-/ REPORT ON SOIL INVESTIGATION SITE: TRAINING & CONSORTIUM, OPP. WALBHAT RIVER, BRIMSROW PROJECT (WS43 ),FROM W.E. HIGHWAY TO RAILWAY BRIDGE NO. 46, GOREGAON (EAST), MUMBAI. SR. NO. TOPICS 1. REPORT a. INTRODUCTION b. SUB-SOIL PROFILE c. LABORATORYTESTING d. FOUNDATION ASPECTS e. RECOMMENDATIONS 2. ANNEXURE I. BORE HOLE LOGS 11. LABORATORY TEST RESUL TS t .'

Upload: ngodan

Post on 15-Sep-2018

224 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: REPORT ON SOIL INVESTIGATION BRIMSROW … Department List/… · report on soil investigation site: training & consortium, opp. walbhat river, brimsrow project (ws43 ),from w.e. highway

-/

REPORT ON SOIL INVESTIGATION

SITE: TRAINING & CONSORTIUM, OPP. WALBHAT RIVER,

BRIMSROW PROJECT (WS43 ),FROM W.E. HIGHWAY

TO RAILWAY BRIDGE NO. 46, GOREGAON (EAST), MUMBAI.

SR. NO. TOPICS

1. REPORT

a. INTRODUCTION

b. SUB-SOIL PROFILE

c. LABORATORYTESTING

d. FOUNDATION ASPECTS

e. RECOMMENDATIONS

2. ANNEXURE

I. BORE HOLE LOGS

11. LABORATORY TEST RESULTS

t

.'

Page 2: REPORT ON SOIL INVESTIGATION BRIMSROW … Department List/… · report on soil investigation site: training & consortium, opp. walbhat river, brimsrow project (ws43 ),from w.e. highway

v. T. GANPULE & ASSOCIATESGEOTECHNICAL & GROUND ENGINEERING CONSULTANTS

REFNTGAl09/0 ~023 DATE: 13.03 2009

REPORT ON SOIL INVESTIGATION

OF TRAINING AND CONSTRUCTION OF WALBHAT RIVER FROM W.E.

HIGHWAY TO RAILWAY BRIDGE NO. 46, GOREGAON

(EAST),BRIMSROW PROJECT ( WS 43 )

FOR M/S. SKYWAY INFRA-PROJECT PRIME (J. V.)

INTRODUCTION:-

M/s. Skyway Infraproject Prime (J.V.) are proposing a

retaining wall for training of Walbhat river project at W-S 43, Training and

Consortium, Opp. Walpart River, from W. E. Highway to Railway Bridge No.

46, Goregaon (East), Mumbai. M/s. Structarch are the structural consultants_

The work of soil investigation work comprising of two trial boreholes

was awarded to M/s. Stefon Constructions. The data provided by these

boreholes is used to describe the subsoil condition prevailing down below.

The subsoil description is followed by discussion on foundation aspects and

recommendation

It may please be noted that the detailed structural design of foundation

is not contemplated in the report. The report is aimed at providing general

information regarding the Geotechnical aspects of subsoil formations from

safe bearing capacity and settlement point of view.

C-4, INDRAYANI COMPLEX, GR. FLR., 1. K. SAWANT MARG, DADAR (W), MUMBAI - 400 028.TEL. : 2436 8048, 2438 5189 TELEFAX: 2433 2248

E-Mail: [email protected]

Page 3: REPORT ON SOIL INVESTIGATION BRIMSROW … Department List/… · report on soil investigation site: training & consortium, opp. walbhat river, brimsrow project (ws43 ),from w.e. highway

V. T. GANPULE & ASSOCIATES Continuation She!,!t No .

The top soil is consisting of filled up layer of 4.5 meter thickness.

SUB-SOIL PROFILE:-

Area Covered by borehole BH-1

Layer I (Start at 0.0 m end at 4.5 m depth)

The top soil is consisting of filled up layer of 4.5 meter thickness.

The filled up layer has got well compacted on which truck movement in fair

season is possible. In rainy season it may cause problem at few location due

to variation in density and moisture content.

Layer 11 (Start at 4.5 end at 5.5 m depth)

It is observed that there is layer of greyish rock fragments of 1.0 meter

thickness.

Layer III (Start at 7.5 m borehole end at 10.0 m depth)

The basaltic layer is observed from a depth of 5.5 meter meters depth

with 26 % to 84% recovery and 28% to 84% ROD value. The rocky layer is

noted up to a drilled depth.

Area Covered by borehole BH-2

Layer I (Start at 0.0 m end at 1.2 m depth)

The filled up layer has got well compacted on which truck movement in fair

It is observed that there is layer of greyish rock fragments of 3.8 meter

season is possible. In rainy season it may cause problem at few location due

to variation in density and moisture content.

Layer 11 (Start at 1.2 m end at 5.0 m depth)

thickness.

Page 4: REPORT ON SOIL INVESTIGATION BRIMSROW … Department List/… · report on soil investigation site: training & consortium, opp. walbhat river, brimsrow project (ws43 ),from w.e. highway

V. T. GANPULE & ASSOCIATES Continuation Shell 0.•..•........•.

Layer III (Start at 5.0 m end at 10.0 m depth)

The basaltic layer is observed from a depth of 5.0 meter meters depth

with 33 % to 75% recovery and 11% to 58% ROD value. The rocky layer is

noted up to a drilled depth.

LABORATORY TESTING:

Rock Core Test Results:

The crushing strength values show vide variation in unconfined

compression strength ranging between 154 kg/cm2 to 801 kg/cm2. The dry

density is in between 2.6 kg/cm2 to 2.9 kg/cm2. The water absorption and

porosity are also limited to the tune of 0.13 % to 0.79 % and 0.40 % to 2.08%

respectively.

Ground water test results:

The ground water is observed at a depth of 4.0 meters below ground

level. The pH (7.54) value indicates the water is slightly alkaline in nature. The

water contains 60 ppm of chloride as CI-. 24 ppm as sulphate as S03-

indicating that water is non aggressive in nature.

FOUNDATION ASPECT:

The proposed structure is a retaining wall of 6 meter retention height.

The expected loading intensity at base of retaining wall may be of medium

heavy range. To negotiate such loading intensity the greyish basaltic

formation is available from 6 meters depth below present ground level.

The foundation resting on greyish basaltic formation can be designed

with SBC of 80 T/m2 with a seat of' 60 cm into the weathered rock. The

expected settlement under loading intensity of 80 T/m2 will be in the range of

---- -- --- -- -

Page 5: REPORT ON SOIL INVESTIGATION BRIMSROW … Department List/… · report on soil investigation site: training & consortium, opp. walbhat river, brimsrow project (ws43 ),from w.e. highway

V. T. GANPULE & ASSOCIATES Continuation S~et No .

around 5 mm which are with in permissible limits.

5 mm which is well within the tolerance of the structure from serviceability

point of view.

The properties of retained earth is depends on quality of backfilled

material.

RECOMMENDATIONS:

1) The foundation resting on grayish basaltic formation may be

designed with SBC of 80 T/m2 at a depth of 6 meter below ground

level with seat of 60 cms.

2) The expected settlement under loading intensity of 80 T1m2 will be

The enclosed bore logs and laboratory test results complete the report.

(G. S. PARAS)B.E. (Civil) M. Tech (Geotech)

Page 6: REPORT ON SOIL INVESTIGATION BRIMSROW … Department List/… · report on soil investigation site: training & consortium, opp. walbhat river, brimsrow project (ws43 ),from w.e. highway

BORE HOLE LOGS

Page 7: REPORT ON SOIL INVESTIGATION BRIMSROW … Department List/… · report on soil investigation site: training & consortium, opp. walbhat river, brimsrow project (ws43 ),from w.e. highway

~ nmrtt @fJU - r:ii::\n"LlCr~CONSTRUCTIONS

CLIENT NAME : M/S. SKYWAY INFRAPROJECT PRIME (JV) DATE OF COMMENCEMENT: lO-L-2:o_~}

MUMBAI. DATE OF COMPLETION : 12.-.3-.lo.c ~

SITE LOCATION : TRAINING & CONSORTIUM OF WALBHAT RIVER FROM W. E. HIGHWAY GROUND WATER LEVEL : 4.00 MTR.

TO RAILWAY BRIDGE NO. 46, GOREGAON (El, BRIMSROWAD PROJECT FINAL DEPTH : 10.00 M

BORE HOLE LOG ( ltJ.S4"3/BORE HOLE NO : ONE PAGE NO.-1

BORE DEPTH ~c: CORE DRILLING REMARKSc DEPTH FROM VISUAL DESCRIPTION FIELD TEST L!..W ---ILl ILl O-J:::: ::::> ~ril RECOVERY R.O.D.v; IN EGL X~ LOG OF STRATA wc.. WASH~ U-J c..:E OU % % WATERU (M) IN %:L!.. >~ U!:!:!I-C/l

0.00 (M) 1-0 c..25150 751100 25 50175 hoe COLOUR

i) ~:~:~ BROWNISH~ F- X///

~ '- 1.00

..•..~:!.:.x/X~ ••c; .••• ;///

- 2.00~(~(?xz x > FILLING~~!.~:~: :<.:)

- 3.00 ~: :<.~~i'- ~~:<.~?

X/X~~'-- 4.00 ~~~~.~4.50 4.50 ./></

5.00~

BOULDERS

- 5.50 1.00

I 1 - 3

~- 6.00

~~ 1- 4-6~ ~=-- 7.00

~ ~- GREYISHROCK 7 -10

~~=---- 8.00

~ @J§28:...

11 - 15r-- 9.00 ~

~~ 6 16- 19~ -,t 10.00 4.50

I- BORE HOLE TER ~INATED AT 10.00 mtr.

'--11.00 I

-12.00

-13.00:...

=----14.00

-

STEFON CONSTRUCTIONSABBRV

ws : WASHSAMPLE EGL : EXISTINGGROUNDLEVEL OS : DISTURBEDSAMPLE

UDS : UNDISTURBEDSAMPLE : WATER LEVEL SPT : STANDARDPENETRAITIONTEST

2110O S.P. : SMALL PIECES B : .'NX' DOUBLETUBE COREBARREL

C-4, INDRAYANI COMPLEX. GR. FLOOR,J.K. SAWANT MARG, DADAR (W), MUMBAI -28.TEL.: 24368048 124385189 eTEL. FAX: 24332248

E-mail: [email protected]

Page 8: REPORT ON SOIL INVESTIGATION BRIMSROW … Department List/… · report on soil investigation site: training & consortium, opp. walbhat river, brimsrow project (ws43 ),from w.e. highway

'" iMMm_~n~Ll:rWCONSTRUCTIONS

CLIENT NAME : M/S. SKYWAY INFRAPROJECT PRIME (JV) DATEOFCOMMENCEMENT: lQ-L.-2..1>_<l~

MUMBAI. DATE OF COMPLETION 12.-.3-.l.Q.c~;

SITE LOCATION : TRAINING & CONSORTIUM OF WALBHAT RIVER FROM W. E. HIGHWAY GROUND WATER LEVEL : 4.00 MTR.

TO RAILWAY BRIDGE NO. 46, GOREGAON (E), BRIMSROWAD PROJECT FINAL DEPTH : 10.00 M

BORE HOLE LOG C UJ.S-43)BORE HOLE NO : ONE PAGE NO.-1

BORE DEPTH IJI CORE DRILLING REMARKSo DEPTH FROM IJIC:: VISUAL DESCRIPTION FIELD TEST ••..w ---ww O...J:: ::> ~~ RECOVERY R.O.D.(ii IN EGL ::.:<t LOG OF STRATA

wc.. WASH<t U...J c..:: O~ % % WATERU (M) IN 5: ••.. ><t••.• IJI UC::

0.00 (M) •...025150 75 hoc 25 50175 hoo COLOUR

~; ~~:<.(~ BROWNISHi :... ~('(~

f - 1.00 ~((.(~~(:<.~~V///)......:,.X/./

- 2.00 ~(:<.~~ FILLING~.;:'.';:-~(:<.~~

- 3.00 x/x/F- ~.;:<.~:-'-- 4.00 ~(:<'~i

xz x >" 4.50 4.50 .;;;;;.

- - 5.00~

BOULDERS

5.50 1.00

~

1 - 3

~t-- 6.00

~f- 4-6

~ ~I:-- 7.00

I~~

"- GREYISHROCK 7 -10~ ~

"-- 8.00

5~ ~28c,

11 -15~- 9.00 ~

~I

16 -19

~ -10.00 4.50

BORE HOLE TER iIIlNATED AT 10.00 rntr,

'--11.00 ,

-12.CO

f-

"--13.00

F-

F--14.00

:-

STEFON CONSTRUCTIONSABBRV

ws : WASH SAMPLE EGL : EXISTINGGROUNDLEVEL OS : DISTURBEDSAMPLE

UDS : UNDISTURBEDSAMPLE : WATERLEVEL SPT : STANDARDPENETRAITIONTEST- S.P. : SMALL PIECES B : .'NX' DOUBLETUBE COREBARREL

C-4, INDRAYANI COMPLEX, GR. FLOOR,J.K. SAWANT MARG, DADAR (W), MUMBAI - ·28.TEL.: 24368048 124385189· TEL. FAX: 2433 2248

E-mail: [email protected]

Page 9: REPORT ON SOIL INVESTIGATION BRIMSROW … Department List/… · report on soil investigation site: training & consortium, opp. walbhat river, brimsrow project (ws43 ),from w.e. highway

CLIENT NAME : M/S. SKYWAY INFRAPROJECT PRIME (JV) DATE OF COMMENCEMENT : tP-2."; Ltl ~

MUMBAI. DATE OF COMPLETION : ').-~-20\)~

SITE LOCATION : TRAINING & CONSORTIUM OF WALBHAT RIVER FROM W. E. HIGHWAY GROUND WATER LEVEL : 4.80 MTR.

TO RAILWAY BRIDGE NO. 46. GOREGAON (E). BRIMSROWAD PROJECT FINAL DEPTH : 10.00 M

BORE HOLE NO : TWOBORE HOLE LOG (WS-43/

PAGE NO.-1

BORE DEPTH Cl) CORE DRILLING REMARKSo DEPTH FROM CI)~ VISUAL DESCRIPTIO" FIELD TEST Ll..1U ---IUW 0-1Z z> wo.. ~f(l RECOVERY R.Q.D. WASHVi IN EGL Xet LOG OF STRATA 0..::et (M) U-I >et O~ % % WATERU IN :LI.. I-CI) U-

0.00 (M) 1-0 0..25150 75 100 25150175 ~OO COLOUR

iJ~ ~~;.-:~ BROWNISHX/ r r » FILLING..•..

- - 1.00 1.20 1.20 ~-:-f.-:-.

'-- 2.00 ~~-~'--- 3.00

~BOULDERS

~- '--- 4.00~~

..- 5.00 T •.00 3.80

~~131 - 2

- 6.0033 I3-9

~,-- 7.00~ 11GREYISHROCK

~10 -13

~- 8.00 - ~I- 14 -18

~ 9.00 • ~r- 19·24

10.00 5.00.v.vu

iIIlNATED AT 10.00 mtr.I- BORE HOLE TER

;--11.00

0-

-12.00

-'---13.00

::..

-14.00

-

STEFON CONSTRUCTIONSABBRV

ws : WASH SAMPLE EGL : EXISTINGGROUNDLEVEL OS : DISTURBEDSAMPLE

UDS : UNDISTURBEDSAMPLE : WATER LEVEL SPT : STANDARDPENETRAITIONTEST

""'" S.P. : SMALL PIECES B : 'NX' DOUBLE TUBE COREBARREL

C-4. INDRAYANI COMPLEX, GR. FLOOR,J.K. SAWANT MARG, DADAR (W), MUMBAI - 28.TEL.: 24368048/24385189· TEL. FAX: 2433 2248

E-mail: stefons@gmail.~om

Page 10: REPORT ON SOIL INVESTIGATION BRIMSROW … Department List/… · report on soil investigation site: training & consortium, opp. walbhat river, brimsrow project (ws43 ),from w.e. highway

LABORATORY

TEST RESULTS

.,}';

I "

Page 11: REPORT ON SOIL INVESTIGATION BRIMSROW … Department List/… · report on soil investigation site: training & consortium, opp. walbhat river, brimsrow project (ws43 ),from w.e. highway

ENLAB SERVICES113/2149,Samta Nagar,Road No.6,Kandivali (East),Mumbai -400101.

({) Lab. : 2885 6466

Our Ref : ES IRock/09/534Date:- 06/0312009

TEST REPORT OF ROCK SAMPLES

Your ReI· 358/03'09

AGENCY M/s. Stefon Constructlons, Mumbai.

CLIENT M/s. Skyway Infra Project Prime (J. V.)

SITE :W-S 43, Traning & Consotium Opp. Valpart River,From Western Express Highway To Railway Bridge No. 46,

Goregaon (E), Mumbai.Crushinq Load Test

SR. Bore Hole No BH -1 BH -1 BH -1 BH-2 BH-2NO. Piece P - 03 P - 08 P -12 P - 01 P - 09

Depth (mtr) 6.00 7.50 8.50 5.00 7.00

1 Specimen Dia(CM) 5.40 5.40 5.40 5.40 5.40

2 Length(CM) 3.40 10.80 6.10 10.80 4.20Ratio 0.630 2.000 1.130 2.000 0.778

3 Dry Weight(Kgs) 0.204 0.723 0.402 0.699 0.252

4 SSD Wt(Kgs) 0.205 0.724 0.403 0.701 0.254

5 Crushing Load (MT) 5.52 16.42 18.35 12.96 3.53

6 Comp.Strength(Kg/Cm2) 241.15 717.33 801.64 566.17 154.21

f"\o~

7 Water Absorption % 0.490 0.138 0.249 0.286

8 Dry Density Gm/cc 2.621 2.925 2.879 2.827 2.621

9 SSD Density Gm/cc 2.634 2.929 2.886 2.836 2.642

10 Porosity % 1.285 0.405 0.716 ·0.809 2080

11 Specific Gravity 2.655 2.936 2.900 2.851 2.6n ,...I

Correction Factor 0.853 1.000 0.906 1.000 0.869~12 Corrected for LID Kg/Cm2 205.62 717.33 726.63 566.17 133.95

Note I) Results are valid for samples submitted by the contractor.

,,

Page 12: REPORT ON SOIL INVESTIGATION BRIMSROW … Department List/… · report on soil investigation site: training & consortium, opp. walbhat river, brimsrow project (ws43 ),from w.e. highway

Tel. : 2684 5224Fax: 26846363

Cell: 9820066842E-mail: [email protected]

Soil, Hater, Rock, Concrete & Construction Material Testing for Physical, Chemical,Bacteriological, Electrochemical & Mechanical Parameters

Raja Market, 1st Floor, New Nagardas Rood, Andheri (East), Mumboi - 400 069.

RefJ SC 1Pat Lab No. MCI,",·0341 09. Date: 6-M ()-(ch

AME OF THE PARTY

NATURE OF SAMPLE

Mls Stefon Constructions

WATER

Client Client: M/s Skyway Infra Project Prime (JV)

Site W-S 43, Training & Consortium Opp. Valpart River, from western express high wayto Railway Bridge No. 46, Goregaon East, Mumbai.

RESULTS OF ANALYSIS BH - 2 (Two)GWL-4.8Om

Final depthlO.OOm

pH (By Digital pH Meter.)

Chloride (as cl )

7.54

60 PPM

PPMSulphate ( as So3 ) 24

Organic matter 280 PPM

RYZNER INDEX

Dissolved solids 100 PPM

130 Mili sms 1cm

20.1 PPM

9.7 PPM

120 PPM

7.54

6.88

6.22

0.66

CONDUCTIVITY

Magnesium

Calcium

Bi Carbonate- pH Measured

pH Sat

RYZNER Index

Langelier Index

Remarks: As per analysis report it is concluded that BR No. 2 sample is Neutral in nature.

L I = pH Measured - pH Sat R I =2pH Sat - pH measuredR.l. < 5.5 Heavy Scale will form5.5<R.1. < 6.2 Scale will form6.2<R.I.< 6.8 No Difficulties6.8<R.I.< 8.5 Water will be CorrosiveR.I.>8.5 Water will be very corrosive

IF L. I. > 0 Water is Scale formingIF L. I. =0 Water is NeutralIF LI < 0 Water is Corrosive.

lab. Shop No. 1, Ita laxmi Estate, Jeevon Vikas Kendra Marg, Off Sahar Road, Vile Porle (East), Mumbai - 400 057.