& lQy cksyhnkrk] ftldh cksyh Lohdkj dh tk, mlds }kjk iznk; vkns'k es
fu/kkZfjr vof/k ds Hkhrj vkns’kkuqlkj lkeku dk iznk; djus dh O;oLFkk djsxkA
¼AA½ vfrfjDr enksa ;k vfrfjDr ifjek.ksa ds fy, iqujkns'k] ;fn ;g cksyh nLrkostksa esa miacf/kr
gks] vuqcaU/k esa nh x;h njksa vkSj 'krksZa ij fn;s tk ldsaxs ;fn ewy vkns'k [kqyh izfr;ksxh
cksfy;ka vkeaf=r djus ds i'pkr fn;k x;k FkkA iznk; ;k iw.kZ gksus dh dkykof/k Hkh
vkuqikfrd #i ls c<k;h tk ldsxhA iqujkns'k dh lhek,a ewy lafonk ds eky ds ewY; dk 50
izfr'krA
¼AAA½ ;fn mikiu laLFkk fdUgha cksyh nLrkost esa mYysf[kr oLrqvksa dh [kjhn ugha djrk gS ;k
cksyh izi= esa fufnZ"V ek=k esa de ek=k esa eky [kjhnrk gS] cksyhnkrk fdlh {kfriwfrZ dk Dyse
djus dk gdnkj ugha gksxkA
36 cksyh izfrHkwfr jkf'k %&
¼d½ cksyh ds lkFk fu/kkZfjr cksyh izfrHkwfr jkf'k tek djkuh gksxhA blds fcuk cksyh ij fopkj
ugha fd;k tk,xkA ;g jkf'k vk;qDr d`f"k] t;iqj ds i{k esa tek djk;h tkuh pkfg,A
¼[k½ cksyh izfrHkwfr jkf'k dk izfrnk;%& vlQy cksyhnkrk dh cksyh izfrHkwfr jkf'k dks vfUre
#i ls Lohdkj djus ds ckn ;Fkk'kD; 'kh?kz ykSVk fn;k tk,xkA
¼x½ cksyh izfrHkwfr jkf'k ls vkaf'kd NwV%& mu QeksZa dks tks funs'kd] m|ksx foHkkx] jktLFkku
ds ikl iathd`r gSa] mu enksa ds lEcU/k esa] ftuds fy, os mDr #i esa jftLVMZ dh xbZ gSa]
muds }kjk ewy iath;u izek.k&i= ;k mldh QksVks LVsV izfr ;k fdlh jktif=r
vf/kdkjh }kjk fof/kor vuqizekf.kr izfr izLrqr djus ij cksyh;sa vkeaf=r djus dh lwpuk esa
fn[kk;s x;s cksyh ds vuqekfur ewY; ds 1@2 izfr'kr nj ij cksyh izfrHkwfr jkf'k tek
djkuh gksxhA½
¼?k½ cksyh izfrHkwfr ds LFkku ij] cksyh izfrHkwfr ?kks"k.kk jkT; ljdkj ds foHkkxksa vkSj ljdkj ds
LokfeRok/khu ;k fu;af=r ;k izcaf/kr miØeksa fuxeksa] Lok;r fudk;ksa] jftLVªhdr
lkslkbfV;ksa] lgdkjh lkslkbfV;ksa vkSj dsUnzh; ljdkj ;k jktLFkku ljdkj ds ljdkjh
midze vkSj dEifu;ksa ls yh tk;sxhA
¼M+½ vuqeksnu dh izrh{kk djus okyh ;k jn~n dh xbZ cksyh;ks ds lEcU/k esa ;k lafonkvksa ds
iw.kZ gks tkus ds dkj.k foHkkx@ dk;kZy; ds ikl tek cksyh izfrHkwfr jkf'k@ izfrHkwfr
fu{ksi dks ubZ cksyh;ks ds fy, cksyh izfrHkwfr jkf'k@ izfrHkwfr /ku ds izfr lek;ksftr ugha
fd;k tk,xkA rFkkfi] ;fn cksyh;ks dks iqu% vkeaf=r fd;k tkrk gS rks cksyh izfrHkwfr
jkf'k dks mi;ksx esa fy;k tk ldrk gSA
37 cksyh izfrHkwfr jkf'k dk leigj.k%& cksyh izfrHkwfr jkf'k dks fuEufyf[kr ekeyksa esa
lgig`r dj fy;k tk,xk%&
¼A½ tc cksyhnkrk cksyh [kksyus ds ckn fdUrq cksyh dks Lohdkj djus ds iwoZ izLrko dks okil
ysrk gS ;k mlesa #ikUrj.k djrk gSA
¼AA½ tc cksyhnkrk fofufnZ"V le; ds Hkhrj fofgr fdlh djkj dks] ;fn dksbZ gks] fu"ikfnr
ugha djrk gSA
e-tender Consumable 2017-18 | 14
¼AAA½ tc cksyhnkrk iznk;xh ds fy, vkns'k nsus ds ckn dk;Z lEikfnr izfrHkwfr jkf'k tek ugha
djkrk gSA
¼iv½ og fofgr le; ds Hkhrj iznk; vkns'k ds vuqlkj enksa dk iznk; izkjEHk djus esa vlQy
jgrk gSA
38 ¼1½ djkj ,oa izfrHkwfr fu{ksi%&
¼A½ lQy cksyhnkrk dks vkns'k ds izkIr gksus ls 15 fnu dh vof/k ds Hkhrj izk#i 17 esa ,d
djkj i= fu/kkZfjr LVkEi M;wVh ds lkFk fu"ikfnr djkuk gksxk rFkk ftu lkekuksa ¼LVkslZ½
ds fy, cksyh;ks Lohdkj dh xbZ gSa] muds ewY; ds 10 izfr'kr ds cjkcj dk;Z lEiknu
izfrHkwfr tek djkuh gksxhA ;g izfrHkwfr izs"k.k ds ml fnukad ls ftldks cksyh ds Lohdkj
fd, tkus dh lwpuk mls nh xbZ gS] 15 fnu ds Hkhrj tek djkbZ tk,xhA
¼AA½ cksyh ds le; tek djkbZ xbZ cksyh izfrHkwfr jkf'k dks lQy cksyhnkrk ds vuqjks/k ij
dk;Z lEiknu izfrHkwfr dh jkf'k ds fy, lek;ksftr fd;k tk ldrk gSA dk;Z lEiknu
izfrHkwfr jkf'k ij foHkkx }kjk C;kt dk Hkqxrku ugha fd;k tk,xkA
¼AAA½ dk;Z lEiknu izfrHkwfr jkf'k ds #i fuEu izdkj gksaxs%&
¼1½ cSad MªkQ~V@ cSadlZ pSd@ pkyku dh jlhn izfr
¼2½ Mkd?kj cpr cSad ikl cqd ftls fof/kor~ fxjoh (Pledge) j[kk tk,xkA
¼3½ jk"Vªh; cpr izek.k i=] vkSj jktLFkku es fdlh Mkd?kj }kjk vYi cpr Ldheks ds v/khu
tkjh dksbZ vU; fLØIV@foys[k ;fn mUgsa fxjoh j[kk tk ldrk gksA bu izek.k i=ksa dks
muds leiZ.k ewY; ¼ljs.Mj osY;w½ ij Lohdkj fd;k tk,xkA
¼4½ fdlh vuqlwfpr cSad dh cSad xkajUVh@xkajfV;k] tkjh djus okys cSad ls lR;kfir djk;h
tkosxhA
¼5½ ,d ckj dh [kjhn ds ekeys esa Ø; vkns'k ds vuqlkj enksa ds vfUre iznk; ls ,d ekg
ds Hkhrj rFkk ;fn lqiqnZxh dks lkUrj (Staggered) fd;k tkrk gS rks nks ekg ds Hkhrj
mldh lafonk ds larks"ktud #i ls iw.kZ dj fn, tkus ds ckn xkj.Vh dh vof/k] ;fn gks]
ds lekIr gksus ds ckn] tks Hkh ckn esa gks rFkk blls lUrq"V gks tkus ij fd cksyhnkrk ds
fo#) dksbZ ns; cdk;k;sa (Outstanding Dues) ugha gS] dk;Z lEiknu izfrHkwfr jkf'k dk
izfrnk; fd;k tk,xkA
¼IV½ dsUnz ljdkj ,oa jktLFkku ljdkj ds miØe dk;Z lEiknu izfrHkwfr jkf'k tek djkus ls
eqDr gksaxsA
¼ V½ dk;Z lEiknu izfrHkwfr dk leigj.k%& dk;Z lEiknku izfrHkwfr dh jkf'k dks iw.kZ ;k vkaf'kd
#i ls fuEufyf[kr ekeyksa esa leig`r fd;k tk ldsxkA
¼1½ tc lafonk ds fdUgha fuca/kuksa vkSj 'krksZa dk mYya?ku fd;k x;k gksA
e-tender Consumable 2017-18 | 15
¼2½ tc cksyhnkrk lEiw.kZ iznk; lUrks"ktud <ax ls djus esa vlQy jgk gksA
¼3½ dk;Z lEiknu izfrHkwfr fu{ksi dks leigr djus ds ekeys esa ;qfDr;qDr le; iwoZ uksfVl
fn;k tk,xkA bl lEcU/k esa mikiu laLFkk dk fu.kZ; vfUre gksxkA
¼4½ djkj i= dks iw.kZ djus ,oa ml ij LVkEi yxkus ds O;; dk Hkqxrku cksyhnkrk }kjk fd;k
tk,xkA
¼5½ dk;Z lEiknu izfrHkwfe dk izfrnk; %& dk;Z lEiknu izfrHkwfr e’khuksa dh xkjWVh@okjWVh
vof/k lekIr gksus ds rhu ekg i’pkr~ ykSVkbZ tkoxhA xkjWVh@okjWVh vof/k esa larks"kizn
lsok d vHkko esa mikiu laLFkk }kjk fy, x, fu.kZ;kuqlkj dk;Z lEiknu izfrHkwfr esa ls
dVkSrh dh tkosxhA
39 chek%& ¼A½ lkeku xUrO; xksnke ij lgh n'kk esa lqiqnZ fd, tk,axsA ;fn iznk;drkZ pkgs
rks og ewY;oku lkeku dh pksjh] uk'ku ;k uqdlku }kjk ;k vkx] ck<] ekSle esa iM+k jgus
ds dkj.k ;k vU;Fkk ¼tSls&;q) fonzksg] naxs vkfn½ }kjk gkfu ls cpkus ds fy, chek djk
ldsxkA ;g chek izHkkj cksyhnkrk }kjk ogu fd;k tk,xk rFkk ;fn ,sls O;; fd, tkrs gSa
rks jkT; esa bu izHkkjksa dk Hkqxrku djus dh vis{kk ugha dh tk,xhA
40 Hkqxrku%& QksVks dkWih e’khuksa dh larks"kizn Lfkkiuk ,oa e’khuksa ds lapkyu ds mijkUr
Hkqxrku fd;k tkosxkA
¼A½ nqyZHk ,oa fof'k"B ekeyksa ds flok; vfxze Hkqxrku ugha fd;k tk,xkA ;fn vfxze Hkqxrku
fd;k tk jgk gks rks og eky izsf"kr djus ds lcwr ij rFkk jsy@ izfrf"Br xqM~l VªkaliksVZ
dEifu;ksa vkfn }kjk foRrh; 'kfDr;ksa esa fofgr dh xbZ lhek rd rFkk iwoZ fujh{k.k] ;fn
dksbZ gks] fd, tkus ij fd;k tk,xkA vfr'ks"k jkf'k] ;fn dksbZ gks] dk Hkqxrku eky vPNh
gkyr esa izkIr gksus ij rFkk fujh{k.k ds le; i`"Bkafdr vkSj cksyhnkrk dks ugha fn, x,
ml vk'k; ds izek.k&i= ij fn, tkus ij fn;k tk,xkA
¼AA½ tc rd i{kdkjksa ds e/; vU;Fkk lgefr u gks tk,] lkeku dh lqiqnZxh ds fy, Hkqxrku
cksyhnkrk }kjk mikiu laLFkk dks mfpr iz:i esa lkekU; foRrh; ,oa ys[kk fu;eksa ds
vuqlkj fcy izLrqr djus ij fd;k tk,xk rFkk lHkh izs"k.k izHkkj cksyhnkrk }kjk ogu fd,
tk,axsA
¼AAA½ mu ekeyksa ds lEcU/k esa] ftuesa ijh{k.k djus dh t#jr gS] Hkqxrku rHkh fd;k tk,xk tc
mudk ijh{k.k dj fy;k tk, rFkk izkIr gq, ijh{k.k ifj.kke fofgr fofunsZ'kksa ds vuq#i gksaA
41¼A½ cksyh izi= esa lqiqnZxh ds fy, fofufnZ"V le; dks lafonk ds lkj #i esa le>k tk,xk
rFkk lQy cksyhnkrk Øsrk vf/kdkjh ls Li"V vkns'k ds izkIr gksus ij vof/k ds Hkhrj
iznk; djsxkA
¼AA½ ifjlekfir uqdlkuh%& ifjlekfir uqdlkuh ds lkFk lqiqnZxh vof/k esa o`f) djus ds ekeys
esa] olwyh fuEufyf[kr izfr'krrk ds vk/kkj ij mu lkekuksa ds ewY;ksa ds fy, dh tk,xh
ftudk cksyhnkrk iznk; djus esa vlQy jgk gS %& ¼bl lEcU/k esa ;fn dksbZ gks rks cksyh
izi= esa vafdr dh xbZ 'krsZa gh ykxw gksxh½
¼A½ ¼d½ fofgr lqiqnZxh vof/k dh ,d pkSFkkbZ vof/k rd ds foyEc ds fy, 2 ½ izfr'kr
e-tender Consumable 2017-18 | 16
¼[k½ ,d pkSFkkbZ vof/k ls vf/kd fdUrq fofgr vof/k dh vk/kh vof/k ls
vuf/kd ds fy,
5 izfr'kr
¼x½ vk/kh vof/k ls vf/kd fdUrq fofgr vof/k ds rhu pkSFkkbZ ls
vuf/kd vof/k ds fy, 7 ½ izfr'kr
¼?k½ fofgr vof/k dh rhu pkSFkkbZ ls vf/kd ds foyEc ds fy, 10 izfr'kr
¼2½ iznk; esa foyEc dh vof/k dh x.kuk djrs le; vk/ks fnu ls de Hkkx dks NksM fn;k
tk,xkA
¼3½ ifjlekfir uqdlkuh dh vf/kdre jkf'k 10 izfr'kr gksxhA
¼4½ ;fn iznk;drkZ fdUgha ck/kkvksa ds dkj.k lafonkUrxZr eky dk iznk; iwjk djus ds fy,
le; esa o`f) djuk pkgrk gS rks og fyf[kr esa ml izkf/kdkjh dks vkosnu djsxk ftlus
iznk;xh gsrq vkns'k fn;k gSA fdUrq og mlds fy, fuosnu ck/kk ds ?kfVr gksus ij rqjUr
mlh le; djsxk u fd iznk; iw.kZ gksus dh rkjh[k ds ckn djsxkA
¼5½ ;fn eky dk iznk; djus esa mRiUu gqbZ ck/kk cksyhnkrk ds fu;U=.k ls ijs dkj.kksa ls gqbZ
gks rks lqiqnZxh dh vof/k esa o`f) ifjlekfir uqdlkuh lfgr ;k jfgr dh tk ldsxhA
42 olwfy;kW%& ifjlekfir uqdlkuh] de iznk;] VwV&QwV jn~n dh xbZ oLrqvksa ds fy, olwyh
lk/kkj.k #i ls fcy esa ls dh tk,xhA iznk;drkZ de iznk;] VwV&QwV] jn~n fd, x,
ekyksa dh lhek rd jkf'k dks Hkh jksdk tk ldsxk rFkk ;fn iznk;drkZ lUrks"ktud <ax ls
mudks ugha cnyrk gS rks ifjlekfir uqdlkuh ds lkFk olwyh mldh ns; jkf'k (dues)
,oa foHkkx ds ikl miyC/k dk;Z lEiknu izfrHkwfr fu{ksi dh tk,xhA ;fn olwyh djuk
lEHko u gks rks jktLFkku ih-Mh-vkj- ,DV ;k izor fdlh vU; dkuwu ds vUrxZr dk;Zokgh
dh tk,xhA
43 cksyhnkrkvksa dks ;fn vko';d gks rks vk;kr ykblsal izkIr djus ds fy, viuh Lo;a dh
O;oLFkk djuh pkfg,A
44 ;fn cksyhnkrk ,slh 'krsZa vkjksfir djrk gS tks blesa of.kZr 'krksZa ds vfrfjDr gS ;k muds
fojks/k esa gS] rks mldh cksyh dks laf{kIr #i esa dk;Zokgh dj jn~n dj fn;k tk,xkA fdlh
Hkh lwjr esa buesa ls fdlh Hkh 'krZ dks Lohdkj fd;k gqvk ugha le>k tk,xk tc rd fd
mikiu laLFkk }kjk tkjh fd, x, cksyh Lohd`fr ds i= esa fo'ks"k #i ls mYysf[kr u fd;k
x;k gksA
45 mikiu laLFkk fdlh Hkh cksyh dks tks vko';d #i ls U;wure nj dh cksyh ugha gS]
Lohdkj djus] fcuk dksbZ dkj.k cryk;s fdlh Hkh cksyh dks jn~n djus ;k ftu oLrqvksa ds
fy, cksyhnkrk us cksyh nh gS] mu lc ds fy, ;k fdlh ,d ;k vf/kd ds fy, cksyh dks
Lohdkj djus ;k ,d QeZ@ iznk;drkZ ls vf/kd dks lkeku dh enksa dks foifjr djus ds
vf/kdkjh dks vius ikl vkjf{kr j[ksxkA
46 cksyhnkrk djkj dks fu"ikfnr djrs fuEufyf[kr nLrkost izLrqr djsxk%&
¼A½ ;fn Hkkxhnkjh QeZ gks rks Hkkxhnkjh foys[k ¼ikVZujf'ki MhM½ dh ,d vuqizekf.kr izfrA
¼AA½ ;fn Hkkxhnkjh QeZ jftLVªkj vkWQ QElZ ds ikl iathdr gks rks iath;u la[;k ,oa mldk
o"kZA
e-tender Consumable 2017-18 | 17
¼AAA½ ,d ek= LokfeRo ds ekeys esa vkokl ,oa dk;kZy; dk irk] VsyhQksu uEcjA
¼iv½ dEiuh ds ekeys esa dEiuh ds jftLVªkj ds }kjk tkjh fd;k x;k izek.k&i=A
47 ;fn lafonk ds fuoZpu (Interpretation) vk'k; ;k lafonk dh 'krksZa ds mYya?ku ds lEcU/k
esa dksbZ fookn mRiUu gksrk gS rks vk;qDr d`f"k jktLFkku] t;iqj dk fu.kZ; vfUre gksxkA
fu.kZ; ls larq"V u gksus ij fu.kZ; ds fo:} izFke vihy vfrfjDr eq[; lfpo df"k]
'kklu lfpoky;] t;iqj ,oa f}rh; vihy mi 'kklu lfpo foRr ¼ctV½ foHkkx] 'kklu
lfpoky;] t;iqj dks dh tk ldsxhA
48 leLr fof/kd dk;Zokfg;kW] ;fn lafLFkr fd;k tkuk vko';d gks] fdlh Hkh i{kdkj
¼ljdkj ;k Bsdsnkj½ }kjk jktLFkku esa fLFkr U;k;ky;ksa esa gh dh tk,xh] vU;= ugha dh
tk,axhA
49 dhers fxjus lEcU/kh [k.M%&
;fn nj lafonk/kkjd] nj lafonk ds pkyw jgus ds nkSjku fdlh Hkh le; jkT; es fdlh dks
nj lafonk dher ls de dher ij lkeku] eky nus ds fy;s mldh dher ls de dher
dksV djrk gS@de djrk gS rks ml nj lafonk ds v/khu mikiu dh fo"k;oLrq ds leLr
ifjnku ds fy;s nj lafonk dher] dher de djus ;k dksV djus dh rkjh[k ls Lor% de
gks tk;sxh vkSj nj lafonk rn~uqlkj la’kksf/kr dh tk;sxhA
50 ;fn mijksDr 'krsZ jktLFkku yksd mikiu esa ikjnf'kZrk vf/kfu;e&2012 o fu;e& 2013
ds fo:} gksus ij jktLFkku yksd mikiu esa ikjnf'kZrk vf/kfu;e&2012 o fu;e& 2013
ykxw gksaxsA
51 fdlh Hkh izdkj dh l&’krZ cksyh dks Lohdkj ugh fd;k tkosxkA
cksyhnkrk ds gLrk{kj
e-tender Consumable 2017-18 | 18
Annexure C :
Compliance with the code of Integrity and No Conflict of Interest Any person participating in a procurement process shall-
(a) not offer any bribe, reward or gift or any material benefit either dircetly of indircetly in exchange for an unfair advantage in procurement process or to otherwise influence the procurement process;
(b) not misrepresent of omit that misleads or attempts to mislead so as to obtain a financial or other benefit or avoid an obligation;
(c) not indulge in any collusion, Bid rigging or anti-competitive behavior to impair the transparency, fairness and progress of the procurement process;
(d) not misuse any information shared between the procuring entity and the bidders with an intent to gain unfair advantage in the procurement process;
(e) not indulge in any coercion including impairing or harming or threatening to do the same, directly or indirectly, to any party or to its property to influence the procurement process;
(f) not obstruct and investigation or audit of a procurement process;
(g) disclose conflict of interest, if any; and
(h) disclose any previous transgressions with any entity in India or any other country during the last three years or any debarment by any other procuring entiry.
Conflict of Interest :-
The Bidder participating in a bidding process must not have a conflict of interest.
A conflict of interest is considered to be a situation in which a party has interests that could improperly influence that party’s performance of official duties or responsibilities, contractual obligations, or compliance with applicable laws and regulations.
i. A Bidder may be considered to be in conflict of interest with one or more parties in a bidding process if, including but not limited to:
a. have controlling partners/shareholders in common; or
b. receive or have received any direct or indirect subsidy from any of them; or
c. have the same legal representative for purposes of the Bid; or
d. have a relationship with each other, directly or through comon third parties, that puts them in a position to have access to information about or influence on the bid of another bidder, or influence the decisions of the procuring entity regarding the bidding process; or
e. the Bidder participates in more than one bid in a bidding process. Participation by a bidder in more than one bid will result in the disqualification of all bids in which the bidder is involved. However, this does not limit the inclusion of the same subcontractor, not otherwise participating as a bidder, in more than one bid; or
f. the bidder or any of its affiliates participated as a consultant in the preparation of the design or technical specifications of the Goods, works or services that are the subject of the bid; or
g. bidder or any of its affiliates has been hired (or is proposed to be hired) by the procuring entity as engineer-in-charge/consultant for the contract.
e-tender Consumable 2017-18 | 19
Annexure D :
Declaration by the Bidder regarding Qualifications
Declaration by the Bidder
In relation to my/our Bid submitted to..........................for procurement of ............................ in
response to their Notice inviting Bids No.............. Dated .................. I/we hereby declare under section 7 of
Rajasthan Transparency in Public Procurementf Act, 2012, that:
1. I/we possess the necessary professional, technical, financial and managerial resources and comptence
required by the Bidding Document issued by the procuring Entiry;
2. I/we have fulfilled my/our obligation to pay such of the taxes payable to the union and the State Government
of any local authority as specified in the Bidding Document;
3. I/we are not insolvent, in receivership, bankrupt or being wound up, not have my/our affairs administered by
a court or a judicial officer, not have my/our business activities suspended and not the subject of legal
proceedings for any of the foregoing reasons;
4. I/we do not have, and our directors and officers not have, been convicted of any criminal offence related to
my/our professional conduct or the making of false statements of misrepresentations as to my/our professional
conduct or the making of false statements off misrepresentations as to my/our qualifications to enter into a
procurement contract within a period of three years preceding the commencement of this procurement
process, or not have been otherwise disqualified pursuant to debarment proceedings;
5. I/we do not have a conflict of interest as specified in the Act, Rules and the Bidding document, which
materially affects fair competition;
Date:
Place:
Signature of bidder
Name :
Designation :
Address :
e-tender Consumable 2017-18 | 20
Annexure E :
Grievance Redressal during Procurement Process
The designation and address of the first Appellate Authority is .....................
The designation and address of the Second Appellate Authority is ..................
(1) Filing an appeal
If any Bidder or prospective bidder is aggrieved that any decision, action or omission of the procuring entity is
in contravention to the provisions of the act or the rules or the guidelines issued thereunder, he may file an
appeal to first appellate authority, as spectified in the bidding document within a period of ten days from the
date of such decision of action, omission, as the case may be, clearlyf giving the specific ground or grounds on
which he feels aggrieved:
Provided that after the declaration of a bidder as successful the appeal may be filed only by a bidder who has
participated in procurement proceedings:
Provided further that in case a procuring entity evaluates the technical bids before the opening of the financial
bids, an appeal related to the matter of financial bids may be filed only by a bidder whose Technical bid is found
to be acceptable.
(2) The officer to whome an appeal is filed under para (I) shall deal with the appeal as expeditiously as possible
and shall endeavour to dispose it of withinn thirty days from the date of the appeal.
(3) If the officer disignated under para (I) fails to dispose of the appeal filed within the period specitied in para
(2), or if the bidder of propective bidder or the procuring entity is aggrieved by the order passed by the first
appellate authority, the bidder or prospective bider or the procuring entiry, as the case may be, may file a
second appeal to second appellate authority specified in the bidding document in this behalf within fifteen days
from the expiry of the period specified in para (2) or of the date of receipt of the order passed by the first
appellate authority, as the case may be.
(4) Appeal not to lie in certain cases
No appeal shall lie against any decision of the procuring entity realting to the following matters,
namely :-
(a) Determination of need of procurement;
(b) provisions limiting participation of bidders in the bid process;
(c) the decision of whether or not to enter into negotiations;
(d) cancellation of a procurement process;
e-tender Consumable 2017-18 | 21
(e) applicability of the provisions of confidentiality.
(5) Form of Appeal
(a) An appeal under para (1) or (3) above shall be in the annexed form along with as many copies as there are
respondents in the appeal.
(b) Every appeal shall be accompanied by an order appealed against, if any, affidavit verifying the facts stated in
the appeal and proof of payment of fee.
(c) Every appeal may be presented to first appellate authority or second appellate authority, as the case may
be, in person or through registered post or authorised representative.
(6) Fee for filing appeal
(a) Fee for first appeal shall be rupees two thousand five hundered and for second appeal shall be rupees ten
thousand, which shall be non-refundable.
(b) The fee shall be paid in the form of bank demand draft or banker’s cheque of a Scheduled Bank in India
payable in the name of appellate authority concerned.
(7) Procedure for disposal of appeal
(a) The first appellate Authority or Second appellate Authority, as the case may be, upon filing of appeal, shall
issue notice accompanied by copy of appeal, affidavit and documents, if any, to the respondents and fix date of
hearing.
(b) On the date fixed for hearing, the first appellate authority or second appellate authority, as the case may be,
shall,-
(i) hear all the parties to appeal present before him; and
(ii) peruse or inspect documents, relevant records or copies thereof relating to the matter.
(c) After hearing the parties, perusal or inspection of documents and relevant records or copies thereof relating
to the matter, the appellate authority concerned shall pass an order in writing and provide the copy of order to
the parties to appeal free of cost.
(d) The order passed under sub-clause (c) above shall also be placed on the State Public Procurement Portal.
e-tender Consumable 2017-18 | 22
Annexure F
Additional Conditions of Contract
1 Corretion of arithmetical errors Provided that a financial bid is substantially responsive, the procuring
entity will correct arithmetical errors during evaluation of financial bids on the following basis:
i. if there is a discrepancy between the unit price and the total price that is obtained by
multiplying the unit price and quantity, the unit price shall prevail and the total price shall be
corrected, unless in the opinion of the procuring entity there is an obvious misplacement of
the decimal point in the unit price, in which case the that price as quoted shall govern and
the unit price shall be corrected;
ii. if there is an irror in a total corresponding to the addition or subtraction of subtotals, the
subtotals shall prevail and the total shall be corrected; and
iii. if there is a discrepancy between words and figures, the amount in words shall prevail, unless
the amount expressed in words is related to an arithmetic error, in which case the
amount in figures shall prevail subject to (i)and (ii) above.
If the bidder that submitted the lowest evaluated bid does not accept the correction of
errors, its bid shall be disqualified and its bid security shall be forfeited or its bid securing
declaration shall be executed.
2. Procuring Entity’s Right to Vary Quantities
(i) At the time of award of contract, the quantity of goods, works or services originally specified in the bidding
document may be increased or decreased by a specified percentage, but such increase or decrease shall not
exceed twenty percent, of the quantity specified in the bidding document. It shall be without any change in
the unit prices or other terms and conditions of the bid and the conditions of contract.
(ii) If the procuring entity does not procure any subject matter of procurement or procures less than the
quantity specified in the bidding document due to change in circumstances, the bidder shall not be entitled
for any claim or compensation except otherwise provided in the conditions of contract.
(iii) In case of procurement of goods or services, additional quantity may be procured by placing a repeat order
on the rates and conditions ofthe original order. However, the additional quantity shall not be more than
25% of the value of goods of the original contract and shall be within one month from the date of expiry of
last supply. If the supplier fails to do so, the procuring entity shall be free to arrange for the balance supply
by limited bidding or otherwise and the extra cost incurred shall be recovered from the supplier.
3. Dividing quantities among more than one Bidder at the time of award (In case of procurement of Goods)
As a general rule all the quantities of the subject matter of procurement shall be procured from the
Bidder, whose bid is accepted. However, when it is considered that the quantity of the subject matter of
procurement to be procured is very large and it may not be in the capacity of the bidder, whose bid is accepted,
to deliver the entire quantity or when it is considered that the subject matter of procurement to be procured is
of critical and vital nature, in such cases, the quantity may be divided between the bidders in that order, in a
fair, transparent and equitable manner at the rates of the bidder, whose bid is accepted.
e-tender Consumable 2017-18 | 23
Annexure "G''
ANNUAL TURN OVER STATEMENT
The Annual Turnover of M/s ...................................................for
the past three years are given below and certified that the statement
is turn and correct.
S.No. Years Turnover in Lakhs (Rs.)
1 2014-15
2 2015-16
3 2016-17
Date
Seal
Signature of Auditor/
Chartered Accountant
(Name in Capital)
e-tender Consumable 2017-18 | 24
Annexure -H
?kks"k.kk i=
¼RTPP Rule-2013 ds Rule 29(H) ds vUrxZr ½
eSa@ge---------------------------------------------------------------------------- ;g ?kks"k.kk djrs gS fd ;fn nj
lafonk ds pkyw jgus ds nkSjku fdlh Hkh le; jkT; es fdlh dks nj lafonk dher ls
de dher ij lkeku@eky nus ds fy;s mldh dher de dksV djrk gWw@ djrs gS rks
ml nj lafonk ds v/khu mikiu dh fo"k;oLrq ds leLr ifjnku ds fy;s nj lafonk
dher] de djus ;k dksV djus dh rkjh[k ls dj nh tkosxhA
gLrk{kj cksyhnkrk
e-tender Consumable 2017-18 | 25
FORM No.1 [See rule 83]
Memorandum of appeal under the Rajasthan Transparency in Public Procurement Act, 2012 Appeal No.................of .......................
Before the ..................................(First/second appellate authority)
1. Particulars of appellant:
(i) Name of the appellant:
(ii) Official address, if any:
(iii) Residential address:
2. Name and address of the respondent (s): (i)
(ii)
(iii)
3. Number and date of the order appealed against and name and disignation of the officer/authority
who passed the order (enclose copy), or a
Statement of a decision, action or omission of
the procuring entity in contravention to the provisions
of the Act by which the appellant is aggrieved:
4. If the Appellant proposes to be represented
by a representative, the name and postal address
of the representative:
5. Number of affidavits and documents enclosed enclosed with the appeal:
6. Ground of appeal:
........................................................................................................................................................................................................
........................................................................................................................................................................................................
...........................................................................................................................-(Supported by an affidavit)
7. Prayer:
........................................................................................................................................................................................................
...................................................................................................................................................................................................
Place ...................................................
Date....................................................
Appellant’s Signature
e-tender Consumable 2017-18 | 26
¼izi= ,l-vkj-AA½
cksyhnkrkvksa }kjk ?kks"k.kk
eSa@ge ?kks"k.kk djrk gw¡@djrs gS fd eSus@geus ftu ekyksa@[email protected]
ds fy, cksyh nh gS] mudk@eS@ge cksukQkbZM@Fkksd foØsrk@lksy foojd@izkf/kd`r
Mhyj@ lksy [email protected] ,ts.V gSA
;fn ;g ?kks"k.kk vlR; ik;h tk, rks fdlh Hkh vU; dk;Zokgh tks dh tk ldrh
gS] ij izfrdwy izHkko Mkys fcuk] esjh@gekjh izfrHkwfr dks iw.kZ :i esa leigzr dj fy;k
tk,xk rFkk cksyh dks] ftl lhek rd ml Lohdkj fd;k x;k gS] jn~n dj fn;k tk,sA
cksyhnkrk ds gLrk{kj e; lhy
cksyhnkrk dk uke
iw.kZ irk
VsyhQksu ua0 ¼fuokl½s
¼dk;kZy;½
e-tender Consumable 2017-18 | 27
AGREEMENT
(See Rule 68)
An agreement made this ........................... between M/s, ............................................,
(hereinafter called "the approved supplier", which expression shall where the context so admits, be
deemed to include his heirs successors, executors and administrator) of the one part and the
Department of Agriculture, Government of Rajasthan, Jaipur. (Hereinafter called "the Govenment"
which experession shall, where the context so admits, be deemed to include his successors in office
and assigns) of the other part.
1. Whereas the approved supplier has agreed with the Government to supply of Photo Copier
Machine in the Office of the Commissoner Agriculture Rajasthan, Jaipur all those articles set forth in
the schedule appended hereto in the manner set forth in the condition of the tender and contract
appended herewith and at the rates set forth & firms names of the said Annexure A.
2. And whereas the approved supplier has deposited a sum of to Rs. ......................
(i) Cash/Bank Draft/Bankers Cheque No. .....................................Dated ................
3. Now these Presents witness:
a) In Consideration of the payment to be made by the Government thorugh .................................. at
the rates set forth in the schedule her to a appended the approved supplier will duly supply the said
article set forth in Annexure A.
b) The conditions of the tender and contract for open tender enclosed to the tender notice no.
............... dated ..................... also appended to this agreement will be deemed to be taken as part of
this agreement and are binding of the parties executing this agreement.
c) Letter no. ..................... dated................... issued by Department of Agriculture and firms reply
received vide letter no. ......................dated ....................Appended to this agreement shall also form
part of this agreement.
d) (a) The Government do hereby agree that if the approved supplier shall duly supply the said
articles in the manner afore said observe and keep the said terms and conditions, the Governement
will through ..................... pay of cause to be paid to the approved supplier at the time and the
manner set forth in the said conditions.
(b) The mode of payment will be as specified below:
1. After satisfactory supply of material as per rate contract.
2. Payment will be made by banker cheque/DD
3. ............................................................
4. The delvery shall be effected and comleted within the period noted bellow form the date of supply order
e-tender Consumable 2017-18 | 28
5. (1) In case extension in the delivery period with liquidated damages, the recovery shall be made on the basisof following percentage of value of stores which the tenderer has failed to supply :
(a) Delay up to one-fourth period of the prescribed 2½% Delivery period.
(b) Delay exceeding one fourth but not exceeding half 5% of the prescribed delivery period.
(c) Delay exceeding one fourth but not exceeding 7½% three fourth of the prescribed delivery period.
(d) Delay exceeding three fourth of the prescribed 10% delivery period. Note :
(i) Fraction of a day in reckoning period of delay in supplied shall be eliminated if it is less than
half a day.
(ii) The maximum amount of agreed liquidated damages shall be 10%
(iii) If the supplier required and extension of time in completion of contractual supply on
account of occurrence of any hindrances, but not after the stipulated date of completion
of supply.
(2) Delivery period may be extended with or without liquidated damages, if the delay in the supply of
good is on account of hindrance beyond the control of the tender.
6. All disputes arising out of this agreement and all question relating to the interpretation of
the agreement shall be decided by the Government and the decision of the Government shall
be final.
7. All legal proceeding if necessary arise to institute may by any of the parties shall have to
be lodged in court situated in Jaipur & not else where.
In witness where of the parties here to have set their hands on the ..................... day of
.....................2018.
Signature of the representative Signature of the
of department approved Supplier
Date : Date :
Witnesses 1 Witnesses 1
Witnesses 2 Witnesses 2