MINUTES OF PRE-BID CONFERENCE
Date: beuaryLQ4, 2Q2±
1. Attendance:
GOVERNMENT SIDE
1. RUSSELL M. DAJAO
2. FLORENCIA 8. SANCHEZ
3. NEVILYN S. BANCE
4. VIOLETA S. TAGAYUNA
5. MARIA u. FLOREN
6. MORPHIL L. ALBIOS
7. ARTURO A. SUARIN
8. NERILYN V. DESONO
9. ELLENITA M. CASTULO
10. AILYN P. DALENA
11. TERESA 8. LEONARDO
12. CELSA F. CABUSAS
CONTRACTORS SIDE
1. AGNES U. OCTUBRE
-Chairperson
-Vice Chairperson
-Regular Member
-Provisional Member-Procurement Engineer-TWG, Member• TWG, Member-TWG, Member-TWG, Member-TWG, Member (Goods)
-BAC Secretariat
-BAC Secretariat
-Representative (O.G. SANTOS CONSTRUCTION)
Z. Calltoorder:The Pre-Bid Conference was formally presided by the chairperson Engr. Russell M. Dajao and
greeted everyone with a pleasant morning. Afterwards, she called the attention of Engr. Arturo A. Suarin tostart the conference with a prayer. Engr. Arturo Suarin led the prayer and asked the Almighty One for
guidance as we go on with our pre-bid conference.
3. Presentation/Explanation by BAC:a. Engr. Russell M. Dajao, the chairperson, made a brief description of each of the project and she
emphasized the following:• Contract I.D.
• Contract Name
• Contract Location• Approved Budgetforthe contract
Afterwards, she called the attention of the BAC-Vice Chairperson Engr. Florencia a. Sanchez
for more details.b. Engr. Florencia B. Sanchez, Chief of planningand Design section, Made a brief and concisedescription
to each of the project specifically the following:• Building-Prepainted Metal sheets, Long span, G.I. Roofing shts, thickness
Fabricated Metal Roofing Accessory (Flashing), Gutter, Structural Steel, Trusses, Structural
Steel, Purlins, Cement Plaster Finish, Storm Drainage & Downspout etc.
• Bridges - Project BHlboard, Carbon Fiber Sheet, Carbon Fiber Plate, Reflectorized
Thermoplastic Pavement Markings (White) Reflectorized Thermoplastic Pavement Markings
(Yellow) etc.• Roads-Scope of work, Road width, PccpThickness, Sub-Base course,Total project Duration
etc.
c. Engr. Russew M. Dajao asked everyone especially in the part of the contractor's if there were any
querieswithregardtotheprojects.Andoneofthecontractor'srepresentativesaskedthroughonlineabout the Boa and PLAN, if it was already available. Engr. Russell Dajao answered that there werealreadyaBOQandaPLANsincetheprojectcannotproceedinthepre-bidconferenceifthereisnoBOQandPLAN.Shealsoaddedthatthelicensestobeattachedinthedocumentsmustbeupdated.
d. Engr. Violeta s.Tagayuna chief of construction section, reminded the contractors on there documentsto be on clear copy especially the pictures and I.D. and the documents must be paginated.
e. Engr. Artui.a A. Suarin also added about the minimum equipment that they will attach on there biddocuments. He made it clear that whenever that particular equipment is not necessary in the projectthat must be excluded or hence, must not be written attach in the documents.
f. Engr. Russeu M. Dajao asked again if there were any queries or questions with regard to the projects.When they say none, the pre-bid conference had adjourned at 11:00 A.M.
21JE0012 -Construction of Multi-Purpose Building (Covered Court) Barangay Libertad,Tukuran, Zamboanga del Sur
Approved Budget for the Contract: ±±j2JZ.4Z±J2QQ±QQ
21JE0030 -Construction of New Bridges Tabuan Bridge 2 along Lanao-Pagadian-Zamboanga City RoadPagadian City, Zamboanga del Sur, Zamboanga del Sur
Approved Budget for the Contract: EbpLZ±J2£QJ2QQiQQ
21JE0031 -Construction of New Bridges Malabaquid Bridge 2 along Lanao-Pagadian-Zamboanga CityRoad Pagadian City, Zamboanga del Sur
Approved Budget for the Contract: ghgil,_Q£Q4QQ=QQ
21JE0032 -Bridge-Retrofitting/Strengthening of Permanent Bridges, Dipolo Gamay Bridge (800460MN)Along Jet. Aurora-Ozamis City Road, Zamboanga del Sur
Approved Budget for the Contract: Ebp_19,600,OQQ±QQ
21JE0033 -Construction of Concrete Road, Concreting of Barangay Road Barangay Dimasangca,Municipality of Labangan, Zamboanga del Sur
Approved Budget for the Contract: Eihp 9,900,000._QQ
21JE0034 -Construction of Concrete Road, Concreting of Barangay Road, From Junction NationalHighway, Purok 3, Barangay Poblacion to Barangay Bambong Diut, Municipality of Ramon
Magsaysay, Zamboanga del sur Ramon Magsaysay, Zamboanga del sur
Approved Budget for the Contract: Ehp 9,900,000.00
21JE0035 -Construction of Concrete Road Alang-Alang-Lower Tiparak-Tungawan By-Pass Road,Zamboanga del Sur, Tambulig, Zamboanga del Sur
Approved Budget for the Contract: Php 9,500,000.0_Q
21JE0036 -Construction of Concrete Road Construction of NRJ Bulanit Leading to Coastal RoadLabangan, Zamboanga del Sur
Approved Budget for the Contract: _P_hp 43,700,000,QQ
21JE0037 -Construction of Multi-Purpose Building Barangay Laperian, Tukuran, Zamboanga del Sur
Approved Budget for the Contract: Pip 2,475,000.QQ
21JE0038 -Construction of Multi-Purpose Building (Training Center) Barangay Panduma, Tukuran,
Zamboanga del Sur
Approved Budget for the Contract: _Php 2,970,000.cO
21JE0039 -Construction/Improvement of Access Roads leading to Declared Tourism Destinations NRJleading to Simata Adventue Park, Brgy. Simata, Molave, Zamboanga del Sur
Approved Budget for the Contract: Pbp 4,goo,000.QQ
21JE0040 -Construction/Maintenance of Flood Mitigation Structure and Drainage System Constructionof Flood Control Structure along Salug Daku River Brgy. Tungawan, Tambulig, Zamboanga
del Sur
Approved Budget for the Contract: EbeJ2,475,_00LO±QQ
4. Other matters discussed:
None
5. Summary of proceedings by BAC Chairman:
TheparticipatingbidderswereremindedthatonlythosedulyauthorizedliaisonofficerswiHbeallowedto
drop the lst and 2nd envelopes on or before the scheduled date and time of the Dropping of Bids.
6. Adjourned:There having no more topics to discuss, the meeting adjourned at 11:00 A.M.