NHDES State of New Hampshire DEPARTMENT OF ENVIRONMENTAL SERVICES 6 Hazen Drive, P.O. Box 95, Concord, NH 03302-0095 (603)271-2900 FAX (603) 271-2456 February 11, 1998 lH- I& ?i. j' fe C-i. di vi i -- C- vi1 »• ' " ' tl SITE: Q^4Lfe-fY _ BREAK: ft-£- ;OTlIER:._53i^ii5 Thomas Danko Chairman, Board of Selectmen Town ofBoscawen 17 High Street Boscawen, New Hampshire 03303 SUBJECT: BOSCAWEN - Queen Street Landfill Site, Test Pit Exploration Program Summary (DES #198400061) Dear Mr. Danko: Enclosed please find the Report summarizing results Of the test pit exploration program Conducted at the Queen Street site by the New Hampshire Department of Environmental Services (Department) with the assistance of the US Environmental Protection Agency (EP A). The intent of the exploration program Was to define the lateral and vertical extent of buried leather wastes at the site in order to refine preliminary cost estimates of leather wastes removal and relocation. The test pit program was conducted on January 14, and 15, 1998. Attached to the Report are Test Pit Logs summarizing field observations, analytical results of samples collected during field work, a site map showing test pit locations and photographs of field activities. As agreed in Our meeting of February 4, 1998, we have also included a Section in the Report titled "Requirements for Site Restoration." In this section we have given the Department's guidelines for depths of restoration cover material and groundwater monitoring at the Site. Should you have any questions, please call me at 271-5569. Very truly yours, Enclosure JLS/pjw/h:\share\superfun\johnspl\queeast cc: Richard Haworth, EPA Thomas R. Plante, P.E. Underwood Engineers Richard S. Reed, WMD Gary S. Lynn, P.E., NHDES (w/o enclosure) File (w/enclosure) L i L. Splend&re, P.E Waste Management Division http://www.state.nh.us TDD Access: Relay NH 1-800-735-2964

Upload: others

Post on 08-Jun-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

NHDES

State of New Hampshire DEPARTMENT OF ENVIRONMENTAL SERVICES

6 Hazen Drive, P.O. Box 95, Concord, NH 03302-0095

(603)271-2900 FAX (603) 271-2456

February 11, 1998

lH- I& ?i. j' fe C-i. di vi i -- C- vi1 »• ' " ' tl SITE: Q^4Lfe-fY _ BREAK: ft-£-

;OTlIER:._53i^ii5

Thomas Danko Chairman, Board of Selectmen Town ofBoscawen 17 High Street Boscawen, New Hampshire 03303

SUBJECT: BOSCAWEN - Queen Street Landfill Site, Test Pit Exploration Program Summary (DES #198400061)

Dear Mr. Danko:

Enclosed please find the Report summarizing results Of the test pit exploration program Conducted at the Queen Street site by the New Hampshire Department of Environmental Services (Department) with the assistance of the US Environmental Protection Agency (EP A). The intent of the exploration program Was to define the lateral and vertical extent of buried leather wastes at the site in order to refine preliminary cost estimates of leather wastes removal and relocation. The test pit program was conducted on January 14, and 15, 1998. Attached to the Report are Test Pit Logs summarizing field observations, analytical results of samples collected during field work, a site map showing test pit locations and photographs of field activities.

As agreed in Our meeting of February 4, 1998, we have also included a Section in the Report titled "Requirements for Site Restoration." In this section we have given the Department's guidelines for depths of restoration cover material and groundwater monitoring at the Site.

Should you have any questions, please call me at 271-5569.

Very truly yours,

Enclosure JLS/pjw/h:\share\superfun\johnspl\queeast cc: Richard Haworth, EPA

Thomas R. Plante, P.E. Underwood Engineers Richard S. Reed, WMD Gary S. Lynn, P.E., NHDES (w/o enclosure) File (w/enclosure)

L i L. Splend&re, P.E

Waste Management Division

http://www.state.nh.us TDD Access: Relay NH 1-800-735-2964

Page 2: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

REPORT ON

TEST PIT EXPLORATION, SAMPLING, AND SURVEY PROGRAM

QUEEN STREET LANDFILL SITE, BOSCAWEN NEW HAMPSHIRE (DES #198400061)

FEBRUARY 1998

Page 3: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

TABLE OF CONTENTS

Summary

Appendix A. Map of Boscawen

Appendix B. Test Pit Field Log Sheets

Appendix C. Test Pit Photo's

• Appendix D. Analytical Results

Notes

Page 4: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

PLEASE NOTE:

1. PAGE 9 OF THIS REPORT IS THE MAP OF BOSCAWEN, WHICH IS PLACED IN THE PLASTIC SLEEVE OF APPENDIX A.

2. THE ORIGINAL REPORT CONTAINED NO NOTES ON PAGE 61.

Page 5: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

SUMMARY OF RESULTS TEST PIT EXPLORATION, SAMPLING, AND SURVEY PROGRAM

QUEEN STREET LANDFILL SITE, BOSCAWEN, NH JANUARY 1998 (DES #198400061)

BACKGROUND

The US Environmental Protection Agency (EPA) New England Region I in conjunction with the Town of Boscawen and the New Hampshire Department of Environmental Services (Department) are planning a removal action to excavate leather wastes from the Queen Street Landfill (SITE). The excavated wastes would be disposed of in the Corn Hill Road Landfill, also in Boscawen. The Corn Hill Road landfill will be permanently closed after receipt of the leather wastes. The removal is planned for the Spring of 1998.

SCOPE OF WORK COMPLETED

The Department completed a test pit exploration, sampling, and survey program at the SITE in January 1998. The intent of the program was to define the lateral and vertical extent of buried leather wastes (leather shavings, trimmings, and buffing dust) that were placed at the SITE by the former Allied Leather Company. Allied placed leather wastes at the SITE as early as 1953 and the practice continued into the late 1970s. The Town of Boscawen municipal burn dump abuts the Site to the southeast. Information from the test pit program is necessary to refine preliminary cost estimates of leather wastes removal and relocation. Preliminary estimates of the waste volume requiring removal vary because good historical information on the lateral and vertical extent of wastes at the SITE did not exist. Preliminary estimates of the quantity of leather wastes requiring removal range from approximately 36,000 to more than 50,000 cubic yards.

The test pit program consisted of the following tasks:

• The advancement of 23 test pits throughout the SITE to visually observe the vertical and horizontal extent of leather wastes.

• Field screening of soil within each test pit for total volatile organic compounds (VOC).

• Collection of twenty-five (25) soil samples in test pits and depths selected by the EPA and the NHDES, Samples were taken of soils or soil-like materials beneath the leather wastes observed.

• Laboratory analysis of twenty-three (23) soil samples for Chromium VI via EPA Method 3500 Cr-D, and twenty- three (23) soil samples for Total Chromium analysis via EPA Method 6010.

• Laboratory analysis of two (2) soil samples for Total Petroleum Hydrocarbon (TPH) via EPA Method 8100 Modified, and two (2) samples for VOC analysis via EPA Method 8260B and two(2) samples for SVOC's (semi volatile organic compounds) for ABN's (acicLbase/neutrals) via EPA Method 8270.

2

Page 6: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

• A stadia survey of the test pits to establish the location and elevation of each test pit.

• Preparation of a SITE map showing test pit locations and corresponding analytical results of soil samples.

• Preparation of test pit logs showing depth of leather waste encountered in each test pit .

SUBSURFACE INVESTIGATION

Test Pit Investigation

On January 14, and 15, 1998, the Department's contractor, Clean Harbors, Inc. advanced a total of 23 test pits (TP-1 through TP-23) at the SITE. The rationale for placement of the test pits was to determine the areal and vertical extent of buried leather waste throughout the SITE, Department and US EPA personnel observed the test pit program. The depth from existing ground surface to the bottom of each test pit was measured. If encountered, the depth to soil not containing leather wastes and the depth to groundwater was also measured. FIGURE 1 (Appendix A) shows the locations of test pits.

Test pits were advanced to depths between 2 feet and 13 feet below ground surface (BGS). Observations of soil samples collected from the test pits indicate the subsurface materials in the study area consist of a varying amount of sand and gravel fill overlying the leather wastes. In the southeastern area of the SITE, a black soil/sludge-like material was observed underlying the leather-waste. This material, which had a septage odor, was observed in test pits TP-1, TP-2, TP-3, TP-4, TP-5, TP-14, TP-17, TP-19, and TP-20. The black soil/sludge-like material was observed to be saturated in test pits TP-1 through TP-5. In test pit 18, a layer of "greenish"colored soil was observed at approximately 7 feet BGS. Trash and debris were observed in test pits TP-16, TP-17, and TP-18, which were advanced in the southeastern area of the site (vicinity of the burn dump).

Test pits 17,18, and 19 were excavated along an approximately 150' trench beginning at the expected bum dump interface with the leather waste dump and ending in the southern interior of the SITE. Scrap metal and bottles were noted in TP-15 in proximity to the bum dump. No refusal was encountered in any of the test pits except what appeared to be shattered bedrock, which was encountered in TP-5. The vertical extent of leather wastes observed in the test pits ranged from approximately six (6) inches BGS (TP-9, TP-11, & TP-12) to greater than ten (10) feet in TP-10. TP-10 was excavated to a depth of thirteen (13) feet BGS in the western portion of the SITE. The test pit logs are included in Appendix B. Photographs of the test pit investigation are also enclosed.

(See Appendix C)

3

Page 7: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

Soil Sampling

Clean Harbors personnel screened soil within each test pit for VOC vapors using an HNU Organic Vapor Meter (OVM), equipped with a 10.2 eV source. Prior to screening, the OVM was "zeroed" and calibrated. No VOC vapors were detected in any of the test pits. Clean Harbors personnel collected soil samples from each test pit for subsequent laboratory analysis. As indicated above, twenty- three (23) samples were collected for analysis of Chromium VI, and Total Chromium. In addition, samples were collected from TP-2, and TP-4 for TPH, VOC and SVOC analysis following EPA Methods 8100 Modified, 8260B and 8270 respectively. The analytical results did not identify the presence of Chromium VI above the laboratory method detection limit of 0.0504 mg/Kg. Total Chromium was reported at concentrations between 9.6 in TP-12, to 76,900 mg/Kg in TP-18 No TPH was detected above the reporting limit. Acetone and toluene were identified in test pits TP-2, and TP-4 at concentrations of 580 ug/Kg and 1,500 ug/Kg, and 190 ug/Kg and 2,100 ug/Kg respectively. The Total Chromium analytical results are presented in Table 1 "Soil Samples-Total Chromium Results." These, analytical results are also shown on FIGURE 1 next to the test pits where the soil sample was taken. The laboratory analytical test reports are included in Appendix D

4

Page 8: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

Table 1 Soil Samples-Total Chromium Results

Test Pit No. (Depth of Soil Sample) Total Chromium (mg/Kg)

TP-1 (2*6") 39.

TP-2 390.

TP-3 2-) 53.

TP-4 (51) 410.

TP-5 (2") 13,000.

TP-6 (4") 70.

TP-7 (2'6") 1,500.

TP-7A (4'6") 460.

TP-8 (3'6") 100.

TP-9A(1') 3.400.

TP-9 ((3') 140.

TP-IO(U') 81.

TP-11 (2') 9.6

TP-12(n 14.

TP-13 (I1) 54.

TP-14(ir) 460.

TP-15 01 23.

TP-16 (2') 33.

TP-17 (10') 75.

TP-18A(2>) 76.900.

TP-18 (8') 140.

TP-20A (7^ 280.

TP-20 (13") 26.

It should be noted that the Total Chromium concentrations shown are equivalent to Chromium

concentrations since Chromium VI was not detected in the samples.

5

Page 9: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

Stadia Survey

Each test pit was subsequently backfilled to approximately existing grade with the material excavated. After backfilling, a grade stake was placed at the approximate center of each test pit and the elevation and distance were surveyed from a bench mark identified by the Department. The results of the stadia survey are presented on Figure 1, which shows the location and elevation of the backfilled test pit at the grade stake.

Summary of Test Pit Program Results

The following summarizes the general observations of the test pit and analytical program.

• In most test pits the leather wastes were observed to be between two (2) and six (6) feet in

thickness.

• In some test pits leather wastes were observed in groundwater

• Several test pits were observed to contain a black sludge-like material with a septic odor In some cases this sludge-like material was saturated with groundwater. A "greenish soil layer was observed in TP-18

• Odors (not septic) were noticed in a few of the test pits containing leather wastes and are • assumed to be attributable to the waste decomposition process which is occurring beneath the SITE'S surface.

• No buried drums or other indication of buried hazardous wastes were observed in the test

pits.

• With two exceptions (test pit 18-A and test pit 5) total chromium results in most soil samples were below "action levels" set in the New Hampshire Risk Characterization and Management Policy (RCMP) for soil cleanup.

• High total chromium in two soil samples will require these soils to be removed with the

leather wastes.

• Hexavalent chromium was below laboratory detection limits in all soil samples.

• Volatile organic compounds were not detected at levels of concern in the two test pit samples which appeared to have the potential for organic contamination.

6

Page 10: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

Conclusions from Test Pit Program

a The results from the test pit investigation confirm that relocation of the wastes to the Corn Hill Road Landfill is a viable option for resolution of the Queen Street Dump Site. The results validate initial remedial cost estimates and leather waste removal plans. Based on test results, significant amounts of soil excavation will not be necessary to meet cleanup standards for Chromium III. In many areas, the Chromium III levels in soils immediately beneath the leather wastes are below cleanup levels and can remain. The test pitting also confirmed that. 1) the lateral extent of the leather waste disposal area is slightly smaller than shown on existing maps and 2) the material that is likely to be encountered during site work will be primarily leather wastes with the exception of some solid waste near the former burn dump.

o Based on visual observations of the waste thickness observed at Queen Street, the EPA and the Department believe that 40,000 cubic yards is a reasonably conservative number to use as a basis for estimating the funds needed to relocate wastes from Queen Street to the Corn

Hill Road Landfill,

REQUIREMENTS FOR SITE RESTORATION

General Requirements

The Department has recently issued a Revision to the RCMP, dated January 1998 This the should be used to determine the management approach to soils which are to remain at the Queen Street site after removal of leather wastes. The following summarizes the criteria which will app y from the RCMP document and the Departments' requirements specific to Queen Street restoration.

Accessible or surficial soils ( 0 to 2 feet below surface). Chromium III level must be no greater than 1,000 mg/kg (ppm). In addition to this, the Department will require at least a one foot depth of clean soil cover placed on remaining SITE soil as part of the restoration process This clean soil cover should have appropriate Characteristics to prevent erosion and support a vegetative cover at the SITE after restoration. It should be noted that at 16 of the test pit locations, Chromium III levels detected were well below 1,000 ppm in the SITE soil

beneath the leather Wastes to be removed.

Potentially accessible soils (2 to 15 feet below surface). Chromium ID level must be no greater than 2,500 mg/kg (ppm). In these areas a minimum of a two foot thick cover of clean soil over remaining SITE soil will be required with the top one foot having similar characteristics to the one foot clean soil cover described earlier.

, Isolated subsurface soils (more than 15 feet below surface). Chromium III level is greater than 2500 mg/kg and no greater than 5,000 mg/kg (ppm). At these areas, the clean soil cover must be greater than 15 feet. We expect the EPA will remove SITE soil with these elevated Chromium IB levels along with the leather wastes rather than cover them in place with clean soil. This would include soils with highly elevated Chromium III near TP 18A.

7

Page 11: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

Landfill Reclamation Work Plan

In addition, to the General Requirements discussed in the preceding Section, Boscawen will be required to submit information required in Section Env-Wm 2508.03 of the New Hampshire Solid Waste Rules. Specifically, the information in Item (8) calls for submittal to the Department of the procedures for site clean-up and grading after the reclamation with detailed drawings depicting

original and final grades.

The reclamation plan for the Site should specify grades that will promote positive drainage and minimize the potential for erosion. Also, the clean soil cover described earlier must be placed above seasonal high groundwater levels. In areas where groundwater is exposed .after Site excavation, clean common backfill must be placed such that the clean cover soil which supports vegetation will be placed above seasonal high groundwater.

Groundwater Monitoring Requirements

The Final Site Inspection Report issued by the EPA Superfund Support Section on November 12, 1991, for the Queen Street Dump Site indicated that a groundwater sample collected from Piezometer No. 6 exceeded Groundwater Standards (GW-1) for Total Chromium as shown in Table 2 of the RCMP (Section 7.4(5)). For this reason the Department requests that groundwater monitoring be implemented at the site after completion of site restoration activities.

As a minimum we recommend one groundwater monitoring well be installed upgradient of the SITE and two groundwater monitoring wells at downgradient locations to the SITE. Based on the groundwater contour map prepared by UnderwOod Engineers, suggested locations would be in the general vicinity of Piezometer Nos. 1 and 9 for the upgradient well. The downgradient locations would be in the general vicinity of Piezometers Nos. 6 and 7. Precise locations would be determined by Underwood Engineers after completion of site restoration activities.

Monitoring for Total Chromium should be conducted on a triannual basis for the first year after site reclamation is completed. Depending on the results from the first year of sampling, the frequency could be reduced in the second year with the Department's prior approval. After the second year of sampling, and depending on the analytical results, the Department may waive the need

for any further sampling.

It should be noted that since the majority of the source (leather wastes) for the chromium detected in groundwater will be removed, the Department does not expect long term groundwater

monitoring to be needed at the Site.

H:\SHARE\SUPERFUN\JOHNSPL\QUEEN.ST

8

Page 12: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

APPENDIX

Page 13: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the
Page 14: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

APPENDIX B

Page 15: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

Test Pit Field Log - Test Pit Exploration Program Queen Street Landfill

fioscawen, N.H,

.. DOMRMDirOr Environmental

Services

New Hampshire Department of Environmental Seivices

Waste Management Division

Test Pit No.: 1 File No.: ̂Date: 14 Jan 98

Hydrogeologist; RLW Weather Sunnv/Cold

Excavation Equipment Contractor: C.H- Capacity:_ Operator. Brackett Model:_ Make: Reach:

Ground Elev.:

Time Started: 1100

Time Completed: 1105

Depth

-0-

-1-

-2-

-7-

-9-

-10-

-11-

-12-

-13-

-14-

Soil Description Excav. Effort

No hides/waste encountered

Sample for total and Chromium VI collected at depth of 2' 6"

Saturated Black Soil (septage odor)

Boulder Count

Qty. Class

Remark No.

Remarks: DES Photo #1

Test Pit Plan Legend Boulder Count

Size Range Classification

6"-18" 18"-36"

36" and Larger

Letter Designation

A B C

Proportions Used

Trace (TR) 0-10% Little (LI) 10- 20% Some (SO) 20- 35% and 35 - 50%

Abbreviations

F - Fine M • Medium C- Coarse F/M-Fineto Medium F/C-Fine to Coarse V-Very GR - Gray -BN - Brown YEL - Yellow

Excavation Effort

E-EaSy M - Moderate D - Difficult

Elapsed Time to ^=-Reading G.W.L.

10

Page 16: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

test Pit Field Log - Test Pit Exploration Program Queen Street Landfill

Boscawen, N.H.

Environmental Services

New Hampshire Department of Environmental Services

Waste Management Division

Test Pit No.: 2 File No.: Date: 14 Jan 98

I Hydrogeologist: RLW i Weather: Sunny/Cold

Excavation Equipment Contractor, Capacity:_ Operator Model: Make: • Reach:

Ground Elev.:

Time Started: 1105

Time Completed: 1125

Depth

-0-

-1-

-2-

—3—

-7-

-S-

—9—

-10-

-11-

-12-

-13-

-14—

Soil Description Excav. Effort

Hides/waste

Black - like Soil (septage odor)

Light Colored Soil

Samples for total and Chromium IV and complete analysis collected at depth of 6'.

Boulder Count

Qty. Class

Remark No.

Remarks: DES Photo #2

Test Pit Plan Legend Boulder Count

Size Range Classification

6"-18" 18"-36"

36" and Larger

Letter Designation

A B C

Proportions Used

Trace (TR) 0-10% Little (LI) 10-20% Some (SO) 20-35% and 35 - 50%

Abbreviations

F-Fine M - Medium C - Coarse F/M-Fineto Medium F/C - Fine to Coarse V-Very GR-Gray BN - Brown YEL-Yellow

Excavation Effort

E - Easy M- Moderate D - Difficult

Elapsed Time to Reading g.W.

% ,W.^

.11

Page 17: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

Test Pit Field Log - Test Pit Exploration Program Queen Street Landfill

Boscawen, N.H.

Environmental Services

New Hampshire Department of Environmental Services

Waste Management Division

Test Pit No.:_3 File No.: Date: 14 Jan 98

Hvdroaeoloaist: RWL Weather Sunnv/Cold

Excavation Equipment Contractor: Capacity:. Operator Modei:_ Make: Reach:

Ground Elev.:

Time Started: 1130

Time Completed: 1145

Depth

-0-

-1-

-2-

-3-

-6-

-7-

-9-

-10-

-11-

-12-

-13-

-14—

Soil Description Excav. Effort

± I' hides/waste encountered Black sludge

Test pit advanced to depth of 2'

Sample for total and Chromium VI collected from depth of 2\

Boulder Count

Qty. Class

Remark No.

Remarks: Test pit constructed at toe of slope adjacent to fence line

Test Fit Plan

i Hideo

Sludge,

Legend Boulder Count

Size Range Classification

6% 18" 18"-36"

36" and Larger

Letter Designation

... A B C

Proportions Used

Trace (TR) 0-10% Little (LI) 10-20% Some (SO) 20 - 35% and 35 - 50%

Abbreviations

F - Fine M - Medium C - Coarse F/M - Fine to Medium F/C-Fine to Coarse V-Very GR - Gray BN - Brown YEL-Yellow

Excavation Effort

E - Easy M - Moderate D - Difficult

Sapsed « Time to Reading G.W.L.

12

Page 18: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

Test Pit Field Log - Test Pit Exploration Program Queen Street Landfill

Boscawen, N.H.

xvironmental Services

New Hampshire Department of Environmental Services

Waste Management Division

Test Pit No.: 4 File No.: Date:

Hydrogeologist: RLW Weather Sunnv/Cold

Excavation Equipment Contractor Capacity: Operator Model: Make: Reach:

Ground Eiev.:

Time Started: 1150

Time Completed: 1205

Depth

-0-

-1-

-2-

-5-

-6-

-7-

-8-

-9-

-10-

-11-

-12-

-13-

-14-

Soil Description Excav. Effort

3' saturated waste/hides encountered

Black Soil

Test pit advanced to depth of 5*

Samples for total and Chromium VI and complete analysis collected at depth of 5'

Boulder Count

Qty. Class

Remark No.

Remarks: EPA photos #2&#3 DES Photos #4 & #5

Test Pit Plan

(OPIUE

Legend Boulder Count

Size Range Classification

6" -18"

18"-36" 36" and Larger

Letter Designation

A B C

Proportions Used

Trace (TR) 0-10% Little (U) 10-20% Some (SO) 20 - 35% and 35 - 50%

Abbreviations

F - Fine M - Medium C-Coarse F/M - Fine to Medium F/C- Fine to Coarse V-Veiy GR - Gray BN - Brown YEL-Yellow

Excavation Effort

E'*l M - Moderate D - Difficult

Elapsed w Time to Reading G.W.l,

f

13

Page 19: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

Test Pit Field Log - Test Pit Exploration Program Queen Street Landfill

Boscawen, N.H.

r owurmBff or Environmental

Services

New Hampshire Department of Environmental Services

Waste Management Division

Test Pit No. File No.: Date: 14 Jan 98

Hydrogeologist: RLW Weather Sunnv/Coid

Excavation Equipment Contractor: Capacity: Operator: Model: Make: Reach:

Ground Elev;:

Time Started: 1210

Time Completed: 1225

Depth

-0-

-1-

-2-

€ —fr-

-10-

-11-

-12-

-13-

-14-

Soil Description Excav. Effort

1.5' saturated waste/hides encountered Rock and Black Soil

Test pit advanced to depth of 2'

Samples for total and Chromium IV collected from depth of 2'

Boulder Count

Qty. Class

Remark No.

Remarks: EPA Photo #4 DES Photo #6

Test Pit Plan

t hides

focK i btacK Soil

Profi le

Legend Boulder Count

Size Range Classification

6"-18"

18" -36" 36" and Larger

Letter Designation

A B C

Proportions Used

Trace (TR) 0-10% Little (LI) 10- 20% Sortie (SO) 20- 35% and 35-50%

Abbreviations

F - Fi n e M - Medium C • Coarse F/M-Fineto Medium F/C-Fine to Coarse V - Very . GR - Gray BN - Brown YEL-Yellow

Excavation Effort

E - Easy M - Moderate D-Difficult

Elapsed « Time to Reading G-w.L.

14

Page 20: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

Test Pit Field Log - Test Pit Exploration Program Queen Street Landfill

Boscawen, N.H.

Environmental Services

New Hampshire Department of Environmental Services

Waste Management Division

Test Pit No.:_6 File No.: Date:

Hydrogeblogist: RLW Weather: Sunnv/Cold

Excavation Equipment Contractor. C.H. Capacity: Operator Model: Make: Reach:̂ .

Ground Elev.:

Time Started: 1230

Time Completed: 1240

Depth

-1-

-2-

-3-

-7-

-8-

-9-

-10-

-11-

-12-

-13-

-14-

Soil Description Excav. Effort

2 1/2* waste/hides encountered

Light Colored Soil

Test pit advanced to depth of 4'

Samples collected for total and Chromium VI from depth of

4'

Boulder Count

Qty. Class

Remark No.

Remarks: DES Photo #7

Test Pit Plan

/*

^ Piezomeier^^

fWl View

Legend Boulder Count

Size Range Letter Classification Designation

6"-18"

18"-36" 36" and Larger

A B C

Proportions Used

Trace (TR) 0-10% Little (LI) 10-20% Some (SO) 20-35% and 35 - 50%

Abbreviations

F-Fine M - Medium C • Coarse F/M - Fine to Medium F/C - Fine to Coarse V - Very GR-Gray BN - Brown YEL-Yellow

Excavation Effort

E - Easy M - Moderate D - Difficult

Elapsed w Time to Reading Q.W.

15

Page 21: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

Test Pit Field Log - Test Pit Exploration Program Queen Street Landfill

Boscawen, N.H.

_ oanumaxr or Environmental

Services

New Hampshire Department of Environmental Services

Waste Management Division

Test Pit No.: 7 File No.: Date: 14 Jan 98

Hydrogeologist: RLW Weather Sunnv/Cold

Excavation Equipment Contractor Capacity: Operator Model: Make:_ Reach:;

Ground Elev.:

Time Started: 1245

Time Completed: 1300

-1-

-2-

-7-

m.

-10-

-11-

-12-

-13-

-14-

Soil Description Excav. Effort

Approx 1.5' waste/hides encountered

Light Colored Soil

Test pit advanced to depth of 4.5'

Samples collected for total and chromium VI from depths of 2'6" and4'6".

Boulder Count

Qty. Class

Remark NO.

Remarks: EPA photo #5 DES Photo #8

Test Pit Plan . Legend Boulder Count

Size Range Classification

6' -18" 18"-36"

36" and Larger

Letter Designation

A ... B C

Proportions Used

Trace (TR) 0-10% Little (LD 10-20% Some (SO) 20-35% and 35 - 50%

Abbreviations

F-Fine M • Medium C - Coarse F/M - Fine to Medium F/C - Fine to Coarse V-Very GR-Gray BN - Brown YEL-Yellow

Excavation Effort

E - Easy M - Moderate D - Difficult

Elapsed « Time to Reading g.W.L.

16

Page 22: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

Test Pit Field Log - Test Pit Exploration Program Queen Street Landfill

Boscawen, N.H.

Environmental Services

New Hampshire Department of Environmental Services

Waste Management Division

Test Pit No.: _8 File No.: Date: 14 Jan 98

HvdroaeolQQist: RLW Weather: Sunnv/Cold

Excavation Equipment Contractor: C.H. Capacity: Operator: - Model: Make: Reach:

Ground Elev,:

Time Started: 1420

Time Completed: 1440

Depth

-0-

-1-

-2-

-5-

-6-

-7-

^8-

-10-

-11-

-12-

-13-

-14-

Soil Description Excav. Effort

Waste/hides/buffing dust

Light Colored soil

Test pit advanced to depth of 3'.6"

Test pit approx 401ong

Sample for total and chromium VI collected from depth of 3' 6"

Boulder Count

Qty. Class

Remark No.

Remarks: EPA Photos #6 & #7 DES Photo #9

Test Pit Plan .

j"

"leadr Pi+

Km'View

Legend Boulder Count

Size Range Classification

6"-18" 18" - 36"

36" and Larger

Letter Designation

A B C

Proportions Used

Trace (TR) 0-10% Little (LI) 10-20% Some (SO) 20-35% and 35 - 50%

Abbreviations

F-Fine M - Medium C-Coarse F/M - Rne to Medium F/C - Fine to Coarse V-Very GR - Gray BN - Brown YEL-Yellow

Excavation Effort

E- Easy M - Moderate D - Difficult

Elapsed w time to X Reading g.W.L

f 17

Page 23: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

Test Pit Field Log - Test Pit Exploration Program Queen Street Landfill

Boscawen, N.H.

avironmental Services

New Hampshire Department of Environmental Services

Waste Management Division

Test Pit No.: 9 File No.: Date: 14 Jan 98

Hydroaeoloaist: RLW Weather: Sunnv/Cold

Excavation Equipment ContractorC.H. Capacity: Operator: Model:. Make: Reach:

Ground Elev.:

Time Started: 1445

Time Completed: 1500

Depth

-0-

-1-

-2-

-8-

-7-

—9—

-10-

-11-

-12-

-13-

-14-

Soil Description Excav. Effort

6" hides/buffing dust

Light Colored Soil

Samples for total and chromium VI collected from depths of T and 3'.

Test pit length - 25'

Boulder Count

Qty. Class

Remark No.

Remarks: EPA Photo # 8 DES Photo #10

Test Pit Plan

Test Pit

?LA.M VIEW

Legend Boulder Count

Size Range Classification

6"-18"

18"-36" 36'' and Larger

Letter Designation

A B C

Proportions Used

Trace (TR) 0-10% Little (U) 10-20% Some (SO) 20-35% and 35 - 50%

Abbreviations

F - Fine M - Medium C - Coarse F/M - Fine to Medium F/C - Fine to Coarse V^Very GR-Gray BN - Brown YEL-YeHow

Excavation Effort

E - Easy M - Moderate D - Difficult

Elapsed w Time to Reading Q.W.L.

18

Page 24: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

Test Pit Field Log - Test Pit Exploration Program Queen Street Landfill

Boscawen, N.H.

nnwiwma ~ onunMBircr Environmental

Services

New Hampshire Department of Environmental Services

Waste Management Division

Test Pit No. :_10 File No.: Date: 14 Jan 98

Hydrogeologist: RLW Weather Sunny/Cold

Excavation Equipment Contractor C.H. Capacity:_ Operator Model: . Make: Reach:

Ground Elev.;

Time Started:1510

Time Completed: 1530

Depth

-0-

-1-

-2-

-3-

-5-

-6-

-7-

-8-

-9-

-10-

-11-

-12-

-13-

-14-

Soil Description Excav. Effort

Approximately 10' thickness of waste/hides

Light Colored Soil Sample for total and chromium VI collected from depth of 11' (!' below waste)

Test RT Advanced to dept of 13'

Boulder Count

Qty. Class

Remark No.

i Remarks: EPA Photo #9 DES Photo #9,10,11 & 12

Test Pit Plan Legend Boulder Count

Size Range Classification

6" -18"

18"-36" 36" and Larger

Letter Designation

A B C

Proportions Used

Trace (TR) 0-10% Little (LI) 10-20% Some (SO) 20-35% and 35 - 50%

Abbreviations

F - Fine M • Medium C • Coarse F/M-Fineto Medium F/C-Fine to Coarse V-Very GR - Gray BN - Brown YEL - Yellow

Excavation Effort

E - Easy M - Moderate D - Difficult

Elapsed ^ Time to -=• Reading g.W.L.

f 19

Page 25: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

Test Pit Field Log - Test Pit Exploration Program Queen Street Landfill

Boscawen, N.H.

MBwiwiinij _ nffumaNTOF Environmental

Services

New Hampshire Department of Environmental Services

Waste Management Division

Test Pit No.: H File No.: -Date: 14 Jan 98

Hydrogeologist: RLW Weather: Sunnv/Cold

Excavation Equipment Contractor: Capacity: Operator: Model: Make: Reach:

Ground Elev.:

Time Started: 1535

Time Completed: 1545

Depth

—o—

-1-

-2-

-3-

-9-

-10-

-11-

' -12-

-13-

-14-

Soil Description Excav. Effort

6" waste/hides

Light Colored Soil

Sample collected for total and chromium VI from depth of 2*

Boulder Count

Qty. Class

Remark No.

Remarks: Pit constructed across access rd

Test Pit Plan Legend Boulder Count

Size Range Classification

6"-18" 18" -36"

36" and Larger

Letter Designation

A B C

Proportions Used

Trace (TR) 0-10% Little (U) 10-20% Some (SO) 20 -35% and 35 - 50%

Abbreviations

F - Fine M - Medium C-Coarse F/M-Fineto Medium F/C - Fine to Coarse V-Very GR - Gray BN - Brown YEL - Yellow

Excavation Effort

E-Easy M - Moderate D - Difficult

Elapsed « Time to ~=-Reading G.W.L.

20

Page 26: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

Test Pit Field Log - Test Pit Exploration Program Queen Street Landfill

Boscawen, N.H.

Environmental Sendees

New Hampshire Department of Environmental Services

Waste Management Division

Test Pit No.: 12 File No.: Date: 14 Jan 98

Hydrogeologist: RLW Weather Sunnv/Cold

Excavation Equipment ContractorC.H. Capacityi_ Operator: - _ Model: Make: Reach:

Ground Elev.:

Time Started: 1550

Time Completed: 1600

Depth

-O-

-1-

-2-

-7-

8-

-9-

-10-

-11-

-12-

-13-

-14-

Soil Description Excav. Effort

6" waste/hides

Light Colored Soil

Sample for total and chromium VI collected from depth of

Boulder Count

Qty. Class

Remark No.

Remarks: test pit constructed opposite access rd

Test Pit Plan Legend Boulder Count

Size Range Classification

6"-18"

18"-36" 36" and Larger

Letter Designation

A B * C

Proportions Used

Trace (TR) 0-10% Little (LI) 10-20% Some (SO) 20-35% and 35 - 50%

Abbreviations

F - Fine M - Medium C - Coarse F/M-Fineto Medium F/C - Fine to Coarse V-Very GR-Gray BN - Brown YEL- Yellow

Excavation Effort

E - Easy M - Moderate D - Difficult

Elapsed w Time to X Reading G.W.L.

21

Page 27: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

Test Pit Field Log - Test Pit Exploration Program Queen Street Landfill

Boscawen, N.H.

NBVHMffWn OOMRWdTOr

nvironmental Services

New Hampshire Department of Environmental Services

Waste Management Division

Test Pit No.: 13 File No.: Date: 15 Jan 98

; Hydrogeologist. 1 Weather:

Excavation Equipment Contractor: Capacity: Operator: Model:__ Make:; Reach:

Ground Elev.:

Time Started:_

Time Completed:.

Depth

-0-

-1-

-2-

t -8-

-10-

-11-

-12-

-13-

-14-

Soil Description Excav. Effort

Sample for total and chromium VI No of burned wood noted

hides small amount

Boulder Count

Qty. Class

Remark No.

Remarks:

Test Pit Plan Legend Boulder Count

Size Range Classification

6"-18" 18" - 36"

36" and Larger

Letter Designation

A B C

Proportions Used

Trace (TR) 0-10% Little (U) 10-20% Some (SO) 20- 35% and 35 - 50%

Abbreviations

F-Fine M - Medium C - Coarse F/M - Fine to Medium F/C - Fine to Coarse V - Very GR - Gray BN -Brown YEL - Yellow

Excavation Effort

E-Easy M - Moderate D - Difficult

Elapsed Time to 4L-Reading G.W.L.

22

Page 28: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

Test Pit Field Log - Test Pit Exploration Program Queen Street Landfill

Boscawen, N.H. .

. . ojont Environmental

Services

New Hampshire Department of Environmental Services

Waste Management Division

Test Pit No. : 14 File No.: Date: 15 Jan 98

Hydrogeologist:. Weather

Excavation Equipment Contractor Capacity: Operator Model: Make: ~ - Reach:

Ground Elev.: Time Started:

Time Completed:.

Depth

-1-

-2-

—3—

-6-

-7-

-8-

-9-

-10-

-11-

-12-

-13^-

-14-

Soil Description Excav. Effort

Boulder Count

Qty. Class

Cover

Hides

Black "Soil" - appeared to be the same material as test pits along stream yesterday only not saturated

Sample for total and chromium VI

Remark No.

Remarks: EPA photos - Frames # 10 and 11

Test Pit Plan

hides

blacK Soil

Tpflpiws,

Legend Boulder Count

Size Range Letter Classification Designation

6"-18"

18"-36" 36" and Larger

A B C

Proportions Used

Trace (TR) 0-10% Little (LI) 10-20% Some (SO) 20-35% and 35 - 50%

Abbreviations

F - Fine M - Medium C - Coarse F/M - Fine to Medium F/C-Fine to Coarse V-Very GR - Gray BN-Brown YEL-Yellow

Excavation Effort

E-Easy M - Moderate D - Difficult

Elapsed w Time to -=• Reading G.W.L,

f 23

Page 29: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

Test Pit Field Log - Test Pit Exploration Program Queen Street Landfill

Boscawen, N.H.

avironniental Services

New Hampshire Department of Environmental Services

Waste Management Division

Test Pit No,: 15 File No.: Date: 15 Jan 98

Hydrogeologist. Weather

Excavation Equipment Contractor:. Capacity: Operator: Model: Make: Reach:

Ground ElSv.: ,

Time Started:

Time Completed:.

Depth

-0-

-1-

-2-

€ -9-

-10-

-11-

-12-

-13-

-14—

Soil Description Excav. Effort

Soil cover minor amounts of scrap metal & bottles noted

Hide - Thin Layof hides (6") present on "tannery side" of test pit but not on "burn dump" side of test pit

Sample for total and chromium VI

Boulder Count

Qty. Class

Remark No.

Remarks: EPA photo frame 12 This test pit represents the extent of tannery waste

Test Pit Plan

~f No hideS

Pu.u View

Legend Boulder Count

Size Range Classification

6" -18"

18"-36" 36" and Larger

Letter Designation

A B C

Proportions Used

Trace (TR) 0-10% Little (U) 10-20% Some (SO) 20- 35% and 35 - 50%

Abbreviations

F - Fine M - Medium C - Coarse F/M«Fine-to Medium F/C- Fine to Coarse V-Very GR - Gray BN - Brown YEL-Yellow

Excavation Effort

E-Easy M - Moderate D - Difficult

Elapsed « Time to -=-Reading g.W.L.

24

Page 30: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

Test Pit Field Log - Test Pit Exploration Program Queen Street Landfill

Boscawen, N.H.

NEW HAMHKB . OWMtTNENTOF Environmental

Services

Mew Hampshire Department of Environmental Services

Waste Management Division

Test Pit No,: 16 File No.: Date: 15 Jan 98

Hydrogeologist:. Weather:

Excavation Equipment Contractor: Capacity:_ Operator_ Model: Make: Reach:.

Ground Elev.:

Time Started:

Time Completed:.

Depth

+5

+4

+3

+2

+1

0

1

3

4

5

6

7

8

SOIL DESCRIPTION Excav. Effort

Clean soil mound

Sample for total and chromium VI

Soil and some trash

Trash

Boulder Count

Qty. Class

Remark No.

Remarks: EPA photo frames 13 +14 Tom Danko on-site - observed this pit

Test Pit Plan Legend Boulder Count

Size Range Classification

6"-18" 18"-36"

36" and Larger

Letter Designation

A B C

Proportions Used

Trace (TR) 0-10% Little (UV 10-20% Some (SO) 20-35% and 35 - 50%

Abbreviations

F - Fine M - Medium C - Coarse F/M - Fine to Medium F/C-Fine to Coarse V-Very GR - Gray BN- Brown YEL-Yellow

Excavation Effort

E - Easy M - Moderate D - Difficult

Elapsed Time to Reading

G.W.L.

25

Page 31: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

Test Pit Field Log - Test Pit Exploration Program Queen Street Landfill

Boscawen, N.H.

Environmental Services

New Hampshire Department of Environmental Services

Waste Management Division

Test Pit No.: 1Z File No.: Date: 15 Jan 98

Hydrogeologist:. Weather

Excavation Equipment Contractor Capacity: Operator Model: Make: " Reach:

Ground Elev.:

Time Started:

Time Completed:,

Depth

-0-

-1-

-2-

-5-

-6-

€ -9-

-10-

-11-

-12-

-13-

-14-

Soil Description ExCav. Effort

Soil cover

Black "Soil" layer

Debris

Light colored clay

Sample for total and chromium VI

Boulder Count

Qty. Class

Remark No.

Remarks: EPA photo frame 15 Tom Danko on-site - observed this pit

Test Pit Plan Legend Boulder Count

Size Range Classification

6"-18" 18"-36"

36" and Larger

Letter Designation

A B C

Proportions Used

Trace (TR) 0-10% Little (LI) 10-20% Some (SO) 20-35% and 35 - 50%

Abbreviations

F - Fine M - Medium C • Coarse F/M - Fine to Medium F/C - Fine to Coarse V - Very GR - Gray BN - Brown YEL- Yellow

Excavation Effort

E - Easy M- Moderate D - Difficult

Elapsed m time to -=-Reading Q.W.L.

26

Page 32: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

Test Pit Field Log - Test Pit Exploration Program Queen Street Landfill

Boscawen, N.H.

Environmental Services

New Hampshire Department of Environmental Services

Waste Management Division

Test Pit No.: 18 File No.: Date: 15 Jan 98

Hydrogeologist:. Weather:

Excavation Equipment Contractor Capacity: Operator Model: Make: Reach:

Ground Elev.;

Time Started:

Time Completed:

Depth

-0-

-1-

-2-

-7-

-8-

-9-

-10-

-11-

-12-

-13-

-14—

Soil Description Excav. Effort

Snil cnver

Sample for total and chromium VI material—— —

- gray tannery looking

Trash

Green layer of soil (?)

Sample for total and chromium VI

Boulder Count

Qty. Class

Remark No.

Remarks: EPA frame #lb Tom Danko on-site - observed this pit

Test Pit Plan Legend Boulder Count

Size Range Classification

6"-18"

18"-36" 36" and Larger

Letter Designation

A B C

Proportions Used

Trace (TR) 0-10% Little (U) 10-20% Some (SO) 20 - 35% and 35 - 50%

Abbreviations

F - Fine M • Medium C - Coarse F/M-Fineto Medium F/C-Fineto Coarse V-Very GR-Gray BN-Brown YEL-Yellow

Excavation Effort

E-Easy M - Moderate D - Difficult

Elapsed w Time to ^ Reading G.W. t

27

Page 33: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

Test Pit Field Log - Test Pit Exploration Program Queen Street Landfill

Boscawen, N.H.

NSW HAimn ooiumaDfror

Environmental Services

New Hampshire Department of Environmental Services

Waste Management Division

Test Pit No. File No.:

19

Date: 15 Jan 98

Hydrogeologist:; Weather

Excavation Equipment Contractor: Capacity: Operator Model: Make: Reach:

Ground Elev.:

Time Started:.

Time Completed:.

Soil Description Excav. Effort

Soil Cover

Hides

Black "soil like" layer

Green Soil

No sample collected

Boulder Count

Qty. Class

Remark No.

Remarks: EPA frame 17

Test Pit Plan Legend Boulder Count

Size Range Classification

6"-18"

18"-36" 36" and Larger

Letter Designation

A B C

Proportions Used

Trace (TR) 0-10% Little (LI) 10-20% Some (SO) 20-35% and 35 - 50%

Abbreviations

F - Fine M - Medium C-Coarse F/M - Fine to Medium F/C - Fine to Coarse V-Very GR - Gray BN - Brown YEL- Yellow

Excavation Effort

E - Easy M - Moderate D - Difficult

Elapsed « Time to -= Reading g.W.L,

28

Page 34: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

Test Pit Field Log - Test Pit Exploration Program Queen Street Landfill

Boscawen, N.H.

mbw lime limn oowmcDaor ivizonmental

Services

New Hampshire Department of Environmental Services

Waste Management Division

Test Pit No.:. File No.:

20

Date: 15 Jan 98

Hydrogeologist:. Weather.

Excavation Equipment Contractor Capacity:. Operator Model: Make: Reach:

Ground Elev.:

Time Started:

Time Completed:.

Depth

-0-

-1-

-2-

-3-

-4~

-5-

-6-

-7-

-8-

—9—

-10-

-11-

-12-

-13-

-14-

Soii Description Excav. Effort

Soil coyer

Hides

Sample for total and chromium VI (tan-like material)

Soil

Sample for total and chromium VI (black soil-like material)

Boulder Count

Qty. Class

Remark No.

Remarks: EPA frame 18 - looking at uphill face - black soil may not show; tan should be obvious

Test Pit Plan Legend BoUlder Count

Size Range Letter Classification Designation

6"-18" 18"-36"

36" and Larger

A B C

Proportions Used

Trace (TR) 0 -10% Little (LI) 10-20% Some (SO) 20 - 35% and 35 - 50%

Abbreviations

F - Fine M - Medium C - Coarse F/M-Fineto Medium F/C - Fine to Coarse V - Very GR - Gray BN - Brown YEL-Yeilow

Excavation Effort

E- Easy M - Moderate D - Difficult

Elapsed Time to Reading g.W.

f 29

Page 35: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

test Pit Field Log - Test Pit Exploration Program Queen Street Landfill

Boscawen, N.H.

- # OCMffVMDffOF Environmental

Services

New Hampshire Department of Environmental Services

Waste Management Division

test Pit No.: 21 File No.: Date: 15 Jan 98

Hydrogeologist:. Weather:

Excavation Equipment Contractor: Capacity: Operator Model: Make: Reach:

Ground Elev.:

Time Started:

Time Completed:,

Depth

-0-

-1-

-2-

Soil Description Excav. Effort

€ -9-

-10-

-11-

-12-

-r13-

-14-

Trar^c r>f ViiHp

Clean soil

Boulder Count

Qty. Class

Remark No.

Remarks: EPA frame 19 No sample collected

Test Pit Plan Legend Boulder Count

Size Range Classification

6". 18" - -

18"-36" 36" and Larger

Letter Designation

A B C

Proportions Used

Trace (TR) 0-10% Little (LI) 10-20% Some (SO) 20 - 35% and 35 - 50%

Abbreviations

F - Fine M • Medium C - Coarse F/M - Fine to Medium F/C - Fine to Coarse V-Very GR - Gray BN - Brown YEL - Yellow

Excavation Effort

E - Easy M - Moderate D - Difficult

Elapsed « Time to Reading G.W.L.

30

Page 36: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

Test Pit Field Log - Test Pit Exploration Program Queen Street Landfill

Boscawen, N.H.

invironmantal Services

Hydrogeologist:. Weather

New Hampshire Department of Environmental Services

Waste Management Division

Excavation Equipment Contractor:̂ ̂Capacity: Operator: . Model: Make: Reach: _

Test Pit No.: 22 &23 File No. Date:

Ground Elev.:

Time Started:.

Time Completed:,

Depth

-0-

-1-

-2-

—3—

-4-

-5-

-6-

-7-

-8-

-9-

-10-

-11-

-12-

-13-

-14-

Soil Description Excav. Effort

Dug to base of mounds along access road - trace of hides on surface - clean fill otherwi$e

Boulder Count

Qty. Class

Remark No.

Remarks: No photos no samples

Test Pit Plan Legend Boulder Count

Size Range Classification

6"-18"

18"-36" 36" and Larger

Letter Designation

A B C

Proportions Used

Trace (TR) 0-10% Little (LI) 10- 20% Some (SO) 20-35% and 35 - 50%

F - Fine M - Medium C- Coarse F/M - Fine to Medium F/C-Fine to Coarse V-Very GR - Gray BN - Brown YEL-Yellow

E - Easy M - Moderate D - Difficult

Elapsed m Time to -==-Reading g.W.L,

31

Page 37: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

APPENDIX C

Page 38: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

32

Page 39: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

TP-4

TP - 6

33

Page 40: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the
Page 41: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

35

Page 42: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

TP - 10

TP - 10A

TP - 10B

36

Page 43: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

TP - 10D

37

Page 44: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

TP - 18A

' V \

SAMPLING OF SOILS

38

Page 45: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

APPENDIX D

Page 46: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

CLEAN HARBORS ID -603-224--6 j 'A 'N. O .uoo r

; js& gr% Environmental M s-J Laboratories Corporation *»—*6 mWs a I

111 Harrick Street. Merrimack, NH 03054 TEL: (903) 424-2022 • FAX: (603) 429-8496

January 22, 1998

Mr. Dennis DiMambro , „ . Clean Harbors Environmental Services Co 20 Dunltlee Rd. Bow, NH 0330*

RE Your project: NH DES Boscawen

Dear Dennis:

Enclosed please find the results for the above-referenced Enclosed pi . ig 199a AMRO operates a Quality

?ont?S'prS|?»» Shich rn^t^or UceedLsPA and "a« retirement..

regarding this project in the future, please -««

Please be advised that any £MBlmnis

rSSrt da«U Stsf?L.i,P^ vUllrwerly dispL. of tha

SH«a JUS sr sssfosssr- says. This letter is an integral part of your data report.

Please do not hesitate to r.all if you have any questions.

Sincerely,

Lc^lRichard Ravenelle y\ ( Organic? Laboratory Manager

End.

39

Page 47: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

CLEAN HARBORS i.D =• 6Ui-/24-67?8 jmN zo so iu;« >N•. .uuo r .

t a

AKRO Environmental Laboratory Report Page l of 2

_4.. Client Designation: Clean Harbors Environment.H 3 services Co NH DE5 Boscawen

20 Dunk l ea Rd. Bow, NH 03304

Attn: Mr. Dennis DiMambrp

S«*pl« «*/•»-. "/solid r4"d:i0n! Tl/«/»•

Date Reo'vd: 01/15/98 Date Complet®4 01/20/98

Sample Identity

AMRO Test Identity parameter

Results Units Date of Run EPA Analysis by Method

TP1 2'-6" 18161-01

TP2A 6'

TP3 2'

TP4A 5'

TPS 2'

TPS 4'

18161-03

18161-04

16161-05

18161-06

TP7 2'6" 13161-07

Chromium VI, Total Total Solids Digestion Chromium, Total

<0.0504 mg/Kg 89.4 *

39.

Chromium VI, Total <0.0504 Total Solids 68.5 Digestion Chromium, Total 390.

mg/Kg

mg/Kg %

mg/Kg

18161-03 Chromium VI, Total <0.0504 mg/Kg _ - • - -- - e Total Solids

Digestion Chromium, Total

Chromium VI, Total Total Solids Digestion Chromium, Total

80.7

5 3 .

<0.0604 68 .6

410.

Chromium VI, Total <0.0504 Total Solids 26.8 Digestion Chromium, Total 13,000.

Chromium VI, Total <0.0504 Total Solids 72.4 Digestion Chromium, Total 70.

Chromium VI, Total <0.0504 Total Solids 73.3 Digestion Chromium, Total 1,500.

mg/Kg

mg/Kg %

mg/Kg

mg/Kg %

mg/Kg

rag/Kg %

mg/Kg

mg/Kg *

mg/Kg

01/16/98 01/19/98 01/16/98 01/19/98

01/16/98 01/20/98 01/16/98 01/19/98

01/16/98 01/19/98 01/16/98 01/19/98

01/16/98 01/19/98 01/16/98 01/19/98

01/16/98 01/19/98 01/16/98 01/20/98

01/16/98 01/19/98 01/16/98 01/19/98

01/16/98 01/19/98 01/16/98 01/19/98

GL* KP SV RK

3500Cr-0 2S10C 1031 603 0

GL« 3 500Cr-D KP 2540G SV 3051 RK 60l(

GL» V500CT-D KP 2S4 0G SV 3051 KX 6010

GL* 3500Cr-D KP : 54 0G sv :csi RK 5010

GL* 3500CT-D KP 35400 SV .3.0-51. RK 4010

gl* j«i:cr-D KP ; 5 4 0G sv i c6 : R K 6 M 0

GL® : 5 5 - - c r -D . KP 2 54CG sv ::si RK 6 : 19

Continued next page

40

Page 48: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

CLEAN HARBORS " si

iD:6p3-2L4-b r r s ,J rtlN ZO 30 i U • 4 j n u . w w w

.*0 Environmental Laboratory Report page 2 of 2

Sample Identity

AMRO Identity

TP7A 4'6M 13161-^08

TPS 3'6" 18161-69

TP9 3'

TP9A 1'

LP 10 1'

TPH 2'

TP12 1'

Test Parameter

Chromium VI, Total Total Solids Digestion Chromium, Total

*«ult5 Units ustey0fa Run

<0.0504 mg/Kg 96.8 %

460. mg/Kg

01/16/98 01/19/98 01/16/98 01/19/98

18161-10

18161-11

18161-12

18161-13

18161-14

chromium VI, Total <0.0504 mg/RS "J;'"''®

Total Solid. 82.1 % Si/il/H

Sil'Sim? Total 100. mg/Kg 01/19/98

Chromium VI, Total Total Solids. Digestion chromium, Total

Chromium VI< Total Total Solids Digestion Chromium, Total 3,

Chromium VI, Total Total Solids Digestion Chromium, Total

Chromium VI, Total Total Solida Digestion Chromium, Tota1

Chromium VI, Total Total solids Digestion Chromium, Total

<0.0504 89.6

140.

<0-0504 35.1

400.

<0.0504 84.8

mg/Kg %

mg/Kg

mg/Kg %

mg/Kg

mg/Kg %

81. mg/Kg

<0.0504 88 .

mg/Kg %

9.6 mg/Kg

<0.0504 86.1

14.

mg/Kg %

mg/Kg

01/16/98 01/19/98 01/16/98 01/19/98

01/16/98 01/19/98 01/16/98 01/19/98

01/16/98 01/19/98 01/16/98 01/19/98

01/16/98 01/19/98 01/16/98 01/19/98

01/16/98 01/20/98 01/16/98 01/19/98

GL* 3500Cr-D KP 2540G SV 3051 RK 6010

GL* 3500Cr-D KP 254QG $V J0S1 RK 6010

GL* 3500CT-D KP 2540G SV 3051 RX 6010

GL* 3300Cr-p KP 2540G SV 3051 RK 6310

GL* KP SV RK

GL« KP SV RK

GL* KP SV RK

3 soccr-D 2 54 0G 3051 6010

33C0CT-D 2 5423 3 251 6020

35;ccr-0 2 54 0G 3 051 6C 20

Becults are in dry weight. .

m sswa-Jfe- —< all than, followed by the detection limit.

> = 'Greater than' GL*"" Analy2̂ by GeoLabe, Inc.

41

Page 49: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

CLEAN HARBORS JHN ^5 -98 i 0 4 0 NQ.UO'0 ID :603~224-6778

GeoLabs, Inc. Snvifaiuaaaml LaAeiafeites

PREPARED POR: Amro Environmental laboratories Corporation

111 Herriek Street Merrimack. NH 03054

Attn: DenlaeBamett

PROJECT ID: 18161

QEOLABS CLIENT ft 1516-97

$AMPLE NUMBER: 03087^3100

DATE PREPARED: January 19,1998

PREPARES Cftrtstine Jonnson

APPROVES BY: A Zo-

Chen, laboratory direetor/Date

— . rr, . Phone: (781) 848-7644 Location: 10 Plain Sees* '

BmlRtrM,MA 02184 **

42

Page 50: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

CLEAN HARBORS 0 i /2U/ ! )» j . a : i* -u;i •'»<.« ID: 603-224-67 7-'8 JriN ?b i .w;40 iNO.uoo r .ur

I « * M% •

@eel&bs«lne. gmrinnamtal La&9Htort*s

CLIENT NAME: AMRO ENVIRONMENTAL SAMPLE TYPE: SOIL COLLECTION DATE: 01/14/98 REC'D BY LAB: 01/18/88 COLLECTED BY: CLIENT

PROJECT »D: 18161

REPORT DATE: 01/18/98 ANALYZED BY: SS 01/16/98 EXTRACTION DATE. N/A D1QESTION DATE N/A

HPCAVALEMT CHROMIUM

SAMPLE number

SAMPLE LOCATION

63087

630BB

63089

53090

63091

63092

63009

63094

63095

83096

93067

63096

63099

63100

NO = NOT DETECTED

01

83

03

04

06

06

07

08

09

10

11

13

13

14

HEXAVALEMT CHROMIUM (mg/Kg)

ND

ND

ND

ND

ND

NO

NO

ND

ND

ND

ND

NO

ND

ND

DETECTION LIMIT (fag/Kg)

0.0504

0.0604

0 0504

O.0804

0.0504

0.0504

0.0504

0.0504

0.0504

0.0504

0.0604

0,0304

0.0504

0.0504

Method Reference:

Standard Method 3500Cr-D(1)

APHAAVWA-WPCF "Stands* Methods for the Examination of WWer end Ws-to-efar-.

1996,19ft Edition. 1)

43

Page 51: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

CLEAN HARBORS ID :603-224-6778 JAN 23 '98 iO :4P No .uUC r . v©

M #1 ® •• 7s a i-UBORAtORY REPORT

TPH BY (3C/FID - EPA METHOD 8100 MODIFIED

Client Clean Harbors Environmental Services Co. Client I.D.: NH DES Bosccwen, NH

TP-2 8' AMRO 1,0.: 18161-15

Date sampled: 01/14/98 Date prepared: 01/19/98

Sample Qty/Type: 1/Solid

Test Parameter

Gasoline Kerosene Mineral Spirits Fuel Oil #2/Dle*el Fuel on #4 Fuel Oil #6 Motor Oll/Hydraullc Oil

Solid Content * 70.1%. Results are in dry weight Gasoline results are provided for screening purposesonty/The recommended procedure for gasoline analysis « a modified EPA

8016 or 8260B (purge and trap).

The Reporting Limit Is defined as the lowest concentration the laboratory can accurately quantitate.

Comments:

NO ~ Not Detected at or aPove the reporting limit.

Analyzed By: MDM

Date Received: 01/15/98 Date Analyzed: 01/20/98

Results (mo/Kg)

ND ND ND ND ND ND ND

Reporting Liwtt/ma/Kq|

70 70 70 70 70

140 70

44

Page 52: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

clean harbors H

ID: 603-224-6778 JAN 23 '98 10:4? n o . woo r .ua

m a .•y UldftATORV Sb'WT

TPH BY (3C/FID - EPA METHOD 8100 MODIFIED

Client Clean Harbors EnvlronmentalServicae Co. CUont I.D.; NH DES Qoaoowen, NH

TP-4S * AMRO I.D.: 18161-16

Date sampled: 01/14/98 Date prepared; 01/19/98

Sample Qty/Type: 1/Solld

Teat Parameter

Gasoline Kerosene Mineral Spirits Fuel Oil #2/Di»sel Fuel Oil #4 Fuel OH 86 Motor on/Hydrauiie Oil

Solid Content = 48.6%. Repute are in dry weight Gasoline results are provided for screening purposes only. The recommended procedure for gasoline analysis'» • modiflod ERA

8016 or 02600 (purge end trap).

The Reporting Limit is defined as the lowest concentration the laboratory can accurately quantitate.

Comments:

ND = Not Detected at or above the reporting limit.

Analyzed By . MDM

Date Received: 01/16/90 "Date Analyzed: 01/20/98

Results fmo/Kq)

ND ND ND NO ND ND NO

Reporting Limittma/Kqi

03 93 93 S3 93

190 93

45

Page 53: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

CLEAN HARBORS iD :ou^ -^ /4 -b r r o jn iN ^0 3 0 iVu .^wb

H S 4v. — laboratory ftfcportt VOLATILE ORGANIC COMPOUNDS-EPA METHOD 8260B

Client Clean Harbors Environmental Services Co.

Client I.D.: NH DEB Boscawen TP26T

-rL*umf!iad- 01/14/9 ̂ 0848 R8cslve :̂ 01/16/98 '"SLpNPMtlWiM DateAnSlyttd: 01/21/98

Sample Qty/Type: 1/Sottd

Test EaSESlSC

Chloromethane Bromomethane Vinyl Chloride Dtehlorodtfluoromethena

Chloroethane Methylene Chloride Trichlorofluoromethane

Diethyl Ether Acetone 1.1-Ofchloroethene Carbon Disulfide Bromochloromethane 1.1-Dlchloroethane 2-Butanone qs-1.2-Olchloroelhene trans-1,2-Otehloroathene

Chloroform Tetrahydrofuran pibromomethana 4-Methyl-2-P«ntanone 1.2-Olchloroethene 2 -̂Dluhloropropene 1.1.1-Trtahloroethane Carbon Tetrachloride Bromodlchloromethane 1.2-Oichloropropona 1.1-Olchloropropene Trichioraathene Dibromochloromethana 1.1.2-Trichtoroethane Benzene 1.3-Olchloropropane Bromoform 1,1.1,2-Tetrachloroethane Tetrachloroethene 1.2-Olbrortx)ethane 2-Haxanone 1,1.22.-Tetrachloroethene Toluene

Results (uo/Ko)

ND NO ND ND ND ND ND ND sao ND NO NO ND ND ND ND ND ND ND ND ND ND ND ND ND NO NO ND ND ND NO ND ND ND ND ND ND ND 190

Reporting Limit iuo/Kal

91 91 91 91 91

180 36 91

360 38 36 36 36

180 38 36 36

180 36

180 36 36 36 36 36 36 36 36 36 36 36 36 36

, 36 36 36

180 36 36

Cont next page

Page 1 of 2

46

Page 54: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

CLEAN HARBORS

/a 14 Jf %ljt

ID S603--224-6778 JAN. 23 98 iu:4y NO.yUb f.ii

3 'LABORATORY WSMttV

VOLATILE ORGANIC COMPOUNDS-EPA METHOD 8280B

Client Clean Harbors Environmental Service oo.

Client I D.: TP2 ff AMRO ID.: 18161-15

Test Parameter

Results tua/Kal

^porting Limit (uo/Kal

Chlorobenzene

Ethylbenzene Bromobenzona isopropylbenzene Styrene n-Prcpylbenzene cis-1,3-D'tchtoropropene trans-1.3-Oichioropfopene Xylene (m&p) o-Xylene 1.2-Olbromp-3-cWciropfopene lert-Butylbenzene 2-Chlorotoluene Hexechtorobutadiene 4-Chloroteluene sec-Butylbenzene 1.3-Dichlorobenzene 1.2-Dlchtort>baru:en« 1.4-Dlchlorobenzene 1.2.3-Tnchloropropene n-Butylbenzene 4HSopropyltoluene Naphthalene 1.2.4-Trimethylbenzene 1.3.5-Trtmethyibenzene 1.2.3-Trlchlorobenzone 1.2.4-Trichtorobenzene Methyl-tert-butyl ether (MTB6)

Solid Content - 70.1 %. Results are In dry weight ND - Not Detected at or above the reporting limit

The Reporting Limit IB defined as the lowest concentration the

laboratory can accurately quentltate.

Analyzed By: KN

ND ND ND ND ND NO ND ND ND NO ND ND ND ND ND ND ND NO ND ND NO ND ND ND ND NO ND ND

36 36 36 36 36 36 36 36 36 36 01 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36

Page 2 of 2

47

Page 55: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

GLEAN HARBORS . ID - oO i -224-6 r r . d j r iN z0 3 O , y ; 4.0 iYfl- .; uy 0 r . 1 Z

it5-. 3^

LABORATORY REPORT VOLATILE ORGANIC COMPOUNDS-ERA METHOD 8260B

Client Clean Harbors Environmental Services Co. Client I.D.: NH DES Boaeawen

TP4ff AMftOI-D.: 18181.16

Date sampled: 01/14101 Date prepared: 01/16/98

Sample Qty/Type: 1/Sofld

Oate Received: 01/16/98 Date Analyzed: 01/21/98

Test Parameter

Chloromethane Bromcmethane Vinyl Chloride DichlorodHtuorometnene

Chloroethane Methylene Chloride Trichlorofluoromethane Diethyl Ether Acetone 1,1-plchloroethene Carbon Disulfide Bromochloromethane 1.1-Dichloroethane 2-8utanone ds-1,2-Olchloroethene trans-1,2-Olchloroethene Chloroform Tefrahydrofuran Dlbrornomethahe 4-Methyl-2-Pentanone 1.2-Dlchloroethane 2,2-Ojchloroprbpane 1.1.1-Trichloroethane Carbon Tetrachloride Bromodtehloromethane 1.2-Dtahloropropene 1.1-Olchloropropene TricMoroethene Dbromochloromothane 1.1.2-Trichloroeihane

' Benzene 1.3-Oiohloropropene Bromoferm 1, •1.1,2-Tetrachloroethane Tetrechloroetherie 1.2-Olbromoethane 2-Hexanone 1.1 ̂ ,2-Tetrachloroethane

Toluene

Results fuo/Ktrt

NO ND ND ND ND ND NO ND

1,500 NO NO NO ND ND ND ND ND ND NO NO ND ND NO ND ND ND ND ND ND ND ND ND ND NO ND ND ND ND

2,100

Reporting Limit (UO/Kflt

110 110 110 110 110 220 44

110 440

44 44 44 44

220 44 44 44

220 44

220 44 44 44 44 44 44 44 44 44 44 44 44 44 44 44 44

220 44 44

Cont next page

Page 1 of 2

48

Page 56: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

C L E A N H A R B O R S I D : 6 0 3 - 2 2 4 - 6 7 J H N 2 3 ' 9 » l u - a * i n o . u u o r . u

A M n ^ = —: — mssmmr^mr—•

VOLATILE ORGANIC COMPOUNWWEPA METHOD 8260B

Client Clean Harbors Envirohrnente! Services Co. Client I.D.: TP4 5"

AMRO I.D.: 18161-16

Teat Results SPPPrtinfl lue/Kat

Chlorobenzene Hhylbenzene Bromobanzene Isopropylbenzene NO Styrene

o-Xylene

n-Butylbenzene

NO 44 NO 44 NO 44

NO 44 n-Propylbenzene NO 44

d3-1,3-0lchloroproper\9 NO 44 trans-1,3-Dichloropropene NO 44 Xylene (m&p) NO 44

NO 44

1.2-Dlbromp-3-chioropropane NO *10 tert-Butylbenzene NO 44 2-Chlorotoluene NO 44 Hexaclilofobutadiene NO 44 4-Chtorotoluone NO 44 sec*Butylbenzene NO 44 1.3-Oichlorobenzene ND 44 1,2-Otehlorabenzene NO 44 1.4-Olchlorobenzene NO 44 1,2,3-Trichioropropane ND 44

ND 44

4-lsopropyltoiuene NO 44 Naphthalene NO 44 1.2.4-Trimethy Ibersene NO 44 1.3.5-Trimethylbenzone NO 44 1,2,3«Trichlorobenzene NO 44 1,2,4-Trtchlorobenzene NO 44 MethyWert-butyi ether (MTB6) NO 44

Solid Content "48.5 %. Results are in dry weight ND = Not Detected at or above the reporting limit

The Reporting Limit is defined bsj the lowest concentration the laboratory an accurately quentitate.

Analyzed By: KN

Page 2 of 2

49

Page 57: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

CLEAN HARBORS AMisJk ID:603-224-6778 JAN 23'98 I 0 : 4 I NO.UUO R.I4

LABORATORY REPORT TENTATIVELY IDENTIFIED COMPOUNDS

VOLATILE ORGANIC ANALYSIS

Client CleanHarbora Enwohmental Services Co.

Client I D: NH DES Boscawen TP?!?

AMRO I.D.: 18181-13 Date sampled: 1/14/91 Date prepared: 1/10/08

Compound Name

Unknown C10H16 Isomer Unknown

Date received: 1/16/98 Data analyzed: 1/21/98

Estimated Cflfteoritratlop! ua/KoA

120 230 100 B

Analyzed By: KN

50

Page 58: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

CLEAN HARBORS AMH& 10:603-224-6778 JAN 23 98 iu:4d NO .uoo r

LABORATORY REPORT TENTATIVELY IDENTIFIED COMPOUNDS

VOLATILE ORGANIC ANALYSIS

Client Clean Harbor* Environmental Services Co.

Client I.D.: NH DES Boacewen TP4ff

AMRO I D. : 18191-16 Date sampled: 1/14/98 Date prepared: 1/16/98

Compound Name

None Detected

Date received: 1/13/98 Date analyzed: 1/21/98

Eetirnated r-9nctntratlon(ug/Ko *

Analyzed By: KN

51

Page 59: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

CLEAN HARBORS ID : 603 -224-6778 JAN 12 .3 ' 98 IU ^m INO

Data Qualifiers Legend

A This tentatively identified compound is a suspected aldol-condensation

product.

B This analyte has been found in the associated method blank as well as the

sample.

E This analyte concentration exceeds the upper level of the calibrauon range.

Es The reporting value of this analyte is estimated due to the presence pi an

interference.

J The reporting value of this analyte is estimated.

N This tentatively identified compound is based on a moss spectral library

search

(a) Result determined by the Method of Standaid Addition

(h) PQL was elevated for Method 6010 due to the presence of an interference.

(c) Result was estimated due to blank contamination.

52

Page 60: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

CLEAN HARBORS ID :603-224-6778 JAN 23 '98 10 :50 No .006 H . i r

AMHO _ -

Shib via: (circle one) Fed Ex., UPS, Other Courier, Other

1. Custody Seate present? 2. Custody Seats Intact? 3. Air Bill included in fatder if received?

5. la COC aianed and dated tivcllarit? f 6 Is pooler temp, accsptatite (4 - 6 o O? Ternp.»_^>(̂

Samples rec. with ioe jaToacto neftharJj)6L

9. Were samples rec. within holdtng tims'fr

11, ware all gametes propwty'preeefvad?

Sample Receipt Checklist

terns to tie Checked Upon Receipt Yes • No T NA Comments

la COC inriudadwtth samptea? m I L l-z: g

lathaCOtbtoedoutcofrecfly and comptatatyT l. Does the Into on the COC waieh the samples? £E

10. were all gemotes property labeled? i=t-r

i2."~w»e proper aampO oontainare used? w 13. Were all aamptearseatvad m&et? (none broten or leaking) J?

%

14. WOre VOA vials rec. w«h no sir tiubbtea? 16. wore the sample volumes sufficient far requested analysis? 16. Were all samples reeaivsd7

W.

1B. Iwtarmation entered inte internal Tracking Log?

"" ~~ pre Weight log? iCfentLog?

Data: ' Data:

NA< Rev.

: Not Applicable 4 09/05/97

SAM-RECJOJ

53

Page 61: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

CLEAN HARBORS

4 SB

ID :603-224-677S

Environmental - Laboratories Corporation

JAN 23'98 10-5i No .006 r . 1.8

111 Herrlck Street. Merrimack, NH 03064 TEL: (603) 424-2022 • PAX: (603) 429-8496

January 22, 1998

Mr. Dennis DiMambro , „ Clean Harbors Environmental Services Co 20 Dunklee Rd. BOW, NH 03304

RE your project: NH DES Boscaven Landfill

Dear Dennis:

Enclosed please find the results for the above-referenced oroiect rocoived on January 16, 1998. AMEO operates a Quality^ Control'program which meets or exceeds EPA and staterBguiraBanta. A cotsV of the appropriate State Certificate is attached. The ̂ enclosed Sample Receipt Checklist details the condition of yo sample upon receipt. No quality control deviationawerenoted during the analyses associated with this project. This project was assigned AMRO Project Number 18174. If youfa^to^i^nSer~ regarding this project in the future, please refer to this number.

Please be advised that any unused sample volume and sample extracts will be stored for a period of thirty (30) days from this Sp"t date. After this time, AMRO will properly dispose of the remaining sample- If you require further analysis, or need the »«iapies held for a longer period, pleaaa oontact us immediate y.

This letter is an integral part of your data report.

Please do not hoaitate to call if you have any questions.

Enel.

Sincerely,

• a,: ~ .1. , '

1/7 Richard Ravenelle /f I Organics Laboratory Manager

54

Page 62: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

CLEAN HARBORS ID:603-224-6778 j hN LO 3b i.U : ax NO . uuo r ,i3

AMRO Environmental Laboratory Report Page l of 2

Client Designation: Clean Harbors SnvSronmental Services Co HH DES Boscaw.il Landfill

—20 Dunklae Rd. Bow, MH 03304

Attn: Mr. Dennis DiMambro

Samples Qty/Type: 9/Solid AMRO "i/ts/98

Site Ree'vd: 01/16/98 Date Complete: 01/20/98

Sample identity

AMRO Identity

Test Parameter

Results Units Date of Run EPA Analysis by Method

TP 13 l' 18174-01

TP 14 11' I? 17 4 - 0 2

TP 3 S 7'

TP16 2'

TP30 8'

18174-03

18174-04

TP17 10' 18174-05

18174-06

chromium VI, Total Total Solids Digestion chromium, Total

Chromium VI, Total Total Solids Digestion chromium. Total

Chromium VI, Total Total Solids Digestion Chromium, Total

Chromium VI, Total Total Solids Digestion Chromium, Total

Chromium VI, Total Total solids Digestion Chromium, Total

chromium vi, Total Total Solids Digestion Chromium, Total

<0.0504 mg/Kg 92.6 *

54.

<0.0504 85.9

460.

<0.0504 08*1

23.

<0.0504 90.8

33.

<0.0504 87.9

75.

<0.0304 64.4

140.

mg/Kg

mg/Kg %

mg/Kg

mg/Kg %

mg/Kg

mg/Kg %

mg/Kg

mg/Kg %

mg/Kg

mg/Kg %

mg/Kg

01/19/98 GEO* 01/19/98 KP 01/19/98 SV 01/20/98 RK

01/19/98 01/19/98 01/19/98 01/20/98

GEO* KP SV RK

01/19/98 GEO* 01/19/98 KP 03/19/98 8V (11/20/98 RK

01/19/98 GEO* 01/19/98 KP 01/19/98 SV 01/20/98 RK

01/19/98 01/19/98 01/19/98 01/20/98

GEO* KP SV RK

3500CT-D 2540G 3031 6010

3500Cr-D 254 GG 3051 6010

isoocr-n 2 34 0G 3051 6 0 1 0

3500Cr-D 2 5 4 OC 3 031 6010

330QCr-D 2 54 0G 3051 6010

01/19/98 GEO* 3 30CCr-D 01/19/98 KP • 5-4 CG 01/19/98 SV 3351 01/20/98 RK 5310

Continued next page

55

Page 63: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

CLEAN HARBORS ID:603-224-6778 JAN 23'98 10:52 : No ,-006 P. 20

®0 Environmental Laboratory Report Page 2 of 2

Sample Identity

AMRO Identity

Test Parameter

Results Units Date of Analysis.

Run EPA by _Method

TP20 13' 18174-07

TP20A 7' 18174-08

TP18A 2' 18174-09

chromium VI, Total <0.0504 mg/Kg Total Solids 90.9 % Digestion Chromium, Total 26. mg/Kg

Chromium vi. Total <0.0504 mg/Kg Total Solids 86.1 * Digestion chromium, Total 280. mg/Kg

Chromium VI, Total <0.0304 mg/Kg Total Solids 48. * Digestion Chromium, Total 76,900. Jig/Kg

01/19/98 GEO* 3500CT-D 01/19/98 KP 2S40G 01/19/98 SV 3051 01/20/98 RK 6010

01/19/98 GEO* 3500Cr-D 01/20/98 RK 2540G 01/19/98 SV 3051 01/20/98 RK 6010

01/19/98 GEO* 3500CT-D 01/20/98 RK 2540G 01/19/98 SV 3051 01/20/98 RX 6010

Results are in dry weight. 44.w

"1 water a «»•«. Standard Kathode for the Examination of Water and Wastewater, -8th Pdition. 1992. and USEPA SW846 Manual, 3rd. ad.

The following standard abbreviations and conventions apply throughout

^ . < » 'Less than' followed by the detection limit. > » 'Greater than'

GEO* = Analyzed by Geolaba, Inc.

1 56

Page 64: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

CLEAN HARBORS xu •ous -^^4 -o r r« JHIN yo iuox INO .uuo r

QeoLabs, Inc. Eiwiranttwtfsl L&defatofHv

PREPARED FOR: Amro Environmental Laboratories Corporation 111 Hemok Street Merrimack, NH 03064

Attn: Denies Bamefct

PROJECT 10: 16174

6B0LABS CLIENT * 1516-97

SAMPLE NUMBER: 63160-63158

DATE PREPARED: January 22.1998

PREPARED BY: Christine Johnson

APPR0VIDBY: Laboratory Olmctor/Date

Location: 10 Plain Street Braimree, MA 02164

Phone: (781) 8447844 FfflC (781) 848-7i11

57

Page 65: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

CLEAN HARBORS 01/22/8®

iD:606-224-6778 10:0® TFRTIMT'TLLL GCOLSBS.

j mN Inc.

ZO AXRO ElfVtR

NO u u o r , . z z ($0002/0004

GaoLabs, Inc. EnvlnMimantof Lmbotstert**

CUENT NAME: SAMPLE TYPE; COLLECTION DATE; REC'D BY LAB: COLLECTED BY:

AflflRO ENVIRONMENTAL SOIL 01/16/98 01/19/96 CUfcPft

PROJECT ID: REPORT DATE: ANALYZED BY: EXTRACTION DATE: DIGESTION DATE:

18174 01/22/98 SS 01/20/98 N/A N/A

HEXAVALEMT CHROMIUM

SAMPU SAMPLE HEXAVALENT CHROMIUM DETECTION LttfflT NUMBER LOCATION (0*1*8) (RiB/Kfl)

83160 01 N0 q-050A

63151 02 ND 0-W04

83152 03 NO 0 0504

83153 <* HO 0.0604

63154 05 NO 0.0504

63156

ND - NOT DETECTED

0 0604

0.0604

63185 04 ND

63166 07 NO

~ eia ND 0.0504 83157 08 iw

MQ 0.0804

0.0504

Standard Method 3600Cr-0(i)

1) APHA-AVWWLWPCF *SMndani Methods tor the Examination cfWatwand Waatswater*.

1966, IBth Edition.

58

Page 66: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

CLEAN HARBORS ID : 60 -3 -224-6 ? 78 J AN , z .3 98 10 :5 b No .uUb r . 2 i U l / Z Z / 9 * 1 U - W S ^ T I B f B H / a A A U O O U 1 B S . A B C . *•»' MKU fcflVIK l£| 0003/0004

ocoL&as, INC. 18 PLAIN STREET

BftAINTRKE. MA 021W

UMITATIOMS & EXCLUSIONS

All the professional opinions presented in this report are iwwl solely on: the scope of work conduced and sources referred to In our report The data presented by GeoLabs in this report was collected and analyzed using generally accepted industry methods and practices at the time the report was generated. This report represents the conditions, locations and materials that ware observed at the time the worit was conducted. No inferences regarding other conditions, locations or materials, at a later or earlier time may he made based on the contents of tha report No other warranty, express or

Implied Is made.

This report was prepared for the sole use of our client Portions of the report may not boused independent of the enflre report.

All analyses were performed within required holding times, In accordance with EPA protocols and using r""Ttori OA/QC procedures. The Information contained in this report is, to the best of my knowledge, accurate and complete.

\

59

Page 67: REPORT ON TEST PIT EXPLORATION, SAMPLING AND …backfilled test pit at the grade stake. Summary of Test Pit Program Results The following summarizes the general observations of the

CLEAN HARBORS . . A S **

ID:603-224-6778 jHIN 23'98 10:33 iNO.uwo r.zu

HA • Not Applicable Rev. 4 09/05/07

SAM-AfC-KLS

60