Request for Proposal Providing network connectivity and infrastructure at HUDA locations and setup of Wi-Fi Zones at administrative offices of HUDA. RFP Reference no 12267/2016 Haryana Urban Development Authority

Upload: vuongngoc

Post on 03-Aug-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

Request for Proposal Providing network connectivity and

infrastructure at HUDA locations and

setup of Wi-Fi Zones at administrative

offices of HUDA.

RFP Reference no 12267/2016

Haryana Urban Development Authority

Page 2: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

2

TABLE OF CONTENTS

1 GENERAL INFORMATION ........................................................................................................................................... 5

1.1 ORGANIZATION OVERVIEW ..................................................................................... 5

1.2 INTRODUCTION ......................................................................................................... 6

1.3 NOTICE INVITING TENDERS (KEY DATES) .............................................................. 7

1.4 CLARIFICATION AND AMENDMENT TO RFP DOCUMENTS .................................... 8

1.5 PREPARATION OF PROPOSAL ................................................................................ 9

1.6 SUBMISSION, RECEIPT AND OPENING OF PROPOSALS ......................................10

1.7 INSTRUCTIONS TO BIDDERS FOR E-TENDERING .................................................12

1.8 PRE-QUALIFICATION CUM TECHNICALCRITERIA .................................................15

1.9 EVALUATION PROCESS ..........................................................................................18

1.10 FINANCIAL EVALUATION .........................................................................................18

1.11 AWARD OF CONTRACT............................................................................................18

1.12 CONFIDENTIALITY ....................................................................................................18

2 PROJECT PROFILE .................................................................................................................................................... 20

2.1 ADMINISTRATIVE SETUP OF HUDA ................................................................................20

2.2 PROJECT OVERVIEW ....................................................................................................20

3 SCOPE OF WORK........................................................................................................................................................ 26

3.1 PHASES OF THE PROJECT .............................................................................................31

4 TECHNICAL REQUIREMENT .................................................................................................................................. 34

5 SERVICE LEVEL REQUIREMENTS ...................................................................................................................... 45

6 TERMS AND CONDITION ......................................................................................................................................... 49

PROFORMA’S ......................................................................................................................................................................... 59

PROFORMA 1 BID PROPOSAL SHEET ..................................................................................60

PROFORMA – 2 .......................................................................................................................63

PROFORMA – 3 FINANCIAL FORM .............................................................................................64

PROFORMA -4 .........................................................................................................................71

Page 3: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

3

PROFORMA-5..........................................................................................................................81

PROFORMA 6 ..........................................................................................................................82

PROFORMA 7 ..........................................................................................................................83

Page 4: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

4

LETTER OF INVITATION

HUDA invites bids for providing network connectivity and infrastructure at HUDA locations and

set up of Wi-Fi zones at administrative offices of HUDA as per details provided in this RFP.

Page 5: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

5

1 GENERAL INFORMATION

1.1 ORGANIZATION OVERVIEW

The Haryana Urban Development Authority (HUDA) is a statutory body of Haryana

Government constituted under the Haryana Urban Development Authority Act, 1977. Before

the constitution of HUDA, the Department Of Urban Estates, which was established in the

year 1962, used to look after the work concerning planned development of urban areas and

it functioned under the aegis of the Town & Country Planning Department. The functioning

of the Urban Estates Department was earlier regulated by the Punjab Urban Estates

(Development & Regulations) Act, 1964 and rules made there under and the various

development activities used to be carried out by different departments of the State

Government such as P.W.D (B&R), Public Health, Haryana State Electricity Board etc. But

it was observed that the involvement of several agencies in the development of Urban

Estates at various places had given rise to problems of coordination with the result that

growth of most of Urban Estates became slow and caused unnecessary dissatisfaction

among the plot-holders in particular and public in general. Besides, as the Department had

to follow the financial rules and regulations of Govt., the arrangement of finances and

sanction of estimates took a long time and the development works had not kept pace with

the required standards of physical development. It was also considered that being Govt.

department, it was unable to raise resources from various lending institutions although

there were various financial institutions in the country to finance urban development

programmes which could be availed of. Thus in order to overcome all these difficulties and

to achieve the expeditious development of urban estates, it was felt that the Department of

Urban Estates should be converted into such a body which could take up all the

developmental activities itself and provide various facilities in the urban estates

expeditiously.

Page 6: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

6

1.2 INTRODUCTION

1. Client Name: Haryana Urban Development Authority (HUDA)

The address and telephone numbers of the Client‟s Office are:

Shri. Sanjay Sharma,

General Manager (IT)

Haryana Urban Development Authority C-3, Sector-6,

Panchkula, Haryana

Phone: 0172-2569504

E-mail: [email protected]

2. The bidder having the least Grand total cost(L1) in the financial bid will be

considered successful bidder and will be awarded the contract.

3. The Bidders are invited to submit a Prequalification cum Technical Proposal and a

Financial Proposal, in the formats specified in this RFP. Responses should be in

English Language. The Bidders must meet the Minimum-qualification criteria

(Section 1.8.1) in order to qualify for this bid. Technical and financial Proposals of

bidders not meeting the Pre-Qualification stand rejected.

The bidder will be responsible for the followings:

(i) The costs of preparing the proposal and of negotiating the contract, including

visits to the HUDAduring bidding phase(the same are not reimbursable from

HUDA or any related party).

(ii) HUDA is not bound to accept any/all of the Proposals submitted.

(iii) HUDA reserves the right to cancel the tender anytime without specifying any

reason thereof.

Page 7: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

7

1.3 NOTICE INVITING TENDERS (KEY DATES)

S. No Event Details

1. Document available on website.

https://etenders.hry.nic.in

19-05-2016

2. Submission of pre-bid queries

by e [email protected]

23 -05 -2016 by 4:00 pm

3. Pre-bid Conference 25-05-2016 3:00 pm in conference Hall,

HUDA, C-3, Sector 6, Panchkula.

Only those bidders will be allowed to

participate in the pre-bid conference who

have submitted Cash/DD of` `5000/-toward

purchase of RFP Document and the queries

of only those bidders will be entertained

who will submit cost of the RFP i.e. `5000/-

However, bidders are free to deposit the

cost of RFP along with the bid document

any time before the closure of the bid.

4. Issue of Clarifications to the

bidders on www.huda.gov.in

30-05-2016

5. Last date for submission of Bid 10-06-2016 by 3:00pm

6. Pre-qualification/Technical Bid

Opening

10-06-2016 at 4:00 pm

7. Commercial Bid Opening

(Online)

To be conveyed

8. Venue for Pre-Bid Conference Conference Hall, HUDA office Complex,C3,

Sector 6, Panchkula

9. Cost of RFP Document `5000/- in form of DD in favour of The

CA, HUDA, Payable at Panchkula

10. Earnest Money Deposit `10,00,000/- (` Ten Lac only) in form of

DD in favour of The CA, HUDA, Payable

at Panchkula

11. Performance Bank Guarantee 15% of the order values with a validity of six

Page 8: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

8

S. No Event Details

months more than the expiry of contract

date. The Performance guarantee is to be

submitted by the successful bidder within

15 days of the award of contract.

12. Website www.huda.gov.in

13. Clarifications Bidders are advised to regularly visit the E-

tendering/HUDA website for all updates

regarding the bid. No updates shall be

provided by any other means.

All queries relating to the bid shall be

submitted as per format attached in MS

Excel format only at [email protected]

Note 1: Manual Submission of Documents - Online Bidders will also require to physically

submit the Bid Document cost and EMD costing in original and other document related to

Technical bid etc. as uploaded on the website, otherwise the bid shall stand rejected. The

documents duly binded, properly tagged and numbered along with EMD and cost of the

Tender Request for Proposal shall be sent either through speed post, courier or personally

and should reach in the office of General Manager(IT), HUDA, C-3, Sector-6, Panchkula

by 10-06-2016 till 2 PM.

Note 2: The commercial bid should be submitted through online mode only.

1.4 CLARIFICATION AND AMENDMENT TO RFP DOCUMENTS

Pre bid queries for clarification of the proposal: All queries regarding the bid shall be sent

by 23-05-2016 by 4:00 PM on email at [email protected] with the Header:

“Clarifications andAmendments to RFP documents for providing network connectivity

and infrastructure at HUDA and Set up of Wi-Fi Zones at administrative offices of

HUDA”along with the name and contact number of the official. The bidders can also

meet the General Manager (IT) between 10:00 AM to 01:00 PM on working days.

Queries of only registered bidders will be addressed i.e., A bidder has to first deposit the

Page 9: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

9

cost of RFP – ` 5000/- by DD in favor of the Chief Administrator, HUDA to get

registered.

1.5 PREPARATION OF PROPOSAL

1. Bidders are requested to submit the proposal in English language only. Any printed

literature in any other language can be submitted with the bid; provided that it is

accompanied by an English translation in which case, for purposes of interpretation

of the bid, the English translation shall govern.

2. The bidding comprises of Pre-qualification cum Technical bid and financial bid.

3. In preparing the bid, bidders are expected to study the different sections comprising

this RFP in detail. The proposal should cover all the aspects and any other

requirements as mentioned in different sections of the RFP. Deficiencies in providing

the information requested may result in rejection of the Proposal.

4. While preparing the Proposal, bidders must give particular attention to the following:

a. The bidder shall not associate with individual bidder(s) and / or other firms or

entities in a joint venture relationship to outsource/sub-contract a part or

whole of services desired of the bidder as a part of this assignment.

b. Except as specifically provided, the Prequalification cum Technical Proposal

shall not include any information relating to the Financial bid.

5. While preparing the Financial Proposal, Bidders are expected to take into account

the requirements, terms and conditions of the RFP document.

6. The Financial Proposal should be inclusive of all taxes, duties, fees, levies, and other

charges imposed under the applicable national/local laws.

7. Bidders should express the price of their services in INR only.

8. The proposals and quoted rates must remain valid for 180 days after the date of

opening of the financial proposals. During this period, the bidder is expected to keep

available the professional staff proposed for the assignment. The HUDA will make its

best effort to complete negotiations within this period.

Page 10: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

10

9. Earnest money deposit: The proposal must be accompanied by earnest money

deposit of `10,00,000/- in the form of Demand Draft drawn on any

nationalized/scheduled bank payable to „The Chief Administrator HUDA‟ at

Panchkula without which the proposal will be rejected outright. EMD will not be

accepted in cash or any other manner. No interest is payable on the amount of

E.M.D.

10. The EMD will be returned along with necessary endorsement for payment to the

bidders whose offers are not accepted by the Authority within two months of the

placing of final order to the successful bidder. However for the successful bidder, the

EMD so submitted will be refunded on submission of Bank guarantee against

security deposit.

1.6 SUBMISSION, RECEIPT AND OPENING OF PROPOSALS

1. Each Bidder shall submit only one Proposal.

2. Proposals should be submitted in English Language.

3. Prequalification cum technical Proposal Contents: The Prequalification Proposal

should contain:

a. Earnest Money Deposit as per the amount specified in the RFP.

b. Checklist for Minimum-Qualification Criteria along with relevant

documentation showing the proof of eligibility as outlined in the subsection

titled “Pre-qualification Cum Technical Criteria” (section 1.8.1)

c. Technical Bid along with relevant documents ( Section 1.8.2)

d. A declaration of any actual or potential conflict of interest.

4. Financial Proposal Contents: The Financial proposal should contains:

a. Financial bids should only be submitted through online mode

Page 11: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

11

5. After the deadline for online submission of proposals, the Pre-Qualification

cumTechnical Proposal shall be viewed immediately by the evaluation committee

6. Proposals and quoted price must remain valid for 180 days after the date of opening

of financial proposals

7. From the time the bids are opened to the time the contract is awarded, if any Bidders

wish to contact the HUDA on any matter related to its proposal, it should do so in

writing at the address of the HUDA„s office indicated above. Any effort by the Bidder

to influence the HUDA in the HUDA„s proposal evaluation, proposal comparison or

contract award decisions may result in the rejection of the proposal.

Page 12: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

12

1.7 INSTRUCTIONS TO BIDDERS FOR E-TENDERING

These conditions will over-rule the conditions stated in the tender documents, wherever

relevant and applicable.

1. Registration of bidders on E-tendering Portal

All the Bidders intending to participate in the tenders processed online, are required

to get registered on the Electronic Tendering System on the Portal

https://etenders.hry.nic.in

2. Obtaining a Digital Certificate

a. The Bids submitted online are required to be signed electronically with a

Digital Certificate to establish the identity of the bidder online. These Digital

Certificates are issued by an Approved Certifying Authority, by the Controller

of Certifying Authorities, Government of India.

b. In case of online bidding if the digital certificate issued to the authorized user

of a firm is used for signing and submitting a bid, it will be considered

equivalent to a no objection certificate/power of attorney /lawful authorization

to that User. The firm has to authorize a specific individual through an

authorization certificate signed by all partners to use the digital certificate as

per Indian Information Technology Act 2000.Unless the certificates are

revoked, it will be assumed to represent adequate authority of the user to bid

on behalf of the firm in HUDA tenders as per Information Technology Act

2000. The digital signature of this authorized user will be binding on the firm.

c. In case of any change in the authorization, it shall be the responsibility of

management / partners of the firm to inform the certifying authority about the

change and to obtain the digital signatures of the new person / user on behalf

of the firm / company. The procedure for application of a digital certificate

however will remain the same for the new user.

Page 13: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

13

d. The same procedure holds true for the authorized users in a private/Public

limited company or L&C Society. In this case, the authorization certificate will

have to be signed by the directors of the company

3. Set up of machine

In order to operate on the electronic tender management system, the user‟s

machine is required to be set up. A help file on setting up of the system can be

downloaded from the home page of the website - https://etenders.hry.nic.in or may

contact on following:-

Tel: 0172-2707732, 2700275

Toll Free: 1800 3070 2232

Mobile: +91-7878007972 and +91-7878007973

4. Download of Tender Documents

The tender documents can be downloaded by the registered user from the

Electronic Tendering System through the Portal https://etenders.hry.nic.in

5. Key Dates

The bidders are strictly advised to follow dates and times as indicated in the Notice

Inviting Tenders (Section 1.3). The date and time will be binding on all bidders. All

online activities are time tracked and the system enforces time locks that ensure that

no activity or transaction can take place outside the start and end dates and the time

of the stage as defined in the Notice Inviting Tenders.

6. Submission of actual online bids

Bidders have to submit their bids online and upload the relevant documents. The

process is required to be completed within the date and time as stated in the Notice

Inviting Tenders (Key Dates). (Section 1.3) The electronic bids of only those bidders

who have submitted their bid within the stipulated time, as per the tender time

schedule (Key Dates), will be accepted by the system. A bidder who does not

Page 14: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

14

submit his bid within the stipulated time will not be allowed to submit his bid by the

E-Tendering System.

Note: - Bidders participating in e-tendering shall check the validity of his/her Digital

Signature Certificate before bidding in the Tenders floated online at e-tendering website

https://etenders.hry.nic.in

Page 15: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

15

1.8 PRE-QUALIFICATION CUM TECHNICALCRITERIA

At the time of submission of bid response, the Consultant should conform to and/or be

able to demonstrate Organizational, Financial and Experience criteria as specified below

The Bidder should have the capability to implement projects in terms of MPLS VPN

Network services, requisite manpower of required qualification and experience, project

management skills and quality/level of work. Bidder should have a proven record in

implementing heterogeneous system integration projects, MPLS VPN (ANY to Any

Topology), connectivity

Please Note: These are the minimum requirements for a bidder to be evaluated for this

RFP. Any bids not meeting the pre-qualification criteria shall be rejected.

1.8.1 MINIMUM ELIGIBILITY CRETERIA

1. The bidder must be a company registered/incorporated under the Indian Companies Act,

1956 and have been in existence for a period of at least 3 years as of 31.03.2016.

(Relevant documents like certificate of incorporation, MOA etc.)

2. The Bidder should not have been Black listed or charged of involvement in any

malpractice, fraud, scandal or any criminal case by any Central or State Government

Department or Agency. (self-declaration on Letter head)

3. The bidder should have a Service tax registration and PAN number. (attach documents)

4. The bidding firm/company must be a registered Telecom company under the Companies

Act for providing unified telecom services and having valid National Long distance (NLD)

license (Attach certificate duly attested).

5. The Bidder should have had an average annual turnover of `1000 Crore during the last

two financial years as evidenced by the audited accounts of the company/division

(Attach Proof).

6. The Bidder should have had prior experience in providing Network Integration Services

in e-Governance/ PSU‟s Banks, & Commercial IT-Telecom & BFSI Segment (Attach

Proof, minimum two work completion certificates duly signed by client and clearly stating

start date, scope, and commercial involved in the project).

7. The EMD should also be enclosed in the Pre-qualification-cum-Technical bid envelope.

Page 16: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

16

8. The bidding firm/ company must be authorized to bid on behalf of the manufacturer and

should submit an up-to date valid authorization letter till the currency of contract from

original manufacturer for such equipment and its accessories, which are not

manufactured by them and supplied under this RFP (Attach certificate).

9. The bidding firm/company must comprise a single company and consortiums are not

permitted.

10. The successful Bidder shall provide the backup connectivity( MPLS and Internet)

using last mile connectivity on other Service Provider Network for the Tier -1

location mentioned in the RFP using Primary & Secondary Link from two different

Services Providers.

11. Successful Bidder shall be responsible for the SLA Compliance & Connectivity Services

from Secondary Link Service provider at every stage of the Contract

12. Successful Bidder shall submit an undertakingon its letter Head for providing

backup connectivity services through a secondary service provider mentioning

the name of the secondary service provider.

13. An Escalation matrix with contact details (Name, mobile number and Email ID) of

relevant authorities and personnel up to the Head of Organization (President/CEO) shall

be submitted.

Documentary evidence in support of all the above mentioned eligibility criteria

should be furnished with bid.

1.8.2 TECHNICAL BID

The Technical bid prepared by the bidder shall comprise of the following, preferable in

the following sequence

(Table of Content to be the first page):

1. The documents required for proof of eligibility mentioned at Section 1.8.1. Bid without

these documents will be rejected outright.

2. Proposed solution / product / software / licenses as per requirement along with part

number, if any for providing network connectivity and Wi-Fi-Zone setup. Technical

Requirements Compliance sheets matrix as attached in Performa 4

3. List of clients for which the bidder is having similar type of contracts and certificate

regarding satisfactory performance of the contract (Please attach documentary proof).

4. Submit copy of HUDA tender document duly signed and sealed on every page.

Page 17: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

17

5. Self-Declaration Compliance to SLA

6. Confirmation to the technical requirements compliance matrix attached at Performa -4

7. Product catalogues / references

8. The bidder should submit IPv6 readiness certificate for the supplied items.

9. The bidders are required to show the presentation and demonstration of the offered

Wireless equipment/ solution at HUDA HQ office.

* It is mandatory for all the bidders to fulfill all the above conditions of the Pre-qualification

criteria and must be supported by attested documents.

Note: No pricing information shall be included in the Prequalification or Technical

Bid. Inclusion of Financial Bid amounts in the Pre-qualification or Technical Bid

shall make the Bid nonresponsive and HUDA shall reject it.

Page 18: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

18

1.9 EVALUATION PROCESS

After the minimum eligibility criteria evaluationis completed, HUDA shall notify the name

of the bidder on website www.huda.gov.inwhose proposals were considered non-

responsive to the RFP and Terms of Reference or not qualified for the financial

evaluation. The HUDA shall simultaneously notify the bidders, whose proposals have

qualified for further evaluation. The notifications will be hosted on HUDA website

www.huda.gov.in.

1.10 FINANCIAL EVALUATION

All financial bids should be submitted as per the format mentioned in Performa 3

The financial bid should be submitted through online mode only.

Only those bidders who qualify the pre-qualification cum technical criteria evaluation

shall be considered for financial evaluation. The bidder having the least Grand total cost

(L1) in the financial bid will be considered successful bidder and will be awarded the

contract.

1.11 AWARD OF CONTRACT

The contract will be awarded to the successful bidder by way of issuing letter of Intent to

the successful bidder. The successful bidder shall accept the LOI within 10

days.Contract shall be signed within 15 days of Acceptance of LOI by the bidder.

The Successful bidder should submit a Bank Guarantee of an amount equal to 15 % of

the Contract Value. The Bank Guarantee shall be submitted within 15 days of Signing

the Contract.

Contract would be valid for 3 years to be extended on mutual agreeable terms between

both parties

1.12 CONFIDENTIALITY

Subject to the other provisions of this RFP, information relating to evaluation of

proposals and recommendations concerning award of contract shall not be disclosed to

Page 19: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

19

the bidders who submitted the proposals or to other persons not officially concerned with

the process.

Note: HUDA however not bind itself to accept the lowest and / or any bidand

reserves the right to accept and / or reject any bid, wholly or in partbased on other

strengths & capabilities of the bidder. The Vendor has tofulfill the above

conditions as mentioned above in all respects. If any of theconditions are not

qualified or not fulfilled, the bid will be considered as non-responsive and would

be rejected summarily and out rightly.

Page 20: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

20

2 PROJECT PROFILE

2.1 Administrative Setup of HUDA

(i) HUDA has set up urban estates throughout the State, and their work is looked

after by Zonal Administrators, assisted by 18 Estate Offices and 31 Divisions

undertaking engineering works. The main duties of the estate offices include selling

plots of all categories of land (developed and undeveloped) and realizing the amount

of installments. All financial transactions are looked after by the estate officers and are

channelized through the Accounts branch of the Head Office for expenditure on

development activities.

(ii) With over 25 years of successful operations, HUDA‟s activities have grown

tremendously. In order to reap the benefits of IT in strengthening managerial

capabilities, HUDA has undertaken the initiative of computerizing Property

Management and Financial Accounting systems.

As a part of its initiative for automation, HUDA is implementing web-based software

application in all urban estates of the state.

2.2 Project Overview

(i) The HUDA offices are spread all over Haryana, with centrally located head

office in Panchkula supported by five Zonal administrator offices as per

detail given below

• Administrator, HUDA, Panchkula, C-3, Sector-6, Panchkula,

• Administrator, HUDA, Faridabad, HUDA Complex, Sector-12,

Faridabad,

• Administrator, HUDA, Gurgaon, HUDA Complex, Sector-14, Gurgaon.

• Administrator, HUDA, Hisar, HUDA Complex, U.E.II, Hisar.

• Administrator, HUDA, Rohtak, Sector 1, HUDA Complex, Rohtak.

Besides 18 Estate offices and 31 Divisional offices. Local Area networking

is there in all offices of HUDA. All offices are interconnected through

MPLS-VPN.

The applications are hosted centrally at State Data center Haryana Sector

17 Chandigarh.

Page 21: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

21

(ii) Router port and interfaces details are given below :

S.NO Address of HUDA

Offices Locations

Band

width

Sizing

Last Mile

Connectivity

Hardware

details

Interface

Details at

Routers

1. SCO 7-8, Sector 7,

Ambala Ambala 1 Mbps Radio Cisco 1841

2 FastEthernet

interfaces,1

ISDN Basic

Rate interface,1

Virtual Private

Network

(VPN) Module

2.

Estate Office,

HUDA, Sector 6,

Bahadurgarh

Bahadurgarh 1 Mbps Radio Cisco 1841

2 FastEthernet

interfaces,2

Serial

interfaces

3.

Estate Officer,

HUDA,

Sector 13, City

Center,

Bhiwani

Bhiwani 1

Mbps BWA Cisco 1841

2 FastEthernet

interfaces,1

Virtual Private

Network

(VPN) Module,

4.

HUDA Complex,

Sector 12,

Faridabad

Faridabad 4 Mbps Copper Cisco 1841

2 FastEthernet

interfaces,,1

ISDN Basic

Rate interface

5.

Division Office, SCO

No.

25, Sector 12,

Faridabad

Faridabad 4 Mbps Copper Cisco 1841

2 FastEthernet

interfaces,1

Serial interfaces

1 ISDN Basic

Rate interface,1

Virtual Private

Network

(VPN) Module,

Page 22: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

22

S.NO Address of HUDA

Offices Locations

Band

width

Sizing

Last Mile

Connectivity

Hardware

details

Interface

Details at

Routers

6.

Estate Office-

II,HUDA,Sector 34

Gurgaon

Gurgaon 4 Mbps Copper Cisco 1841

2 FastEthernet

interfaces,2

Serial interfaces

1 ISDN Basic

Rate interface

,1 Virtual

Private Network

(VPN) Module,

7.

CE OFFICE - HUDA

South City I

Gurgaon

Gurgaon 1 Mbps Copper Cisco 1841

2 FastEthernet

interfaces,1

Serial

interfaces,1

Virtual Private

Network

(VPN) Module,

8. HUDA Sector 41

Gurgaon Gurgaon 1 Mbps Copper Cisco 1841

2 FastEthernet

interfaces,2

Serial interfaces

9. HUDA, Sector 14,

Gurgaon Gurgaon 4 Mbps Copper Cisco 1841

2 FastEthernet

interfaces,2

Serial interfaces

10. HUDA Complex,

Sector 13, Hisar Hisar 2 Mbps Radio Cisco 1841

2 FastEthernet

interfaces,1

Virtual Private

Network

(VPN) Module,

11.

Estate Officer,

HUDA, Sector 17,

Jagadhari

Jagadhari 1 Mbps Radio Cisco 1841

2 FastEthernet

interfaces,1

Virtual Private

Network

(VPN) Module,

Page 23: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

23

S.NO Address of HUDA

Offices Locations

Band

width

Sizing

Last Mile

Connectivity

Hardware

details

Interface

Details at

Routers

12.

Estate Officer,

HUDA, Safidon

Road, Jind

Jind 1 Mbps Radio Cisco 1841

2 FastEthernet

interfaces,1

Virtual Private

Network

(VPN) Module,

13.

Estate Officer,

HUDA, Sector 20,

Kaithal

Kaithal 1 Mbps BWA Cisco 1841

2 FastEthernet

interfaces,1

Virtual Private

Network

(VPN) Module,

14. HUDA Complex,

Sector 12, Karnal Karnal 2 Mbps Copper Cisco 1841

2 FastEthernet

interfaces,1

Serial

interfaces,1

Virtual

Private Network

(VPN) Module

15.

Estate Officer,

HUDA, Sector 13,

Kurukshetra

Kurukshetra 2 Mbps Radio Cisco 1841

2 FastEthernet

interfaces,1

Virtual Private

Network

(VPN) Module,

16. HUDA HO at

Panchkula Panchkula 20 Mbps Copper Cisco 3900

4 FastEthernet

interfaces,2

Serial

interfaces

17. HUDA Sector 8,

Panchkula Panchkula 4 Mbps Copper Cisco 1841

2 FastEthernet

interfaces,2

Serial

interfaces,1

Page 24: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

24

S.NO Address of HUDA

Offices Locations

Band

width

Sizing

Last Mile

Connectivity

Hardware

details

Interface

Details at

Routers

Virtual

Private Network

(VPN) Module

18.

HUDA, Industrial

Area,

Phase-I, Panchkula

Panchkula 2 Mbps Radio Cisco 1841

2 FastEthernet

interfaces,2

Serial

interfaces,1

Virtual

Private Network

(VPN) Module

19.

EO Office, HUDA,

Sector

18, Panipat

Panipat 2 Mbps Radio Cisco 1841

2 FastEthernet

interfaces,2

Serial

interfaces,1

Virtual

Private Network

(VPN) Module

20.

HUDA Complex,

Sector 1,

Rewari

Rewari 2 Mbps Radio Cisco 1841

2 FastEthernet

interfaces,1

Serial

interfaces

21.

HUDA Complex,

Sector

1, Rohtak

Rohtak. 2 Mbps Radio Cisco 1941 2 Gigabit

Ethernet

22. HUDA, Sector 14,

Gurgaon Gurgaon 2 Mbps Copper Cisco 1841

2 Fast Ethernet

interfaces

,1 Virtual

Private Network

(VPN) Module

Page 25: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

25

S.NO Address of HUDA

Offices Locations

Band

width

Sizing

Last Mile

Connectivity

Hardware

details

Interface

Details at

Routers

23.

HUDA office,

Sonipat

Road, Sec.3,Rohtak.

Rohtak. 4 Mbps Copper Cisco 1941 2 Gigabit

Ethernet

24.

Estate

Officer,HUDA,

Sector 20, Sirsa

Sirsa 2 Mbps BWA Cisco 1841

2 Fast Ethernet

interfaces

,1 Virtual

Private Network

(VPN) Module

25.

HUDA Complex,

Sector

15, Sonepat

Sonepat 2 Mbps Radio Cisco 1841

2 Fast Ethernet

interfaces,1

Virtual

Private Network

(VPN) Module

26. Sector 15,Gurgaon Gurgaon 2 Mbps copper Cisco 1941

2 Gigabit

Ethernet

27 HSDC sector 17 Chandigarh 20 Mbps Fibre Cisco 3900

4 Gigabit

Ethernet

28 HSDC Sector 17

(Internet) Chandigarh 20 Mbps Fibre Cisco 3900

4 Gigabit

Ethernet

29 HUDA HQ

Panchkula (Internet) Panchkula 10 Mbps Copper Cisco 3900

4 Gigabit

Ethernet

(iii) LAN is installed in all the offices.

Page 26: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

26

3 SCOPE OF WORK

The minimum specified work is mentioned below and is to be performed as per the

specifications and conditions mentioned in the different parts of this document. The

broad items of minimum specified work are as under:-

PART A- INSTALLATION, SETUP AND COMMISSIONING OF MPLS

CONNECTIVITY AND NETWORK EQUIPMENTS

1. Successful Bidder may include additional component if any required in its technical

and financial bids otherwise any components required for completion of project

shall be treated as included in the solution and will have to be provided by the

Successful Bidder without any additional cost.

2. The Successful bidder has to provide completely managed MPLS

connectivity servicesincluding all necessary end to end equipment etc.

required for connectivity services for a period of 3 years from the date of

successful commissioning of links and equipment

3. To connect all the locations on a secure and resilient, total IP-MPLS VPN (ANY to

Any Topology) network as per SLA. Last mile connectivity is through

Copper/Fiber/RF.

4. The details of Locations to be connected is as per “Performa – 3 Category- B”.

5. To provide and ensure that the specified HUDA offices are able to access and

update the information on its servers hosted at State Data Center, Sec.17,

Chandigarh.

6. Solution should comply with all statutory and other legal requirements for the

installation, integration, running, operation and maintenance of the System as

specified in the RFP.

7. The above network shall be so conceptualized so as to have end to end secured

communication through VPN and should support seamless transformation and

integration of protocols based on open standards as well as open NMS support for

monitoring configuring and measurement of the network resources.

8. The network so designed shall meet the security guidelines of CERT-In.

9. The bidder should design and engineer the system after understanding the existing

network and should provide turn-key solution for the entire network and include

any missing item(s) notwithstanding the detailed Bill of Material (BOM) given in

RFP for the successful end to end implementation of the HUDA Connectivity.

Page 27: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

27

10. The successful bidder will provide all necessary support for the smooth transfer of

the networkafter the expiry of contract.

11. The successful bidder shall supply, install and Commission the Equipment as

Performa -3 Category A and Category B.

12. HUDA will provide site for installation along with Power.

13. Solution should comply with all statutory and other legal requirements for the

installation, integration, running, operation and maintenance of the System as

specified in the RFP.

14. Successful Bidder will coordinate with all existing agencies/Service providers for

smooth transition of the system.

15. Successful Bidder should give a detail methodology about his understanding of the

project implementation in the time frame given in this RFP. The Successful Bidder

shall also arrange a presentation of the same.

16. Proactive Monitoring of the entire Network.

17. Monitoring tool/portal: -Bidder will provide a Web-based Online Customer

Management Network (CNM) Portal for providingdetailed information of the links

(location-wise) on under mentioned parameters:

Site Status-Near Real-time

Bandwidth Utilization -· Daily, Weekly, Monthly, Yearly

Service Uptime· Daily, Monthly

Latency Statistics- Monthly

Jitter Statistics – Monthly

Packet Error Statistics– Near Realtime

Including above the portal must have functionality of raising online ticket for

complaints related toMPLS services provided at all HUDA locations

18. The successful bidder will be responsible for smooth operations and maintenance

of all services throughout the service of the contract.

19. The connectivity services provided by the successful bidder should meet the

SLA requirements of HUDA

20. Shifting of premises- In the event of shifting of premises, order to this effect will

be placed with the selected bidder. Bidder will carry out site-survey at the new

location for feasibility of location for type of media and intimate HUDA within two

weeks. On receipt of confirmation from the HUDA, the Bidder to install and

Page 28: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

28

commission the link at the new location prior to shifting of office from old location.

The vendor is required to implement and commission the location within 3 weeks

from the date of order. The connectivity at the old location has to be dismantled

and removed on the last day of shifting. The cost towards installation as per the

contracted rate for the respective category will be applicable

21. Shifting of equipment within premises/office- For shifting of equipment/lines

(MPLS/ISDN) within the premises, vendor shall depute the concerned

engineer/official within 24 hrs from the time of reporting of such requirement by the

HUDA. This is to enable smooth transition of network equipment and to ensure

proper functioning of network connectivity at the new place of installation, in

coordination with HUDA‟s engineer/officials. Such shifting of equipment within

premises/office shall be done at no cost to HUDA, whatsoever

22. Up-gradation of Bandwidth- In the event of operational requirement bandwidth of

any location will be upgraded/degrade from the initial contracted value to

higher/lower value permanently, at the contracted rate. The HUDA will place order

for the same.

23. Bandwidth on Demand- The Bidder to provide bandwidth on demand:

At all locations/offices,for Video Conferencing or for some special occasions for a

specific period [say a week or part thereof]. However, order will be placed in

advance (Min 4 days). The Bidder would be intimated in advance.

24. Up gradation of Location from one Category to Other- At any time during the

contract due to operational requirement any of the location will be upgraded from

the existing category to higher category. Once the location is upgraded all terms

and conditions [SLA etc] of the new category will be applicable. From the date of

up- gradation rate as per that category/bandwidth will be applicable.

25. All the network devices will be with under 3 Years comprehensive warranty with

24*7 customer support. All peripherals, power and network cables required for

successful installation shall be supplied by the bidder only.

PART B – SETUP WIFI-ZONES AT ADMINISTRATIVE HUDA OFFICES

Successful bidder is to implement Wi-Fi Network Solution at following Administrative offices

of HUDA:-

Page 29: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

29

• HUDA HQ C-3, Sector-6, Panchkula,

• HUDA Complex, Sector-12, Faridabad,

• HUDA Complex, Sector-14, Gurgaon.

• HUDA Complex, sector 13, Hisar.

• HUDA office, Rohtak, Sector 3, Rohtak

Site Survey:

a) The successful bidder shall undertake a Site-survey of all the specified sites and submit a

site wise survey report to HUDA mentioning the location & number of Access Points(APs)

required to be installed at each site.

b) The Successful bidder shall incorporate the changes (if any) suggested by HUDA and

submit a final site survey report for approval by HUDA.

c) The format of the site-survey report shall be submitted to HUDA for approval.

d) In case of indoor installation Room No. shall be indicated in the survey report.

e) In case of outdoor installation, proper location of the APs should be indicated.

The minimum specified work is mentioned below and is to be performed as per the

specifications and conditions mentioned in the different parts of this document. The bidder is

required to provide an end to end solution for setting up and operating WI-Fi zones in above

mentioned offices of HUDA.

1. Supply, Installation, Configuration and Commissioning of following equipment's as

per specifications with necessary accessories at HUDA offices

a. Wi-Fi controller

b. 24 Port POE L2 Switch

c. Wi-Fi Access Points

d. Firewall

e. Installation all necessary equipment‟s as required

f. Supply, install and Configure Dedicated Internet Line(1:1) (10 Mbps)

(Ref: technical requirements Specifications)

2. Setting up a new Wi-Fi network isolated from existing LAN of HUDA.

3. The Wi-Fi network should be accessed through mobile, laptop and wireless enabled

device by employee's and visitors through secured login.

4. Each user should have a unique username and password for accessing Wi-Fi

Internet.

Page 30: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

30

5. Temporary guest account should be created with quota system/restricted usage

along with MIS for viewing the details of users accessing their account.

6. Solutions should able to support all security features, web filtering and category wise

URL Filtering

7. All the five Locations to be covered under new Wi-Fi zone with approx. 200 users or

more at each location.

8. Wi-Fi network should ensure better availability and should be free from unauthorized

access and security attacks.

9. Undertake cabling necessary for system integration and overall solution as per

international IT standards.

10. Providing the operational training at HUDA office. The cost of training shall be

deemed to be included in the cost of Supply of Device.

11. Supply, Installation, testing, commissioning and maintenance of all equipment

(along-with necessary software(s)) for operating & Managing the system. The cost of

equipment will be deemed to be inclusive of any other hardware, software and/or

network items required for achieving the functionality as required by HUDA and no

separate / extra payment will be made by HUDA on this account.

12. To provide threeyear on-site comprehensive warranty after complete commissioning

of the project. Comprehensive Warranty of the hardware to be provided from the

OEM‟s

13. Customization to meet HUDA requirements may be carried out for supplied

equipment(s) / product(s) and related trainings without any extra cost.

14. All mounting, power and networking equipment, peripherals and cables required for

Wireless access point, controllers, switches, firewalls etc.shall be provided by the

bidder and cost must be inclusive of all above components.

15. The bidder must bid for all items listed in Performa 3. It is also mandatory that all the

optional items specified for an individual respective item, if any, must be quoted.

Note: HUDA is not bound to procure and provide the hardware/ networking/ software/

infrastructure equipment‟s/ other products as suggested and/or specified by the

bidder.

16. The major responsibilities as specified are indicative only and not exhaustive in any

manner.

17. Warranty, Support, shall be delivered by the bidder. The warranty contract

agreement will be signed with the bidder and all payment will be made to the bidder.

In case of authorized partner being the bidder, certificate from OEM addressed to

Page 31: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

31

HUDA should be attached stating that the OEM/partner will provide onsite support

during the warranty period.

18. All Hardware, Software and Tools to be supplied under the scope of the project must

be of current versions, unless otherwise required by HUDA and must be IPv6 ready.

19. Software tools must be compliant with acceptable standards.

20. All hardware devices/equipmentsupplied must be with under 3 Years comprehensive

warranty with 24*7 customer support.

21. Wi-Fi/Network devices to be provided by successful bidder as per Performa3

category A and as per technical requirement mentioned in section 4. All peripherals,

power and network cables required for successful installation shall be supplied by the

bidder only

3.1 Phases of the project

The Phases of the Project is elaborated in Scope of work.

Scope of Supply

1. Provision of Infrastructure and bandwidth as per ANNEXURE “Performa – 3

Category- B”. In addition bidder should specify additional bandwidth that can be

supported (by CPE) and provided immediately at SDC Chandigarh and HUDA HO

Panchkula and other sites in case of additional requirement. Last mile connectivity is

through Copper/Fiber/RF.

2. Supply of Products/equipment including active and passive components and their

related accessories at the offices of HUDA mentioned at ANNEXURE “Performa – 3

Category- A”.

3. The Successful Bidder shall not bid /supply any equipment that is likely to be

declared end of sale within next six months. If, any equipment is declared end of sale

within next six months, the Successful Bidder would be required to replace all such

equipment with latest one and equivalent or better configuration. The Successful

Bidder shall submit an OEM undertaking with this regard to Tenderer.

4. The Successful Bidder shall ensure that equipment should be latest and the

specifications of the items supplied must be equivalent or superior to the existing

equipment.

5. The Successful Bidder shall be responsible for end-to-end implementation and shall

identify as mandatory and optional items viz., routers, modems, racks, etc and shall

Page 32: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

32

quote and provide / supply quantities that are considered necessary for the

successful commissioning of the network

6. Design the connectivity as described in the tender document on MPLSVPN (Any to

Any Topology).

7. Site study, Design, installation and commissioning of Wi-Fi zones in all five

administrative offices of HUDA

8. SLA compliance tools.

9. Detailed implementation plan/schedule for carrying out the activities as per the

project timeliness defined in RFP.

10. Daily Network status report twice a day (10A.M and 4 P.M) to be sent HUDA Head

office through e-mail.

11. The successful bidder will certify that the solution prescribed iscomplete to meet

HUDA‟s requirements as mentioned in the scope ofwork.

12. Successful Bidder should include and quote for all necessary andMandatory

components even if not mentioned in the RFP.

13. Proactive management of all links.

14. The Successful Supply of Products/equipment including their related accessories at

the offices of HUDA mentioned above.

15. Bidder shall be responsible for implementation and shall identifyas mandatory and

optional items and shall quote and provide /supply quantities that are considered

necessary for the successful commissioning.

16. The Successful Bidder shall provide software updates for a periodof three years

from date of acceptance for all software components.

17. No product supplied under the RFP should be at the end of life or out ofsupport.

18. No IT equipment model should have been introduced in the market notlater than 2

years back as on date of the bid.

19. The Prices coated should be least prices supplied by the bidder at anygovernment

agency/ department for the next 6 months. In case of anydiscrepancy Huda reserve

the right to take the Differential cost.

20. All Licenses, if any, should be of Full use and in the name of Haryana

UrbanDevelopment Authority. The certificate should be given to HUDA inoriginal one

week after the commissioning of the JOB.

21. A certificate from OEMs to be attached for the products authorization tosell for

HUDA.

22. Wireless Controller and Wireless AP s should be from same OEM

23. The equipment should be interoperable with all leading brands.

Page 33: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

33

Scope of Acceptance Testing

The Successful Bidder will first carryout accepting testing at his own level and submit the

report to HUDA. HUDA has the right to carry out the necessary acceptance testing on its

own or through its consultants.

Page 34: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

34

4 TECHNICAL REQUIREMENT

The RFP specifies the indicative requirements of robust network architecture, fail safe

system configuration, detailed functional specifications of the solution desired for

project. The technical specifications specified are the minimum suggestive

specifications and these should be taken as guidelines for design and implementation of

project. The bidder can offer suggestions in the network design as well as indicate

missing components if any, that may be considered necessary in his bid to implement

and operate the facility to meet the required objectives of the project as has been laid

down in this document.

i) The bidder will offer equipment that will best accommodate and meet the present

and future requirements for expansion of the Project.

ii) Bids not meeting these minimum suggestive technical specifications are liable to

be rejected. In case the equipment quoted exceeds/differ with the RFP technical

specifications, the same should be clearly mentioned along with justification.

iii) One set of service and operation/instruction manual is required to be supplied

witheach equipment.

iv) All the equipment should be new and of the prevailing/current standard production

of the manufacturer at the time of the proposal.

v) Equipment supplied by the Successful Bidder must be fully compatible with existing

Network equipment. These should be latest and of superior or equivalent

specifications.

The technical specifications given below are indicative only and not exhaustive in any

manner. The bidder shall be deemed to have examined all requirements for successful

implementation of the scope of the work.

a) Technical specification of Switches:

S.No Specification

1. Switch should have minimum 24 No‟s of 10/100/1000 Base-TxPoE ports (Duplex, Full,

Half) and 4 x 1GE Uplink port.

Page 35: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

35

S.No Specification

2. Should have minimum switching capacity of 56 Gbps. All ports on the switch should work

on line rate.

3. Should be IPv4 and IPv6 ready from day one

4. The switch should support dedicated stacking port separate from uplink ports with 64 Gbps

of stacking bandwidth.

5. The switch should support atleast 16K MAC, 1K Multicast Routes and 1K unicast Routes

6. It shall support IEEE 802.1s Multiple Spanning Tree Protocol and provide legacy support

for IEEE 802.1d STP and IEEE 802.1w RSTP or equivalent technology and static routes.

7.

Port Security to secure the access to a port based on the MAC address of a user‟s device.

The aging feature to remove the MAC address from the switch after a specific time to allow

another device to connect to the same port.

8. Switch should support Port-based and 802.1Q tag-based VLANs, MAC-based VLAN,

Guest VLAN, Private VLAN Edge, also known as protected ports, with multiple uplinks

9. All ports should have features of auto- negotiate, flow control (802.3x), port based network

access control (802.1x), port security, MAC filtering etc.

10. The switch should support IPv6 RA-Guard, DHCPv6 Guard, IPv6 Source Guard, IPv6

Prefix Guard, IPv6 Destination Guard, IPv6 Snooping and device tracking features

Should support Jumbo Frame support to improve the performance of large data transfers

11. Should support TFTP, Telnet Server, DHCP Client

12. Should support International Certifications and Compliance

13. All necessary interfaces, connectors, patch cords (if any) & licenses must be delivered

along with the switch from day one.

14. The Switch should be 19" Rack mountable & the switch should be supplied with Indian

standard AC (5Amp) power cord.

b) Technical specification Wireless Controller

Sr.

No.

Specification

1 Must be compliant with IEEE CAPWAP for controller-based WLANs.

Page 36: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

36

2 WLAN Controller should support up to 70 Access points in a single 1 RU chassis.

3 WLAN controller must have at least 4 x 1Gbps of uplink interfaces.

4 Must not require a separate controller for Wireless Intrusion Prevention Access Points.

5 Must support both 1+1 and N+1 redundancy models.

6 Must support an ability to dynamically adjust channel and power settings based on the

RF environment.

7 Radio coverage algorithm must allow adjacent APs to operate on different channels, in

order to maximize available bandwidth and avoid interference

8 Must have Automatic 802.11 interference detection, identification, classification, and

mitigation. Classification should support a dynamically updatable signature library

9 Must support coverage hole detection and correction that can be adjusted on a per

WLAN basis.

10 Must support RF Management with 40 and 80 MHz channels with 802.11n and 802.11ac

11 WLC should support L2 and L3 roaming of IPv4/v6 clients

12 WLC should support First hop security features in IPv4/v6 network like Router

Advertisement guard, DHCP v4/v6 guard

13 WLC should support IPv4/v6 access control lists

14 Should support local username/password creation for users. Should also support User

authentication through ADS, RADIUS, SSO, local and thin client

15 WLC should support Guest-access functionality for IPv4/v6 clients

16 Should support ability to adjust Delivery Traffic Indicator Message (DTIM) on a per

WLAN basis to improve performance for latency sensitive applications.

17 Should adhere to the strictest level of security standards, including 802.11i Wi-Fi

Protected Access 2 (WPA2), WPA, Wired Equivalent Privacy (WEP), 802.1X with

multiple Extensible Authentication Protocol (EAP) types, including Protected EAP

(PEAP), EAP with Transport Layer Security (EAP-TLS), EAP with Tunneled TLS (EAP-

TTLS), RFC 4347

Page 37: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

37

18 Should support Management frame protection for the authentication of 802.11

management frames by the wireless network infrastructure.

19 Controller should have rogue AP detection, classification and automatic containment

feature

20 Must support internal and external web authentication.

21 Must be able to set a maximum per-user bandwidth limit on a per-SSID basis.

22 Must support user load balancing across Access Points.

23 Controller must provide Mesh capability for Mesh supported AP.

24 Must be able to dedicate some APs to monitor-only for Intrusion Prevention Services.

25 Must support client roaming across controllers separated by a layer 3 routed boundary.

26 Solution proposed must support clients roaming across at least 70 APs.

27 Should support the ability to schedule AP power on/off for energy savings.

28 Should provide a snapshot of air quality in terms of the performance and impact of

interference on the wireless network identifying the problem areas.

29 Should provide an Air Quality rating on a per- radio basis to help gauge the impact of

interference on the network

30 Should provide real-time charts showing interferers per access point, on a per-radio, per-

channel basis.

31 Should support encrypted mechanism to securely upload/download software images to

and from wireless controllers

32 Must support IEEE 802.11a, 802.11b, 802.11g, 802.11d, WMM/802.11e, 802.11h,

802.11k, 802.11n, 802.11r, 802.11u, 802.11w, 802.11ac

33 Should have Voice and Video Call Admission and Stream prioritization for preferential

QOS

34 Should support Internet Group Management Protocol (IGMP) snooping and access point

should transmits multicast packets only if a client associated to the access point is

Page 38: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

38

subscribed to the multicast group.

35 Controller should support deep packet inspection for all user traffic across Layer 4-7

network to analyses information about applications usage, peak network usage times for

all access points from day one in a central switching mode.

c) Technical specification of Outdoor Wireless Access Point

S.

No.

Specification

1 Access Points proposed must include radios for both 2.4 GHz and 5 GHz.

2 AP should support dual band antenna ports.

3 Must support a variety of antenna options. (Omni and directional)

4 Should have an option of adding external modules with technology options such as a 4G

LTE Pico cell or a sensor. Such a module could be field-upgradeable to an existing

network.

5 Must have -88 dB or better Receiver Sensitivity.

6 Must support 4X4 multiple-input multiple-output (MIMO) with three spatial streams

7 Must support 802.11ac and backward compatible with 802.11n standards

8 Must support data ratesup to 1.3 Gbps on 5Ghz radio.

9 Must support 80 MHz wide channels in 5 GHz.

10 Must support up to 30dbm or higher of transmit power

11 Access point should 802.11ac, 802.11n and 802.11a/b/g Beam forming

12 The Wireless Backhaul shall operate in 5Ghz

13 Support Encrypted and authenticated connectivity between all backhaul components

14 Mesh nodes shall provide Power Over Ethernet through the wired interface to power

other equipment

15 Access point should have multiple wired uplink interfaces including 10/100/1000BASE-T

Ethernet autosensing (RJ-45) and a build-in Fiber SFP port

16 Wireless AP should support beam forming technology to improve downlink performance

of all mobile devices, including one-, two-, and three-spatial-stream devices on 802.11ac

without taking the inputs from client.

17 Wireless AP Should have custom chipset to detect and classify non-Wi-Fi wireless

transmissions while simultaneously serving network traffic

Page 39: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

39

18 Should support configuring the access point as network connected sensor to access any

network location covered by the access point to get real-time Spectrum analysis data.

19 Must incorporate radio resource management for power, channel, coverage hole

detection and performance optimization

20 Access point shall support powering from AC, DC, and UPOE.

21 Access point shall support pole, wall and Cable strand mounting options.

22 The equipment shall support up to 100 MPH sustained winds & 165 MPH wind gusts.

23 The Access point shall be IP67 and NEMA rated

24 The Access point shall support operating temperature of -40 to 65°C

25 The Access point shall support Storage temperature of -50 to 70°C

26 802.11e and WMM

27 Wi-Fi Alliance Certification for WMM and WMM power save

28 Must support Reliable Multicast to Unicast conversion to maintain video quality at AP

level

29 Must support QoS and Video Call Admission Control capabilities.

30 Must support the ability to serve clients and monitor the RF environment concurrently.

31 Must support Spectrum analysis including @ 80 MHz

32 Same model AP that serves clients must be able to be dedicated to monitoring the RF

environment.

33 Should support mesh capabilities for temporary connectivity in areas with no Ethernet

cabling.

34 Mesh support should support QoS for voice over wireless.

35 Should have and option of configuring all the antennae port via software to run all on dual

band or any single band configuration.

36 Must support 16 WLANs per AP for SSID deployment flexibility.

37 Must support telnet and SSH login to APs directly for troubleshooting flexibility.

38 Access point should be supplied with OEM mounting kit ,shall support pole, wall,

roof mounting options and required power cables

d) Technical specification of Indoor Wireless Access Point

Sr.

No.

Specification

1 Access Points proposed must include radios for 2.4 GHz and 5 GHz with

802.11ac Wave 1.

Page 40: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

40

2 Mounting kit should be standard from OEM directly.

3 High-speed spectrum intelligence across 20-, 40-, and 80-MHz-wide channels

to combat performance problems due to wireless interference

4 Access point must have an additional Ethernet port for downlink connectivity

to an IP device like Camera etc.

5 Access point should have serial/console port

6 Must have at least 4 dB Antenna gain on both 2.4 Ghz and 5Ghz

7 Must support 3x3 multiple-input multiple-output (MIMO) with three spatial

streams

8 Must support minimum of 1.3 Gbps on 802.11ac respectively.

9 Must support minimum of 22dbm of transmit power on both 2.4Ghz & 5GHz

radio.

10 The AP must be capable of optimizing the SNR exactly at the position where

802.11a/g/n/ac client is placed (beam forming) without requiring any support

from clients, hence it should work with all 802.11a/g/n/ac clients.

11 Should have detecting and classifying non-Wi-Fi wireless transmissions while

simultaneously serving network traffic

12 Should support configuring the access point as network connected sensor to

access any network location covered by the access point to get real-time

Spectrum analysis data.

13 Must support AP enforced load-balance between 2.4Ghz and 5Ghz band.

14 Must incorporate radio resource management for power, channel, coverage

hole detection and performance optimization

15 Must have -100 dB or better Receiver Sensitivity.

16 Must support Proactive Key Caching and/or other methods for Fast Secure

Roaming.

17 Must support Management Frame Protection.

18 Should support locally-significant certificates on the Aps using a Public Key

Infrastructure (PKI).

19 Must operate as a sensor for wireless IPS

20 Should support non-Wi-Fi detection for off-channel rogues and Containment

for both radio

21 Access point should able to do the spectrum scanning for WiFi and non-WiFi

interference at all 20Mhz ,40Mhz and 80Mhz channels

22 Access Points must support a distributed encryption/decryption model.

Page 41: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

41

23 Access Points must support Hardware-based encrypted user data and

management traffic between controller and Access point for better security.

24 Same model AP that serves clients must be able to be dedicated to

monitoring the RF environment.

25 AP model proposed must be able to be both a client-serving AP and a

monitor-only AP for Intrusion Prevention services.

26 Should support mesh capabilities for temporary connectivity in areas with no

Ethernet cabling.

27 Mesh support should support QoS for voice over wireless.

28 Must be plenum-rated (UL2043).

29 Must support 16 WLANs per AP for SSID deployment flexibility.

30 Must continue serving clients when WAN link to controller is back up again,

should not reboot before joining

31 The Aps must support centralized wireless mode with the use of a controller,

but the Aps must also support operation in autonomous mode without the

presence of any controller, when needed.

32 When operated in remote AP mode, the AP must not disconnect any clients

when the connection to the controller fails or in the case the failed connection

has been restored again.

33 Access point should able to do the spectrum scanning for WiFi and non-WiFi

interference at all 20Mhz ,40Mhz and 80Mhz channels

34 Must support telnet and/or SSH login to Aps directly for troubleshooting

flexibility.

35 Must support Power over Ethernet, local power (DC Power), and power

injectors.

36 Must operate at 3x3 or higher with 802.3af PoE is the source of power

37 802.11e and WMM

38 Must support QoS and Video Call Admission Control capabilities.

39 Access Point should 802.11 DFS certified

40 Should be supplied with OEM mounting kit and all necessary power cables

and patch cords

Page 42: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

42

e) Technical Specification of Firewall

Sr.

No.

Specification

1. Firewall should have minimum of one WAN port and minimum 4-GbE ports

10/100/1000 Mbps

2. Firewall should support “Stateful” policy inspection technology. It should also

have application intelligence for commonly used TCP/IP protocols like telnet,

ftp etc.

3 Firewall should support Access control: MAC-based access control, IP/MAC

binding, wireless profiles. Should support username , group based policies

4. User authentication through ADS, RADIUS, SSO,local and thin client

5. Should support Web filtering:web categories database, Static URL blocking,

keyword blocking, Controls based on URL, Keyword and File type

6. Firewall should support Bandwidth Management. Application, Web Category

and User Identity based Bandwidth Management and Application & User

Identity based Traffic Discovery

7. Should support a minimum of 200 Users.

8. Should support Real-time and historical Monitoring and haveLog Viewer for-

Web filter, Authentication, System and Admin Events

9. Should have following Administration & System Management features

- Web-based configuration wizard and Web UI

- Role-based Access control

- Firmware Upgrades via Web UI

- Command Line Interface (Serial, SSH, Telnet)

- SNMP (v1, v2c)

- Should be able to provide seamless centralized management, policy

replication and consolidated reporting across the network

Page 43: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

43

f) Requirement of MPLS Links:

S.

No. Address of HUDA Offices Site Type Locations

Bandwidth

Sizing

Backup

Bandwidth

1.

Haryana State Data Center, Mini

Secretariat, Sector 17, Chandigarh.

(internet)

Tier - 1 Chandigarh

(Internet )

20 Mbps

10 Mbps

2. Haryana State Data Center, Mini

Secretariat, Sector 17, Chandigarh. Tier - 1

Chandigarh

(Intranet) 20 Mbps 10 Mbps

3. HUDA Complex, Sector 12, Faridabad Tier -1 Faridabad 6 Mbps 4 Mbps

4. Estate Office-II,HUDA,Sector 34

Gurgaon Tier - 1 Gurgaon 4 Mbps --

5. HUDA, Sector 14, Gurgaon Tier - 1 Gurgaon 6 Mbps 4 Mbps

6. HUDA Complex, Sector 13, Hisar Tier - 1 Hisar 6 Mbps 4 Mbps

7.

HUDA HO at Panchkula Tier - 1

Panchkula

(Intranet) 20 Mbps 10 Mbps

8. HUDA HO at Panchkula

Tier - 1 Panchkula

Internet 30 Mbps 10 Mbps

9. HUDA office, Sonipat Road,

Sec.3,Rohtak.

Tier - 1 Rohtak 6 Mbps 4 Mbps

10. SCO 7-8, Sector 7, Ambala Tier - 2 Ambala 2 Mbps --

11. Estate Office, HUDA, Sector 9,

Bahadurgarh

Tier - 2 Bahadurgarh 2 Mbps --

12. Estate Officer, HUDA, Sector 13, City

Center, Bhiwani Tier - 2 Bhiwani 2 Mbps --

13. CE OFFICE - HUDA South City I

Gurgaon

Tier - 2 Gurgaon 1 Mbps --

14. HUDA Sector 9 Gurgaon Tier - 2 Gurgaon 1 Mbps --

15. HUDA sector 15, Gurgaon Tier - 2 Gurgaon 1 Mbps --

16. Huda nursery hort. Div. Sec.14,

Gurgaon

Tier-2 Gurgaon 1 Mbps --

17. Estate Officer, HUDA, Sector 17,

Jagadhari

Tier - 2 Jagadhari 2 Mbps --

18. Estate Officer, HUDA, Safidon Road, Tier - 2 Jind 1 Mbps --

Page 44: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

44

S.

No. Address of HUDA Offices Site Type Locations

Bandwidth

Sizing

Backup

Bandwidth

Jind

19. Estate Officer, HUDA, Sector 20,

Kaithal

Tier - 2 Kaithal 1 Mbps --

20. HUDA Complex, Sector 12, Karnal Tier - 2 Karnal 2 Mbps --

21. Estate Officer, HUDA, Sector 13,

Kurukshetra

Tier - 2 Kurukshetra 2 Mbps --

22. HUDA Sector 8, Panchkula Tier - 2 Panchkula 2 Mbps --

23. HUDA, Industrial Area, Phase-I,

Panchkula

Tier - 2 Panchkula 2 Mbps --

24. EO Office, HUDA, Sector 18, Panipat Tier - 2 Panipat 2 Mbps --

25. HUDA Complex, Sector 1, Rewari Tier - 2 Rewari 2 Mbps --

26. HUDA Complex, Sector 1, Rohtak Tier - 2 Rohtak 1 Mbps --

27. Estate Officer,HUDA, Sector 20, Sirsa Tier - 2 Sirsa 2 Mbps --

28. HUDA Complex, Sector 15, Sonepat Tier - 2 Sonepat 2 Mbps --

29. Division Office, SCO No. 25, Sector 12,

Faridabad Tier - 2 Faridabad 2 Mbps --

Wifi Zone Internet Link

30 HUDA HQ SEC 6 , panchkula

Tier -1 Panchkula 10Mpbs

--

31 HUDA Complex, Sector 12, Faridabad Tier -1 Faridabad 10Mpbs

32 HUDA office, Sonipat Road,

Sec.3,Rohtak.

Tier -1 Rohtak

10Mpbs

33 HUDA Complex, Sector 13, Hisar Tier -1 Hisar 10Mpbs

34 HUDA, Sector 14, Gurgaon Tier -1 Gurgaon 10Mpbs

Page 45: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

45

5 SERVICE LEVEL REQUIREMENTS

SLA is designed to monitor the delivery schedule for the items sought by the HUDA. If the

Successful Bidder delivers as per the base line matrix payment is to be made to the

Successful Bidder as per details below: -

A: SERVICE LEVEL AGREEMENT FOR CONNECTIVITY (MPLS and Internet)

S.

N.

Job

Description Baseline Payment

Lower

Performance Payment Breach Payment

1.

Commissioning

of complete

Network at all

locations.

T +8

Weeks

First

Installment –

at the end of

quarter

Delay by

2

Weeks

Deduct 10% of

Quarterly

payment (QP)

Greater

than

2

Weeks

Deduct

15% of

QP

2.

Site remains

down

continuously for

3 days or more

DCL+3

days

No Payment

for the

Month will

be made for

that

particular

site

Delay by

another 1

days

Deduct 10% of

QP

Delay

by

another

1 days

Deduct

15% of

QP

3.

Non

Submission of

Network report

Daily at

10

AM and

4 PM

Deduct .25% of

quarterly

payment for

each default

4.

Total Network

availability at

each Site (Total

hours in the

quarter at

particular site –

Down time in

hours at

particular site)/

Total hours in

>=99.5% Full Payment

>=98% &

<99.5% 5% of QP

>=98% &

<=95%

10% of QP for

each % point

>=95% &

<=93%

20% of QP

for each %

point below

95%

<=93% No Payment

Page 46: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

46

S.

N.

Job

Description Baseline Payment

Lower

Performance Payment Breach Payment

the quarter for a

particular site

5.

Shifting of

links/up

gradation of

bandwidth

<= 3

weeks

from the

date of

order

Full payment >3 weeks

In the event of

non-

commissioning

of the link

within 3 weeks

from the date

or order,

penalty

at the rate of

10% of the

order value will

be charged for

every week

delay, subject

to a maximum

of 30% of the

order value

beyond which

link will be

shifted/upgrade

d at no cost to

HUDA

6.

Average Jitter

during Quarter

(milliseconds)

<=50ms Full payment >50ms to <

100ms

0.1 % of

quarterly

payment of the

particular link

>=100ms

0.5% of

quarterly

payment of the

particular link

Page 47: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

47

S.

N.

Job

Description Baseline Payment

Lower

Performance Payment Breach Payment

7.

Latency ( Tier-I)

<90 ms Full payment

>= 90 ms for

>=2 and <5

hours

0.1% of

quarterly

payment of the

particular link

>= 5 hours

0.5% of

quarterly

payment of the

particular link

8. Latency ( Tier-

2)

<130 ms Full payment

>=130ms for

>=2 and <5

hours

0.1% of

quarterly

payment of the

particular link

>= 5 hours

0.5% of

quarterly

payment of the

particular link

T = Date of placement of Letter of Intent.

QP = Quarterly payment payable to service provider for particular site

DCL = Date of Call Logging.

(Call will be considered logged if the user finds a link down in network report to be submitted

by the user twice a day OR by during random checking of a link or from any reason where

the user cannot be able to access or update the site from that location. Logging time will be

10:00 AM or 4:00PM as per reports)

DCC= Date of call closed. (Call will be considered close if the user will be able to access and

update the information from the respective site)

The Successful bidder shall provide full committed bandwidth at All locations to HUDA.

Page 48: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

48

B: Service Level Agreement for Supply and Installation of Hardware (Network and

Wireless device)

S.

N.

Job

Description

Baseline Payment (P1) Lower

Performance

Payment

(P2)

Breach Payment

(P3)

1. Successful

Delivery,

Installation and

Inspection of

hardware

T + 6

Weeks

30% of Q1 Delay by <=

2

Weeks

Deduct 15 %

of P1

Greater

than 2

Weeks

Deduct

30 % of P1

2 Successful

Commissioning

of Wi-Fi Zones

( Signoff letter

by HUDA)

T+10

Weeks

50% of Q1 Delay by

<=2 weeks

Deduct 15 %

of P1

Greater

than 2

Weeks

Deduct

30 % of P1

3 Call Resolution DCL + 4

hours

Delay of 4

Hours from

DCL

Rs.500/- per

8 hours of

delay to be

deducted

from

quarterly

payment

T = Date of placement of Order.

Q1 = is the quotes submitted by the Successful Bidder for Hardware etc.

DCL = Date of Call Logged

Page 49: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

49

6 TERMS AND CONDITION

6.1 Use of RFP document and other Information

(i) Successful bidder shall not, without the Tenderer‟s prior written consent, disclose

the contract agreement, or any provision thereof, or any specification, pattern,

sample or information furnished by or on behalf of Tenderer in connection to

any person other than a person employed by the Tenderer in the performance

of the contract agreement and the scope of work. Disclosure of

document/information to any such employed person shall be made in

confidence and shall extend only as far as may be necessary for such

performance.

6.2 Responsibilities of Successful bidder

(i) The successful bidder is responsible to execute all but not limited to the work

specified under scope of work as specified in section-3 of this RFP.

(ii) The successful bidder shall be responsible for arranging Hardware, software,

bandwidth integration, Commissioning and maintenance to ensure end to end

connectivity as well as adhering to the SLA defined in the RFP.

(iii) The successful bidder shall handle all the technical and implementation

matters including timely commissioning and maintenance of the equipment

provided against this RFP.

6.3 Warranty

(i) Successful bidder will also be responsible for providing comprehensive onsite

warranty during the period of contract for all end to end equipment and their

related accessories supplied under this RFP. The warranty of the all

equipment should be 3 Years. The bidder will submit relevant

documents/undertaking for 3 year warranty of all equipment

(ii) Warranty shall be deemed to commence from the date of the successful

completion and final acceptance by HUDA

(iii) Successful bidder shall undertake the preventive maintenance of all supplied

equipment supplied under this RFP once in every quarter during the currency

of contract so as to ensure the smooth functioning of the system.

Page 50: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

50

6.4 Project Management and Service Level Agreement

(i) The successful bidder shall provide MPLS VPN services initially for three

years with an option to extend the same on quarterly basis for a maximum of

Four quarters. The successful bidder shall also manage the end to end

equipment supplied and installed under this project.

(ii) Service level agreement:-

For Connectivity: The successful bidder will sign a Service Level Agreement

with HUDA to ensure minimum 99.5% uptime for locations of the entire

Network and uptime for individual sites as per SLA. SLA Matrix is at “Section

5”.

For Hardware/ Software: The successful bidder will sign a Service Level

Agreement with HUDA to ensure minimum 99.0% uptime

(This includes all the hardware and associated software provided by the

Successful Bidder)

6.5Payment schedule

Payments will be made from HUDA HQ.

a) Bandwidth:

(i) The payments are to be released on equated quarterly basis on the

submission of the Bills.

(ii) Payments will be made quarterly basis on submission of invoices and

calculation of penalties as per SLA. The First quarter will start from the date

of Commissioning of project

b) For Hardware/ Software:

Sno. Milestone Payment

1 Successful supply and installation of

equipment (Network, Wireless etc. ) at

respective locations of HUDA

30 % of total category A as

per Performa-3

Page 51: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

51

2 Successful commissioning of equipment

(network Wireless etc.) at HUDA

locations and Receiving signoff from

HUDA

40 % of total category A as

per Performa-3

3 Remaining Payment for equipment

(Network, Wireless etc.) based on

successful working of Equipment etc. for

the duration of contract

30 % of total category A as

per Performa-3 as Equated

Quarterly payments

6.6 Compliance with laws, permits

The successful bidder shall comply with all local, state rules, regulations,

ordinances, codes, and laws relating to the work or the conduct thereof and shall

secure and pay for any permits and licenses necessary for the execution of the

work and successful bidder shall be responsible for the same.

6.7 Earnest Money Refund

(i) The Draft of earnest money to the bidder(s), who fail(s) to qualify forthe technical bid,

will be returned back by HUDA to the authorized representative of the bidder against

a proper receipt or will be sent by the registered post at the mailing address of the

bidder as specified in the bid within four weeks of opening of the prequalification bid.

(ii) The Draft of earnest money to the bidder(s), who fail(s) to qualify for the commercial

bid, will be returned back by HUDA to the authorized representative of the bidder

against a proper receipt or will be sent by the registered post at the mailing address

of the bidder as specified in the bid within eight weeks after completion of technical

bid evaluation.

(iii) The Draft of earnest money to the bidder(s), who qualify(s) for the commercial

bid, but do not get the order for the project will be returned back by HUDA to

the authorized representative of the bidder against a proper receipt or will be

sent by the registered post at the mailing address of the bidder as specified in

the bid within one month after signing of contract agreement between HUDA

and the successful bidder.

Page 52: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

52

6.8 Forfeiture of earnest money

(i) If the bidder with Draws his bid before the expiry of validity or after the

acceptance of the bid, the earnest money deposited by the successful bidder

will be forfeited.

(ii) If the successful bidder fails to comply with any of the terms, conditions or

requirement of this contract and the technical specifications for the equipment

requirement as indicated in various sections of the RFP document, the earnest

money deposited by the bidder will be forfeited.

(iii) In case successful bidder fails to comply with the project milestones the

earnest money deposited will be forfeited.

(iv) In case of issue of the Letter of Intent, if the bidder fails to:

(a) Accept the Letter of Intent by returning a duly signed copy within the time

limit specified; and / or

(b) Execute the contract agreement; and / or

(c) Furnish the performance HUDA guarantee as specified in this Document.

The earnest money deposit will be forfeited

6.10 Letter of intent and Performance Bank Guarantee

(i) After Acceptance of a Bid Proposal by HUDA, a letter of intent will be issued

by the HUDA to the successful Bidder

(ii) Acceptance of the letter of intent: The successful bidder shallaccept the Letter

of Intent within 10 (ten) days from the date of issueof the Letter of Intent by

returning a duly signed copy to HUDA

(iii) Signing of contract: The successful Bidder shall enter into theContract

Agreement with HUDA within 15 days of the acceptance ofthe Letter of Intent

(iv) Performance bank guarantee: While signing the Contract Agreement with

HUDA, the successful bidder within 15 (fifteen) daysof signing the Contract

agreement shall furnish unconditionalirrevocable Performance Bank

Guarantee of 15% of the total valueof the project cost from a Nationalized

Bank in favor of "CA, HUDA"on the prescribed Format (as mentioned at

Annexure 1), by thebidders valid till Six months more than the currency of the

contract.The said Performance Bank Guaranteebe extendable by the HUDA

as per the requirement and shall bekept in full force and effect for the full term

of the ContractAgreement. Further,the decision of the HUDA with regard to

the Performance BankGuarantee shall be binding on the successful bidder.

Page 53: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

53

HUDA mayforfeit the Performance Bank Guarantee for any failure on part

ofsuccessful bidder to complete its obligations under the Agreement.The

Performance Guarantee shall be denominated in Indian Rupeesand shall be

in the formof a Bank Guarantee issued by a scheduledbank located in India.

6.11 Force Majeure

Neither party shall be responsible to the other for any delay or failure in

performance of its obligations due to any occurrence commonly known as Force

Majeure which is beyond the control of any of the parties, including, but without

limited to, fire, flood, explosion, acts of God or any Governmental body, public

disorder, riots, embargoes, or strikes, acts of military authority, epidemics, strikes,

lockouts or other labour disputes, insurrections, civil commotion, war, enemy

actions. If a Force Majeure arises, the Bidder shall promptly notify HUDA and

HUDA in writing of such condition and the cause thereof. Unless otherwise directed

by HUDA and HUDA, the successful bidder shall continue to perform his obligations

under the contract as far as is reasonably practical, and shall seek all reasonable

alternative means for performance not prevented by the Force Majeure event. The

successful bidder shall be excused from performance of his obligations in whole or

part as long as such causes, circumstances or events shall continue to prevent or

delay such performance.

6.12 Termination of the contract

(i) In the event of the bidder failing duly and properly to fulfill the contract or

committing breach of any of the terms and conditions of this contract or

repeatedly supplying goods liable to rejection hereunder or failing, declining,

neglecting or delay to comply with any demand or requisition or otherwise not

executing the same in accordance with terms of this contract or not achieving

the project milestones or if the bidder or his agent or servants being guilty of

fraud in respect of this contract or any of his partners or representatives found

directing, giving, promising or offering any bribes, gratuity, gift loan, perquisite,

reward or advantage pecuniary or otherwise to any person in the employment

of Government in any way relating to such officers or person or persons,

officer or employment or if the bidder or any of his partners become insolvent

or apply for relief as insolvent debtor or commence any insolvency

proceedings or make any composition with his/their creditors or attempts to do

so, then without prejudice to HUDA rights and remedies otherwise, HUDA

Page 54: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

54

shall be entitled to terminate this contract forth with and may claim back all or

part of the money already paid to the bidder.

(ii) The termination of this contract in whole or part under any conditions shall not

be affected by the acceptance, meanwhile or subsequently, of supplies

accepted or made at any station whether in ignorance of the termination or

otherwise.

(iii) If during the currency of the contract, the successful bidder becomes bankrupt

or otherwise insolvent or is likely to become insolvent or bankrupt, HUDA may,

at any time, terminate the contract agreement by giving written notice to the

successful bidder. Notwithstanding the above, such termination will not

prejudice or affect any right of action or remedy which has accrued or will

accrue thereafter to HUDA.

6.13 Insurance of items

Successful bidder shall insure all the delivered items against loss or damage

incidental to manufacture or acquisition transportation, storage and delivery. The

insurance shall be obtained by the Successful Bidder, naming the purchaser as the

beneficiary, in an amount equal to the exact value of the Goods up to the

installation at site on all risks basis, including strikes clauses etc. till the date of

acceptance of the project.

6.14 Arbitration

a) In the event of any dispute or difference arising between the Successful Bidder

and HUDA and HUDA out of or in connection with the Contract or RFP or any of

the terms and conditions contained therein or as to the interpretation or any other

matter, both the parties shall resolve such dispute or difference first by mutual

discussions. If any dispute or difference still persists, it shall be referred to the

court of Financial commissioner and Principle Secretary Town and Country

Planning, Haryana and such a decision shall be binding on both the parties.

b) This RFP and the Contract shall, in all respects, be governed by and construed in

all respects in accordance with the laws of the Republic of India.

6.15 Acquaintance with all conditions

The bidder acknowledges that he has made himself fully acquainted with all the

conditions and circumstances under which the supplies required under the contract

Page 55: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

55

will have to be made or furnished and with all the terms, clauses, conditions,

specifications and other details of the contract and the bidder shall not plead

ignorance of any of those as excuse in case of complaint against or on rejection of

supplies tendered by him or with a view either to ask for encashment of any rates

agreed to in the contract or to evading any of his obligations under the contract.

6.16 Limitations of Liability

Further, bidders‟ cumulative liability for its obligations under contract shall not

exceed the total contract value.

6.17 Risk & Cost

Risk purchase at the cost of supplier / service provider will be made on the failure of

the supplier / service provider to make supply / to provide services as per Terms

and Conditions mentioned in the tender documents. The difference of excess in

cost thus incurred will be recovered from the supplier / service provider in a suitable

manner and even from his pending bills, earnest money or security whichever is

available.

Page 56: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

56

Annexure

Page 57: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

57

(To be submitted by the successful bidder)

Annexure – 1

Format of Performance Bank Guarantee in favour of HUDA

In consideration of Haryana Urban Development Authority (HUDA) and having its

Headquarter at Sector 6 Panchkula, which expression unless the context otherwise requires,

shall include its successors and permitted assigns (the “HUDA”) having agreed to accept

from [ ] (the name of the Contractor) a company incorporated, organized and

subsisting under the Companies Act, 1956 (1 of 1956) and having its registered office at

[ ] which expression unless the context otherwise requires, shall include its

successors and permitted assigns (the “Contractor”) under the terms and conditions of an

agreement dated the [………] day of [……..] between the HUDA and the Contractor for

Providing network connectivity and infrastructure at HUDA locations and setup of Wi-Fi

Zones at administrative offices of HUDA as specified in the RFP Document for the same.

Security deposit for the due fulfillment by the Contractor of the terms and conditions

contained in the Contract Agreement on production of an interest free bank guarantee

(“Performance Bank Guarantee”) of 15% of the total work value of Rs.____________

(Rs.___________only) amounting to Rs. _______________ (Rs._______ only) in favour of

the HUDA valid six months more than the currency of the contract agreement.

We, [ ] (name of the, Bank) do hereby guarantee and undertake to indemnify and

pay and keep indemnified the HUDA in terms of the Contract Agreement to the extent of this

Bank Guarantee value of Rs.________ (_____rupees only).

1. We, [ ] (name of the Bank) further agree that if a demand is made by the

HUDA for honoring the Performance Bank Guarantee we, [ ] (name of the

Bank) having no right of decline to cash the same for any reason whatsoever. The fact

that there is a dispute between the HUDA and the Contractor is no ground for us [

] (name of the Bank) to decline to honour the Performance Bank Guarantee.

2. We, [ ] (name of the Bank) further agree that a mere demand by the

HUDA is sufficient for us [ ] (name of the Bank) to pay the amount covered

by the Performance Bank Guarantee without reference to the Contractor and any

protest by the Contractor cannot be valid for us [ ] (name of the Bank) to

decline payment to the HUDA.

3. We, [ ] (name of the Bank) further agree that the HUDA shall have the

fullest liberty, without affecting in any manner our obligations hereunder to vary any of

Page 58: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

58

the terms and conditions of the Contract Agreement or to extend time of performance

by the Contractor from time to time or to postpone for any time or from time to time,

any of the powers exercisable by the HUDA against the Contractor and to forbear or

enforce any of the terms and conditions relating to the Contract Agreement and we

shall not be relieved from our liability by reasons of any such variation or extension

being granted to the Contractor or for any forbearance, act or omission on the part of

the HUDA or any indulgence by the HUDA to the Contractor or any such matter or

thing whatsoever which under the law relating to sureties would but for this provision

have effect of so relieving us [ ] (name of the Bank).

4. We [ ] (name of the Bank) lastly undertake not to revoke this Guarantee

during its currency except with the previous consent of the HUDA in writing.

DATED THE [ ] DAY OF [ ] Signatures _____________

Name _________________

Designation______________

For [Name of the Bank]

(Seal of the Bank)

Page 59: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

59

PROFORMA’S

Page 60: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

60

Proforma 1 BID PROPOSAL SHEET

Bidder‟s Proposal

Reference No. and Date

:

Bidder‟s Name and address :

Tel. No. Fax No.

Bidders Correspondence

address

Tel. No. Fax No

Name of contact Person :

Designation :

Telephone No (s) :

Fax No (s) :

Mobile No :

Email ID :

Page 61: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

61

To,

The Chief Administrator, HUDA, C-3

Sector 6, Panchkula.

Subject: Proposal for – providing network connectivity and infrastructure at all HUDA

locations and set up of Wi-Fi zones at administrative offices of HUDA

Dear Sir,

1. We, M/s __________________, having read and examined in detail the specifications,

requirements as mentioned in the TENDER do hereby propose to provide and

commission the requirements as specified in the TENDER.

2. PRICE AND VALIDITY

All the prices mentioned in our proposal are in accordance with the terms as specified

in bidding documents. All the prices and other terms and conditions of this proposal

are valid for a period of 180 days from the opening of the commercial bid or six months

from the last date of submission of the TENDER, whichever is later.

3. EARNEST MONEY

We have enclosed the earnest money in the form of HUDA Draft amounting to Rs.

________________(Rs._________________). It is liable to be forfeited in accordance

with the provisions of TENDER document.

4. ASSURANCE

We declare that all the services shall be performed strictly in accordance with the

technical specifications and other terms and conditions covered in TENDER document.

5. BID PRICING

We further declare that the prices stated in our proposal are in accordance with your

terms & conditions in the bidding document.

Page 62: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

62

6. QUALIFYING DATA

We confirm having submitted the qualifying data as required by you in your TENDER

document. In case you require any further information/ documentary proof in this

regard before evaluation of our bid, we agree to furnish the same, in time, to your

satisfaction.

7. Compliance

We declare that we shall compliance for all the Services, supply of Hardware,

Resolution of call logged in time and All Terms and Conditions mentioned in the RFP

Document.

8. We hereby declare that in case the contract is awarded to us, we shall submit the

HUDA Guarantee as per terms of TENDER document.

9. We hereby declare that our proposal is made in good faith, without collusion or fraud

and the information contained in the proposal is true and correct to the best of our

knowledge & belief. We further declare that we have read the provisions of this

TENDER and confirmed that these are acceptable to us.

10. Bid submitted by us is properly prepared and sealed so as to prevent any subsequent

alteration and replacement.

11. We understand that you are not bound to accept the lowest or any bid by you.

Thanking you,

Yours faithfully,

(Authorized Signatory)

Signatures of authorized signatory

Seal of the company

Name:

Address:

Date:

(To be enclosed with Technical Bid)

Page 63: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

63

Proforma – 2

UNDERTAKING BY THE BIDDER

NAME OF THE BIDDER: M/s___________________________________

The bidder is requested to sign and affix their seal on each page of this document and

submit this duly signed original TENDER document with Technical bid in respective cover

without fail.

The bidder is also requested to give the following declaration as per the format.

We M/s ____________________________________ have gone through the terms and

conditions and will abide by them as laid down vide pages from 1 to ____ (TENDER

Commercial Bid and all relevantAnnexures and formats enclosed)

We M/s ____________________________________ hereby confirm that our firm has not

been blacklisted by any State Government / Central Government. We M/s

____________________________________ further confirm that our firm has no legal case

pending in any of the courts for winding up the company.

We M/s ____________________________________ hereby declare that the particulars

furnished by us in this offer are true to the best of our knowledge and we further understand

and accept that, if at any stage the information furnished is found to be incorrect or false, we

are liable for disqualification from this tender and also is liable for any penal action that may

arise due to the above.

Signature:

Date: Name:

Place: Designation:

(To be enclosed with Commercial Bid)

Page 64: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

64

Proforma – 3 Financial Form

CATEGORY- A

S.

N.O

Hardware / Software Quantity* Per unit cost Total Cost

Including

Taxes

1 Supply, Installation, Commissioning at

respective locations with three Year On-

site Comprehensive Warranty

Maintenance of Network Switches with

management software and licenses etc.

along with all necessary accessories as

per technical specifications and scope of

work at all HUDA locations

05

2 Supply, Installation, Commissioning at

respective locations with three Year On-

site Comprehensive Warranty

Maintenance of Wi-Fi Controller with

management software and licenses etc.

along with all necessary accessories as

per technical specifications and scope of

work

05

3 Supply, Installation, Commissioning with

three Year On-site Comprehensive

Warranty Maintenance of Outdoor

Wireless Access Point with all necessary

accessories as per technical

specifications and scope of work

Location Quantity

Panchkula 3

Rohtak 1

Faridabad 1

Gurgaon 1

Hisar 1

Total 7

Page 65: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

65

S.

N.O

Hardware / Software Quantity* Per unit cost Total Cost

Including

Taxes

4 Supply, Installation, Commissioning with

three Year On-site Comprehensive

Warranty Maintenance of Indoor

Wireless Access Point with all necessary

accessories as per technical

specifications and scope of work

Location Quantity

Panchkula 12

Rohtak 8

Faridabad 8

Gurgaon 6

Hisar 6

Total 40

5 Supply, Installation, Commissioning with

three Year On-site Comprehensive

Warranty Maintenance of Firewalls with

all necessary accessories as per

technical specifications and scope of

work

05

6 Total cost of Supply, Installation, testing,

commissioning of network connectivity &

devices at all HUDA locations and

interconnection of Wireless access

points through with all industry standard

accessories such as Racks (min. 5 no.) ,

PVC Conduit, UTP Cables, Patch Panel,

Patch Cord, Cat-6 cables, cable laying

accessories , electrical works etc. for all

five locations

01

Total Costfor category ‘A’

* The above mentioned Quantities are tentative only and successful bidder shall suggest the required

quantity after site survey.

Page 66: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

66

*Suggested quantity may be increased/decreased by HUDA

Category – B

Commercial sheet for MPLS VPN connectivity

S.

No.

address of HUDA

Offices

Site

Type Locations

Bandwidth

Sizing

Backup

Bandwidth

Three year

charges for

bandwidth

including taxes

as applicable

1.

Haryana State Data

Center, Mini

Secretariat, Sector

17, Chandigarh.

Tier -1

Internet

Chandigarh

(Internet )

20 Mbps

10 Mbps

2.

Haryana State Data

Center, Mini

Secretariat, Sector

17, Chandigarh.

Tier – 1

Chandigarh

20 Mbps

10Mbps

3.

HUDA Complex,

Sector 12,

Faridabad

Tier -1

Faridabad 6 Mbps 4 Mbps

4.

Estate Office-

II,HUDA,Sector 34

Gurgaon

Tier - 1

Gurgaon 4 Mbps

5. HUDA, Sector 14,

Gurgaon

Tier – 1

Gurgaon 6 Mbps 4 Mbps

6. HUDA Complex,

Sector 13, Hisar

Tier – 1

Hisar 6 Mbps 4 Mbps

7.

HUDA HO at

Panchkula

Tier - 1 Panchkula

Intranet

20 Mbps

10 Mbps

8. HUDA HO at

Panchkula

Tier-1

Internet

Panchkula

Internet

30 Mbps 10 Mbps

Page 67: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

67

S.

No.

address of HUDA

Offices

Site

Type Locations

Bandwidth

Sizing

Backup

Bandwidth

Three year

charges for

bandwidth

including taxes

as applicable

9. HUDA office,

Sonipat Road,

Sec.3,Rohtak.

Tier - 1 Rohtak 6 Mbps 4 Mbps

10. SCO 7-8, Sector 7,

Ambala

Tier - 2 Ambala 2 Mbps

11. Estate Office,

HUDA, Sector 9,

Bahadurgarh

Tier - 2 Bahadurgarh 2 Mbps

12.

Estate Officer,

HUDA, Sector 13,

City Center,

Bhiwani

Tier - 2 Bhiwani 2 Mbps

13. CE OFFICE -

HUDA South Cit-y I

Gurgaon

Tier - 2 Gurgaon 1 Mbps

14. HUDA Sector 9

Gurgaon

Tier - 2 Gurgaon 1 Mbps

15. HUDA

sector 15, Gurgaon

Tier - 2 Gurgaon 1 Mbps

16. Huda nursery hort.

Div. Sec.14,

gurgaon

Tier-2 Gurgaon 1 Mbps

17. Estate Officer,

HUDA, Sector 17,

Jagadhari

Tier - 2 Jagadhari 2 Mbps

18. Estate Officer,

HUDA, Safidon

Tier - 2 Jind 1 Mbps

Page 68: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

68

S.

No.

address of HUDA

Offices

Site

Type Locations

Bandwidth

Sizing

Backup

Bandwidth

Three year

charges for

bandwidth

including taxes

as applicable

Road, Jind

19. Estate Officer,

HUDA, Sector 20,

Kaithal

Tier - 2 Kaithal 1 Mbps

20. HUDA Complex,

Sector 12, Karnal

Tier - 2 Karnal 2 Mbps

21. Estate Officer,

HUDA, Sector 13,

Kurukshetra

Tier - 2 Kurukshetra 2 Mbps

22. HUDA Sector 8,

Panchkula

Tier - 2 Panchkula 2 Mbps

23. HUDA, Industrial

Area, Phase-I,

Panchkula

Tier - 2 Panchkula 2 Mbps

24. EO Office, HUDA,

Sector 18, Panipat

Tier - 2 Panipat 2 Mbps

25. HUDA Complex,

Sector 1, Rewari Tier - 2 Rewari 2 Mbps

26. HUDA Complex,

Sector 1, Rohtak

Tier - 2 Rohtak 1 Mbps

27. Estate

Office,HUDA,

Sector 20, Sirsa

Tier - 2 Sirsa 2 Mbps

28. HUDA Complex,

Sector 15, Sonepat

Tier - 2 Sonepat 2 Mbps

29.

Division Office,

SCO No. 25, Sector

12, Faridabad

Tier - 2 Faridabad 2 Mbps

Page 69: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

69

S.

No.

address of HUDA

Offices

Site

Type Locations

Bandwidth

Sizing

Backup

Bandwidth

Three year

charges for

bandwidth

including taxes

as applicable

WIFI ZONE INTERNET BANDWIDTH

30.

HUDA sector -6

Panchkula HQ

( leased line for Wi-

Fi Zone)

Tier -1

Panchkula 10 Mbps

31.

HUDA Complex,

Sector 12,

Faridabad ( leased

line for Wi-Fi Zone)

Tier -1

Faridabad

10 Mbps

32.

HUDA office,

Sonipat Road,

Sec.3, Rohtak.

(leased line for Wi-

Fi Zone)

Tier -1 Rohtak 10 Mbps

33.

HUDA Complex,

Sector 13, Hisar

(leased line for Wi-

Fi Zone)

Tier -1 Hisar 10 Mbps

34.

HUDA, Sector 14,

Gurgaon ( leased

line for Wi-Fi Zone)

Tier -1 Gurgaon 10 Mbps

Total Cost for ‘Category B’

Note-1) HUDA may increase/decrease bandwidth required at sites.

2) HUDA may Increase/decrease the number of Sites.

Page 70: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

70

Bids will be evaluated on least Grand Total Cost

Total cost will be calculate as follows

Grand Total cost = 30% of category A + 70 % total cost of category B

Note:

• Grand Total Cost of the project will be on the basis of making payments as described

in clause 6.5

• The above rates will also be applicable to any new site that may come during the

contract period.

• HUDA may increase /decrease the no of locations/ Hardware /Software/ Bandwidth.

• The prices quoted should be inclusive of all taxes/levies and will remain valid during

the entire currency of the contract.

Page 71: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

71

Proforma -4

TECHNICAL REQUIREMENT COMPLIANCE MATRIX RESPONSE

The technical specifications given in this annexure are indicative only and not exhaustive in

any manner. The bidder shall be deemed to have examined all requirements for successful

implementation of the scope of the work.

a) Technical specification of Switches:

S.No Specification Compliance

Yes/No

1. Switch should have minimum 24 No‟s of 10/100/1000 Base-TxPoE

ports (Duplex, Full, Half) and 4 x 1GE Uplink port.

2. Should have minimum switching capacity of 56 Gbps. All ports on the

switch should work on line rate.

3. Should be IPv4 and IPv6 ready from day one

4. The switch should support dedicated stacking port separate from

uplink ports with 64 Gbps of stacking bandwidth.

5. The switch should support atleast 16K MAC, 1K Multicast Routes and

1K unicast Routes

6.

It shall support IEEE 802.1s Multiple Spanning Tree Protocol and

provide legacy support for IEEE 802.1d STP and IEEE 802.1w RSTP

or equivalent technology and static routes.

7.

Port Security to secure the access to a port based on the MAC

address of a user‟s device. The aging feature to remove the MAC

address from the switch after a specific time to allow another device

to connect to the same port.

8.

Switch should support Port-based and 802.1Q tag-based VLANs,

MAC-based VLAN, Guest VLAN, Private VLAN Edge, also known as

protected ports, with multiple uplinks

Page 72: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

72

S.No Specification Compliance

Yes/No

9.

All ports should have features of auto- negotiate, flow control

(802.3x), port based network access control (802.1x), port security,

MAC filtering etc.

10.

The switch should support IPv6 RA-Guard, DHCPv6 Guard, IPv6

Source Guard, IPv6 Prefix Guard, IPv6 Destination Guard, IPv6

Snooping and device tracking features

11. Should support Jumbo Frame support to improve the performance of

large data transfers

12. Should support TFTP, Telnet Server, DHCP Client

13. Should support International Certifications and Compliance

14. All necessary interfaces, connectors, patch cords (if any) & licenses

must be delivered along with the switch from day one.

15. The Switch should be 19" Rack mountable & the switch should be

supplied with Indian standard AC (5Amp) power cord.

b) Technical specification Wireless Controller

Sr.

No.

Specification

1 Must be compliant with IEEE CAPWAP for controller-based WLANs.

2 WLAN Controller should support up to 70 Access points in a single 1 RU chassis.

3 WLAN controller must have at least 4 x 1Gbps of uplink interfaces.

4 Must not require a separate controller for Wireless Intrusion Prevention Access Points.

5 Must support both 1+1 and N+1 redundancy models.

6 Must support an ability to dynamically adjust channel and power settings based on the

RF environment.

7 Radio coverage algorithm must allow adjacent APs to operate on different channels, in

order to maximize available bandwidth and avoid interference

Page 73: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

73

8 Must have Automatic 802.11 interference detection, identification, classification, and

mitigation. Classification should support a dynamically updatable signature library

9 Must support coverage hole detection and correction that can be adjusted on a per

WLAN basis.

10 Must support RF Management with 40 and 80 MHz channels with 802.11n and 802.11ac

11 WLC should support L2 and L3 roaming of IPv4/v6 clients

12 WLC should support First hop security features in IPv4/v6 network like Router

Advertisement guard, DHCP v4/v6 guard

13 WLC should support IPv4/v6 access control lists

14 Should support local username/password creation for users. Should also support User

authentication through ADS, RADIUS, SSO, local and thin client

15 WLC should support Guest-access functionality for IPv4/v6 clients

16 Should support ability to adjust Delivery Traffic Indicator Message (DTIM) on a per

WLAN basis to improve performance for latency sensitive applications.

17 Should adhere to the strictest level of security standards, including 802.11i Wi-Fi

Protected Access 2 (WPA2), WPA, Wired Equivalent Privacy (WEP), 802.1X with

multiple Extensible Authentication Protocol (EAP) types, including Protected EAP

(PEAP), EAP with Transport Layer Security (EAP-TLS), EAP with Tunneled TLS (EAP-

TTLS), RFC 4347

18 Should support Management frame protection for the authentication of 802.11

management frames by the wireless network infrastructure.

19 Controller should have rogue AP detection, classification and automatic containment

feature

20 Must support internal and external web authentication.

21 Must be able to set a maximum per-user bandwidth limit on a per-SSID basis.

22 Must support user load balancing across Access Points.

23 Controller must provide Mesh capability for Mesh supported AP.

Page 74: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

74

24 Must be able to dedicate some APs to monitor-only for Intrusion Prevention Services.

25 Must support client roaming across controllers separated by a layer 3 routed boundary.

26 Solution proposed must support clients roaming across at least 70 APs.

27 Should support the ability to schedule AP power on/off for energy savings.

28 Should provide a snapshot of air quality in terms of the performance and impact of

interference on the wireless network identifying the problem areas.

29 Should provide an Air Quality rating on a per- radio basis to help gauge the impact of

interference on the network

30 Should provide real-time charts showing interferers per access point, on a per-radio, per-

channel basis.

31 Should support encrypted mechanism to securely upload/download software images to

and from wireless controllers

32 Must support IEEE 802.11a, 802.11b, 802.11g, 802.11d, WMM/802.11e, 802.11h,

802.11k, 802.11n, 802.11r, 802.11u, 802.11w, 802.11ac

33 Should have Voice and Video Call Admission and Stream prioritization for preferential

QOS

34 Should support Internet Group Management Protocol (IGMP) snooping and access point

should transmits multicast packets only if a client associated to the access point is

subscribed to the multicast group.

35 Controller should support deep packet inspection for all user traffic across Layer 4-7

network to analyses information about applications usage, peak network usage times for

all access points from day one in a central switching mode.

Page 75: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

75

c) Technical specification of Outdoor Wireless Access Point

S.

No.

Specification Compliance

Yes/No

1 Access Points proposed must include radios for both 2.4 GHz and 5

GHz.

2 AP should support dual band antenna ports.

3 Must support a variety of antenna options. (Omni and directional)

4 Should have an option of adding external modules with technology

options such as a 4G LTE Pico cell or a sensor. Such a module could

be field-upgradeable to an existing network.

5 Must have -88 dB or better Receiver Sensitivity.

6 Must support 4X4 multiple-input multiple-output (MIMO) with three

spatial streams

7 Must support 802.11ac and backword compatible with 802.11n

standards

8 Must support data rates up to 1.3 Gbps on 5Ghz radio.

9 Must support 80 MHz wide channels in 5 GHz.

10 Must support up to 30dbm or higher of transmit power

11 Access point should 802.11ac, 802.11n and 802.11a/b/g Beam

forming

12 The Wireless Backhaul shall operate in 5Ghz

13 Support Encrypted and authenticated connectivity between all

backhaul components

14 Mesh nodes shall provide Power Over Ethernet through the wired

interface to power other equipment

15 Access point should have multiple wired uplink interfaces including

10/100/1000BASE-T Ethernet autosensing (RJ-45) and a build-in Fiber

SFP port

16 Wireless AP should support beam forming technology to improve

downlink performance of all mobile devices, including one-, two-, and

three-spatial-stream devices on 802.11ac without taking the inputs

from client.

17 Wireless AP Should have custom chipset to detect and classify non-

Wi-Fi wireless transmissions while simultaneously serving network

traffic

Page 76: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

76

18 Should support configuring the access point as network connected

sensor to access any network location covered by the access point to

get real-time Spectrum analysis data.

19 Must incorporate radio resource management for power, channel,

coverage hole detection and performance optimization

20 Access point shall support powering from AC, DC, and UPOE.

21 Access point shall support pole, wall and Cable strand mounting

options.

22 The equipment shall support up to 100 MPH sustained winds & 165

MPH wind gusts.

23 The Access point shall be IP67 and NEMA rated

24 The Access point shall support operating temperature of -40 to 65°C

25 The Access point shall support Storage temperature of -50 to 70°C

26 802.11e and WMM

27 Wi-Fi Alliance Certification for WMM and WMM power save

28 Must support Reliable Multicast to Unicast conversion to maintain

video quality at AP level

29 Must support QoS and Video Call Admission Control capabilities.

30 Must support the ability to serve clients and monitor the RF

environment concurrently.

31 Must support Spectrum analysis including @ 80 MHz

32 Same model AP that serves clients must be able to be dedicated to

monitoring the RF environment.

33 Should support mesh capabilities for temporary connectivity in areas

with no Ethernet cabling.

34 Mesh support should support QoS for voice over wireless.

35 Should have and option of configuring all the antennae port via

software to run all on dual band or any single band configuration.

36 Must support 16 WLANs per AP for SSID deployment flexibility.

37 Must support telnet and SSH login to APs directly for troubleshooting

flexibility.

38 Access point should be supplied with OEM mounting kit ,shall support

pole, wall,roof mounting options and required power cables

Page 77: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

77

d) Technical specification of Indoor Wireless Access Point

Sr.

No.

Specification Compli

ance

Yes/No

1 Access Points proposed must include radios for 2.4 GHz and

5 GHz with 802.11ac Wave 1.

2 Mounting kit should be standard from OEM directly.

3 High-speed spectrum intelligence across 20-, 40-, and 80-

MHz-wide channels to combat performance problems due to

wireless interference

4 Access point must have an additional Ethernet port for

downlink connectivity to an IP device like Camera etc.

5 Access point should have serial/console port

6 Must have at least 4 dB Antenna gain on both 2.4 Ghz and

5Ghz

7 Must support 3x3 multiple-input multiple-output (MIMO) with

three spatial streams

8 Must support minimum of 1.3 Gbps on 802.11ac respectively.

9 Must support minimum of 22dbm of transmit power on both

2.4Ghz & 5GHz radio.

10 The AP must be capable of optimizing the SNR exactly at the

position where 802.11a/g/n/ac client is placed (beam forming)

without requiring any support from clients, hence it should

work with all 802.11a/g/n/ac clients.

11 Should have detecting and classifying non-Wi-Fi wireless

transmissions while simultaneously serving network traffic

12 Should support configuring the access point as network

connected sensor to access any network location covered by

the access point to get real-time Spectrum analysis data.

Page 78: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

78

13 Must support AP enforced load-balance between 2.4Ghz and

5Ghz band.

14 Must incorporate radio resource management for power,

channel, coverage hole detection and performance

optimization

15 Must have -100 dB or better Receiver Sensitivity.

16 Must support Proactive Key Caching and/or other methods for

Fast Secure Roaming.

17 Must support Management Frame Protection.

18 Should support locally-significant certificates on the AP using

a Public Key Infrastructure (PKI).

19 Must operate as a sensor for wireless IPS

20 Should support non-Wi-Fi detection for off-channel rogues and

Containment for both radio

21 Access point should able to do the spectrum scanning for WiFi

and non-Wi-Fi interference at all 20Mhz ,40Mhz and 80Mhz

channels

22 Access Points must support a distributed

encryption/decryption model.

23 Access Points must support Hardware-based encrypted user

data and management traffic between controller and Access

point for better security.

24 Same model AP that serves clients must be able to be

dedicated to monitoring the RF environment.

25 AP model proposed must be able to be both a client-serving

AP and a monitor-only AP for Intrusion Prevention services.

26 Should support mesh capabilities for temporary connectivity in

areas with no Ethernet cabling.

27 Mesh support should support QoS for voice over wireless.

28 Must be plenum-rated (UL2043).

29 Must support 16 WLANs per AP for SSID deployment

flexibility.

30 Must continue serving clients when WAN link to controller is

back up again, should not reboot before joining

Page 79: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

79

31 The AP must support centralized wireless mode with the use

of a controller, but the AP must also support operation in

autonomous mode without the presence of any controller,

when needed.

32 When operated in remote AP mode, the AP must not

disconnect any clients when the connection to the controller

fails or in the case the failed connection has been restored

again.

33 Access point should able to do the spectrum scanning for WiFi

and non-WiFi interference at all 20Mhz ,40Mhz and 80Mhz

channels

34 Must support telnet and/or SSH login to Aps directly for

troubleshooting flexibility.

35 Must support Power over Ethernet, local power (DC Power),

and power injectors.

36 Must operate at 3x3 or higher with 802.3af PoE is the source

of power

37 802.11e and WMM

38 Must support QoS and Video Call Admission Control

capabilities.

39 Access Point should 802.11 DFS certified

40 Should be supplied with OEM mounting kit and all necessary

power cables and patch cords

e) Technical Specification of Firewall

S.

No.

Specification

1. Firewall should have minimum of one WAN port and minimum 4-GbE ports

10/100/1000 Mbps

2. Firewall should support “Stateful” policy inspection technology. It should also

have application intelligence for commonly used TCP/IP protocols like telnet,

ftp etc.

3 Firewall should support Access control: MAC-based access control, IP/MAC

binding, wireless profiles. Should support username , group based policies

Page 80: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

80

4. User authentication through ADS, RADIUS, SSO,local and thin client

5. Should support Web filtering: web categories database, Static URL blocking,

keyword blocking, Controls based on URL, Keyword and File type

6. Firewall should support Bandwidth Management. Application, Web Category

and User Identity based Bandwidth Management and Application & User

Identity based Traffic Discovery

7. Should support a minimum of 200 Users.

8. Should support Real-time and historical Monitoring and haveLog Viewer for-

Web filter, Authentication, System and Admin Events

9. Should have following Administration & System Management features

- Web-based configuration wizard and Web UI

- Role-based Access control

- Firmware Upgrades via Web UI

- Command Line Interface (Serial, SSH, Telnet)

- SNMP (v1, v2c)

- Should be able to provide seamless centralized management, policy

replication and consolidated reporting across the network

Page 81: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

81

Proforma-5

Technical Deviations

______________________________________________________________

Sr. Clause Page Statement of deviations

No. No. No. and variations

______________________________________________________________

______________________________________________________________

Date: Signature

Name

Place: Seal

(To be enclosed with commercial bid)

Page 82: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

82

Proforma 6

Financial Deviations

______________________________________________________________

Sr. Clause Page Statement of deviations and No. No. No. Variations

______________________________________________________________

______________________________________________________________

Date: Signature

Name

PLACE: SEAL

Page 83: Request for Proposal - Haryana Urban Development … · Request for Proposal ... (HUDA) is a statutory body of Haryana ... Checklist for Minimum-Qualification Criteria along with

83

Proforma 7

Call Escalation Matrix

Location

Tier1 1st level 2nd level 3rd level 4th level

Helpdesk Nos. Escalation Escalation Escalation Escalation

24 X 7 (30 Mins) (With Mobile

No.&EmailID) (1 Hrs) (With Mobile No &E-

mailID) (2 Hrs) (With

Mobile No.

.&EmailID)

(4 Hrs) (With

Mobile No. .&E-

mailID) Chandigarh Panchkula Gurgaon Faridabad Hisar Rohtak