REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/27/13 CONSTRUCTION BUREAU RUN TIME--08.54.49 CONSTRUCTION STATUS REPORT PAGE 1 FIRST DIVISION FINAL ESTIMATES ONLY CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 01-003 BRIDGE REPLACEMENTS (BRIDGE CULVERTS) & APPROACHES AT VARIOUS SITES (4) AS INDICATED ON THE PLANS GRBN1-100042573 ( HASTINGS GENERAL CONTRACTING, INC. ) ACGBBR-2200(205) CULLMAN VARIOUS 01-009 MAINTENANCE ROADSIDE MOWING AND LITTER COLLECTION ALONG I 65 FROM THE BLOUNT COUNTY LINE TO THE 99054-100058071 MORGAN COUNTY LINE; BENTLEY TURF & LANDSCAPE, INC. 99-401-224-665-201 CULLMAN I 65 01-010 1.448 MI RELOCATION (GRADE, DRAINAGE, PAVEMENT & BRIDGE) ON SR-74 (US-278) IN VICINITY OF VEST EBEXL-100046482 CREEK WEST OF CULLMAN; (THE MORRIS GROUP, INC.) EBSPL-100046482 EBF-0074(509) CULLMAN 01-015 4.610 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR 3 (US 31) FROM S OF CR 594 (MP 320.730) TO STOAE-100056034 SR 69 IN CULLMAN; WIREGRASS CONSTRUCTION CO. INC HSIPE-100056034 STPOA-HSIP-0003(566) CULLMAN SR 3 01-024 0.253 MI RESURFACING AND TRAFFIC STRIPE ON BEASON GAP RD FROM DOGWOOD BLVD TO CR 89 IN FORT PAYNE; HSIP1-00055115 JACKSON PAVING & CONSTRUCTION, INC. HSIP-CN11(909) DEKALB 01-039 0.687 MI RESURFACING AND TRAFFIC STRIPE ON BEASON GAP ROAD FROM LINCOLN AVENUE TO DOGWOOD BLVD. IN HSIP -100050823 FORT PAYNE; (JACKSON PAVING & CONSTRUCTION, INC.) HSIP-CN09(902) DEKALB 01-043 INTERCHANGE LIGHTING ON SR-2 (US-72) AT SR-277 NORTH OF STEVENSON; NH04L-100045457 (TEMPLE ELECTRIC COMPANY, INC.) NH04E-100045457 NH-0002(520) JACKSON 01-044 0.184 MI BRIDGE REPLACEMENT (PARTIAL) ON SR-35 AT THE TENNESSEE RIVER; BROPL-100045262 (SCOTT BRIDGE COMPANY, INC.) BRF-0035(503) JACKSON 01-045 7.539 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-2 (US-72) FROM 0.44 MILES W OF SR-35 THROUGH NH04E-100053219 HOLLYWOOD TO C-113; (JACKSON PAVING & CONST., INC.) NH-0002(553) JACKSON 01-046 3.719 MI RESURFACING AND TRAFFIC STRIPE ON CR-11 FROM THE INTERSECTION OF SR-2 (US-72) IN ASPEL TO STNUM-100059296 THE INTERSECTION OF SR-35 IN LIM ROCK; JACKSON PAVING & CONSTRUCTION, INC. STPNU-3609(200) JACKSON CR-11

Upload: dinhnguyet

Post on 04-Feb-2018

214 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/27/13 CONSTRUCTION BUREAU RUN TIME--08.54.49 CONSTRUCTION STATUS REPORT PAGE 1 FIRST DIVISION

FINAL ESTIMATES ONLY

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 01-003 BRIDGE REPLACEMENTS (BRIDGE CULVERTS) & APPROACHES AT VARIOUS SITES (4) AS INDICATED ON THE PLANS GRBN1-100042573 ( HASTINGS GENERAL CONTRACTING, INC. ) ACGBBR-2200(205) CULLMAN VARIOUS

01-009 MAINTENANCE ROADSIDE MOWING AND LITTER COLLECTION ALONG I 65 FROM THE BLOUNT COUNTY LINE TO THE 99054-100058071 MORGAN COUNTY LINE; BENTLEY TURF & LANDSCAPE, INC. 99-401-224-665-201 CULLMAN I 65

01-010 1.448 MI RELOCATION (GRADE, DRAINAGE, PAVEMENT & BRIDGE) ON SR-74 (US-278) IN VICINITY OF VEST EBEXL-100046482 CREEK WEST OF CULLMAN; (THE MORRIS GROUP, INC.) EBSPL-100046482 EBF-0074(509) CULLMAN

01-015 4.610 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR 3 (US 31) FROM S OF CR 594 (MP 320.730) TO STOAE-100056034 SR 69 IN CULLMAN; WIREGRASS CONSTRUCTION CO. INC HSIPE-100056034 STPOA-HSIP-0003(566) CULLMAN SR 3

01-024 0.253 MI RESURFACING AND TRAFFIC STRIPE ON BEASON GAP RD FROM DOGWOOD BLVD TO CR 89 IN FORT PAYNE; HSIP1-00055115 JACKSON PAVING & CONSTRUCTION, INC. HSIP-CN11(909) DEKALB

01-039 0.687 MI RESURFACING AND TRAFFIC STRIPE ON BEASON GAP ROAD FROM LINCOLN AVENUE TO DOGWOOD BLVD. IN HSIP -100050823 FORT PAYNE; (JACKSON PAVING & CONSTRUCTION, INC.) HSIP-CN09(902) DEKALB

01-043 INTERCHANGE LIGHTING ON SR-2 (US-72) AT SR-277 NORTH OF STEVENSON; NH04L-100045457 (TEMPLE ELECTRIC COMPANY, INC.) NH04E-100045457 NH-0002(520) JACKSON

01-044 0.184 MI BRIDGE REPLACEMENT (PARTIAL) ON SR-35 AT THE TENNESSEE RIVER; BROPL-100045262 (SCOTT BRIDGE COMPANY, INC.) BRF-0035(503) JACKSON

01-045 7.539 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-2 (US-72) FROM 0.44 MILES W OF SR-35 THROUGH NH04E-100053219 HOLLYWOOD TO C-113; (JACKSON PAVING & CONST., INC.) NH-0002(553) JACKSON

01-046 3.719 MI RESURFACING AND TRAFFIC STRIPE ON CR-11 FROM THE INTERSECTION OF SR-2 (US-72) IN ASPEL TO STNUM-100059296 THE INTERSECTION OF SR-35 IN LIM ROCK; JACKSON PAVING & CONSTRUCTION, INC. STPNU-3609(200) JACKSON CR-11

Page 2: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/27/13 CONSTRUCTION BUREAU RUN TIME--08.54.49 CONSTRUCTION STATUS REPORT PAGE 2 FIRST DIVISION

FINAL ESTIMATES ONLY

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 01-047 BRIDGE COATING ON VARIOUS ROUTES AT VARIOUS BRIDGES AS INDICATED BY THE PLANS IN JACKSON, 99005-100055295 MADISON & CHEROKEE COUNTIES; P & H STUCCO & CONSTRUCTION, INC 99-501-690-000-001 JACKSON VARIOUS

01-051 2.569 MI OUTSIDE SLOPE SAFETY IMPROVEMENTS ALONG I-20 FROM E OF SR-25 (MP 145.230) IN LEEDS TO W IM04E-100042143 OF KELLY CREEK (MP 147.800); E.O. BYARS CONSTRUCTION, INC. DE-I020(331) ST. CLAIR I 20

01-057 3.832 MI RESURFACING AND TRAFFIC STRIPE ON CR-6 FROM SR-25 (US-411) IN BRANCHVILLE TO CR-12; STOAR-100058429 MCCARTNEY CONSTRUCTION COMPANY, INC. STPOA-5823(201) ST. CLAIR CR-6

01-062 4.280 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR 2 (US431/231) FROM MASTIN LAKE RD NH04E-100053224 (MP 337.490) IN NORMAL TO N OF BOB WADE LANE (MP 341.770); APAC MID-SOUTH, INC. HSIPE-100053224 NH-HSIP-0001(571) MADISON SR 2

01-071 0.712 MI WIDENING, PLANING, RESURFACING, TRAFFIC STRIPE & SIGNALS ON CR-16 (WALL TRIANA HWY) FROM STHVC-100053335 GOOCH LANE TO THE MADISON CITY LIMITS; (APAC MID-SOUTH, INC.) STMHV-8509(601) MADISON

01-074 2.076 MI. ADDITIONAL LANES ON TAYLOR ROAD FROM TERRY DRAKE ROAD TO SUTTON ROAD IN HNTOA-100008378 HUNTSVILLE (REED CONTRACTING SERVICES, INC.) STPAA-4500(210) MADISON ROAD

01-076 0.113 MI. GRADE, DRAIN, PAVE & TRAFFIC STRIPE ON RELOCATED HOLMES AVE AT SPARKMAN DR. IN HUNTSVILLE HSST -100032154 ( SHELBY CONTRACTING CO., INC. ) STPHS-000S(108) MADISON AVENUE

01-081 0.500 MI. BRIDGE GIRDER END REPAIR ON I 565 AT THE SR 1 (US 231) INTERCHANGE RAMPS IN IBRCP-100043649 HUNTSVILLE (FIBRWRAP CONSTRUCTION, INC.) STAAL-100043649 IBRCPF-STPAAF-I565(306) MADISON I 565

01-088 6.960 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-1 (US-431) FROM ETOWAH CO LINE TO MILLER ST IN NH04E-100056030 ALBERTVILLE; (WHITAKER CONTRACTING CORP.) NH-0001(567) MARSHALL

01-118 2.321 MI PLANING, RESURFACING & TRAFFIC STRIPE ON CR-103 (HAYES ST) FROM SR-3 TO KARL PRINCE DRIVE DCSTC-100053673 AND ON SPARKMAN STREET FROM KARLPRINCE DR TO SR-3 IN HARTSELLE; (REED CONTRACTING SERVICES, INC.) STMOA-CN10(923) MORGAN

Page 3: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/27/13 CONSTRUCTION BUREAU RUN TIME--08.54.49 CONSTRUCTION STATUS REPORT PAGE 3 FIRST DIVISION

FINAL ESTIMATES ONLY

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 01-142 0.892 MI GRADE, DRAINAGE, PAVEMENT, BRIDGE AND SIGNALS ON THE BLACK CREEK PARKWAY EXTENSION IN GDSTC-100008476 RAINBOW CITY; (WRIGHT BROTHERS CONSTRUCTION CO.) STMOA-STPOA-8104(600) ETOWAH

01-147 2.963 MI SHOULDER WIDENING ON CR-290 (LAY SPRINGS RD) FROM DELMONT RD TO OLD CAMP RD NE OF GADSDEN HSIPE-100053863 CITY LIMIT; (RICHARDS & SONS CONSTRUCTION CO.) HSIPR-100053863 HRRR-HSIP-CN10(210) ETOWAH

01-150 0.900 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR 291 FROM SR 759 TO SR 1 (US-431) IN 99103-100057500 GADSDEN; MCCARTNEY CONSTRUCTION CO. INC. 99-301-285-291-303 ETOWAH SR 291

01-173 0.255 MI. BRIDGE REHABILITATION ON THE BROAD ST. BRIDGE IN GADSDEN. OAST -100008496 ( PNEUMATIC CONCRETE CO., INC. ) STPOA-8116(600) ETOWAH STREET

01-212 0.376 MI WIDENING (GRADE, DRAINAGE, PAVEMENT AND SIGNAL) ON MERIDIAN STREET FROM MONROE STREET TO HNTOA-100033483 PRATT AVENUE IN HUNTSVILLE; (CARCEL & G CONSTRUCTION, LLC) STHVL-100033483 STPHV-STPAA-4500(213) MADISON

01-226 1.259 MILES WIDENING (GRADE, DRAINAGE, PAVEMENT & SIGNAL ON WINCHESTER ROAD FROM THE HUNTSVILLE STHVL-100008553 CITY LIMIT TO DOMINION CIRCLE APAC-SOUTHEAST, INC., PO BOX 385025, B'HAM 35238 STPHV-8556(600) MADISON HUNTSVI

01-245 NH-0001(563); 4.959 MI PLANING,RESURFACING,TRAFFICSTRIPE & BRIDGE RAIL RETROFIT ON SR-1 (US-231/US- NH04E-100053319 431) FROM MP 341.770 N OF HUNTSVILLE THRU MERIDIANVILLE TO MP 346.730); (APAC MID-SOUTH, INC.) NH04L-100053320 NH-0001(562) MADISON

01-247 NH-0002(541); 15.918 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON I-565 FROM LIMESTONE CO LINE TO IM04E-100055269 SR-2 (US-72) & ON SR-2 FROM I-565 TO WEST OF CR- 393 IN HUNTSVILLE; (WIREGRASS CONST. CO.) NH04E-100055270 IM-I565(309) MADISON

Page 4: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

ACGBBR-2200(205) CULLMAN VARIOUS 0.69 % 01-003 HASTINGS GEN 975,616 120 W 099 100 08-15-04 983,087 8,499.29 1,231,237 29,800 7,471 37,271

FINAL PROJECT STATUS - F12 - AWAITING DOCUMENTATION FROM CONTRACTOR

99-401-224-665-201 CULLMAN I 65 3.15 % 01-009 BENTLEY TURF 76,636 24 W 083 100 11-01-12 51,596 2,661.84 84,300 0 0 0

FINAL PROJECT STATUS - F15 - FINAL ESTIMATE SENT TO GENERAL OFFICE

EBF-0074(509) CULLMAN 11.47 % 01-010 THE MORRIS GR 11,873,127 300 W 099 100 03-15-12 13,512,170 1,830,158.48 15,955,380 95,108 1,639,043 1,734,151

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

STPOA-HSIP-0003(566) CULLMAN SR 3 6.26 % 01-015 WIREGRASS 2,849,403 65 W 068 100 02-12-13 2,684,381 223,059.78 3,561,554 88,081 0 88,081

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

HSIP-CN11(909) DEKALB 0.00 % 01-024 JACKSON PAVIN 53,860 40 W 053 100 09-30-12 48,377 .00 0 0 0 0

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

HSIP-CN09(902) DEKALB 3.28 % 01-039 JACKSON PAVIN 169,981 30 W 093 100 09-08-10 166,642 6,738.52 205,285 1,121 -3,339 -2,218

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

NH-0002(520) JACKSON 6.31 % 01-043 TEMPLE ELECTR 882,665 110 W 065 100 12-31-11 934,133 73,406.06 1,161,958 122,166 51,468 173,634

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

BRF-0035(503) JACKSON 8.84 % 01-044 SCOTT BRIDGE 14,331,999 280 W 204 100 08-01-12 22,174,528 1,619,414.23 18,306,334 10,588 0 10,588

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

NH-0002(553) JACKSON 3.27 % 01-045 JACKSON PAVIN 5,224,296 100 W 092 100 02-25-13 4,399,500 214,108.16 6,530,005 2,800 -834,218 -831,418

FINAL PROJECT STATUS - F15 - FINAL ESTIMATE SENT TO GENERAL OFFICE

STPNU-3609(200) JACKSON CR-11 2.19 % 01-046 JACKSON PAVIN 483,673 30 W 037 100 05-31-13 452,849 12,938.18 588,167 0 -30,824 -30,824

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

Page 5: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

99-501-690-000-001 JACKSON VARIOUS 4.20 % 01-047 P & H STUCCO 988,183 100 W 065 100 02-19-13 991,179 45,709.16 1,087,001 0 2,996 2,996

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

DE-I020(331) ST. CLAIR I 20 11.76 % 01-051 E.O. BYARS CO 939,711 1913 D 105 100 08-15-13 1,145,277 139,161.98 1,182,616 25,871 205,566 231,437

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

STPOA-5823(201) ST. CLAIR CR-6 2.43 % 01-057 MCCARTNEY 719,246 45 W 091 100 06-15-13 717,304 21,031.93 863,229 0 -1,942 -1,942

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

NH-HSIP-0001(571) MADISON SR 2 8.31 % 01-062 APAC MID-SOUT 1,532,366 50 W 094 100 01-31-13 1,487,472 159,273.04 1,915,351 0 -44,901 -44,901

FINAL PROJECT STATUS - F15 - FINAL ESTIMATE SENT TO GENERAL OFFICE

STMHV-8509(601) MADISON 1.90 % 01-071 APAC MID-SOUT 881,408 90 W 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

STPAA-4500(210) MADISON ROAD 12.16 % 01-074 REED CONTRACT 8,107,491 300 W 087 100 04-30-08 1,520,823 1,134,380.92 9,323,615 332,530 0 332,530

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

STPHS-000S(108) MADISON AVENUE 2.05 % 01-076 SHELBY CONTRA 174,787 75 W 095 100 04-29-05 81,000 3,179.88 154,689 0 0 0

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

IBRCPF-STPAAF-I565(306) MADISON I 565 3.74 % 01-081 FIBRWRAP CONS 204,810 75 W 027 100 01-14-08 148,469 9,621.78 256,682 0 -56,341 -56,341

FINAL PROJECT STATUS - F15 - FINAL ESTIMATE SENT TO GENERAL OFFICE

NH-0001(567) MARSHALL 8.50 % 01-088 WHITAKER CONT 3,835,609 75 W 096 100 04-30-13 4,069,455 407,961.04 4,794,243 43,250 219,196 262,446

FINAL PROJECT STATUS - F15 - FINAL ESTIMATE SENT TO GENERAL OFFICE

STMOA-CN10(923) MORGAN 5.97 % 01-118 REED CONTRACT 260,595 30 W 057 100 12-31-10 249,828 15,132.11 253,154 0 0 0

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

STMOA-STPOA-8104(600) ETOWAH 2.30 % 01-142 WRIGHT BROTHE 7,443,256 250 W 100 100 12-31-11 6,982,304 49,244.02 2,138,433 18,463 -460,952 -442,489

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

Page 6: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

HRRR-HSIP-CN10(210) ETOWAH 9.31 % 01-147 RICHARDS & SO 196,595 45 W 098 100 06-30-10 194,920 22,033.25 236,425 0 -1,675 -1,675

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

99-301-285-291-303 ETOWAH SR 291 25.78 % 01-150 MCCARTNEY 547,722 30 W 080 100 04-15-13 528,588 135,362.70 525,000 0 -22,484 -22,484

FINAL PROJECT STATUS - F15 - FINAL ESTIMATE SENT TO GENERAL OFFICE

STPOA-8116(600) ETOWAH STREET 5.25 % 01-173 PNEUMATIC CON 585,834 120 W 072 100 07-29-05 681,318 38,876.40 739,508 0 0 0

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

STPHV-STPAA-4500(213) MADISON 15.15 % 01-212 CARCEL & G CO 1,837,374 200 W 083 100 04-01-11 1,675,265 292,432.08 1,930,000 53,640 -162,109 -108,469

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

STPHV-8556(600) MADISON HUNTSVI 43.01 % 01-226 APAC-SOUTHEAS 3,597,618 300 W 093 100 12-01-11 3,543,377 1,779,845.89 4,137,261 50,537 -54,241 -3,704

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

NH-0001(562) MADISON 7.76 % 01-245 APAC MID-SOUT 1,867,969 75 W 100 100 04-15-12 1,877,209 181,188.88 2,334,830 8,430 -40,243 -31,813

FINAL PROJECT STATUS - F15 - FINAL ESTIMATE SENT TO GENERAL OFFICE

IM-I565(309) MADISON 6.95 % 01-247 WIREGRASS CON 8,376,557 2111 D 100 100 12-01-11 9,158,459 761,783.54 10,946,024 33,750 781,902 815,652

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER DIVISION TOTALS: 79,018,387 81,353,575 91,169,336 922,862 1,207,030 2,129,892 9,201,087.73

Page 7: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/27/13 CONSTRUCTION BUREAU RUN TIME--08.54.49 CONSTRUCTION STATUS REPORT PAGE 4 SECOND DIVISION

FINAL ESTIMATES ONLY

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 02-004 INTERECTION IMPROVEMENTS INCLUDING SIGNALS AT SECOND STREET, COX BOULEVARD & JACKSON HIGHWAY IN HSST -100007076 SHEFFIELD. ( APAC-ALABAMA,INC. ) STPHS-108(26) COLBERT STREET

02-010 0.150 MI. GRADE, DRAIN & PAVEMENT ON B'HAM AVE. FROM ASHE BOULEVARD TO SR#17 & ON THIRD ST. FROM SR# HSST -100007072 17 TO ASHE BOULEVARD IN SHEFFIELD. ( APAC-ALABAMA, INC. ) STPHS-108(27) COLBERT SR#17

02-016 STPNU-4703(200); 3.896 MI RESURFACING, TRAFFIC STRIPE, CULVERT EXTENSION & GUARDRAIL ON CR-48 AND STNUE-100053537 CR-28 AT SITES INDICATED BY THE PLANS; (S.T. BUNN CONSTRUCTION CO., INC.) STNUE-100056134 STPNU-4719(200) MARION

02-017 0.056 MI INTERSECTION LIGHTING ON CR-312 (HALEY DRIVE) AT CR-35 (GARNER LANE) IN BARTON AT THE STATO-100055450 RIBERFRONT INDUSTRIAL PARK; (SHOALS ELECTRIC COMPANY, INC.) ST-017-888-020 COLBERT

02-018 1.185 MI RESURFACING, DRAINAGE, SIDEWALK & SIGNAL ON JACKSON HWY. (SR-13 / US-43) FROM 2ND STREET SHST -100047001 IN MUSCLE SHOALS TO SR-2 (US-72); (JOE KEENUM EXCAVATION & CONSTRUCTION, INC.) STPOA-8822(600) COLBERT

02-020 4.832 MI. GRADE,DRAINAGE, PAVEMENT, PARTIAL PLANING & RESURFACING ON SR 24(CORRIDOR V) APD8H-100009848 FROM 3 MILES WEST OF RUSSELLVILLE TO WEST OF SR 13 (US 43) IN RUSSELLVILLE APD-0355(504) FRANKLIN SR 24

02-022 11.244 MI RESURFACING, TRAFFIC STRIPE & PAVEMENT MARKERS ON CR-23 FROM SR-19 IN VINA TO SR-24 AND STNUL-100051594 ON CR-79 FROM MARION COUNTY LINE TO SR-243; S&M EQUIPMENT CO., INC, 835 SHAW RD, LEIGHTON,AL STPNU-3010(201)-STPOA-3036(200FRANKLIN

02-026 3.200 MI RESURFACING & TRAFFIC STRIPE ON DUNCAN CREEK ROAD (SR-62) FROM RUSSELLVILLE CITY LIMITS NUST -100053847 TO WATERLOO ROAD (CR-65) (S&M EQUIPMENT CO., INC.) STPNU-3039(200) FRANKLIN

02-027 0.776 MI DUAL BRIDGES ON RELOCATED SR-13 AT BEAR CREEK NORTHWEST OF DIME; STOAL-100050490 (SCOTT BRIDGE COMPANY, INC.) STPOAF-0013(544) FRANKLIN

02-028 7.859 MI ADDITIONAL LANES (GRADE, DRAINAGE, PARTIAPAVE & BRIDGES) SR-24 (CORRIDOR "V") FROM SR-247 APD54-100038595 EAST OF RED BAY TO CR-21 W.S. NEWELL & SONS, INC. AC8L -100038595 ACAPD-0355(501) FRANKLIN

Page 8: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/27/13 CONSTRUCTION BUREAU RUN TIME--08.54.49 CONSTRUCTION STATUS REPORT PAGE 5 SECOND DIVISION

FINAL ESTIMATES ONLY

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 02-031 5.066 MI ADDITIONAL LANES (GRADE, DRAINAGE, PAVE &PARTIAL BASE) ON SR-13 (US-43) FROM EXISTING FOUR STAAC-100004262 LANE AT KILLEN TO SR-64; (RACON, INC.) STMAAF-0013(503) LAUDERDALE

02-034 10.053 MI PLANING, RESURFACING & TRAFFIC STRIPE ONSR-64 FROM SR-13 (US-43) TO SR-101 IN LEXINGTON; STAAE-100053156 (ROGERS GROUP, INC.) STPAA-0064(500) LAUDERDALE

02-038 0.253 MI. BRIDGE REPLACEMENT (3 BRIDGE CULVERTS) & AAPPROACHES AT VARIOU LOCATIONS AS INDICATED ON GRBN1-100044503 THE PLANS. ( B. H. CRAIG CONSTRUCTION CO., INC. ) ACGBBRZ-CN04(209) LAUDREDALE SITES

02-041 .312 MI BRIDGE REPLACEMENT AND APPROACHES ON CR-16AT LITTLE CYPRESS CREEK WEST OF PETERSVILLE; BROPL-100052818 (RILEY BRIDGE & ENGINEERING CO., INC.) BR-3912(200) LAUDERDALE

02-051 1.728 MI PLANING, RESUFACING AND TRAFFIC STRIPE ONSR33 FROM S OF CR9 (RIDGE RD) (MP 19.700) TO CR96 EBEXE-100053186 (MP 21.436) S OF WREN; JOE KEENUM EXCAVATION & CONSTRUCTION, INC. EB-0033(504) LAWRENCE SR 33

02-052 4.659 MI PLANING RESURFACING AND TRAFFIC STRIPE ON SR 24 (WESTBOUND ROADWAY ONLY) FROM EAST OF NH04E-100057587 CR320 (MP 59.000) TO THE MORGAN CO LINE; WIREGRASS CONSTRUCTION CO., INC. NH-0024(507) LAWRENCE SR 24

02-053 5.840 MI. GRADEM DRAIN, PARTIAL BASE, PAVE & BRIDGES ON SR 24 (CORRIDOR V) FROM THE APD8H-100009845 MISSISSIPPI STATE LINE THROUGH RED BAY TO SR 247 (S & M EQUIPMENT CO., INC.) APD-0355(505) FRANKLIN SR 24

02-054 6.270 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR20 (US-72 ALT) FROM W OF SR33 (MP 50.430) TO NH04L-100057585 E OF CR383 (MP 56.700) IN HILLSBORO; WIREGRASS CONSTRUCTION CO. INC. NH-0020(514) LAWRENCE SR 20

02-069 0.411 MI SIDEWALK, TRAFFIC CONTROL MARKINGS & SIGNS ALONG BERKLEY AVENUE AND PARK DRIVE IN SRIE1-00057545 WINFIELD AT SITES AS INDICATED BY THE PLANS; BALLARD BUILDERS, INC. SRTS-SR12(908) MARION BERKLEY

02-076 0.224 MI GUARDRAIL & GUARDRAIL END ANCHORS ON CR- 41 AT DUNCAN BRIDGE OVER THE SIPSEY CREEK NEAR HSIPE-100057523 ARLEY; (ALABAMA GUARDRAIL, INC.) HSIP-6702(201) WINSTON

Page 9: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/27/13 CONSTRUCTION BUREAU RUN TIME--08.54.49 CONSTRUCTION STATUS REPORT PAGE 6 SECOND DIVISION

FINAL ESTIMATES ONLY

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 02-077 0.276 MI GRADE, DRAINAGE & PAVEMENT ON JOINT ARMEDFORCES ACCESS ROAD IN HALEYVILLE; TCSPL-100048841 (TRI-COUNTY CONSTRUCTION, INC.) TCSP-06AL(002) WINSTON

02-085 4.411 MI RESURFACING AND TRAFFIC STRIPE ON CR-15 FROM CR-23 EAST OF HALEYVILLE TO SR-195; STNUE-100054611 (ROGERS GROUP, INC.) STPNU-6700(213) WINSTON

02-086 4.544 MI. GRADEM DRAINAGE, PAVEMENT & BRIDGE WIDENINGON SR 118 FROM SR 107 (US 43) IN GUIN OAST -100038463 TO LUXAPALLILA CREEK IN WINFIELD (TRI-COUNTY CONCRETE CONSTRUCTION, INC) STPOA-0118(503) MARION SR 118

02-101 MAINTENANCE ROADSIDE MOWING AND LITTER COLLECTION ALONG VARIOUS STATE ROUTES AT SITES AS INDICATED 99054-100058106 BY THE PLANS; J. WEST, INC. 99-402-692-000-201 FRANKLIN

02-107 1.887 MI BRIDGE DECK OVERLAY, SPALL REPAIR AND TRAFFIC STRIPE ON I 65 AT THE TENNESSE RIVER IM04E-100058191 BRIDGES E OF DECATUR; INTERSTATE IMPROVEMENT, INC IM-I065(430) MORGAN I 65

02-108 17.311 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR53 FROM SR251 (6TH STREET) TO MAINSTREET/ EBSPE-100056029 ARDMORE AVE IN ARDMORE & ON SR251 FROM SR3 IN ATHENS TO SR53; WIREGRASS CONSTRUCTION CO., INC. EBSPE-100056028 EB-0053(558) & EB-0251(500) LIMESTONE SR 53

02-118 0.021 MI BRIDGE REPLACEMENT ON CR-93 AT BEAR CREEKSOUTH OF OAK GROVE; TRI-COUNTY CONSTRUCTION, INC. STOAC-100054691

STMOA-BRZ-3000(209) FRANKLIN

02-119 1.770 MI PLANING, RESURFACING & TRAFFIC STRIPE AT VARIOUS SITES IN SHEFFIELD AS INDICATED BY PLANS; SHSTC-100053622 (S&M EQUIPMENT CO., INC.) STMOA-CN10(900) COLBERT

02-121 1.404 MI PLANING, RESURFACING & TRAFFIC STRIPE IN FLORENCE AT VARIOUS SITES INDICATED BY THE PLANS; SHSTC-100053627 (S & M EQUIPMENT CO., INC.) STMOA-CN10(919) LAUDERDALE

02-127 5.629 MI RESURFACING & TRAFFIC STRIPE ON CR-47 (2 SITES) AND ON J.C. MAULDIN HIGHWAY AT SITES SHSTC-100053616 INDICATED BY THE PLANS; (S&M EQUIPMENT CO., INC.) STMOA-CN10(211) LAUDERDALE

Page 10: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/27/13 CONSTRUCTION BUREAU RUN TIME--08.54.49 CONSTRUCTION STATUS REPORT PAGE 7 SECOND DIVISION

FINAL ESTIMATES ONLY

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 02-142 0.473 MI RESURFACING & TRAFFIC STRIPE ON SR-13 FROM SR-237 IN PHIL CAMPBELL TO NORTH OF CR-81 99203-100054167 (KENT STREET) (MP 283.017); (S & M EQUIPMENT CO., INC.) 99-302-302-013-101 FRANKLIN

02-144 1.296 MI RESURFACING AND TRAFFIC STRIPE ON CR-20 FROM CR-22 TO CR-63 NORTH OF PHIL CAMPBELL; STNUR-100055193 (APAC MID-SOUTH, INC.) STPNU-3017(201) FRANKLIN

02-150 2.339 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-24 FROM THE MISSISSIPPI STATE LINE TO KENNEDY NH04E-100053155 STREET IN RED BAY; (S&M EQUIPMENT CO., INC.) NH-0024(502) FRANKLIN

02-179 MAINTENANCE ROADSIDE MOWING & LITTER COLLECTION ALONG I-65 & I-565 AT SITES INDICATED BY PLANS; 99054-100056150 (ORR CONTRACTING, INC.) 99-401-690-000-101 MORGAN

02-181 2.914 MI RESURFACING & TRAFFIC STRIPE ON EASTER FERRY ROAD FROM DUPREE HOLLOW RD TO ELK RIVER EBEXE-100056502 BRIDGE WEST OF ELKMONT; (REED CONTRACTING SERVICES, INC.) EB-4220(201) LIMESTONE

02-185 STPNU-4703(200); 3.896 MI RESURFACING, TRAFFIC STRIPE, CULVERT EXTENSION & GUARDRAIL ON CR-48 AND STNUE-100053537 CR-28 AT SITES INDICATED BY THE PLANS; (S.T. BUNN CONSTRUCTION CO., INC.) STNUE-100056134 STPNU-4719(200) MARION

Page 11: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

STPHS-108(26) COLBERT STREET 5.02 % 02-004 APAC-ALABAMA, 103,262 30 W 100 100 11-09-00 0 5,966.46 118,751 0 0 0

FINAL PROJECT STATUS - -

STPHS-108(27) COLBERT SR#17 4.38 % 02-010 APAC-ALABAMA, 104,148 30 W 130 100 08-01-01 123,467 5,983.30 136,516 0 0 0

FINAL PROJECT STATUS - -

STPNU-4719(200) MARION 3.63 % 02-016 S.T. BUNN CON 1,051,963 45 W 091 100 10-21-11 1,155,008 45,582.11 1,255,114 1,540 0 1,540

FINAL PROJECT STATUS - F08 - FINAL QUAN. FURNISHED TO CONTR. WITH REQUEST FOR DOCUM.

ST-017-888-020 COLBERT 7.17 % 02-017 SHOALS ELECTR 25,727 45 W 116 100 02-10-12 25,450 3,297.40 45,980 0 0 0

FINAL PROJECT STATUS - F08 - FINAL QUAN. FURNISHED TO CONTR. WITH REQUEST FOR DOCUM.

STPOA-8822(600) COLBERT 10.05 % 02-018 JOE KEENUM EX 853,701 106 W 096 100 02-08-10 1,592,335 133,119.29 1,323,415 94,242 0 94,242

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

APD-0355(504) FRANKLIN SR 24 25.03 % 02-020 HASTINGS GENE 9,321,533 844 C 162 100 09-30-08 10,700,136 2,842,398.99 11,354,326 188,068 0 188,068

FINAL PROJECT STATUS - F08 - FINAL QUAN. FURNISHED TO CONTR. WITH REQUEST FOR DOCUM.

STPNU-3010(201)-STPOA-3036(200 FRANKLIN 3.10 % 02-022 S&M EQUIPMENT 1,541,649 40 W 100 100 10-22-08 1,710,275 26,953.01 867,594 0 0 0

FINAL PROJECT STATUS - F15 - FINAL ESTIMATE SENT TO GENERAL OFFICE

STPNU-3039(200) FRANKLIN 5.29 % 02-026 S&M EQUIPMENT 435,119 30 W 073 100 03-31-10 449,445 24,190.12 456,876 0 0 0

FINAL PROJECT STATUS - F08 - FINAL QUAN. FURNISHED TO CONTR. WITH REQUEST FOR DOCUM.

STPOAF-0013(544) FRANKLIN 12.23 % 02-027 SCOTT BRIDGE 17,711,338 500 W 103 100 04-15-13 19,043,054 2,735,440.38 22,362,070 66,960 0 66,960

FINAL PROJECT STATUS - -

ACAPD-0355(501) FRANKLIN 60.83 % 02-028 W.S. NEWELL & 11,171,159 425 W 093 100 07-01-11 18,154,190 135,056.26 222,000 314,178 0 314,178

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

Page 12: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

STMAAF-0013(503) LAUDERDALE 21.25 % 02-031 RACON, INC. 8,490,337 300 W 097 100 04-30-12 10,604,753 2,138,745.93 10,060,232 774,204 0 774,204

FINAL PROJECT STATUS - F01 - DELAY IN ACCEPTANCE

STPAA-0064(500) LAUDERDALE 9.49 % 02-034 ROGERS GROUP, 2,697,034 80 W 099 100 10-30-11 2,871,119 320,067.08 3,371,103 0 0 0

FINAL PROJECT STATUS - F04 - FINAL PLAN ASSEMBLY AND SUPPORTIND DATA RECEIVED BY DIV

ACGBBRZ-CN04(209) LAUDREDALE SITES 5.10 % 02-038 B. H. CRAIG C 699,099 150 C 100 100 09-30-04 704,323 47,772.78 936,694 0 0 0

FINAL PROJECT STATUS - F15 - FINAL ESTIMATE SENT TO GENERAL OFFICE

BR-3912(200) LAUDERDALE 8.09 % 02-041 RILEY BRIDGE 1,408,030 120 W 093 100 08-31-10 1,381,227 125,421.27 1,548,833 0 0 0

FINAL PROJECT STATUS - F06 - AWAITING DOCUMENTATION FROM PROJECT/COUNTY ENGINEER

EB-0033(504) LAWRENCE SR 33 4.89 % 02-051 JOE KEENUM 268,735 45 W 067 100 11-30-12 241,242 19,133.86 390,818 0 0 0

FINAL PROJECT STATUS - -

NH-0024(507) LAWRENCE SR 24 7.21 % 02-052 WIREGRASS 914,942 30 W 073 100 10-30-12 923,705 82,507.60 1,143,613 0 0 0

FINAL PROJECT STATUS - -

APD-0355(505) FRANKLIN SR 24 18.52 % 02-053 S & M EQUIPME 20,465,149 855 C 193 100 01-15-11 25,889,698 5,596,548.38 30,218,700 697,306 0 697,306

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

NH-0020(514) LAWRENCE SR 20 9.88 % 02-054 WIREGRASS 2,627,000 45 W 098 100 03-03-13 2,747,222 324,636.49 3,283,567 0 0 0

FINAL PROJECT STATUS - -

SRTS-SR12(908) MARION BERKLEY 0.00 % 02-069 BALLARD 82,959 30 W 094 100 10-25-12 76,314 .00 0 3,800 0 3,800

FINAL PROJECT STATUS - -

HSIP-6702(201) WINSTON 0.00 % 02-076 ALABAMA GUARD 25,363 30 W 098 100 00-00-00 0 .00 0 0 0 0

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

TCSP-06AL(002) WINSTON 9.16 % 02-077 TRI-COUNTY CO 219,966 60 W 088 100 08-30-10 189,403 27,090.86 295,496 43,789 0 43,789

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

Page 13: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

STPNU-6700(213) WINSTON 3.14 % 02-085 ROGERS GROUP, 338,453 30 W 093 100 09-30-10 360,652 12,282.60 390,167 0 0 0

FINAL PROJECT STATUS - F05 - DIVISION PERSONNEL CHECKING FINAL ESTIMATE DATA

STPOA-0118(503) MARION SR 118 13.58 % 02-086 TRI-COUNTY CO 10,493,771 451 C 118 100 04-20-07 16,135,438 1,832,329.01 13,489,900 128,729 0 128,729

FINAL PROJECT STATUS - F15 - FINAL ESTIMATE SENT TO GENERAL OFFICE

99-402-692-000-201 FRANKLIN 0.00 % 02-101 J. WEST INC 436,848 110 W 056 100 11-30-12 439,088 .00 480,533 0 0 0

FINAL PROJECT STATUS - -

IM-I065(430) MORGAN I 65 1.80 % 02-107 INTERSTATE 6,846,165 112 D 130 100 09-12-12 6,829,755 161,791.61 8,946,191 0 0 0

FINAL PROJECT STATUS - -

EB-0053(558) & EB-0251(500) LIMESTONE SR 53 12.31 % 02-108 WIREGRASS 3,274,545 90 W 101 100 08-27-13 3,684,436 504,183.62 4,092,951 0 0 0

FINAL PROJECT STATUS - -

STMOA-BRZ-3000(209) FRANKLIN 1.13 % 02-118 TRI-COUNTY CO 345,070 60 W 093 100 08-31-10 1,381,227 3,020.53 265,000 0 0 0

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

STMOA-CN10(900) COLBERT 0.95 % 02-119 S&M EQUIPMENT 360,010 30 W 100 100 07-31-10 316,153 2,935.29 306,788 8,250 0 8,250

FINAL PROJECT STATUS - F12 - AWAITING DOCUMENTATION FROM CONTRACTOR

STMOA-CN10(919) LAUDERDALE 12.73 % 02-121 S&M EQUIPMENT 335,500 30 W 097 100 06-25-10 358,461 57,053.38 448,064 0 0 0

FINAL PROJECT STATUS - F12 - AWAITING DOCUMENTATION FROM CONTRACTOR

STMOA-CN10(211) LAUDERDALE 0.44 % 02-127 S&M EQUIPMENT 494,656 30 W 097 100 07-30-10 454,481 2,725.38 617,690 0 0 0

FINAL PROJECT STATUS - F12 - AWAITING DOCUMENTATION FROM CONTRACTOR

99-302-302-013-101 FRANKLIN 0.60 % 02-142 S & M EQUIPME 243,641 30 W 057 100 03-17-11 214,470 1,642.97 273,375 0 0 0

FINAL PROJECT STATUS - F08 - FINAL QUAN. FURNISHED TO CONTR. WITH REQUEST FOR DOCUM.

STPNU-3017(201) FRANKLIN 3.80 % 02-144 APAC MID-SOUT 246,614 30 W 070 100 12-15-10 245,042 11,800.97 309,988 0 0 0

FINAL PROJECT STATUS - F05 - DIVISION PERSONNEL CHECKING FINAL ESTIMATE DATA

Page 14: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

NH-0024(502) FRANKLIN 13.18 % 02-150 S&M EQUIPMENT 849,053 40 W 100 100 11-10-10 734,174 135,219.54 1,025,393 0 0 0

FINAL PROJECT STATUS - F12 - AWAITING DOCUMENTATION FROM CONTRACTOR

99-401-690-000-101 MORGAN 0.00 % 02-179 ORR CONTRACTI 174,372 72 W 039 100 12-15-11 174,318 .00 177,246 0 0 0

FINAL PROJECT STATUS - -

EB-4220(201) LIMESTONE 2.43 % 02-181 REED CONTRACT 419,616 30 W 070 100 12-31-11 414,531 12,174.08 500,651 0 0 0

FINAL PROJECT STATUS - F04 - FINAL PLAN ASSEMBLY AND SUPPORTIND DATA RECEIVED BY DIV

STPNU-4719(200) MARION 3.63 % 02-185 S.T. BUNN CON 1,051,963 45 W 091 100 10-21-11 1,155,008 45,582.11 1,255,114 1,540 0 1,540

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER DIVISION TOTALS: 106,128,490 131,479,600 121,970,749 2,322,606 0 2,322,606 17,422,652.66

Page 15: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/27/13 CONSTRUCTION BUREAU RUN TIME--08.54.49 CONSTRUCTION STATUS REPORT PAGE 8 THIRD DIVISION

FINAL ESTIMATES ONLY

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 03-014 16.800 MI PLANING, RESURFACING AND TRAFFIC STRIPE AT VARIOUS SITES IN AND AROUND BIRMINGHAM AS STBHL-100055918 INDICATED BY THE PLANS; DUNN CONSTRUCTION COMPANY,INC. STPBH-CN12(907) JEFFERSON

03-023 PEDESTRIAN IMPROVEMENTS ON SR-75 & ON 23RD AVENUE IN CENTER POINT AT SITES INDICATED BY THE PLANS; HPPH1-100048883 (BOB SMITH CONSTRUCTION, INC.) HPPL1-100048883 HPP-A136(900) JEFFERSON

03-027 0.136 MI BRIDGE REPLACEMENT CR-61 (ALLIANCE RD) ATTHE LOCUST FORK OF WARRIOR RIVER WEST OF PORT BROPL-100047972 BIRMINGHAM; THE MORRIS GROUP, INC., 3 OFFICE PARK CIRCLE, STE., 302, BIRMINGHAM, AL 35202 GRBN1-100047972 ACGBBRF-BRF-3707(200) JEFFERSON

03-031 STMBH-CN07(909); SIDEWALK & LANDSCAPING ALONG ROCKVIEW LANE & PARK AVE IN HOOVER AT SITES STBHC-100048387 INDICATED BY THE PLANS; (ANGELO IAFRATE CONSTRUCTION CO.) STBHC-100048388 STMBH-CN07(908) JEFFERSON

03-037 NH-0005(536), STPAA-7112(605) & ST-659-15; DEMOLITION & STRUCTURE REMOVAL AT VARIOUS SITES APD8E-100055382 INDICATED ON PLANS; (CARCEL & G CONSTRUCTION, LLC) NH04E-100055397 APD-0471(534) JEFFERSON STATE-100055396 STAAE-100055394

03-038 4.952 MI PAVEMENT REHABILITATION ON I-59 FROM N END OF 11TH STREET BRIDGE TO S END OF FAIRFIELD IM04E-100047537 BLVD BRIDGE IN BESSEMER; (DUNN CONSTRUCTION CO., INC.) IM-I059(333) JEFFERSON

03-039 0.166 MI INTERSECTION IMPROVEMENTS (GRADE, DRAIN, PAVEMENT & SIGNALS) AT VARIOUS INTERSECTIONS IN STBHC-100007545 HOOVER INDICATED BY THE PLANS; (R.E. GRILLS CONSTRUCTION CO., INC.) STMBH-7005(600) JEFFERSON

03-041 0.543 MI BRIDGE REPLACEMENT & APPROACHES ON SR-269AT THE BIRMINGHAM SOUTHERN RAILROAD IN MAYTOWN; BROPE-100003822 (ALABAMA BRIDGE BUILDERS, INC.) BRF-0269(500) JEFFERSON

03-051 0.596 MI SIDEWALKS ALONG GRASSELLI ROAD, RIDGEWOODAVE, E.J. OLIVER BLVD AND 64TH ST IN FAIRFIELD; SRIL -100054659 (WALKER PATTON COMPANY, INC.) SRTS-SR10(915) JEFFERSON

03-054 1.128 MI GRADE, DRAINAGE, PAVEMENT AND TRAFFIC STRIPE ON JEFFERSON AVE SW FROM 50TH STREET TO 40 STBHC-100029491 TH STREET SW IN BIRMINGHAM; (ANGELO IAFRATE CONSTRUCTION COMPANY) STMBH-7045(601) JEFFERSON

Page 16: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/27/13 CONSTRUCTION BUREAU RUN TIME--08.54.49 CONSTRUCTION STATUS REPORT PAGE 9 THIRD DIVISION

FINAL ESTIMATES ONLY

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 03-056 1.676 MI SIDEWALK, LANDSCAPING, IRRIGATION & LIGHTCONDUIT ALONG 14TH STREET FROM 10TH AVENUE SOUTH STBHH-100007566 TO 8TH AVENUE NORTH IN BIRMINGHAM; (WALKER PATTON COMPANY, INC.) STPBH-7089(600) JEFFERSON

03-057 INTERSECTION IMPROVEMENTS AT FOUR SITES INDICATED BY THE PLANS ON LORNA ROAD IN HOOVER; STBHC-100029509 (R.E. GRILLS CONSTRUCTION CO., INC.) STMBH-CMAQ-9802(918) JEFFERSON

03-058 0.172 KILO TURN LANE (GRADE, DRAINAGE & PAVEMENT ON E LAKE BLVD FROM VANDERBILT RD (SR-79) TO STBHC-100007607 THIRTY NINTH STREET IN BIRMINGHAM; (DUNN CONSTRUCTION CO., INC.) STMBH-STPBH-7173(600) JEFFERSON

03-061 2.615 MI ADDITIONAL LANES (GRADE, DRAINAGE, ITS, PAVEMENT & LIGHTING) ON I-65 FROM N OF CR-17 IM04E-100051822 (VALLEY DALE RD) TO S OF I-459 IN HOOVER; (DUNN CONSTRUCTION CO., INC.) IM-I065(390) SHELBY

03-063 10.869 MI, INTERSTATE MEDIAN CROSSOVER PROTECTION ON I20/I59 FROM I459 TO CR56 (VALLEY RD) SW OF IM04E-100055916 FAIRFIELD; GULF EQUIPMENT CORPORATION IM-I020(342) JEFFERSON I20/I59

03-066 7.281 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR 7 (US 11) FROM CHALKVILLE RD IN TRUSSVILLE HSIPE-100056636 TO THE ST. CLAIR CO LINE; APAC MID-SOUTH, INC. L24AC-100056636 STPAA-HSIP-0007(532) JEFFERSON SR 7

03-068 1.651 MI PAVEMENT RECONSTRUCTION ON I-59 FROM ALABAMA ADVENTURE PARKWAY 9EXIT 110) TO NORTH OF IM04E-100053701 THE CSXT RAILROAD OVERPASS IN BESSEMER; (DUNN CONSTRUCTION COMPANY, INC.) IM-I059(351) JEFFERSON

03-069 CONCRETE SIDEWALK AND LANDSCAPING AT VARIOUS SITESIN HOMEWOOD AS INDICATED BY THE PLANS; SRIH -100055092 (BURNETT CIVIL CONTRACTING, LLC) SRIL -100055092 SRTS-SR09(915) JEFFERSON

03-070 8.500 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-25 FROM 0.2 MI N OF CR-73 IN MONTEVALLO TO CR- EBEXE-100053040 310 IN CALERA; (DUNN CONSTRUCTION CO., INC.) HSIPE-100053040 EB-HSIP-0025(524) SHELBY

03-072 2.418 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON INVERNESS PARKWAY FROM VALLEYDALE RD (CR 17) STBHL-100055924 TO SR 38 (US 280) IN HOOVER; DUNN CONSTRUCTION CO. INC. STPBH-CN12(903) SHELBY CR 52

Page 17: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/27/13 CONSTRUCTION BUREAU RUN TIME--08.54.49 CONSTRUCTION STATUS REPORT PAGE 10 THIRD DIVISION

FINAL ESTIMATES ONLY

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 03-073 WIDENING (GRADE, DRAINAGE & PAVEMENT) ON SR-119 (CAHABA VALLEY RD) AT FOUR SITES FROM CR-379 TO BHST -100033195 DOUBLE OAK LANE IN INDIAN SPRINGS VILLAGE; KENT CONST., CO., LLC, PO BOX 2546, CULLMAN, AL STPBH-7136(600) SHELBY

03-074 11.512 MI PAVEMENT REHABILITATION ON I-65 FROM THE CHILTON CO LINE (MP 225.948) TO EXIT 238 IM04E-100047394 (MP 237.438); (WIREGRASS CONSTRUCTION COMPANY, INC.) IM-I065(363) SHELBY

03-079 MAINTENANCE ROADSIDE MOWING ALONG I-65 AND SR-38 (US-280) AT VARIOUS LOCATIONS INDICATED BY PLANS; 99054-100057942 (BENTLEY TURF & LANDSCAPE, INC.) 99-403-595-000-202 SHELBY

03-098 1.069 MI. ADDITIONAL LANES INCLUDING SIGNALS ON CR 52 FROM I-65 TO CR 11 IN PELHAM BHST -100007583 (GILCO CONTRACTING, INC.) STPBH-7280(600) SHELBY CR 52

03-101 5.365 MI, PLANING, RESURFACING AND TRAFFIC STRIPE ON SR3 (US31) FROM CR68 TO 0.120 MI S HSIPE-100056434 OF RIVERCHASE PKWY (MP 262.710) N OF ALABASTER; DUNN CONSTRUCTION CO. INC. EBSPE-100056434 EB-HSIP-0003(570) SHELBY SR3

03-106 ACCESS IMPROVEMENTS, LANDSCAPING AND LIGHTING AT THE AMERICAN VILLAGE IN MONTEVALLO; WALKER PATTON TCSPL-100047117 CO. INC. TCSP-TC05(900) SHELBY

03-107 8.006 MI ADAPTIVE TRAFFIC SIGNAL CONTROL AT TWENTYFIVE INTERSECTIONS ALONG SR38 (US280) FROM BROOK NH04E-100057895 MANOR DR IN MOUNTAIN BROOK TO DOUG BAKER BLVD; AMERICAN LIGHTING AND SIGNALIZATION, INC NHF-0038(529) JEFFERSON

03-110 6.090 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR 25 FROM SR 53 (US 231) TO CR 55 IN STERRETT; EBEXE-100056430 APAC MID-SOUTH, INC EB-0025(534) SHELBY SR 25

03-111 7.728 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR 70 FROM E OF SR 3 (US 31) (MP 0.515) TO W STAAE-100056424 OF SR 25 (MP 8.244) IN COLUMBIANA; WIREGRASS CONSTRUCTION COMPANY, INC STPAA-HSIP-0070(501) SHELBY SR 70

03-112 5.940 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR 261 FROM CR 17 IN HELENA TO SR 3 (US 31) HSIPE-100056420 IN PELHAM; APAC MID-SOUTH, INC. STAAE-100056420 STPAA-HSIP-0261(500) SHELBY SR 261 L24AC-100056420

Page 18: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/27/13 CONSTRUCTION BUREAU RUN TIME--08.54.49 CONSTRUCTION STATUS REPORT PAGE 11 THIRD DIVISION

FINAL ESTIMATES ONLY

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 03-183 7.503 MI. PARTIAL GRADE & DRAIN, PAVEMENT, STRIPING & SIGNING ON CORRIDOR X FROM SR#13 NORTH OF ELDR AP54G-100009924 IDGE TO EAST OF SR#118. ( S & M EQUIPMENT COMPANY, INC. ) CX54H-100009924 APD-471(507) WALKER CORR X

03-210 5.451 MI ADDITIONAL LANES (GRADE, DRAIN, PAVE AND BRIDGES) ON I-65 FROM CR-52 TO CR-17 (VALLEYDALE ACR05-100044675 ROAD) AT INDIAN SPRINGS; WIREGRASS CONST. CO INC, P.O. BOX 48, ARITON, AL 36311 IM04L-100044675 IM-ACNHF-I065(353) SHELBY

03-238 0.723 MI CONCRETE SIDEWALK, LANDSCAPING & LIGHTINGON BROADWAY STREET IN HOMEWOOD; STBHE-100048386 (CARCEL & G. CONSTRUCTION, LLC) STPBH-CN07(907) JEFFERSON

03-268 0.289 MI BRIDGE REPLACEMENT AND APPROACHES ON CR-11 AT PEAVINE CREEK IN ALABASTER; BROPE-100056389 (BOB SMITH CONSTRUCTION, INC.) BR-7118(601) SHELBY

03-269 0.236 MI BRIDGE REPLACEMENT & APPROACHES ON RIPLEYCUTOFF ROAD AT LOST CREEK EAST OF CARBON HILL; BROFR-100048215 (RILEY BRIDGE & ENGINEERING CO., INC.) BRZ-6400(210) WALKER

Page 19: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

STPBH-CN12(907) JEFFERSON 1.09 % 03-014 DUNN CONSTRUC 3,640,119 100 W 099 100 08-23-13 0 45,645.02 4,186,137 0 0 0

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

HPP-A136(900) JEFFERSON 15.62 % 03-023 BOB SMITH CON 238,839 89 W 099 100 04-30-12 256,769 48,459.95 310,171 12,713 0 12,713

FINAL PROJECT STATUS - F15 - FINAL ESTIMATE SENT TO GENERAL OFFICE

ACGBBRF-BRF-3707(200) JEFFERSON 5.09 % 03-027 THE MORRIS GR 9,295,339 314 W 261 100 01-24-13 8,929,109 599,765.62 11,768,388 112,840 -248,884 -136,044

FINAL PROJECT STATUS - F04 - FINAL PLAN ASSEMBLY AND SUPPORTIND DATA RECEIVED BY DIV

STMBH-CN07(908) JEFFERSON 14.55 % 03-031 ANGELO IAFRAT 371,840 120 W 093 100 01-15-13 399,987 87,813.71 603,519 1,236 8,153 9,389

FINAL PROJECT STATUS - F08 - FINAL QUAN. FURNISHED TO CONTR. WITH REQUEST FOR DOCUM.

APD-0471(534) JEFFERSON 7.64 % 03-037 CARCEL & G. C 224,209 90 W 072 100 09-21-11 233,767 21,707.23 284,016 7,541 9,558 17,099

FINAL PROJECT STATUS - F15 - FINAL ESTIMATE SENT TO GENERAL OFFICE

IM-I059(333) JEFFERSON 13.11 % 03-038 DUNN CONSTRUC 7,391,674 111 D 114 100 07-18-13 8,544,427 1,463,870.52 11,159,033 56,482 1,096,272 1,152,754

FINAL PROJECT STATUS - F04 - FINAL PLAN ASSEMBLY AND SUPPORTIND DATA RECEIVED BY DIV

STMBH-7005(600) JEFFERSON 15.23 % 03-039 R.E. GRILLS C 1,633,320 275 W 074 100 01-15-13 1,900,847 286,115.96 1,878,318 14,765 81,426 96,191

FINAL PROJECT STATUS - F02 - PROJECT RECOMMENDED FOR ACCEPTANCE

BRF-0269(500) JEFFERSON 16.31 % 03-041 ALABAMA BRIDG 3,113,786 200 W 089 100 11-13-12 3,697,318 864,272.33 5,298,000 -3,240 582,545 579,305

FINAL PROJECT STATUS - F05 - DIVISION PERSONNEL CHECKING FINAL ESTIMATE DATA

SRTS-SR10(915) JEFFERSON 0.72 % 03-051 WALKER PATTON 128,946 50 W 100 100 10-23-12 0 1,018.83 140,394 3,254 0 3,254

FINAL PROJECT STATUS - F05 - DIVISION PERSONNEL CHECKING FINAL ESTIMATE DATA

STMBH-7045(601) JEFFERSON 17.28 % 03-054 ANGELO IAFRAT 2,282,362 215 W 099 100 03-26-13 2,768,400 453,804.81 2,624,716 91,688 0 91,688

FINAL PROJECT STATUS - F04 - FINAL PLAN ASSEMBLY AND SUPPORTIND DATA RECEIVED BY DIV

Page 20: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

STPBH-7089(600) JEFFERSON 0.47 % 03-056 WALKER PATTON 1,373,516 120 W 099 100 05-02-13 1,522,599 6,651.05 1,402,339 75,936 239,510 315,446

FINAL PROJECT STATUS - F04 - FINAL PLAN ASSEMBLY AND SUPPORTIND DATA RECEIVED BY DIV

STMBH-CMAQ-9802(918) JEFFERSON 12.44 % 03-057 R.E. GRILLS C 1,590,850 153 W 103 100 09-06-13 15,747,295 155,152.31 1,246,205 100,898 0 100,898

FINAL PROJECT STATUS - F02 - PROJECT RECOMMENDED FOR ACCEPTANCE

STMBH-STPBH-7173(600) JEFFERSON 0.85 % 03-058 DUNN CONSTRUC 356,025 90 W 100 100 02-04-13 400,527 2,911.53 339,737 33,197 3,603 36,800

FINAL PROJECT STATUS - F08 - FINAL QUAN. FURNISHED TO CONTR. WITH REQUEST FOR DOCUM.

IM-I065(390) SHELBY 24.67 % 03-061 DUNN CONSTRUC 6,992,038 1911 D 124 100 07-27-12 6,729,388 2,178,182.60 8,828,042 266,239 -174,329 91,910

FINAL PROJECT STATUS - F09 - DISPUTED FINAL QUANTITIES BY CONTRACTOR

IM-I020(342) JEFFERSON I20/I59 13.27 % 03-063 GULF EQUIPMEN 1,637,081 112 D 099 100 07-10-13 1,795,693 284,082.32 2,139,248 191,815 -33,203 158,612

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

STPAA-HSIP-0007(532) JEFFERSON SR 7 10.64 % 03-066 APAC MID-SOUT 1,539,341 40 W 113 100 03-06-13 1,350,621 195,553.89 1,836,611 31,160 -219,880 -188,720

FINAL PROJECT STATUS - F06 - AWAITING DOCUMENTATION FROM PROJECT/COUNTY ENGINEER

IM-I059(351) JEFFERSON 5.38 % 03-068 DUNN CONST. C 9,507,060 113 D 099 100 10-08-12 10,470,148 681,413.79 12,660,414 402,944 815,521 1,218,465

FINAL PROJECT STATUS - F12 - AWAITING DOCUMENTATION FROM CONTRACTOR

SRTS-SR09(915) JEFFERSON 0.77 % 03-069 BURNETT CIVIL 164,775 75 W 095 100 08-01-13 189,623 1,470.36 189,491 3,025 10,622 13,647

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

EB-HSIP-0025(524) SHELBY 8.36 % 03-070 DUNN CONST. C 1,893,883 50 W 125 100 03-21-13 1,989,120 189,106.62 2,259,620 0 98,249 98,249

FINAL PROJECT STATUS - F09 - DISPUTED FINAL QUANTITIES BY CONTRACTOR

STPBH-CN12(903) SHELBY CR 52 10.13 % 03-072 DUNN CONSTRUC 787,044 30 W 100 100 04-09-13 801,032 85,339.15 842,137 0 0 0

FINAL PROJECT STATUS - F09 - DISPUTED FINAL QUANTITIES BY CONTRACTOR

STPBH-7136(600) SHELBY 11.75 % 03-073 KENT CONSTRUC 2,799,616 120 W 195 100 11-11-11 3,277,736 305,886.56 2,601,382 158,404 336,063 494,467

FINAL PROJECT STATUS - F09 - DISPUTED FINAL QUANTITIES BY CONTRACTOR

Page 21: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

IM-I065(363) SHELBY 9.07 % 03-074 WIREGRASS CON 16,187,393 411 D 112 100 07-21-12 17,486,013 1,972,174.18 21,738,695 0 1,308,620 1,308,620

FINAL PROJECT STATUS - F08 - FINAL QUAN. FURNISHED TO CONTR. WITH REQUEST FOR DOCUM.

99-403-595-000-202 SHELBY 18.38 % 03-079 BENTLEY TURF 110,072 60 W 082 100 12-20-12 109,876 21,250.83 115,576 0 -196 -196

FINAL PROJECT STATUS - F15 - FINAL ESTIMATE SENT TO GENERAL OFFICE

STPBH-7280(600) SHELBY CR 52 0.89 % 03-098 GILCO CONTRAC 5,970,000 1020 C 102 100 04-20-09 6,920,201 63,911.03 7,105,170 569,758 393,763 963,521

FINAL PROJECT STATUS - F05 - DIVISION PERSONNEL CHECKING FINAL ESTIMATE DATA

EB-HSIP-0003(570) SHELBY SR3 9.43 % 03-101 DUNN CONSTRUC 3,336,370 90 W 098 100 12-03-12 3,324,154 436,834.66 4,627,909 0 -12,216 -12,216

FINAL PROJECT STATUS - F05 - DIVISION PERSONNEL CHECKING FINAL ESTIMATE DATA

TCSP-TC05(900) SHELBY 0.76 % 03-106 WALKER PATTON 1,042,492 60 W 099 100 07-02-13 0 8,396.81 1,097,566 0 0 0

FINAL PROJECT STATUS - F02 - PROJECT RECOMMENDED FOR ACCEPTANCE

NHF-0038(529) JEFFERSON 16.33 % 03-107 AMERICAN 1,453,932 1612 D 089 100 05-22-13 1,622,729 310,349.52 1,899,919 209,965 80,146 290,111

FINAL PROJECT STATUS - F08 - FINAL QUAN. FURNISHED TO CONTR. WITH REQUEST FOR DOCUM.

EB-0025(534) SHELBY SR 25 12.35 % 03-110 APAC MID-SOUT 987,044 40 W 098 100 03-17-13 844,286 145,816.83 1,180,639 0 -138,662 -138,662

FINAL PROJECT STATUS - F12 - AWAITING DOCUMENTATION FROM CONTRACTOR

STPAA-HSIP-0070(501) SHELBY SR 70 16.78 % 03-111 WIREGRASS CON 1,486,674 45 W 067 100 07-01-13 1,666,960 241,613.12 1,439,172 154,193 26,300 180,493

FINAL PROJECT STATUS - F04 - FINAL PLAN ASSEMBLY AND SUPPORTIND DATA RECEIVED BY DIV

STPAA-HSIP-0261(500) SHELBY SR 261 17.39 % 03-112 APAC MID-SOUT 1,408,148 60 W 095 100 10-31-13 1,254,221 294,118.65 1,691,112 0 -141,408 -141,408

FINAL PROJECT STATUS - -

APD-471(507) WALKER CORR X 7.29 % 03-183 S & M EQUIPME 16,700,324 796 C 100 100 10-31-06 17,269,756 1,487,338.20 20,374,979 15,723 565,632 581,355

FINAL PROJECT STATUS - F10 - CLAIM PENDING BY CONTRACTOR

IM-ACNHF-I065(353) SHELBY 9.35 % 03-210 WIREGRASS CON 78,457,181 1911 D 099 100 07-31-12 77,813,472 9,093,884.27 97,164,119 1,391,762 -638,135 753,627

FINAL PROJECT STATUS - F09 - DISPUTED FINAL QUANTITIES BY CONTRACTOR

Page 22: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

STPBH-CN07(907) JEFFERSON 11.91 % 03-238 CARCEL & G. C 307,503 90 W 100 100 07-26-13 290,398 41,993.13 352,490 0 0 0

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

BR-7118(601) SHELBY 2.77 % 03-268 BOB SMITH CON 1,475,284 200 W 099 100 08-01-13 0 51,211.15 1,844,002 0 0 0

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

BRZ-6400(210) WALKER 17.30 % 03-269 RILEY BRIDGE 1,081,109 145 W 095 100 08-09-13 1,146,177 244,536.61 1,412,734 -7,600 76,637 69,037

FINAL PROJECT STATUS - F12 - AWAITING DOCUMENTATION FROM CONTRACTOR DIVISION TOTALS: 186,965,189 200,752,649 234,642,000 3,894,698 4,125,707 8,020,405 22,371,653.15

Page 23: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/27/13 CONSTRUCTION BUREAU RUN TIME--08.54.49 CONSTRUCTION STATUS REPORT PAGE 12 FOURTH DIVISION

FINAL ESTIMATES ONLY

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 04-004 0.307 MI WIDENING (GRADE, DRAINAGE & PAVEMENT) ON EDITH AVE FROM STA. 50+00.00 NEAR EDITH AVENUE ANST -100054921 CONNECTOR TO CAFFEY DRIVE IN OXFORD; (JERRY DOSS CONSTRUCTION, INC.) STPOA-7406(600) CALHOUN

04-010 0.962 MI. BRIDGE REMOVAL, BRIDGE CULVERT (PRECAST)& APPROACHES ON I-20 IN OXFORD. IM98 -100039769 ( CLARK CONSTRUCTION CO., INC. ) NH98 -100039769 NHF-IM-I020(306) CALHOUN I-20

04-015 5.089 MI FULL DEPTH RECLAMATION, RESURFACING AND TRAFFIC STRIPE ON CR104 FROM CR237 TO THE RANDOLPH STOAE-100058099 CO LINE & ON CR186 FROM CR299 TO SR50 W OF VALLEY;THE MILLER PAVING GROUP, INC. STOAE-100058098 STPOA-0900(227)&STPOA-CN12(214CHAMBERS CR 104

04-017 6.933 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR 15 (US 29) FROM CR88 (FAIRFAX BYPASS) TO THE STAAE-100053206 GEORGIA STATE LINE; EAST ALABAMA PAVING CO., INC. STPAA-0015(521) CHAMBERS SR15

04-037 0.00 MI.STRUCTURE REMOVAL AND UNDERGROUND STORAGE TANK REMOVEL AND SOLID REMEDIATION ON U.S.#29 IN STOA -100008290 (SERCON CORP.) STPOA-338(8) CHAMBERS US 29

04-054 BR-0015(510); 0.432 MI BRIDGE CULVERT & BRIDGE RE-PLACEMENT & APPROACHES ON SR-15 (US-29) AT UNNAMED BROPE-100041414 BRANCH & HALAWAKEE CREEK NE OF AUBURN; (NEWELL & BUSH, INC.) BROPE-100046784 BR-0015(506) LEE

04-057 11.846 MI GUARDRAIL (MEDIAN CROSSOVER PROTECTION) ON I-85 FROM 0.3 MI S OF THE MACON CO LINE TO THE IM04E-100045572 US-29 OVERPASS; (GULF EQUIPMENT CORP.) IM-I085(324) LEE

04-058 2.734 MI RESURFACING AND TRAFFIC STRIPE ON CR-391 FROM THE OPELIKA CITY LIMITS TO US-280/431; AOST1-00056630 EAST ALABAMA PAVING COMPANY, INC. STPOA-4114(200) LEE CR-391

04-062 4.616 MI RESURFACING AND TRAFFIC STRIPE ON CR-65 FROM CR-59 AT TIN SHOP TO CR-87; STNUE-100057520 (APAC MID-SOUTH, INC.) STPNU-5670(200) RANDOLPH

04-065 8.867 MI WIDENING, (PLANING, RESURFACING, TRAFFIC STRIPE & DRAINAGE) ON SR-1 (US-431) FROM 0.09 MI HSIP -100052436 N OF CR-26 TO NEAR WEDOWEE CITY LIMITS; (APAC MID-SOUTH, INC.) NCPDH-100052436 NHF-NCPD-HSIPF-0001(544) RANDOLPH

Page 24: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/27/13 CONSTRUCTION BUREAU RUN TIME--08.54.49 CONSTRUCTION STATUS REPORT PAGE 13 FOURTH DIVISION

FINAL ESTIMATES ONLY

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 04-071 0.346 MI PARTIAL GRADE & DRAIN, PAVEMENT & TRAFFICSIGNAL ON STADIUM DR FROM OPELIKA RD TO N OF 25TH STPCL-100058324 STREET IN PHENIX CITY; (ROBINSON PAVING CO., INC.) STPPC-8015(600) RUSSELL

04-072 6.655 KM RESURFACING AND TRAFFIC STRIPEON U.S.#431 (SR#1) FROM KM 173.445 TO KM 180.100 IN PHENIX 99403-100034094 CITY ( EAST ALABAMA PAVING CO., INC. ) 99-304-576-001-704 RUSSELL US#431

04-075 3.920 MI ROADWAY LIGHTING ON SR-1 (US-431) FROM SOUTH OF SR-165 TO SR-38 (US-80) IN PHENIX CITY; NH04E-100053676 (STONE ELECTRIC COMPANY, INC.) NH-0001(561) RUSSELL

04-077 6.771 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-1 (US-431) FROM PHENIX CITY CITY LIMIT (MP 115. NH04E-100057480 766) TO NORTH OF CR-430 (MP 122.537); (ROBINSON PAVING COMPANY, INC.) NH-0001(570) RUSSELL

04-079 4.800 MI. BASE, PAVE, PARTIAL GRADE AND DRAIN ON SR 1 (US 431) (PITTSVIEW BYPASS) NH04L-100004759 FROM NORTH OR CR 12 TO NORTH OF PITTSVIEW (APAC-SOUTHEAST,INC.) NHF-0001(520) RUSSELL SR 1

04-083 7.910 MI TRAFFIC STRIPE, MARKERS, LEGENDS AND SIGNS ON CR-103 FROM CR-24 TO SR-76 AND CR-26 FROM HSIRE-100059156 CR-511 TO 10TH STREET NORTH SYLACAUGA; OZARK STRIPING COMPANY, INC. HRRR-CN13(200) TALLADEGA CR-103

04-086 3.655 MI. ADDITIONAL LANES (GRADE, DRAINAGE, PAVEMENT AND BRIDGES) ON I 20 FROM WEST OF IM04L-100033401 THE COLDWATER INTERCHANGE (MP 128.34) TO MP 182.09 NEAR OXFORD (MCCARTNEY CONST.) NH04L-100033401 IM-ACNHF-I020(332) TALLADEGA I 20

04-097 4.952 MI RESURFACING & TRAFFIC STRIPE ON SR-49 FROM MACON COUNTY LINE TO SR-14 SOUTH OF REELTOWN; 99403-100053196 (CHARLES E. WATTS, INC.) 99-304-621-049-101 TALLAPOOSA

04-102 0.466 MI WIDENING, RESURFACING & TRAFFIC STRIPE ON W GLEN AVE IN AUBURN FROM DONAHUE DR TO N AOST1-00055853 COLLEGE ST; D & J ENTERPRISES, INC. STPOA-9025(601) LEE W GLEN

04-111 BRIDGE COATING ON VARIOUS BRIDGES AS INDICATED BY THE PLANS; P & H STUCCO & CONSTRUCTION, INC. 99005-100056161

99-504-690-000-101 TALLADEGA

Page 25: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/27/13 CONSTRUCTION BUREAU RUN TIME--08.54.49 CONSTRUCTION STATUS REPORT PAGE 14 FOURTH DIVISION

FINAL ESTIMATES ONLY

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 04-114 4.830 MI RESURFACING AND TRAFFIC STRIPE ON CR 73 (BOILING SPRINGS RD) FROM SR144 TO SR77 SE OF STOAE-100058013 OHATCHEE; MCCARTNEY CONSTRUCTION CO. INC. STPOA-0813(200) CALHOUN CR 73

04-116 10.133 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR14 FROM THE MACON CO LINE TO SR147 IN AUBURN; HSIPE-100057483 EAST ALABAMA PAVING COMPANY, INC. STOAE-100057483 STPOA-HSIP-0014(528) LEE SR 14

04-139 6.154 MI RESURFACING AND TRAFFIC STRIPE ON CR-89 FROM SR-50 IN CAMP HILL TO THE CHAMBERS COUNTY A1RDY-100058450 LINE; GARY INGRAM GRADING & PAVING, INC. ACNU58450-ATRP(001) TALLAPOOSACR-89

04-156 2.100 MI RESURFACING AND TRAFFIC STRIPE ON CR-86 FROM HARRIS ST TO THE TALLAPOOSA CO LINE IN STNUM-100059730 GOODWATER; GARY INGRAM GRADING & PAVING, INC. STPNU-1911(201) COOSA CR-86

04-158 10.270 MI PLANING, RESURFACING & TRAFFIC STRIPE ONSR-38 (US-280) FROM CR-49 TO THE TALLAPOOSA COUNTY EBSPE-100053176 LINE SW OF GOODWATER; (GARY INGRAM GRADING & PAVING, INC.) EB-0038(527) COOSA

04-166 1.604 MI INTERCHANGE (GRADE, DRAINAGE, PAVEMENT, SIGNING & BRIDGE) ON I-85 AT CR-10 (BEEHIVE RD) AOST -100041200 AT THE AUBURN TECHNOLOGY PARK; (W.S. NEWELL & SONS, INC.) HPPL1-100041200 HPP-IM-STPOA-I085(311) LEE

04-174 1.510 MI BRIDGE REPLACEMENT & APPROACHES ON SR-22 AT HILLABEE CREEK EAST OF ALEXANDER CITY; BROPE-100041383 (RACON, INC.) STOAE-100041383 STPOA-BR-0022(507) TALLAPOOSA

04-182 99-304-615-077-103; 6.098 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-77 FROM CLAY CO LINE TO SR- HSIPE-100053195 21 IN TALLADEGA; (MCCARTNEY CONSTRUCTION CO., INC.) 99403-100056615 HSIP-0077(514) TALLADEGA

04-183 1.548 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-77 FROM SR-21 IN TALLADEGA TO 0.2 MI SOUTH OF NH04E-100057482 SR-275; (MCCARTNEY CONSTRUCTION COMPANY, INC.) NH-0077(515) TALLADEGA

04-191 3.901 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SUMMERVILLE RD FROM 13TH STREET TO PHENIX CITY STPCL-100054130 CITY LIMIT; (EAST ALABAMA PAVING CO, INC.) STPCR-100054130 STPPC-8040(601) RUSSELL

Page 26: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/27/13 CONSTRUCTION BUREAU RUN TIME--08.54.49 CONSTRUCTION STATUS REPORT PAGE 15 FOURTH DIVISION

FINAL ESTIMATES ONLY

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 04-195 99-304-576-169-101; 19.623 MI RESURFACING & TRAFFISTRIPE ON SR-169 FROM CR-175 (MEADOWS MILL RD) TO 99403-100056616 SR-51 (MARVYN PKWY) IN OPELIKA & FROM SEALE TO CRAWFORD; (CHARLES E. WATTS, INC.) 99403-100056617 99-304-416-169-101 LEE

04-197 BRIDGE COATING ON VARIOUS BRIDGES INDICATED BY THEPLANS; 99005-100055237 (P & H STUCCO & CONSTRUCTION, INC.) 99-504-690-000-001 TALLADEGA

Page 27: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

STPOA-7406(600) CALHOUN 21.42 % 04-004 JERRY DOSS CO 628,993 90 W 086 100 08-08-13 597,035 176,072.62 821,933 0 0 0

FINAL PROJECT STATUS - F02 - PROJECT RECOMMENDED FOR ACCEPTANCE

NHF-IM-I020(306) CALHOUN I-20 21.19 % 04-010 CLARK CONSTRU 5,556,648 340 C 160 100 01-05-06 5,541,096 1,516,938.72 7,156,071 78,542 -96,094 -17,552

FINAL PROJECT STATUS - F15 - FINAL ESTIMATE SENT TO GENERAL OFFICE

STPOA-0900(227)&STPOA-CN12(214 CHAMBERS CR 104 5.48 % 04-015 THE MILLER 898,697 45 W 058 100 06-13-13 852,636 59,289.24 1,081,487 0 -46,061 -46,061

FINAL PROJECT STATUS - F14 - FINAL ESTIMATE SENT TO CONTRACTOR

STPAA-0015(521) CHAMBERS SR15 7.07 % 04-017 EAST ALABAMA 1,977,216 60 W 097 100 09-03-13 1,864,667 174,825.67 2,471,382 37,400 0 37,400

FINAL PROJECT STATUS - F02 - PROJECT RECOMMENDED FOR ACCEPTANCE

STPOA-338(8) CHAMBERS US 29 71.59 % 04-037 SERCON CORP. 87,615 60 W 123 100 06-14-95 100,423 82,331.90 114,990 -37,163 10,971 -26,192

FINAL PROJECT STATUS - F15 - FINAL ESTIMATE SENT TO GENERAL OFFICE

BR-0015(506) LEE 21.91 % 04-054 NEWELL & BUSH 2,393,069 165 W 098 100 10-12-11 2,610,665 748,793.62 3,417,561 24,831 160,277 185,108

FINAL PROJECT STATUS - F02 - PROJECT RECOMMENDED FOR ACCEPTANCE

IM-I085(324) LEE 14.87 % 04-057 GULF EQUIPMEN 1,113,158 2812 D 088 100 10-04-12 1,144,102 216,405.76 1,454,614 35,508 13,569 49,077

FINAL PROJECT STATUS - F14 - FINAL ESTIMATE SENT TO CONTRACTOR

STPOA-4114(200) LEE CR-391 0.00 % 04-058 EAST ALABAMA 364,032 45 W 091 100 09-13-13 329,389 .00 0 0 0 0

FINAL PROJECT STATUS - F02 - PROJECT RECOMMENDED FOR ACCEPTANCE

STPNU-5670(200) RANDOLPH 10.82 % 04-062 APAC MID-SOUT 672,766 60 W 053 100 06-06-13 670,815 91,689.25 847,002 0 -1,951 -1,951

FINAL PROJECT STATUS - F02 - PROJECT RECOMMENDED FOR ACCEPTANCE

NHF-NCPD-HSIPF-0001(544) RANDOLPH 8.50 % 04-065 APAC MID-SOUT 4,633,834 100 W 100 100 09-19-11 4,303,891 219,454.02 2,580,849 12,513 -342,455 -329,942

FINAL PROJECT STATUS - F14 - FINAL ESTIMATE SENT TO CONTRACTOR

Page 28: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

STPPC-8015(600) RUSSELL 0.00 % 04-071 ROBINSON PAVI 712,607 110 W 095 100 03-13-13 824,838 .00 0 15,860 103,023 118,883

FINAL PROJECT STATUS - F14 - FINAL ESTIMATE SENT TO CONTRACTOR

99-304-576-001-704 RUSSELL US#431 5.61 % 04-072 EAST ALABAMA 999,860 55 W 100 100 06-09-97 951,869 56,608.87 1,008,478 3,375 -47,991 -44,616

FINAL PROJECT STATUS - F15 - FINAL ESTIMATE SENT TO GENERAL OFFICE

NH-0001(561) RUSSELL 12.46 % 04-075 STONE ELECTRI 995,300 240 W 100 100 07-29-13 983,694 164,478.48 1,320,000 25,987 0 25,987

FINAL PROJECT STATUS - -

NH-0001(570) RUSSELL 5.08 % 04-077 ROBINSON PAVI 4,997,266 120 W 090 100 01-23-13 4,701,173 317,310.88 6,246,232 0 0 0

FINAL PROJECT STATUS - F02 - PROJECT RECOMMENDED FOR ACCEPTANCE

NHF-0001(520) RUSSELL SR 1 12.95 % 04-079 APAC-SOUTHEAS 10,446,910 382 W 119 100 03-01-12 15,771,828 1,931,072.00 14,910,700 2,532,023 5,082,536 7,614,559

FINAL PROJECT STATUS - F14 - FINAL ESTIMATE SENT TO CONTRACTOR

HRRR-CN13(200) TALLADEGA CR-103 2.34 % 04-083 OZARK STRIPIN 92,306 30 W 100 100 07-08-13 85,275 3,278.89 140,105 0 0 0

FINAL PROJECT STATUS - F02 - PROJECT RECOMMENDED FOR ACCEPTANCE

IM-ACNHF-I020(332) TALLADEGA I 20 6.07 % 04-086 MCCARTNEY CON 29,157,752 2009 D 100 100 11-10-10 34,115,510 2,221,361.60 36,542,536 225,244 4,765,827 4,991,071

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

99-304-621-049-101 TALLAPOOSA 4.57 % 04-097 HARLES E. WA 446,907 30 W 043 100 10-31-11 578,861 28,128.69 615,299 0 112,953 112,953

FINAL PROJECT STATUS - F15 - FINAL ESTIMATE SENT TO GENERAL OFFICE

STPOA-9025(601) LEE W GLEN 0.00 % 04-102 D & J ENTERPR 1,214,210 3112 D 105 100 11-13-12 876,249 .00 0 0 0 0

FINAL PROJECT STATUS - F02 - PROJECT RECOMMENDED FOR ACCEPTANCE

99-504-690-000-101 TALLADEGA 5.65 % 04-111 P & H STUCCO 480,000 100 W 044 100 06-01-13 479,287 29,868.30 528,000 0 0 0

FINAL PROJECT STATUS - F02 - PROJECT RECOMMENDED FOR ACCEPTANCE

STPOA-0813(200) CALHOUN CR 73 1.20 % 04-114 MCCARTNEY 777,470 30 W 100 100 09-27-12 749,198 12,289.67 1,015,956 0 0 0

FINAL PROJECT STATUS - F02 - PROJECT RECOMMENDED FOR ACCEPTANCE

Page 29: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

STPOA-HSIP-0014(528) LEE SR 14 5.99 % 04-116 EAST ALABAMA 4,489,510 85 W 100 100 08-21-13 4,394,362 336,539.41 5,611,574 0 0 0

FINAL PROJECT STATUS - F02 - PROJECT RECOMMENDED FOR ACCEPTANCE

ACNU58450-ATRP(001) TALLAPOOSA CR-89 2.72 % 04-139 GARY INGRAM 738,405 30 W 090 100 07-23-13 668,036 21,118.47 775,327 0 0 0

FINAL PROJECT STATUS - F02 - PROJECT RECOMMENDED FOR ACCEPTANCE

STPNU-1911(201) COOSA CR-86 1.88 % 04-156 GARY INGRAM G 290,811 30 W 090 100 09-12-13 234,286 7,616.18 403,934 0 0 0

FINAL PROJECT STATUS - F02 - PROJECT RECOMMENDED FOR ACCEPTANCE

EB-0038(527) COOSA 7.40 % 04-158 GARY INGRAM G 5,913,695 160 W 100 100 09-17-12 6,990,627 630,988.56 8,516,910 34,546 1,061,995 1,096,541

FINAL PROJECT STATUS - F02 - PROJECT RECOMMENDED FOR ACCEPTANCE

HPP-IM-STPOA-I085(311) LEE 45.11 % 04-166 W.S. NEWELL & 18,255,545 1112 D 098 100 07-22-13 20,248,446 830,033.67 1,840,014 777,951 1,268,832 2,046,783

FINAL PROJECT STATUS - F02 - PROJECT RECOMMENDED FOR ACCEPTANCE

STPOA-BR-0022(507) TALLAPOOSA 21.73 % 04-174 RACON, INC. 6,833,192 270 W 132 100 08-21-13 7,352,720 1,509,814.99 6,947,485 75,992 103,182 179,174

FINAL PROJECT STATUS - F02 - PROJECT RECOMMENDED FOR ACCEPTANCE

HSIP-0077(514) TALLADEGA 3.88 % 04-182 MCCARTNEY CON 1,825,960 60 W 100 100 05-10-13 1,892,967 78,413.62 2,017,426 0 0 0

FINAL PROJECT STATUS - F02 - PROJECT RECOMMENDED FOR ACCEPTANCE

NH-0077(515) TALLADEGA 14.52 % 04-183 MCCARTNEY CON 381,514 30 W 090 100 07-26-13 407,709 69,251.22 476,866 0 26,195 26,195

FINAL PROJECT STATUS - F02 - PROJECT RECOMMENDED FOR ACCEPTANCE

STPPC-8040(601) RUSSELL 6.89 % 04-191 EAST AL PAVIN 1,676,684 75 W 093 100 09-13-12 1,289,055 134,326.70 1,947,925 0 0 0

FINAL PROJECT STATUS - F02 - PROJECT RECOMMENDED FOR ACCEPTANCE

99-304-416-169-101 LEE 2.79 % 04-195 CHARLES E. WA 1,299,707 30 W 080 100 08-06-12 1,372,982 61,429.31 2,200,000 4,125 69,150 73,275

FINAL PROJECT STATUS - F02 - PROJECT RECOMMENDED FOR ACCEPTANCE

99-504-690-000-001 TALLADEGA 10.74 % 04-197 P&H STUCCO & 532,000 100 W 083 100 04-18-13 522,257 62,853.51 585,200 -8,000 0 -8,000

FINAL PROJECT STATUS - F02 - PROJECT RECOMMENDED FOR ACCEPTANCE DIVISION TOTALS: 110,883,639 123,505,948 113,595,856 3,838,734 12,243,958 16,082,692

Page 30: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

11,792,583.82

Page 31: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/27/13 CONSTRUCTION BUREAU RUN TIME--08.54.49 CONSTRUCTION STATUS REPORT PAGE 16 FIFTH DIVISION

FINAL ESTIMATES ONLY

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 05-012 6.173 MI RESURFACING, TRAFFIC STRIPE, RUMBLE STRIP& SIGNING ON CR-24 FROM CR-37 TO CR-49 SOUTH OF HSIPR-100052296 CLANTON & ON CR-59 AT CR-24 SW OF CLANTON; (WIREGRASS CONSTRUCTION COMPANY) STOAL-100052296 STPOA-HRRR-1111(201) CHILTON

05-022 5.916 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-13 FROM SR-102 AT FOWLERS CROSSROADS TO THE NH04L-100057140 WALKER COUNTY LINE; S.T. BUNN CONSTRUCTION CO., INC. NH981-00057140 NH-0013(575) FAYETTE SR-13

05-031 0.045 MI BRIDGE REPLACEMENTS (2 CULVERTS) AND APPROACHES ON KIRKWOOD DR AT WILLOW CREEK & ON BRDH -100047204 CLARK DRIVE AT UNNAMED CREEK IN EUTAW; (GLASGOW CONSTRUCTION CO., INC.) BRD-3200(204) GREENE

05-038 28.060 MI MAINTENANCE ROADSIDE MOWING ALONG I-59 FROM THE SUMTER COUNTY LINE TO THE TUSCALOOSA CO 99054-100053018 LINE; (COOK CONTRACTORS, INC.) 99-405-323-659-911 GREENE

05-068 6.910 MI RESURFACING & TRAFFIC STRIPE ON CR-12 FROM 2.25 MILES EAST OF SR-183 TO SR-5 EAST OF STNUC-100053729 UNIONTOWN; (ASPHALT CONTRACTORS, INC.) STMNU-STPNU-5303(200) PERRY

05-069 (206) 0.083 MI. BRIDGE REPLACEMENTS ( 1 BRIDGE CULVERT & 3 PRECASTS) ON VARIOUS COUNTY ROADS GRBN1-100044902 AS INDICATED ON THE PLANS (GLASGOW CONSTRUCTION CO.,INC.) GRBN1-100044903 ACGBBRZ-3300(203)(204)(205) HALE VARIOUS GRBN1-100044904 GRBN1-100044905

05-073 11.761 MI RESURFACING AND TRAFFIC STRIPE ON CR-2 FROM SR-14 SOUTH OF ALICEVILLE TO CR-63 STNUL-100050334 ST BUNN CONSTRUCTION CO., INC., 1904 UNIVERSITY BLVD., TUSCALOOSA, AL 35401 STPNU-5404(201) PICKENS CR-63

05-076 7.116 MI PLANING, RESURFACING & TRAFFIC STRIPE SR-17 FROM SUMTER COUNTY LINE TO HUYCK BRIDGE NE OF HSIP -100051362 COCHRANE; S.T. BUNN CONSTRUCTION CO., INC., 1904 UNIVERSITY BOULEVARD, TUSCALOOSA, AL 35403 STAAL-100051362 STPAA-HSIP-0017(523) PICKENS

05-077 99-305-543-000-901; 8.732 MI PLANING, RESURFACING TRAFFIC STRIPE ON SR-6 (US-82) FROM 0.3 MI WEST OF HSIP -100053721 HOLLEY CREEK TO WEST OF TUSCALOOSA CO LINE & 0.4 MILE OF SR-159 IN GORDO;(S. T. BUNN CONSTRUCTION) HSIP-0006(539) PICKENS

05-078 4.993 MI FULL DEPTH RECLAMATION, RESURFACING AND TRAFFIC STRIPE ON CR-85 FROM SUMTER CO LINE TO STNUC-100054347 SR-17 NEAR COCHRANE; (S.T. BUNN CONSTRUCTION COMPANY, INC.) STMNU-RECA-5422(200) PICKENS

Page 32: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/27/13 CONSTRUCTION BUREAU RUN TIME--08.54.49 CONSTRUCTION STATUS REPORT PAGE 17 FIFTH DIVISION

FINAL ESTIMATES ONLY

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 05-080 45.515 MI MAINTENANCE ROADSIDE MOWING ALONG I-59 FROM THE GREENE CO LINE TO THE JEFFERSON CO LINE; 99054-100053016 (BENTLEY TURN & LANDSCAPE, INC.) 99-405-632-659-911 TUSCALOOSA

05-094 5.814 MI ADDITIONAL LANES,GRADE,DRAINAGE,PAVEMENT I-59 WEST OF CR 32 MP 80.92 IN COTTONDALE TO E OF NH04L-100042123 BROOKWOOD INTERCHANGE MP 86.73(APAC-SOUTHEAST,INC) NHF-I059(317) TUSCALOOSAI59

05-100 45.515 MI MAINTENANCE ROADSIDE MOWING ALONG I-59 FROM GREENE COUNTY LINE TO JEFFERSON COUNTY LINE; 99054-100053016 (BENTLEY TURF & LANDSCAPE, INC.) 99-405-632-659-911-1ST RENEWALTUSCALOOSA

05-132 11.771 MI RESURFACING & TRAFFIC STRIPE ON CR-50 FROM SR-69 IN MOUNDVILLE TO CR-49; STOAL-100052234 (APAC MID-SOUTH, INC.,) STPOA-3319(201) HALE

05-133 28.060 MI MAINTENANCE ROADSIDE MOWING ALONG I-59 FROM THE SUMTER COUNTY LINE TO THE TUSCALOOSA CO 99054-100053018 LINE; (COOK CONTRACTORS, INC.) 99-405-323-659-911 (RENEWAL) GREENE

Page 33: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

STPOA-HRRR-1111(201) CHILTON 3.14 % 05-012 WIREGRASS CON 1,653,191 40 W 090 100 09-03-10 1,340,175 54,528.86 1,735,851 0 0 0

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

NH-0013(575) FAYETTE SR-13 12.59 % 05-022 S. T. BUNN 1,133,700 35 W 080 100 06-06-13 1,110,127 110,183.08 875,000 86,224 0 86,224

FINAL PROJECT STATUS - F11 - ACCEPTANCE OF FINAL QUANTITIES BY CONTRACTOR

BRD-3200(204) GREENE 13.88 % 05-031 GLASGOW CONST 356,626 100 W 070 100 10-26-10 349,523 61,155.81 440,447 4,102 0 4,102

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

99-405-323-659-911 GREENE 0.02 % 05-038 COOK CONTRACT 83,146 60 W 050 100 12-30-09 63,065 42.29 146,233 0 0 0

FINAL PROJECT STATUS - F06 - AWAITING DOCUMENTATION FROM PROJECT/COUNTY ENGINEER

STMNU-STPNU-5303(200) PERRY 10.78 % 05-068 ASPHALT CONTR 910,737 50 W 047 100 09-13-11 1,296,607 28,588.83 265,000 102,714 0 102,714

FINAL PROJECT STATUS - F02 - PROJECT RECOMMENDED FOR ACCEPTANCE

ACGBBRZ-3300(203)(204)(205) HALE VARIOUS 3.03 % 05-069 GLASGOW CONST 1,041,279 355 C 089 100 01-11-06 922,184 38,610.84 1,270,397 0 0 0

FINAL PROJECT STATUS - F06 - AWAITING DOCUMENTATION FROM PROJECT/COUNTY ENGINEER

STPNU-5404(201) PICKENS CR-63 0.79 % 05-073 ST BUNN 1,193,791 45 W 091 100 10-01-10 1,201,192 9,959.22 1,253,481 0 0 0

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

STPAA-HSIP-0017(523) PICKENS 5.71 % 05-076 S.T. BUNN CON 2,566,384 65 W 117 100 11-08-10 2,817,926 177,477.45 3,103,476 0 0 0

FINAL PROJECT STATUS - F09 - DISPUTED FINAL QUANTITIES BY CONTRACTOR

HSIP-0006(539) PICKENS 78.17 % 05-077 S.T. BUNN CON 3,636,103 75 W 100 100 11-12-10 3,398,681 206,533.73 264,197 0 0 0

FINAL PROJECT STATUS - F09 - DISPUTED FINAL QUANTITIES BY CONTRACTOR

STMNU-RECA-5422(200) PICKENS 1.26 % 05-078 S.T. BUNN CON 1,229,802 45 W 111 100 10-28-10 1,324,372 3,353.93 265,000 39,750 0 39,750

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

Page 34: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

99-405-632-659-911 TUSCALOOSA 1.91 % 05-080 BENTLEY TURF 126,129 80 W 036 100 01-14-10 126,129 5,091.89 266,195 0 0 0

FINAL PROJECT STATUS - F15 - FINAL ESTIMATE SENT TO GENERAL OFFICE

NHF-I059(317) TUSCALOOSA I59 6.16 % 05-094 APAC-SOUTHEAS 25,620,947 0 C 100 100 08-16-10 27,838,895 1,979,995.67 32,115,964 1,044,040 0 1,044,040

FINAL PROJECT STATUS - F09 - DISPUTED FINAL QUANTITIES BY CONTRACTOR

99-405-632-659-911-1ST RENEWAL TUSCALOOSA 1.91 % 05-100 BENTLEY TURF 126,129 80 W 039 100 10-20-10 126,130 5,091.89 266,195 0 0 0

FINAL PROJECT STATUS - F08 - FINAL QUAN. FURNISHED TO CONTR. WITH REQUEST FOR DOCUM.

STPOA-3319(201) HALE 3.56 % 05-132 APAC MID-SOUT 1,126,913 45 W 087 100 04-09-10 1,021,310 42,230.98 1,183,259 0 0 0

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

99-405-323-659-911 (RENEWAL) GREENE 0.02 % 05-133 COOK CONTRACT 83,146 60 W 050 100 11-16-10 40,163 42.29 146,233 0 0 0

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER DIVISION TOTALS: 40,888,023 42,976,479 43,596,928 1,276,830 0 1,276,830 2,722,886.76

Page 35: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/27/13 CONSTRUCTION BUREAU RUN TIME--08.54.49 CONSTRUCTION STATUS REPORT PAGE 18 SIXTH DIVISION

FINAL ESTIMATES ONLY

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 06-001 0100(201) 0.097 MI. BRIDGE REPLACEMENTS (2) (PRECAST) ON CR#57 & CR#10 AT BRIDGE CREEK NORTHWEST OF GRBN1-100042393 PRATTVILLE. ( WARRIOR CONSTRUCTORS, INC. ) GRBN1-100042392 AACGBBR-0108(201) & ACGBBRZ-01AUTAUGA CR#57

06-003 9.412 MI RESURFACING AND TRAFFIC STRIPE ON CR-21 FROM CR-40 THROUGH WHITE CITY TO THE CHILTON CO STOAL-100051855 LINE; (ASPHALT CONTRACTORS, INC.) STPOA-0119(200) AUTAUGA

06-004 6.245 MI RESURFACING & TRAFFIC STRIPE ON CR-24 FROM CR-37 IN BILLINGSLEY TO CR-21; STNUR-100055445 (APAC MID-SOUTH, INC.) STPNU-0127(200) AUTAUGA

06-006 1.467 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-75 (MCQUEEN SMITH RD) FROM CR-2 (EAST MAIN ST) MNSTC-100053770 SR-14; (ASPHALT CONTRACTORS, INC.) STMOA-7812(601) AUTAUGA

06-008 0.347 MI. ADDITIONAL LANES INCLUDING SIGNAL ON EAST MAIN STREET FROM WEST OF ADELL STREET TO EAST MTST -100042030 OF SHADY OAK LANE IN PRATTVILLE (R.E. GRILLS CONSTRUCTION CO.,INC) STPMT-7804(600) AUTAUGA E MAIN

06-012 7.453 MI. PLANING, RESURFACING, STRIPING, CLEARING & WASH REPAIRS ON I-65 FROM NORTH OF IM04 -100033216 SR 14 (MP 182.457) TO MP 190.00 NORTH OF PINE LEVEL (WIREGRASS CONSTRUCTION CO., INC.) IM-I065(342) AUTAUGA I-65

06-016 0.567 MI. BRIDGE REPLACEMENTS (3) (PRECAST) & APPROACHES ON CR#31 OVER CONECUH RIVER, LITTLE CONECUH GRBN1-100043354 RIVER & RELIEF SOUTH OF UNION SPRINGS. ( MURPHREE BRIDGE CORPORATION ) ACGBBR-0625(200) BULLOCK CR#31

06-017 99-906-062-223-001; 0.103 MI CROSSDRAIN PIPE RE- PLACEMENT (GRADE, DRAIN & PAVEMENT) ON SR-197 0.03 ERJ80-100055578 MI N OF TYE AVE IN UNION SPRINGS & ON SR-223 0.9 MI S OF CR-191; (HILTON COOPER CONTRACTING, INC.) 99009-100055579 ER-8910(955) BULLOCK

06-020 STMAA-0055(505); 6.384 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-3 (US-31) AND SR-55 AT VARIOU STAAC-100052879 SITES INDICATED ON PLANS; (BULLARD EXCAVATING, INC.) STAAC-100052880 STMAA-0003(550) BUTLER

06-022 (201) 0.310 MI. BRIDGE REPLACEMENTS(3 PRECASTS) & APPROACHES ON CR#8 AT BOGUE CHITTA CK. & LITTLE SA GRBN1-100043790 NDY CK. E. OF PEROTE & ON CR#53 AT DOUBLE CK. E. OF TANYARD. ( MURPHREE BRIDGE CORPORATION ) GRBN1-100043789 ACGBBR-0603(200)& ACGBBRZ-0600BULLOCK CR#8

Page 36: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/27/13 CONSTRUCTION BUREAU RUN TIME--08.54.49 CONSTRUCTION STATUS REPORT PAGE 19 SIXTH DIVISION

FINAL ESTIMATES ONLY

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 06-024 7.902 MI RESURFACING AND TRAFFIC STRIPE ON CR-15 FROM SR-106 AT STARLINGTON TO CR-38; STNUC-100054670 (APAC MID-SOUTH, INC.) STMNU-STPNU-0707(200) BUTLER

06-026 BRIDGE COATING ON VARIOUS STRUCTURES SEVEN (7) AT SITES INDICATED BY PLANS; 99005-100054880 (P & H STUCCO & CONSTRUCTION, INC.) 99-506-690-000-001 BUTLER

06-027 0.625 MI. INTERSECTION IMPROVEMENTS INCLUDING SIGNAL UPGRADE ON SR 14 AT SR 143 IN STATC-100050216 ROBINSON SPRINGS (STONE ELECTRIC CO., INC.) ST-026-014-001 ELMORE SR 14

06-029 PEDESTRIAN SAFETY IMPROVEMENTS AT VARIOUS LOCATIONIN THE SIXTH DIVISION. TEST -100039208 ( SAFETY GUIDE OF ALABAMA, L..L.C. ) STPTE-CN01(926) 6TH DIV. SITES

06-032 0.217 MI SAFETY IMPROVEMENTS (GUARDRAIL AND END ANCHORS) ON CR-3 AT TATUM CREEK BRIDGE & AT CHANEY HSIPE-100057167 CREEK BRIDGE; (H & L CONSTRUCTION, INC.) HSIP-2400(210) DALLAS

06-040 2.939 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-14 FROM 0.25 MI W OF CR-3 (MP 160.928) TO WEST HSIPE-100055895 END OF MORTAR CREEK BRIDGE N OF COOSADA; (ASPHALT CONTRACTORS, INC.) STAAE-100055895 STPAA-HSIP-0014(526) ELMORE

06-045 0.083 MI BRIDGE REPLACEMENT ON CR-29 AT WEOKA CREEK SOUTHEAST OF TITUS; STOAH-100047400 NEWELL & BUSH, INC., PO BOX 240397, MONTGOMERY, AL36124 STPOA-2618(200) ELMORE

06-049 3.787 MI. RESURFACING AND TRAFFIC STRIPE ON CR 7 FROM CR 14 TO SR 6 (U.S. 82) AT STOA -100046865 HECTOR (ASPHALT CONTRACTORS, INC.) STPOA-0606(200) BULLOCK CR 7

06-051 2.684 MI. ADDITIONAL LANES (INCLUDING SIGNALS) ON SR#14 FROM I-65 TO SR#143 AT ROBINSON SPRINGS. AAST -100008929 ( SOURHEAST CHEROKEE CONSTRUCTION CO., INC.) STPAA-201(523) ELMORE SR#14

06-059 0.362 MI. INTERSECTION REALIGNMENT ON SR 229 AT SR 50 AND CASTAWAY ISLAND ROAD IN RED HILL RECA -100009070 (TEN-T CORPORATION) RECA-0229(501) ELMORE SR 229

Page 37: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/27/13 CONSTRUCTION BUREAU RUN TIME--08.54.49 CONSTRUCTION STATUS REPORT PAGE 20 SIXTH DIVISION

FINAL ESTIMATES ONLY

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 06-070 99-306-513-053-001; 4.639 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-53 (US-231) FROM PINE LEVEL HSIPE-100052164 (MP 96.360) TO SOUTH OF ATHEY RD (MP 101.000); (WIREGRASS CONSTRUCTION COMPANY, INC.) 99603-100055246 HSIP-0053(536) MONTGOMERY

06-076 0.481 MI PEDESTRIAN IMPROVEMENTS AT CHISHOLM ELEMENTARY, HARRISON ELEMENTARY & CARVER SRIL -100055093 ELEMENTARY SCHOOLS IN MONTGOMERY; (BURNETT CIVIL CONTRACTING, LLC) SRTS-SR09(912) MONTGOMERY

06-079 99-506-013-887-701 & 99-506-015-782-701; BRIDGE SCOUR REPAIR SR-3 (US-31) AT CATOMA CREEK IN 99055-100050361 MONTGOMERY & ON SR-8 (US-80) AT LINE CREEK RELIEF EAST OF MONTGOMERY; (MBC SOUTHEAST, INC.) 99055-100050362 99-506-005-088-701, MONTGOMERY

06-080 PARKING LOT RESURFACING AT DRAPER, ELMORE, STATON,TUTWILER AND KILBY CORRECTIONAL FACILITIES AT SITE CSWA3-100055956 INDICATED BY PLANS; (APAC MID-SOUTH, INC.) SWA-DOC-001 MONTGOMERY

06-091 0.022 MI BRIDGE REPLACEMENT (PRECAST) ON CR-43 AT COSSEY BRANCH NORTH OF SOCIETY HILL; BROPE-100055059 (MCINNIS CONSTRUCTION, LLC BR-4414(202) MACON

06-093 0.529 MI. INTERCHANGE MODIFICATIONS (GRADE, DRAIN, PAVE, SIGNING, SIGNALS & LIGHT) ON I-85 AT THE SR IM98 -100005090 #271 (TAYLOR ROAD) INTERCHANGE IN MONTGOMERY. ( REESE & HOWELL, INC. ) IM-85-1(143) MONTGOMERYI-85

06-100 99-406-690-000-601 & 99-406-513-110-701; 24.770 MISHOULDER PAVING, DRAINAGE AND GUARDRAIL ON SR-110 99044-100051444 AT VARIOUS SITES INDICATED ON THE PLANS; (CARDWELL CORPORATION) 99044-100048688 99-406-062-110-801 BULLOCK 99014-100050355

06-102 0.224 MI WIDENING (GRADE, DRAINAGE & PAVEMENT) ON SR-14 (COOSA RIVER PKWY) FROM EAST END OF RELIEF MNST -100044250 BRIDGE #2 TO W END OF RELIEF BRIDGE #1 IN WETUMPKA(WIREGRASS CONSTRUCTION CO., INC.) STPOA-0014(513) ELMORE

06-108 10.400 KM CONCERTE RUBBLIZING, PAVEMENT REHABILITATION, GUARDRAIL REPLACEMENT & RAISING BRIDGES ON I IM98 -100001674 -65 FROM KMP 258.971 TO KMP 269.371 SOUTH OF MONTGOMERY. ( WIREGRASS CONSTRUCTION CO., INC.) IM-65-1(239) MONTGOMERYI-65

06-109 0.275 MI TURN LANES (GRADE, DRAINAGE, PAVEMENT & SIGNING) ON SR-3 (US-31) AT NEW SCHOOL GEORGIANA; STATC-100051726 (BULLARD EXCAVATING, INC.,) ST-007-003-001 BUTLER

Page 38: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/27/13 CONSTRUCTION BUREAU RUN TIME--08.54.49 CONSTRUCTION STATUS REPORT PAGE 21 SIXTH DIVISION

FINAL ESTIMATES ONLY

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 06-110 BRIDGE APPROACHES ON U. S.#31 AT THE ALABAMA RIVER NORTH OF MONTGOMERY. BRD9 -100002616 ( REESE & HOWELL, INC. ) BRF-117(5) 6TH DIV.COU.S.#31

06-112 3.466 MI. ADDITIONAL LANES (GRADE, DRAINAGE, BRIDGE, & BRIDGE CULVERTS) ON U.S.#331 FROM NEAR PLEASA MGSP -100004578 NT GROVE ROAD TO SNOWDON. ( W. S. NEWELL & SONS, INC. ) MGF-0009(500) MONTGOMERYU.S.331

06-113 ADDITIONAL LANES INCLUDING BRIDGES AND SIGNALS ON TEAGUE ROAD FROM SR#3 (US#31) NEAR HOPE HULL TO SR AAST -100042233 #9 (US#331). ( NEWELL ROADBUILDERS, INC. ) AAST -100042234 STPAA-5114(201) & (202) MONTGOMERYSR#3

06-123 6.156 MI. RESURFACE & TRAFFIC STRIPE ON CR#92 FROM U.S.#231 NORTH TO THE WETUMPKA CITY LIMITS & ON C STNUH-100044492 R#97 FROM CR#92 EAST TO CR#8 SOUTH OF WETUMPKA. ( APAC-SOUTHEAST, INC. ) ACGBSTPNU-CN04(205) ELMORE CR#92

06-124 3.459 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-14 FROM SR-212 TO SR-9 & ON SR-212 FROM SR-111 STAAC-100051863 IN WETUMPKA; (APAC MID-SOUTH, INC.) STMAA-CN09(908) ELMORE

06-126 9.439 MI RESURFACING & TRAFFIC STRIPE ON CR-59 FROM PRATTVILLE CITY LIMITS TO CR-40 & ON CR-59 MNSTH-100050964 FROM CR-40 TO CR-59 SPUR (WIREGRASS CONSTRUCTION COMPANY, INC.) STPOA-CN08(266) AUTAUGA

06-129 2.412 MI. ADDITIONAL LANES (GRADE, DRAINAGE, PAVEMENT & SIGNALS ON US 31 FROM NORTH OF MGSPH-100009311 HYUNDAI BOULEVARD TO US 80 IN MONTGOMERY (SOUTHEAST CHEROKEE CONSTRUCTION CO.,INC) MG-7725(601) MONTGOMERYUS 31

06-131 3.780 MI SHOULDER PAVING & TRAFFIC STRIPE ON CR-59FROM 0.085 MI NORTH OF CR-8 TO SR-14 EAST OF MNST -100054297 WETUMPKA; (GARY INGRAM GRADING & PAVING, INC.) STPOA-2624(201) ELMORE

06-147 4.660 MI RELOCATION (GRADE, DRAINAGE, PARTIAL BASE& PAVE & BRIDGE) ON SR-55 FROM 2 MI S OF GEORGIANA STOAL-100009080 TO SR-106 JUST WEST OF GEORGIANA; (NEWELL ROADBUILDERS, INC.) STPOA-0055(501) BUTLER

06-150 0.066 MI BRIDGE REPLACEMENT (BRIDGE CULVERT) AND APPROACHES ON CR-18 AT SPRING CREEK NE OF SMUTEYE; BROFL-100051115 H&L CONSTRUCTION, INC., P.O. BOX 243, TROY, AL 36081 BRZ-0600(203) BULLOCK

Page 39: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/27/13 CONSTRUCTION BUREAU RUN TIME--08.54.49 CONSTRUCTION STATUS REPORT PAGE 22 SIXTH DIVISION

FINAL ESTIMATES ONLY

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 06-151 0.086 MI. BRIDGE REPLACEMENT (PRECAST) & ON CR 61 AT LITTLE INDIAN CREEK NORTHEAST GRBN1-100044955 OF SMUTEYE (MURPHREE BRIDGE CORPORATION) ACGBBRZ-0600(202) BULLOCK CR 61

06-157 2.255 MI RESURFACING AND TRAFFIC STRIPE ON CR-69 FROM ECLECTIC S CITY LIMIT TO JEAN ST IN ECLECTIC; STNUL-100053621 (APAC MID-SOUTH, INC.) STPNU-2650(200) ELMORE

06-158 6.558 MI SHOULDER PAVING & TRAFFIC STRIPE ON CR-4 FROM CR-8 TO MITCHELL CREEK ROAD SOUTHEAST OF MNSTC-100053865 WETUMPKA; (ASPHALT CONTRACTORS, INC.) STMOA-2601(201) ELMORE

06-160 8.323 MI. RESURFACING AND TRAFFIC STRIPE ON CR 17 FROM CR 12 TO SR 8 (US 80) AT STOAH-100050649 WHITE HALL (APAC-SOUTHEAST, INC.) STPOA-4308(200) LOWNDES CR 17

06-161 10.010 MI RESURFACING & TRAFFIC STRIPE ON CR-29 FROM SR-53 (US-231) AT RIDDLE TO THE COOSA CO LINE MNST -100055828 (ASPHALT CONTRACTORS, INC.) STNUE-100055828 STPOA-STPNU-2618(201) ELMORE

06-162 4.763 MI ADDITIONAL LANES (GRADE DRAINAGE PAVEMENT& RUST REMOVAL) ON SR-9 (US-331) FROM SOUTH OF SR- STAAC-100004580 94 AT ADA TO SOUTH OF CR-24 AT LEGRAND; (W.S. NEWELL, INC.) STMAAF-0009(509) MONTGOMERY

06-163 2.840 MI RESURFACING & TRAFFIC STRIPE ON CR-37 FROM CR-24 IN BILLINGSLEY TO CHILTON COUNTY LINE; STNUC-100054157 (APAC MID-SOUTH, INC.) STMNU-STPNU-0123(200) AUTAUGA

06-170 1.634 MI PLANING, RESURFACING & TRAFFIC STRIPE ON MAIN STREET FROM FIRST AVENUE EAST TO THE ECLECTIC STNUC-100054489 CITY LIMIT IN ECLECTIC; (WIREGRASS CONSTRUCTION COMPANY, INC.) STMNU-STPNU-2606(202) ELMORE

06-172 0.511 MI ADDITIONAL LANES (GRADE, DRAIN, PAVEMENT & BRIDGE WIDENING ON PERRY HILL ROAD FROM I-85 TO MNSTC-100040820 HARRISON RD IN MONTGOMERY; (DUBOSE CONSTRUCTION COMPANY, LLC) STMOA-7724(601) MONTGOMERY

06-177 7.491 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-9 (US-231) FROM TALLAPOOSA RIVER BRIDGE TO SR- HSIPE-100051864 21 IN WETUMPKA; (ASPHALT CONTRACTORS, INC.) NH04E-100051864 NH-HSIP-0009(527) ELMORE

Page 40: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/27/13 CONSTRUCTION BUREAU RUN TIME--08.54.49 CONSTRUCTION STATUS REPORT PAGE 23 SIXTH DIVISION

FINAL ESTIMATES ONLY

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 06-183 1.520 MI RESURFACING & TRAFFIC STRIPE ON ALABAMA RIVER PARKWAY FROM SR-143 EAST OF PRATTVILLE CITY MNSTC-100053771 LIMIT TO JACKSON LAKE ROAD; (ASPHALT CONTRACTORS, INC.) STMOA-7804(601) ELMORE

06-188 3.662 MI RESURFACING & TRAFFIC STRIPE ON CR-62 FROM BUTLER CO LINE TO SR-3 (US-31) SOUTH OF STNUR-100055314 SANDY RIDGE; (WIREGRASS CONSTRUCTION CO., INC.) STPNU-CN10(219) LOWNDES

06-214 4.391 MI RESURFACING & TRAFFIC STRIPE ON COOSADA RD FROM MAIN ST IN MILLBROOK TO BLACKWELL DRIVE; MNST -100055826 (WIREGRASS CONSTRUCTION COMPANY, INC.) STPOA-7906(601) ELMORE

06-215 3.143 MI RESURFACING & TRAFFIC STRIPE ON CR-42 FROM CR-71 WEST OF GREENVILLE TO CR-54; STNUE-100056301 (APAC MID-SOUTH, INC.) STPNU-0715(200) BUTLER

06-216 4.306 MI RESURFACING & TRAFFIC STRIPE ON CR-54 FROM DICKENS FIELD ROAD TO CR-42 NW OF GREENVILLE; STNUE-100056300 (APAC MID-SOUTH, INC.) STPNU-0715(201) BUTLER

06-219 3.153 MI RESURFACING AND TRAFFIC STRIPE ON COOSADAPARKWAY FROM ALABAMA PARKWAY TO COOSADA ROAD IN MNST -100055825 COOSADA; (WIREGRASS CONSTRUCTION COMPANY, INC.) STPOA-7905(601) ELMORE

Page 41: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

AACGBBR-0108(201) & ACGBBRZ-01 AUTAUGA CR#57 1.04 % 06-001 WARRIOR CONST 989,933 150 W 081 100 05-01-04 963,069 12,476.36 1,194,988 0 0 0

FINAL PROJECT STATUS - F06 - AWAITING DOCUMENTATION FROM PROJECT/COUNTY ENGINEER

STPOA-0119(200) AUTAUGA 5.33 % 06-003 ASPHALT CONTR 801,310 30 W 078 100 07-31-09 760,153 47,042.49 881,441 0 0 0

FINAL PROJECT STATUS - F11 - ACCEPTANCE OF FINAL QUANTITIES BY CONTRACTOR

STPNU-0127(200) AUTAUGA 5.96 % 06-004 APAC MID-SOUT 601,102 30 W 067 100 02-28-11 584,878 44,830.16 751,345 0 0 0

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

STMOA-7812(601) AUTAUGA 11.52 % 06-006 ASPHALT CONTR 435,797 30 W 086 100 08-02-10 312,057 80,099.07 695,101 0 0 0

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

STPMT-7804(600) AUTAUGA E MAIN 17.10 % 06-008 RE GRILLS CON 1,035,676 0 273 100 10-01-05 866,722 191,100.70 1,116,917 18,064 0 18,064

FINAL PROJECT STATUS - F13 - REQESTED DOCUMENTATION FROM DIST./PROJ/COUNTY ENGINEER

IM-I065(342) AUTAUGA I-65 12.35 % 06-012 WIREGRASS CON 5,547,497 298 C 123 100 06-30-06 5,949,039 853,289.22 6,906,528 83,992 0 83,992

FINAL PROJECT STATUS - F11 - ACCEPTANCE OF FINAL QUANTITIES BY CONTRACTOR

ACGBBR-0625(200) BULLOCK CR#31 27.84 % 06-016 MURPHREE BRID 1,010,104 85 W 069 100 05-07-04 987,160 48,997.77 175,958 0 0 0

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

ER-8910(955) BULLOCK 20.08 % 06-017 HILTON COOPER 487,798 66 W 079 100 01-09-13 464,986 115,394.48 574,459 40,187 0 40,187

FINAL PROJECT STATUS - F14 - FINAL ESTIMATE SENT TO CONTRACTOR

STMAA-0003(550) BUTLER 7.94 % 06-020 BULLARD EXCAV 2,314,579 65 W 068 100 12-31-09 2,120,877 200,582.06 2,524,130 0 0 0

FINAL PROJECT STATUS - F05 - DIVISION PERSONNEL CHECKING FINAL ESTIMATE DATA

ACGBBR-0603(200)& ACGBBRZ-0600 BULLOCK CR#8 1.84 % 06-022 MURPHREE BRID 1,272,740 360 C 100 100 08-01-05 1,329,895 28,681.85 1,552,788 0 57,155 57,155

FINAL PROJECT STATUS - F11 - ACCEPTANCE OF FINAL QUANTITIES BY CONTRACTOR

Page 42: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

STMNU-STPNU-0707(200) BUTLER 16.69 % 06-024 APAC MID-SOUT 845,704 45 W 053 100 09-07-10 853,353 44,247.72 265,000 0 0 0

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

99-506-690-000-001 BUTLER 17.05 % 06-026 P&H STUCCO & 499,999 90 W 089 100 10-18-11 496,997 104,184.97 610,956 0 0 0

FINAL PROJECT STATUS - -

ST-026-014-001 ELMORE SR 14 75.47 % 06-027 STONE ELECTRI 256,884 40 W 015 100 08-31-08 58,125 203,773.64 270,000 31,252 0 31,252

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

STPTE-CN01(926) 6TH DIV. SITES 18.43 % 06-029 SAFETY GUIDE 407,313 90 W 081 100 06-20-03 368,601 94,294.52 511,381 0 0 0

FINAL PROJECT STATUS - F14 - FINAL ESTIMATE SENT TO CONTRACTOR

HSIP-2400(210) DALLAS 18.94 % 06-032 H & L CONSTRU 67,024 30 W 100 100 11-26-12 71,687 15,873.86 83,776 0 0 0

FINAL PROJECT STATUS - F15 - FINAL ESTIMATE SENT TO GENERAL OFFICE

STPAA-HSIP-0014(526) ELMORE 8.55 % 06-040 ASPHALT CONTR 1,228,326 35 W 091 100 09-21-12 1,192,025 131,411.87 1,535,321 0 0 0

FINAL PROJECT STATUS - F15 - FINAL ESTIMATE SENT TO GENERAL OFFICE

STPOA-2618(200) ELMORE 7.45 % 06-045 NEWELL & BUSH 1,846,174 100 W 100 100 02-12-09 1,736,454 148,306.34 1,989,403 0 0 0

FINAL PROJECT STATUS - F06 - AWAITING DOCUMENTATION FROM PROJECT/COUNTY ENGINEER

STPOA-0606(200) BULLOCK CR 7 3.49 % 06-049 ASPHALT CONTR 337,269 30 W 100 100 01-31-06 340,313 12,392.14 354,132 0 -3,044 -3,044

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

STPAA-201(523) ELMORE SR#14 11.12 % 06-051 SE. CHEROKEE 5,179,871 240 C 099 100 05-01-04 5,841,704 728,368.97 6,549,039 30,650 0 30,650

FINAL PROJECT STATUS - F09 - DISPUTED FINAL QUANTITIES BY CONTRACTOR

RECA-0229(501) ELMORE SR 229 12.84 % 06-059 TEN-T CORP. 1,046,106 270 C 092 100 06-28-05 1,230,022 186,219.94 1,450,301 4,000 161,694 165,694

FINAL PROJECT STATUS - F11 - ACCEPTANCE OF FINAL QUANTITIES BY CONTRACTOR

HSIP-0053(536) MONTGOMERY 6.04 % 06-070 WIREGRASS CON 2,894,044 90 W 100 100 05-10-11 2,977,549 195,812.46 3,239,547 6,939 0 6,939

FINAL PROJECT STATUS - F05 - DIVISION PERSONNEL CHECKING FINAL ESTIMATE DATA

Page 43: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

SRTS-SR09(912) MONTGOMERY 9.64 % 06-076 BURNETT CIVIL 116,569 45 W 096 100 11-02-11 78,511 12,372.46 128,225 -8,287 0 -8,287

FINAL PROJECT STATUS - -

99-506-005-088-701, MONTGOMERY 25.66 % 06-079 MBC SOUTHEAST 322,049 45 100 100 07-31-08 227,922 57,280.31 223,142 0 0 0

FINAL PROJECT STATUS - F11 - ACCEPTANCE OF FINAL QUANTITIES BY CONTRACTOR

SWA-DOC-001 MONTGOMERY 3.11 % 06-080 APAC MID-SOUT 359,744 30 W 090 100 05-31-11 377,169 13,598.25 437,004 0 0 0

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

BR-4414(202) MACON 17.49 % 06-091 MCINNIS CONST 295,008 50 W 086 100 12-01-10 286,101 59,353.46 339,259 0 0 0

FINAL PROJECT STATUS - F11 - ACCEPTANCE OF FINAL QUANTITIES BY CONTRACTOR

IM-85-1(143) MONTGOMERY I-85 16.17 % 06-093 REESE & HOWEL 1,408,331 110 W 155 100 02-27-05 1,738,465 261,999.98 1,619,580 2,700 0 2,700

FINAL PROJECT STATUS - F09 - DISPUTED FINAL QUANTITIES BY CONTRACTOR

99-406-062-110-801 BULLOCK 26.79 % 06-100 CARDWELL CORP 1,186,776 118 W 124 100 10-31-10 1,005,898 379,473.79 1,416,388 15,730 0 15,730

FINAL PROJECT STATUS - F12 - AWAITING DOCUMENTATION FROM CONTRACTOR

STPOA-0014(513) ELMORE 18.03 % 06-102 WIREGRASS CON 539,873 60 W 082 100 03-31-10 583,283 123,279.85 683,498 0 0 0

FINAL PROJECT STATUS - F02 - PROJECT RECOMMENDED FOR ACCEPTANCE

IM-65-1(239) MONTGOMERY I-65 8.87 % 06-108 WIREGRASS CON 11,324,037 240 W 114 100 05-25-04 13,987,227 1,219,042.30 13,739,420 118,484 0 118,484

FINAL PROJECT STATUS - F06 - AWAITING DOCUMENTATION FROM PROJECT/COUNTY ENGINEER

ST-007-003-001 BUTLER 21.86 % 06-109 BULLARD EXCAV 432,454 75 W 099 100 10-01-10 433,303 129,009.95 590,000 0 850 850

FINAL PROJECT STATUS - F11 - ACCEPTANCE OF FINAL QUANTITIES BY CONTRACTOR

BRF-117(5) 6TH DIV.CO U.S.#31 12.18 % 06-110 REESE & HOWEL 2,794,559 250 W 105 100 10-21-02 3,404,199 425,755.48 3,494,400 18,018 0 18,018

FINAL PROJECT STATUS - F14 - FINAL ESTIMATE SENT TO CONTRACTOR

MGF-0009(500) MONTGOMERY U.S.331 16.58 % 06-112 W.S. NEWELL & 3,937,851 225 W 045 100 01-12-06 4,852,497 885,731.13 5,340,123 527,400 914,646 1,442,046

FINAL PROJECT STATUS - F05 - DIVISION PERSONNEL CHECKING FINAL ESTIMATE DATA

Page 44: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

STPAA-5114(201) & (202) MONTGOMERY SR#3 14.24 % 06-113 NEWELL ROADBU 7,434,836 689 C 101 100 03-14-06 8,335,544 1,744,138.25 12,247,650 258,195 0 258,195

FINAL PROJECT STATUS - F12 - AWAITING DOCUMENTATION FROM CONTRACTOR

ACGBSTPNU-CN04(205) ELMORE CR#92 5.91 % 06-123 APAC-SOUTHEAS 537,946 45 W 113 100 09-08-04 493,956 33,397.40 564,843 0 -43,990 -43,990

FINAL PROJECT STATUS - F14 - FINAL ESTIMATE SENT TO CONTRACTOR

STMAA-CN09(908) ELMORE 15.55 % 06-124 APAC MID-SOUT 997,395 30 W 117 100 10-31-10 889,796 178,561.45 1,147,836 0 0 0

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

STPOA-CN08(266) AUTAUGA 4.10 % 06-126 WIREGRASS CON 1,034,814 60 W 040 100 02-01-09 649,224 46,712.22 1,138,295 0 0 0

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

MG-7725(601) MONTGOMERY US 31 11.55 % 06-129 SOUTHEAST CHE 6,298,961 743 W 113 100 06-01-07 7,107,672 910,528.31 7,881,260 21,513 0 21,513

FINAL PROJECT STATUS - F09 - DISPUTED FINAL QUANTITIES BY CONTRACTOR

STPOA-2624(201) ELMORE 20.21 % 06-131 GARY INGRAM G 150,355 30 W 087 100 02-25-11 122,127 36,255.71 179,391 -7,456 0 -7,456

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

STPOA-0055(501) BUTLER 20.34 % 06-147 NEWELL ROADBU 6,982,938 300 W 117 100 08-01-11 11,087,728 1,756,153.33 8,632,203 896,000 2,082,447 2,978,447

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

BRZ-0600(203) BULLOCK 7.40 % 06-150 H&L CONSTRUCT 289,777 60 W 099 100 01-30-09 305,452 22,537.75 304,267 0 0 0

FINAL PROJECT STATUS - F02 - PROJECT RECOMMENDED FOR ACCEPTANCE

ACGBBRZ-0600(202) BULLOCK CR 61 0.63 % 06-151 MURPHREE BRID 523,000 80 W 096 100 04-30-06 525,225 3,832.25 600,880 0 0 0

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

STPNU-2650(200) ELMORE 21.26 % 06-157 APAC MID-SOUT 147,999 30 W 100 100 11-14-09 138,004 33,040.00 155,399 0 0 0

FINAL PROJECT STATUS - F12 - AWAITING DOCUMENTATION FROM CONTRACTOR

STMOA-2601(201) ELMORE 13.85 % 06-158 ASPHALT CONTR 225,268 30 W 063 100 03-05-10 213,819 37,741.13 272,494 0 0 0

FINAL PROJECT STATUS - F12 - AWAITING DOCUMENTATION FROM CONTRACTOR

Page 45: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

STPOA-4308(200) LOWNDES CR 17 5.95 % 06-160 APAC-SOUTHEAS 861,360 50 W 100 100 09-30-08 730,574 55,102.82 924,895 0 0 0

FINAL PROJECT STATUS - F11 - ACCEPTANCE OF FINAL QUANTITIES BY CONTRACTOR

STPOA-STPNU-2618(201) ELMORE 7.55 % 06-161 ASPHALT CONTR 1,061,627 45 W 100 100 07-05-11 983,111 86,549.24 1,145,095 0 0 0

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

STMAAF-0009(509) MONTGOMERY 11.45 % 06-162 W.S. NEWELL, 14,904,308 325 W 098 100 09-04-12 18,479,244 2,161,276.07 18,869,375 86,213 0 86,213

FINAL PROJECT STATUS - -

STMNU-STPNU-0123(200) AUTAUGA 8.04 % 06-163 APAC MID-SOUT 290,515 30 W 080 100 04-09-10 273,799 21,322.17 265,000 0 0 0

FINAL PROJECT STATUS - F06 - AWAITING DOCUMENTATION FROM PROJECT/COUNTY ENGINEER

STMNU-STPNU-2606(202) ELMORE 2.88 % 06-170 WIREGRASS CON 282,524 30 W 077 100 05-11-10 284,693 7,649.63 265,000 0 0 0

FINAL PROJECT STATUS - F15 - FINAL ESTIMATE SENT TO GENERAL OFFICE

STMOA-7724(601) MONTGOMERY 26.29 % 06-172 DUBOSE CONST. 1,695,426 125 W 084 100 11-01-11 1,951,709 512,648.37 1,949,740 0 0 0

FINAL PROJECT STATUS - -

NH-HSIP-0009(527) ELMORE 10.11 % 06-177 ASPHALT CONTR 3,369,990 125 W 094 100 10-29-11 3,270,886 411,728.07 4,069,903 31,171 0 31,171

FINAL PROJECT STATUS - -

STMOA-7804(601) ELMORE 10.20 % 06-183 ASPHALT CONTR 404,207 30 W 110 100 09-09-10 348,591 43,595.25 427,339 0 0 0

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

STPNU-CN10(219) LOWNDES 5.46 % 06-188 WIREGRASS CON 587,366 35 W 100 100 06-02-11 592,515 38,269.36 700,795 0 0 0

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

STPOA-7906(601) ELMORE 3.71 % 06-214 WIREGRASS CON 583,032 30 W 067 100 11-16-11 510,066 25,823.68 695,624 0 0 0

FINAL PROJECT STATUS - -

STPNU-0715(200) BUTLER 5.49 % 06-215 APAC MID-SOUT 408,346 30 W 100 100 11-30-11 398,890 26,767.35 487,204 0 0 0

FINAL PROJECT STATUS - F13 - REQESTED DOCUMENTATION FROM DIST./PROJ/COUNTY ENGINEER

Page 46: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

STPNU-0715(201) BUTLER 3.96 % 06-216 APAC MID-SOUT 548,550 30 W 100 100 11-30-11 491,032 25,926.83 654,483 0 0 0

FINAL PROJECT STATUS - F13 - REQESTED DOCUMENTATION FROM DIST./PROJ/COUNTY ENGINEER

STPOA-7905(601) ELMORE 8.62 % 06-219 WIREGRASS CON 643,156 30 W 100 100 10-30-11 559,022 66,202.26 767,359 0 0 0

FINAL PROJECT STATUS - - DIVISION TOTALS: 102,086,197 115,222,920 125,589,880 2,174,765 3,169,758 5,344,523 15,340,036.45

Page 47: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/27/13 CONSTRUCTION BUREAU RUN TIME--08.54.49 CONSTRUCTION STATUS REPORT PAGE 24 SEVENTH DIVISION

FINAL ESTIMATES ONLY

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 07-001 DRAINAGE EXTENSION ON US-431 NORTH OF HUNTER'S INLET ROAD IN EUFAULA; BURNETT CIVIL CONTRACTING STATC-100040827 LLC, P.O. BOX 6154, MONTGOMERY, AL 36111 ST-003-001-002 BARBOUR

07-002 ER-8910(938); 0.059 MI BRIDGE CULVERT MODIFICATION& RIPRAP PLACEMENT ON CR-36 AT JOHNSON'S CREEK E L24AC-100054038 OF OZARK & ON CR-64 AT W FORK OF CHOCTAWATCHEE RIVER EAST OF SKIPPERVILLE;(HILTON COOPER CONT) ER9X8-100054041 ER-8910(940) DALE

07-005 2.842 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-248 FROM SR-27 TO COMMON DRIVE IN ENTERPRISE 99703-100050848 BULLARD EXCAVATING, INC., 13264 EVA DRIVE, ANDALUSIA, AL 36420 99-307-162-248-804 COFFEE SR-248

07-006 5.582 MI ADDITIONAL LANES (GRADE, DRAINAGE, BRIDGEAND RUST REMOVAL) ON SR-12 (US-84 FROM SR-141 TO EBSPL-100004564 CR-364 IN ELBA; (S.A. GRAHAM CO., INC., PO BOX 726, BRUNDIDGE, AL) EBF-0012(510) COFFEE

07-007 BRIDGE REPLACEMENT ON SR#95 AT WHITE OAK CK. S. OF EUFAULA. ONBR -100012345 ( F & W CONSTRUCTION CO., INC. ) BR-3419(200) 7TH DIV.CO SR#95

07-020 4.242 MI. BASE, PAVE & PARTIAL GRADE & DRAIN ON THE RELOCATION OF SR 12 (U.S. 84) FROM MGEXH-100004084 CR 507 TO WEST OF DOUBLE BRIDGES CREEK IN NEW BROCKTON (APAC-SOUTHEAST, INC.) MGF-0012(509) COFFEE SR 12

07-026 0.631 MI SIDEWALK & SCHOOL ZONE STRIPING ALONG 6THST., BEGONIA ST., & CACTUS ST., AT SITES IN SRIL -100056004 FLORALA AS INDICATED BY THE PLANS. ROBBIE'S DOZER & CONSTRUCTION SERVICES, LLC SRTS-SR11(916) COVINGTON VAR SIT

07-049 4.726 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-134 FROM CR-67 IN MIDLAND CITY TO THE HENRY CO HSIPE-100053247 LINE; (LEWIS, INC.) STAAE-100053247 STPAA-HSIP-0134(504) DALE

07-050 0.068 MI REMOVAL AND REALIGNMENT OF A SEGMENT OF CR 4 APPROXIMATELY THREE MILES SE OF SR 52 NEAR HSIRR-100057975 THURSTON; WIREGRASS CONSTRUCTION COMPANY, INC. HRRR-3104(200) GENEVA

07-052 1) 3.544 MI.ADDITIONAL LANES & BRIDGE REPLACEMENTS (3) ON SR#12 (US#84) FROM SR#100 IN ANDALUSIA TO ONBR -100038275 NEAR CR#67 IN SANFORD. ( BULLARD EXCAVATING, INC. ) OAST -100003965 BRF-0006(015) & STPOAF-0012(50COVINGTON SR#12

Page 48: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/27/13 CONSTRUCTION BUREAU RUN TIME--08.54.49 CONSTRUCTION STATUS REPORT PAGE 25 SEVENTH DIVISION

FINAL ESTIMATES ONLY

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 07-053 NHF-HSIPF-0053(535); 3.465 MI ADDITIONAL LANES (GRADE, DRAINAGE, PAVEMENT & SIGNALS) ON SR-53 NH04L-100038201 (US-231) FROM SR-210 (ROSS CLARK CIRCLE) IN DOTHANTO TROY UNIVERSITY'S DRIVEWAY; (WIREGRASS CONST) 99703-100050712 NHF-0053(522) HOUSTON

07-059 3.109 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-248 FROM THE END OF THE FIVE LANE IN STAAL-100053128 ENTERPRISE TO THE FORT RUCKER GATE; (MERCHANTS BONDING COMPANY (MUTUAL)) STPAA-0248(500) COFFEE

07-061 0.365 MI SIDEWALK, PEDESTRIAN BRIDGE AND TRAFFIC CONTROL MARKINGS NEAR THE HEADLAND MIDDLE SCHOOL SRIE1-00056003 AT SITES IN HEADLAND AS INDICATED BY THE PLANS; GEISLER CONTRACTING, INC. SRTS-SR11(915) HENRY

07-073 11.841 MI RESURFACING AND TRAFFIC STRIPE ON CR69 AND CR 77 (SOUTH ROCKY CREEK RD) FROM HICKORY A1RDY-100058539 GROVE RD TO US 84 EAST IN ASHFORD; APAC MID-SOUTH, INC. ACNU58539-ATRP(001) HOUSTON CR69

07-078 1.878 MI SANITARY SEWER LIFT STATION & FORCE MAIN AT THE SR-1 (US-231) REST AREA SOUTH OF DOTHAN; NH04E-100055611 (BLANKENSHIP CONTRACTING, INC.) NH-CN11(902) HOUSTON

07-091 STPNU-5514(200), STPNU-5500(213); 11.273 MI PLAN- ING, RESURFACING & TRAFFIC STRIPE ON CR-2246, CR- STNUE-100054024 4409 & ON CR-6628 AT SITES INDICATED BY PLANS; (APAC MID-SOUTH, INC.) STNUE-100056236 STPNU-5506(200) PIKE STNUE-100056237

07-101 3.654 MI ADDITIONAL LANES (GRADE, DRAINAGE AND PAVEMENT) ON SR-52 FROM CR-59 IN TAYLOR TO CR-300 AAST -100008855 IN MALVERN; (W.S. NEWELL & SONS, INC.) STAAE-100008855 STPAA-0052(504) HOUSTON

07-102 99-307-351-095-801; 1.076 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-95 FROM SR-52 TO HENRY CO HSIP -100051690 LINE IN COLUMBIA; LEWIS, INC., P.O. BOX 254, HEADLAND, AL 36345 HSIP-0095(500) HOUSTON

07-106 0.834 MI SIDEWALK & TRAFFIC CONTROL MARKINGS, ALONG REGENCY AND ANTLER DRIVE AT SITES NEAR THE SRIL1-00056002 FT. RUCKER BLVD ELEMENTARY SCHOOL IN ENTERPRISE; ROBBIE'S DOZER & CONSTRUCTION SERVICES, LLC SRTS-SR11(914) COFFEE

07-109 4.860 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-10 FROM BLUE SPRINGS EAST TOWN LIMITS TO THE HSIPE-100053123 HENRY COUNTY LINE; (WIREGRASS CONSTRUCTION COMPANY, INC.) STAAE-100053123 STPAA-HSIP-0010(525) BARBOUR

Page 49: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/27/13 CONSTRUCTION BUREAU RUN TIME--08.54.49 CONSTRUCTION STATUS REPORT PAGE 26 SEVENTH DIVISION

FINAL ESTIMATES ONLY

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 07-111 3.770 KM. ADDITIONAL LANES (GRADE, DRAINAGE, PAVEMENT AND SIGNALS) ON WESTGATE PARKWAY STOAH-100008611 FROM SR 53 (US 231) TO HARRISON ROAD (CR 10) IN DOTHAN (APAC-SOUTHEAST, INC.) STPOA-9412(600) HOUSTON PKWAY

07-113 4.921 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR 1 (US 431) FROM N OF CR 93 (BROAD ST) TO HSIPE-100057490 0.25 MI S OF LINDSEY DR IN EUFAULA; APAC MID-SOUTHINC. NH04L-100057490 NH-HSIP-0001(572) BARBOUR SR 1

07-114 99-307-162-051-806; 10.293 MI RESURFACING, TRAFFICSTRIPE & DRAINAGE EXTENSION ON SR-51 FROM SR-167 HSIP -100051467 TO DALE COUNTY LINE; WIREGRASS CONSTRUCTION CO., INC., P.O. BOX 48, ARITON, AL 36311 HSIP-0051(502) & COFFEE

07-118 4.887 MI PLANING, RESURFACING AND TRAFFIC SIGNAL UPGRADE ON SR 10/53 (US231) FROM THE TROY S CITY NH04E-100056173 LIMITS TO 0.87 MILE N OF SR 15 (US 29); APAC MID-SOUTH, INC. NH-0053(563) PIKE SR10/53

07-121 BARBOUR, COVINGTON, DALE, HENRY, PIKE, GENEVA & HOUSTON BRIDGE COATING AT EXISTING BRIDGES ON SR55 BROPE-100053017 SR52, SR123, SR1 (US 431), SR6 (US 82)& SR15 AT SITES AS INDICATED BY THE PLANS; GULF COAST CONTRA BHP-CN11(911) BARBOUR

07-122 BARBOUR, COFFEE, COVINGTON, CRENSHAW, DALE, GENEVAHOUSTON & PIKE COUNTIES SCORING BITUMINOUS HSIPE-100056192 PAVEMENT SURFACE (SHOULDERS) ON VARIOUS ROUTES THROUGHOUT THE 7TH DIV; SURFACE PREPARATION TECH HSIP-CN12(906) BARBOUR VARIOUS

07-123 3.537 MI RESURFACE AND TRAFFIC STRIPE ON COUNTY RD16 FROM THE DALE CO LINE TO AL HWY 173 IN HEADLAND STNUM-100059276 WIREGRASS CONSTRUCTION COMPANY, INC. STPNU-3400(207) HENRY

07-125 7.239 MI RESURFACING AND TRAFFIC STRIPE ON CR 65 FROM SR 95 TO SR 10 IN SHORTERVILLE; A1RDY-100058228 APAC MID-SOUTH, INC. ACNU58228-ATRP(001) HENRY CR 65

07-130 3.063 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-1 (US-431) FROM THE HEADLAND SOUTH CITY STOAC-100052434 LIMIT (MP 23.232) TO NORTH OF SR-173 (MP 26.295); (LEWIS, INC.) STMOA-0001(543) HENRY

07-133 7.129 MI RESURFACING AND TRAFFIC STRIPE ON CR-606 FROM CR-625 TO SR-192 AT THE ENTERPRISE CITY A1RDY-100058533 LIMITS; WIREGRASS CONSTRUCTION COMPANY, INC. ACNU58533-ATRP(001) COFFEE CR 606

Page 50: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/27/13 CONSTRUCTION BUREAU RUN TIME--08.54.49 CONSTRUCTION STATUS REPORT PAGE 27 SEVENTH DIVISION

FINAL ESTIMATES ONLY

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 07-136 2.639 MI RESURFACING ON FORTNER STREET IN DOTHAN FROM 875' EAST OF SOUTH BRANNON STAND ROAD TO CSWA6-100023038 400' WEST OF HONEYSUCKLE ROAD; (LEWIS, INC.) STMOA-STPOA-9414(601) HOUSTON

07-138 PILE ENCASEMENT & RIPRAP PLACEMENT ON SR-10 AT THEEAST FORK OF CHOCTAWHATCHEE RIVER, ON SR-10 AT 99055-100056131 VAN MILL CREEK & ON SR-95 AT ABBIE CREEK; (F&W CONSTRUCTION COMPANY, INC.) 99-507-346-000-101 HENRY

07-139 ER-8910(932); 0.116 MI SLOPE REPAIR ON SR-52 AT VARIOUS SITES INDICATED BY THE PLANS; STAAE-100054591 (CARDWELL CORPORATION) STAAE-100054590 ER-8910(927) HOUSTON

07-141 & ACNU58505-ATRP(001); 15.328 MI RESURFACING AND TRAFFIC STRIPE ON CR-33 & ON CLIO SHORT RD (CR-9) A1RDY-100058506 AT SITES AS INDICATED BY THE PLANS; WIREGRASS CONSTRUCTION COMPANY, INC. A1RDY-100058505 ACNU58506-ATRP(001) BARBOUR CR-33

07-143 BRIDGE SCOUR REPAIR & PILE ENCASEMENT ON SR-12 (US-84) ON SR-167 & ON SR-52 AT VARIOUS SITES INDICAT ERH05-100054540 ON PLANS; (CARDWELL CORPORATION) ERLF8-100054540 ER-8910(926) GENEVA

07-145 0.336 MI FLOOD DAMAGE REPAIR ON SR-87 NEAR THE PEA RIVER BRIDGE SOUTH OF SAMSON; ERH05-100054488 (BURNETT CIVIL CONTRACTING, LLC) ERD09-100054488 ER-8910(925) GENEVA

07-146 NH-HSIP-0210(503); 3.602 MI PLANING, RESURFACING, TRAFFIC STRIPE & BRIDGE RAIL RETROFIT ON SR-210 NH04E-100052414 (ROSS CLARK CIRCLE) FROM W OF SR-1 (US-231) TO N OF SR-12 (US-84) IN DOTHAN; (APAC MID-SOUTH, INC.) HSIPE-100052413 NH-0210(502) HOUSTON NH04E-100052413

07-147 8.143 MI RESURFACING, PLANING AND TRAFFIC STRIPE ON SR-6 (US-82) FROM THE BULLOCK CO LINE TO W OF STAAM-100058595 CR-79 (POPLAR SPRINGS RD); WIREGRASS CONSTRUCTION COMPANY, INC. STPAA-0006(550) BARBOUR SR-6

07-157 99-307-215-010-101; 6.862 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-10 (SR-29) FROM EAST OF HSIPE-100056203 LUVERNE (MP 150.343) TO THE PIKE COUNTY LINE; (APAC MID-SOUTH, INC.) 99703-100056594 HSIP-0010(533) CRENSHAW

07-158 10.907 MI PLANING, RESURFACING & TRAFFIC STRIPE ONSR-53 FROM S OF HOOD ST IN COTTONWOOD TO MIMOSA DR HSIPE-100054975 IN DOTHAN; (APAC MID-SOUTH, INC.) STAAE-100054975 STPAA-HSIP-0053(555) HOUSTON

Page 51: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/27/13 CONSTRUCTION BUREAU RUN TIME--08.54.49 CONSTRUCTION STATUS REPORT PAGE 28 SEVENTH DIVISION

FINAL ESTIMATES ONLY

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 07-159 99-307-351-095-101; 11.413 MI RESURFACING, TRAFFICSTRIPE ON SR-95 FROM S OF BOAT LANDING ROAD IN HSIPE-100053139 GORDON TO SR-52; (APAC MID-SOUTH, INC.) 99703-100056589 HSIP-0095(501) HOUSTON

07-161 6.154 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-53 (US-231) FROM N OF CR-2 (MP 50.769) TO SOUTH 99703-100056584 OF THE COFFEE CO LINE (MP 56.923) W OF ARITON; (WIREGRASS CONSTRUCTION COMPANY, INC.) 99-307-234-053-101 DALE

07-164 6.018 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-10 FROM BARBOUR CO LINE TO 0.4 MILES WEST OF HSIPE-100055589 CR-25 NW OF ABBEVILLE; (LEWIS, INC.) STAAE-100055589 STPAA-HSIP-0010(530) HENRY

07-166 ER-8910(939); 0.118 MI PILE ENCASEMENTS & SLOPE STABILIZATION ON CR-24 AT CLAYBANK CREEK IN ER9V8-100054023 DALEVILLE & ON CR-9 AT MOSSY CAMP BRANCH SOUTH OF NEWTON; (MCINNIS CONSTRUCTION, LLC) ER9V8-100054036 ER-8910(941) DALE

07-170 99-307-341-134-001; 6.224 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-134 FROM DALE CO LINE TO HSIPE-100053246 SR-1 (US-431) IN HEADLAND; (LEWIS, INC.) 99703-100055289 HSIP-0134(503) HENRY

Page 52: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

ST-003-001-002 BARBOUR 142.98 % 07-001 BURNETT CIVIL 97,991 40 200 100 11-24-08 127,065 214,483.34 150,000 2,100 29,074 31,174

FINAL PROJECT STATUS - F14 - FINAL ESTIMATE SENT TO CONTRACTOR

ER-8910(940) DALE 5.49 % 07-002 HILTON COOPER 168,777 60 W 092 100 02-10-12 122,476 2,906.81 52,891 0 -46,301 -46,301

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

99-307-162-248-804 COFFEE SR-248 0.00 % 07-005 BULLARD 693,076 35 W 071 100 06-03-08 671,006 11.28 751,558 0 -22,070 -22,070

FINAL PROJECT STATUS - F11 - ACCEPTANCE OF FINAL QUANTITIES BY CONTRACTOR

EBF-0012(510) COFFEE 17.75 % 07-006 S.A. GRAHAM C 8,488,619 285 W 497 100 08-05-11 10,313,856 1,866,525.14 10,512,603 147,984 1,677,253 1,825,237

FINAL PROJECT STATUS - F11 - ACCEPTANCE OF FINAL QUANTITIES BY CONTRACTOR

BR-3419(200) 7TH DIV.CO SR#95 19.01 % 07-007 F & W CONS. C 3,713,947 421 C 189 100 08-29-07 3,387,854 697,696.63 3,668,430 -33,130 426,978 393,848

FINAL PROJECT STATUS - F14 - FINAL ESTIMATE SENT TO CONTRACTOR

MGF-0012(509) COFFEE SR 12 12.14 % 07-020 APAC-SOUTHEAS 8,835,474 461 C 172 100 05-30-08 9,578,183 1,150,284.26 9,469,862 42,850 699,859 742,709

FINAL PROJECT STATUS - F06 - AWAITING DOCUMENTATION FROM PROJECT/COUNTY ENGINEER

SRTS-SR11(916) COVINGTON VAR SIT 23.66 % 07-026 ROBBIE'S DOZE 120,864 60 W 047 100 11-06-12 129,902 32,893.77 138,993 500 8,338 8,838

FINAL PROJECT STATUS - F11 - ACCEPTANCE OF FINAL QUANTITIES BY CONTRACTOR

STPAA-HSIP-0134(504) DALE 12.92 % 07-049 LEWIS, INC. 1,213,352 45 W 084 100 06-01-12 1,180,196 204,969.31 1,585,542 0 -33,156 -33,156

FINAL PROJECT STATUS - F11 - ACCEPTANCE OF FINAL QUANTITIES BY CONTRACTOR

HRRR-3104(200) GENEVA 15.12 % 07-050 WIREGRASS CON 66,947 30 W 060 100 12-18-12 62,162 12,084.15 79,875 0 -4,785 -4,785

FINAL PROJECT STATUS - F11 - ACCEPTANCE OF FINAL QUANTITIES BY CONTRACTOR

BRF-0006(015) & STPOAF-0012(50 COVINGTON SR#12 17.29 % 07-052 BULLARD EXCAV 5,482,820 320 W 130 100 03-01-06 2,219,696 1,238,160.10 7,159,348 -5,865 149,583 143,718

FINAL PROJECT STATUS - F06 - AWAITING DOCUMENTATION FROM PROJECT/COUNTY ENGINEER

Page 53: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

NHF-0053(522) HOUSTON 12.13 % 07-053 WIREGRASS CON 13,671,828 310 W 097 100 08-17-11 14,038,689 2,104,034.79 17,337,944 0 366,861 366,861

FINAL PROJECT STATUS - F11 - ACCEPTANCE OF FINAL QUANTITIES BY CONTRACTOR

STPAA-0248(500) COFFEE 11.83 % 07-059 LEWIS, INC. 1,022,853 30 W 140 100 09-08-10 1,024,508 159,418.70 1,347,470 0 1,655 1,655

FINAL PROJECT STATUS - F11 - ACCEPTANCE OF FINAL QUANTITIES BY CONTRACTOR

SRTS-SR11(915) HENRY 0.00 % 07-061 GEISLER CONTR 115,307 60 W 062 100 07-31-13 105,484 .00 0 0 -9,823 -9,823

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

ACNU58539-ATRP(001) HOUSTON CR69 8.79 % 07-073 APAC MID-SOUT 1,926,645 35 W 100 100 06-20-13 1,972,681 186,493.16 2,119,309 0 33,189 33,189

FINAL PROJECT STATUS - F05 - DIVISION PERSONNEL CHECKING FINAL ESTIMATE DATA

NH-CN11(902) HOUSTON 44.81 % 07-078 BLANKENSHIP C 363,376 60 W 098 100 04-06-12 326,337 212,807.28 474,840 4,720 41,759 46,479

FINAL PROJECT STATUS - F11 - ACCEPTANCE OF FINAL QUANTITIES BY CONTRACTOR

STPNU-5506(200) PIKE 9.33 % 07-091 APAC MID-SOUT 990,222 45 W 091 100 03-06-12 276,785 110,344.57 1,181,449 0 -713,437 -713,437

FINAL PROJECT STATUS - F11 - ACCEPTANCE OF FINAL QUANTITIES BY CONTRACTOR

STPAA-0052(504) HOUSTON 14.15 % 07-101 W.S. NEWELL & 10,941,310 320 W 099 100 01-30-13 12,600,643 1,522,983.60 10,761,000 400,834 1,258,449 1,659,283

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

HSIP-0095(500) HOUSTON 1.07 % 07-102 LEWIS, INC., 345,359 30 W 100 100 06-02-09 303,355 366.80 34,216 0 -42,004 -42,004

FINAL PROJECT STATUS - F11 - ACCEPTANCE OF FINAL QUANTITIES BY CONTRACTOR

SRTS-SR11(914) COFFEE 0.00 % 07-106 ROBBIE'S DOZE 127,112 60 W 062 100 10-11-12 135,834 .00 0 8,060 662 8,722

FINAL PROJECT STATUS - F11 - ACCEPTANCE OF FINAL QUANTITIES BY CONTRACTOR

STPAA-HSIP-0010(525) BARBOUR 5.69 % 07-109 WIREGRASS CON 1,024,767 35 W 074 100 07-14-10 1,026,466 93,011.88 1,631,819 0 -673 -673

FINAL PROJECT STATUS - F15 - FINAL ESTIMATE SENT TO GENERAL OFFICE

STPOA-9412(600) HOUSTON PKWAY 13.59 % 07-111 APAC-SOUTHEAS 9,046,516 340 W 100 100 07-30-10 10,854,456 1,547,149.19 11,382,666 56,237 0 56,237

FINAL PROJECT STATUS - F11 - ACCEPTANCE OF FINAL QUANTITIES BY CONTRACTOR

Page 54: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

NH-HSIP-0001(572) BARBOUR SR 1 8.15 % 07-113 APAC MID-SOUT 3,639,464 95 W 091 100 06-11-13 3,010,668 371,145.79 4,549,634 0 -628,796 -628,796

FINAL PROJECT STATUS - F11 - ACCEPTANCE OF FINAL QUANTITIES BY CONTRACTOR

HSIP-0051(502) & COFFEE 0.00 % 07-114 WIREGRASS CON 1,787,316 55 W 098 100 07-17-09 2,148,845 29.20 885,390 7,567 353,962 361,529

FINAL PROJECT STATUS - F11 - ACCEPTANCE OF FINAL QUANTITIES BY CONTRACTOR

NH-0053(563) PIKE SR10/53 5.40 % 07-118 APAC MID-SOUT 4,605,871 90 W 081 100 06-04-13 4,524,068 325,861.20 6,025,517 0 -81,803 -81,803

FINAL PROJECT STATUS - F11 - ACCEPTANCE OF FINAL QUANTITIES BY CONTRACTOR

BHP-CN11(911) BARBOUR 12.45 % 07-121 GULF COAST 1,223,386 100 W 065 100 01-04-13 1,223,454 199,071.04 1,598,654 0 68 68

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

HSIP-CN12(906) BARBOUR VARIOUS 16.61 % 07-122 SURFACE 232,925 100 W 052 100 12-11-12 188,965 50,569.97 304,374 0 -43,960 -43,960

FINAL PROJECT STATUS - F11 - ACCEPTANCE OF FINAL QUANTITIES BY CONTRACTOR

STPNU-3400(207) HENRY 2.70 % 07-123 WIREGRASS 479,010 30 W 037 100 07-23-13 463,960 15,018.02 554,992 0 -15,050 -15,050

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

ACNU58228-ATRP(001) HENRY CR 65 1.18 % 07-125 APAC MID-SOUT 1,002,550 40 W 073 100 08-02-13 982,077 12,506.99 1,052,678 0 -20,473 -20,473

FINAL PROJECT STATUS - F04 - FINAL PLAN ASSEMBLY AND SUPPORTIND DATA RECEIVED BY DIV

STMOA-0001(543) HENRY 9.04 % 07-130 LEWIS, INC. 1,337,796 75 W 085 100 09-30-10 1,432,980 161,480.09 1,786,186 0 95,184 95,184

FINAL PROJECT STATUS - F11 - ACCEPTANCE OF FINAL QUANTITIES BY CONTRACTOR

ACNU58533-ATRP(001) COFFEE CR 606 3.58 % 07-133 WIREGRASS 969,013 30 W 083 100 08-12-13 929,527 36,513.54 1,017,463 0 -39,486 -39,486

FINAL PROJECT STATUS - F04 - FINAL PLAN ASSEMBLY AND SUPPORTIND DATA RECEIVED BY DIV

STMOA-STPOA-9414(601) HOUSTON 0.00 % 07-136 LEWIS, INC. 441,138 30 W 070 100 08-18-10 456,630 .00 148,127 0 -252,705 -252,705

FINAL PROJECT STATUS - F15 - FINAL ESTIMATE SENT TO GENERAL OFFICE

99-507-346-000-101 HENRY 8.54 % 07-138 F&W CONST. CO 394,076 120 W 135 100 10-25-12 288,114 38,708.92 453,187 0 -105,962 -105,962

FINAL PROJECT STATUS - F11 - ACCEPTANCE OF FINAL QUANTITIES BY CONTRACTOR

Page 55: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

ER-8910(927) HOUSTON 1.48 % 07-139 CARDWELL CORP 50,734 40 W 053 100 08-16-10 683,045 868.26 58,345 0 7,820 7,820

FINAL PROJECT STATUS - F15 - FINAL ESTIMATE SENT TO GENERAL OFFICE

ACNU58506-ATRP(001) BARBOUR CR-33 2.42 % 07-141 WIREGRASS 1,847,000 40 W 055 100 07-09-13 1,872,285 47,056.90 1,939,351 0 25,285 25,285

FINAL PROJECT STATUS - F11 - ACCEPTANCE OF FINAL QUANTITIES BY CONTRACTOR

ER-8910(926) GENEVA 24.66 % 07-143 CARDWELL CORP 455,678 70 W 094 100 01-05-11 437,793 163,590.95 663,216 0 -17,885 -17,885

FINAL PROJECT STATUS - F11 - ACCEPTANCE OF FINAL QUANTITIES BY CONTRACTOR

ER-8910(925) GENEVA 36.30 % 07-145 BURNETT CIVIL 114,102 30 W 097 100 02-08-11 98,730 52,055.70 143,390 0 -15,372 -15,372

FINAL PROJECT STATUS - F11 - ACCEPTANCE OF FINAL QUANTITIES BY CONTRACTOR

NH-0210(502) HOUSTON 6.25 % 07-146 APAC MID-SOUT 2,770,412 115 W 072 100 08-01-11 2,401,881 225,071.06 3,598,484 7,193 361,338 368,531

FINAL PROJECT STATUS - F11 - ACCEPTANCE OF FINAL QUANTITIES BY CONTRACTOR

STPAA-0006(550) BARBOUR SR-6 4.04 % 07-147 WIREGRASS CON 1,546,849 30 W 040 100 08-27-13 1,451,879 85,777.59 2,118,770 0 -94,970 -94,970

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

HSIP-0010(533) CRENSHAW 2.05 % 07-157 APAC MID-SOUT 1,996,777 65 W 038 100 09-18-12 1,786,489 48,287.30 2,349,143 0 -210,288 -210,288

FINAL PROJECT STATUS - F11 - ACCEPTANCE OF FINAL QUANTITIES BY CONTRACTOR

STPAA-HSIP-0053(555) HOUSTON 6.54 % 07-158 APAC MID-SOUT 2,641,069 85 W 087 100 05-03-12 2,574,622 225,810.16 3,451,203 0 -66,447 -66,447

FINAL PROJECT STATUS - F11 - ACCEPTANCE OF FINAL QUANTITIES BY CONTRACTOR

HSIP-0095(501) HOUSTON 1.60 % 07-159 APAC MID-SOUT 4,492,064 135 W 076 100 07-31-12 4,201,434 92,120.68 5,745,522 0 -290,630 -290,630

FINAL PROJECT STATUS - F11 - ACCEPTANCE OF FINAL QUANTITIES BY CONTRACTOR

99-307-234-053-101 DALE 0.16 % 07-161 WIREGRASS CON 3,667,425 100 W 076 100 12-18-12 4,210,402 6,579.01 4,053,293 247,787 295,190 542,977

FINAL PROJECT STATUS - F11 - ACCEPTANCE OF FINAL QUANTITIES BY CONTRACTOR

STPAA-HSIP-0010(530) HENRY 10.63 % 07-164 LEWIS, INC. 1,376,300 60 W 095 100 12-02-11 1,471,114 191,294.77 1,798,473 0 94,814 94,814

FINAL PROJECT STATUS - F11 - ACCEPTANCE OF FINAL QUANTITIES BY CONTRACTOR

Page 56: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

ER-8910(941) DALE 3.57 % 07-166 MCINNIS CONST 135,745 60 W 050 100 06-22-11 118,303 6,012.74 168,119 0 -17,442 -17,442

FINAL PROJECT STATUS - F14 - FINAL ESTIMATE SENT TO CONTRACTOR

HSIP-0134(503) HENRY 0.12 % 07-170 LEWIS, INC. 1,482,265 60 W 072 100 06-03-11 1,460,002 2,173.97 1,769,081 0 -22,263 -22,263

FINAL PROJECT STATUS - F11 - ACCEPTANCE OF FINAL QUANTITIES BY CONTRACTOR DIVISION TOTALS: 107,146,127 108,874,901 126,072,407 886,837 3,131,540 4,018,377 13,714,228.61

Page 57: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/27/13 CONSTRUCTION BUREAU RUN TIME--08.54.49 CONSTRUCTION STATUS REPORT PAGE 29 EIGHTH DIVISION

FINAL ESTIMATES ONLY

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 08-001 2.900 MI RESURFACING & TRAFFIC STRIPE ON CR-14 FROM UTSEY SMITH ROAD TO SR-17 IN GILBERTOWN; STNUE-100057522 (HOSEA O. WEAVER & SONS, INC.) STPNU-1203(201) CHOCTAW

08-004 0.103 MI. BRIDGE REPLACEMENT (BRIDGE CULVERT) AND APPROACHES ON CR 32 AT YANTLEY CREEK EAST BROPH-100047134 OF YANTLEY (GLASGOW CONSTRUCTION CO., INC.) GRBN1-100047134 ACGBBR-BR-1205(200) CHOCTAW CR 32

08-022 0.094 MI EMERGENCY SLIDE REPAIRS SR-69 SLIDE REP NEAR MP 8.000 FROM APP 0.8 MI N OF JACKSON CREEK ER96 -100053711 TO SOUTH OF MAYS CROSS ROADS; (SOUTHWEST ALABAMA CONSTURCTION, LLC) ER09S-100053711 ER-8910(906) CLARKE

08-032 0.227 MI SLIDE REPAIR ON SR-114 FROM 0.65 MILES WEST OF CR-11 TO 0.90 MILES WEST OF CR-11 IN STAAE-100055366 MYRTLEWOOD; (CARCEL & G. CONSTRUCTION, LLC) STPAA-0114(501) MARENGO

08-041 4.949 MI RESURFACING & TRAFFIC STRIPE ON CR-16 FROM CR-7 IN SWEET WATER TO SR-13 (US-43); STNUE-100056139 (S.T. BUNN CONSTRUCTION CO., INC.) STPNU-4603(200) MARENGO

08-043 0.946 MI BRIDGE REPLACEMENTS & APPROACHES ON SR-28AT CHICKASAW BOGUE CREEK & RELIEF EAST OF BROPE-100043702 THOMASTON; (NEWELL & BUSH, INC.) BR-0028(500) MARENGO

08-048 GUARDRAIL INSTALLATIONS AT BRIDGES ON SR-17, SR-69AND SR-21 AT SITES INDICATED BY PLANS; 99075-100056408 (H & L CONSTRUCTION, INC.) 99-508-690-000-121 MONROE

08-060 0.879 MI. BRIDGE REPLACEMENT (5 BRIDGE CULVERTS) & CR#24 OVER TRIBUTARIES OF FACTORY CREEK. GRBN1-100043657 ( GLASGOW CONSTRUCTION CO., INC. ) ACGBBRZ-CN03(219) SUMTER CR#24

08-066 0.425 MI. BRIDGE REPLACEMENTS (2 BRIDGE CULVERTS)& APPROACHES ON CR#5 AT THORNTON CREEK & AT PHELPS GRBN1-100044659 CREEK SOUTH OF CUBA. ( GLASGOW CONSTRUCTION CO., INC. ) ACGBBRZ-6000(201) SUMTER CR#5

08-076 5.686 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-13 (US-43) FROM MOBILE CO LINE (MP 30.146) TO HSIPE-100053107 MP 35.833 SOUTH OF MCINTOSH; (MOBILE ASPHALT COMPANY, LLC) NH04E-100053107 NH-HSIP-0013(578) WASHINGTON

Page 58: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/27/13 CONSTRUCTION BUREAU RUN TIME--08.54.49 CONSTRUCTION STATUS REPORT PAGE 30 EIGHTH DIVISION

FINAL ESTIMATES ONLY

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 08-093 11.358 MI PLANING, RESURFACING & TRAFFIC STRIPE ONSR-28 FROM E OF SR-5 (MP 65.851) NEAR CATHERINE TO STAAL-100052791 WEST OF SR-162 (MP 71.529) (ASPHALT CONTRACTORS, INC.) STPAA-0028(505) WILCOX

08-101 7.629 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR 7 (US 11) FROM N OF MALLARD DR IN YORK TO STOAE-100057538 THE SUCARNOOCHEE RIVER BRIDGE IN LIVINGSTON; S.T. BUNN CONSTRUCTION CO. INC. STPOA-0007(530) SUMTER SR 7

08-120 0.343 MI TURN LANES (GRADE, DRAINAGE & PAVEMENT) ON SR-13 (US-43) AT THOMASVILLE SOUTH INDUSTRIAL GSPH5-100051693 PARK ACCESS ROAD IN THOMASVILLE (S. A. GRAHAM CO.,) DE-AL84(915) CLARKE

08-124 7.005 MI RESURFACING, TRAFFIC STRIPE & CULVERT EXTENSIONS ON CR-27 FROM MISSISSIPPI LINE TO CR-2 HSIPR-100053744 & ON CR-2 FROM CR-27 TO SR-7 (US-11) IN YORK; (S.T. BUNN CONSTRUCTION COMPANY) STNUL-100053744 STMNU-STPNU-HRRR-6020(200) SUMTER

08-146 4.500 MI FULL DEPTH RECLAMATION, RESURFACING AND TRAFFICS TRIPE ON CR-85 FROM CR-35 TO CR-34 AT STOAE-100056590 WARSAW; (THE MILLER PAVING GROUP, INC. STPOA-6021(200) SUMTER

08-149 6.196 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-12 (US-84) FROM CR-35 TO THE MONROE CO LINE; 99803-100055602 (HOSEA O. WEAVER & SONS, INC.) 99-308-134-012-111 CLARKE

08-159 FERRY TERMINAL, PAVILION & PARKING FOR THE GEE'S BEND FERRY (2 SITES) NORTH OF CAMDEN AT THE FBDFC-100054114 ALABAMA RIVER; (CORNERSTONE CIVIL CONTRACTORS, LLC) FBD-CN10(928) WILCOX

Page 59: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

STPNU-1203(201) CHOCTAW 3.31 % 08-001 HOSEA O. WEAV 581,125 30 W 040 100 05-31-12 564,446 23,019.05 693,350 0 0 0

FINAL PROJECT STATUS - F06 - AWAITING DOCUMENTATION FROM PROJECT/COUNTY ENGINEER

ACGBBR-BR-1205(200) CHOCTAW CR 32 3.29 % 08-004 GLASGOW CONST 533,883 45 W 084 100 09-05-06 445,239 19,297.82 585,710 0 0 0

FINAL PROJECT STATUS - F09 - DISPUTED FINAL QUANTITIES BY CONTRACTOR

ER-8910(906) CLARKE 94.78 % 08-022 SOUTHWEST AL 117,585 30 W 043 100 11-20-09 229,940 71,674.03 75,620 10,000 0 10,000

FINAL PROJECT STATUS - F15 - FINAL ESTIMATE SENT TO GENERAL OFFICE

STPAA-0114(501) MARENGO 19.62 % 08-032 CARCEL & G CO 872,825 90 W 100 100 12-31-11 975,169 223,778.84 1,140,560 0 0 0

FINAL PROJECT STATUS - F09 - DISPUTED FINAL QUANTITIES BY CONTRACTOR

STPNU-4603(200) MARENGO 2.02 % 08-041 S.T. BUNN CON 858,019 30 W 073 100 09-08-11 799,698 22,748.63 1,121,212 0 0 0

FINAL PROJECT STATUS - F08 - FINAL QUAN. FURNISHED TO CONTR. WITH REQUEST FOR DOCUM.

BR-0028(500) MARENGO 15.58 % 08-043 NEWELL & BUSH 3,404,573 190 W 104 100 08-31-12 3,335,379 693,364.44 4,448,908 4,346 0 4,346

FINAL PROJECT STATUS - F15 - FINAL ESTIMATE SENT TO GENERAL OFFICE

99-508-690-000-121 MONROE 34.24 % 08-048 H & L CONSTRU 183,428 30 W 090 100 06-07-12 178,986 90,066.99 263,046 0 0 0

FINAL PROJECT STATUS - F15 - FINAL ESTIMATE SENT TO GENERAL OFFICE

ACGBBRZ-CN03(219) SUMTER CR#24 9.47 % 08-060 GLASGOW CONS. 948,190 365 C 104 100 08-05-05 921,812 100,030.33 1,056,231 27,048 0 27,048

FINAL PROJECT STATUS - F14 - FINAL ESTIMATE SENT TO CONTRACTOR

ACGBBRZ-6000(201) SUMTER CR#5 8.03 % 08-066 GLASGOW CONST 497,473 180 C 109 100 05-08-05 458,502 44,505.40 554,157 0 -19,865 -19,865

FINAL PROJECT STATUS - F14 - FINAL ESTIMATE SENT TO CONTRACTOR

NH-HSIP-0013(578) WASHINGTON 6.40 % 08-076 MOBILE ASPHAL 1,690,694 60 W 075 100 03-21-13 1,842,618 141,530.24 2,209,306 0 0 0

FINAL PROJECT STATUS - F08 - FINAL QUAN. FURNISHED TO CONTR. WITH REQUEST FOR DOCUM.

Page 60: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

STPAA-0028(505) WILCOX 0.82 % 08-093 ASPHALT CONTR 1,472,908 30 W 150 100 11-30-10 1,503,221 15,544.57 1,894,753 1,644 0 1,644

FINAL PROJECT STATUS - F15 - FINAL ESTIMATE SENT TO GENERAL OFFICE

STPOA-0007(530) SUMTER SR 7 7.33 % 08-101 S.T. BUNN 1,822,896 40 W 100 100 11-16-12 1,704,239 174,794.91 2,382,061 0 0 0

FINAL PROJECT STATUS - F13 - REQESTED DOCUMENTATION FROM DIST./PROJ/COUNTY ENGINEER

DE-AL84(915) CLARKE 19.78 % 08-120 S.A. GRAHAM C 361,150 60 W 122 100 12-05-08 430,120 91,834.80 464,056 527 0 527

FINAL PROJECT STATUS - F13 - REQESTED DOCUMENTATION FROM DIST./PROJ/COUNTY ENGINEER

STMNU-STPNU-HRRR-6020(200) SUMTER 3.33 % 08-124 S.T. BUNN CON 1,022,681 45 W 102 100 07-30-10 869,983 27,007.00 808,815 2,322 0 2,322

FINAL PROJECT STATUS - F13 - REQESTED DOCUMENTATION FROM DIST./PROJ/COUNTY ENGINEER

STPOA-6021(200) SUMTER 2.83 % 08-146 THE MILLER PA 1,016,767 60 W 060 100 08-31-12 1,023,888 30,313.80 1,067,606 0 0 0

FINAL PROJECT STATUS - F08 - FINAL QUAN. FURNISHED TO CONTR. WITH REQUEST FOR DOCUM.

99-308-134-012-111 CLARKE 2.65 % 08-149 HOSEA O WEAVE 1,418,443 45 W 078 100 05-18-12 1,451,196 55,551.25 2,091,566 0 0 0

FINAL PROJECT STATUS - F12 - AWAITING DOCUMENTATION FROM CONTRACTOR

FBD-CN10(928) WILCOX 25.96 % 08-159 SMITHERMAN BR 1,258,129 1611 D 100 100 12-16-11 1,238,359 328,688.78 1,265,800 0 0 0

FINAL PROJECT STATUS - F15 - FINAL ESTIMATE SENT TO GENERAL OFFICE DIVISION TOTALS: 18,060,769 17,972,795 22,122,757 45,887 -19,865 26,022 2,153,750.88

Page 61: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/27/13 CONSTRUCTION BUREAU RUN TIME--08.54.49 CONSTRUCTION STATUS REPORT PAGE 31 NINTH DIVISION

FINAL ESTIMATES ONLY

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 09-002 3.653 MI GRADE, DRAIN, PAVEMENT, SIGNALS, RUST REMOVAL AND BRIDGE ON CR-83 FROM US-90 TO CR-64 HPPL2-100048106 NE OF ROBERTSDALE; (HOSEA O. WEAVER & SONS, INC.) HPPH2-100048106 HPP-STPAA-STPNU-RECA-1702(905)BALDWIN

09-006 7.587 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-42 (US-98) FROM D'OLIVE CREEK THRU DAPHNE TO STAAE-100054094 SR-104; (ROADS, INC. OF NWF) STPAA-0042(519) BALDWIN

09-007 7.215 MI RESURFACING AND TRAFFIC STRIPE ON CR-32 FROM SR-59 IN SUMMERDALE TO CR-87; STOAC-100054730 (ROADS, INC. OF NWF) STMOA-STPOA-0210(200) BALDWIN

09-027 0.981 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR 42 (US 98) FROM SR 16 (US 90) TO I 10 IN EBSPE-100058287 SPANISH FORT; HOSEA O. WEAVER & SONS, INC. EB-0042(523) BALDWIN SR 42

09-028 6.057 MI PLANING, RESURFACING & TRAFFIC STRIPE ON I-65 FROM GUNNISON CREEK (MP 19.923) IN CREOLA TO IM04E-100049177 NORTH OF SR-226 (MP 32.054); (HOSEA O. WEAVER & SONS, INC.) IM-I065(398) BALDWIN

09-029 4.071 MI ADDITIONAL LANES (GRADE, DRAINAGE, SIGNAL& PAVEMENT) ON SR-181 FROM CR-64 TO SOUTH OF SR-16 L24AC-100044795 (US-90) SOUTH OF MALBIS; (MOBILE ASPHALT COMPANY, LLC) ACSTPAA-0181(500) BALDWIN

09-035 5.909 MI RESURFACING & TRAFFIC STRIPE ON CR-42 FROM BEULAH ROAD TO EVERGREEN CITY LIMITS; EBSPE-100055676 (WIREGRASS CONSTRUCTION CO., INC.) EB-1801(202) CONECUH

09-036 4.346 MI PASSING LANES (GRADE, DRAINAGE & PAVEMENTON SR-41 AT VARIOUS LOCATIONS BETWEEN BREWTON AND STAAR-100051624 I-65 AS INDICATED BY PLANS; (HOSEA O. WEAVER & SONS, INC.) STPAA-0041(506) CONECUH

09-042 0.575 MI SIDEWALK, CROSSWALKS AND SIGNING ALONG US 31 AND N SHIPP ST IN EVERGREEN AT SITES AS SRIE1-00057450 INDICATED BY THE PLANS; CTS CONSTRUCTION CO. INC SRTS-SR12(914) CONECUH US 31

09-043 4.738 MI RESURFACING AND TRAFFIC STRIPE ON CR 20 FROM CR 5 IN BERMUDA TO CR 15; MOBILE ASPHALT STOAE-100058198 CO. LLC STPOA-1809(201) CONECUH CR 20

Page 62: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/27/13 CONSTRUCTION BUREAU RUN TIME--08.54.49 CONSTRUCTION STATUS REPORT PAGE 32 NINTH DIVISION

FINAL ESTIMATES ONLY

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 09-050 2.849 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR 3 (US 31) FROM BURNT CORN CREEK TO N OF STAAE-100057472 TIGER DR (MP 71.909) IN BREWTON; HOSEA O. WEAVER & SONS, INC. STPAA-0003(569) ESCAMBIA SR 3

09-061 2.698 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR21 FROM N OF MAGNOLIA ST IN ATMORE (MP 0.967) STOAE-100057889 TO THE BEGINNING OF THE FOUR-LANE SECTION (MP 3.665); HOSEA O. WEAVER & SONS, INC. STPOA-0021(537) ESCAMBIA SR 21

09-062 BRIDGE COATING ON SR-15 (US-29) AT MURDER CREEK INBREWTON; ADELPHI, INC. 99005-100058830

99-509-273-015-207 ESCAMBIA SR-15

09-066 1.338 MI CULVERT EXTENSIONS AND SLIDE REPAIRS ON I-65 AT VARIOUS LOCATIONS INDICATED BY THE PLANS; L24AC-100055836 (WALKER PATTON COMPANY, INC.) ER-8930(917) ESCAMBIA

09-067 2.365 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-41 FROM SR-3 (US-31) IN BREWTON TO NORTH OF STAAE-100057569 BURNT CORN CREEK (MP 10.161); (HOSEA O. WEAVER & SONS, INC.) STPAA-0041(507) ESCAMBIA

09-085 MAINTENANCE ROADSIDE MOWING AT SITES I-10, I-165 & AS INDICATED ON THE PLANS. 99054-100044548 ( BENTLEY TURF & LANDSCAPE, INC. ) 99-409-491-000-450 MOBILE SITES

09-088 0.719 MI BRIDGE REPLACEMENT (WBR) AND APPROACHES ON SR-158 AT CHICKASAW CREEK IN PRICHARD; BROPL-100049577 (RACON, INC.) BRF-0158(501) MOBILE

09-090 99-309-491-665-105; 12.812 MI PLANING, RESURFACING& TRAFFIC STRIPE ON I-65 E & W SERVICE RDS FROM HSIPE-100051727 SR-42 (US-98) TO SR-17 (US-45) & FROM SR-16 (US-90TO SR-17 IN PRICHARD; (HOSEA O. WEAVER & SONS) 99903-100056579 HSIP-CN11(905) MOBILE

09-101 3.126 MI SIDEWALK ALONG VARIOUS STREETS IN SUMMERDALE AT SITES AS INDICATED BY THE PLANS; SRIL-100054647 JOHN G. WALTON CONSTRUCTION CO. INC. SRTS-SR10(903) BALDWIN SIDEWAL

09-102 0.937 MI SIDEWALK, TRAFFIC CONTROL MARKINGS AND SIGNS ALONG FAIRWOOD BLVD, JAN DRIVE AND MARSIM SRIR1-00057441 DRIVE IN FAIRHOPE AT SITES AS INDICATED BY THE PLANS; PEAVY CONSTRUCTION COMPANY, INC. SRTS-SR12(904) BALDWIN

Page 63: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/27/13 CONSTRUCTION BUREAU RUN TIME--08.54.49 CONSTRUCTION STATUS REPORT PAGE 33 NINTH DIVISION

FINAL ESTIMATES ONLY

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 09-109 11.814 MI RESURFACING AND TRAFFIC STRIPE ON SR 59 FROM CR 80 (DANNY HILL RD) THROUGH BLACKSHER TO STOAE-100057885 THE LITTLE RIVER BRIDGE; MOBILE ASPHALT CO. INC STPOA-0059(509) BALDWIN SR 59

09-113 SIDEWALKS, CROSSWALKS AND PEDESTRIAN BRIDGE ALONG HIGHPOINT BLVD AT INDIAN SPRINGS ELEMENTARY SCHOOL SRIE1-00054657 IN PRICHARD; JOHN G. WALTON CONSTRUCTION CO. INC SRTS-SR10(913) MOBILE CR 91

09-120 0.191 MI BRIDGE REPLACEMENT AND APPROACHES ON MICHIGAN AVENUE AT THE CSX RAILROAD IN MOBILE; STMBC-100053516 (L & A CONTRACTING COMPANY) STMMB-7507(600) MOBILE

09-127 6.210 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-16 (US-90) FROM SR-181 (MP 48.091) TO SR-59 STAAM-100058771 IN LOXLEY; MOBILE ASPHALT COMPANY, LLC STPAA-0016(512) BALDWIN SR-16

09-130 2.232 ADDITIONAL LANES (GRADE, DRAINAGE, PAVEMENT & SIGNALS) ON OLD SHELL ROAD FROM SCHILLINGER ROAD STAAL-100007704 TO HILLCREST ROAD IN MOBILE; (HOSEA O. WEAVER & SONS, INC.) STMBL-100007704 STPAA-STPMB-7535(601) MOBILE

09-136 9.147 MI PLANING, RESURFACING & TEMPORARY TRAFFIC STRIPE ON SR-59 FROM SR-287 IN BAY MINETTE TO CR- STAAE-100057474 21 (BRYANT LANDING RD) IN STOCKTON; (MOBILE ASPHALT COMPANY, LLC) STPAA-0059(507) BALDWIN

09-137 0.990 MI WIDENING (GRADE, DRAIN, PAVEMENT) ON MOBILE STREET/FILLINGIM STREET FROM SPRINGHILL AVE STAAE-100037281 TO STANTON ROAD IN MOBILE; (FRANK TURNER CONSTRUCTION CO., INC.) STPAA-7531(600) MOBILE

09-141 0.676 MI CONCRETE SIDEWALK INSTALLATION ALONG CR 71 & SR 16 (US 90) IN ROBERTSDALE AT SITES AS INDI SRIL -100055995 CATED BY THE PLANS. H & L CONSTRUCTION, INC., P.O.BOX 243, TROY, AL 36079 SRTS-SR11(903) BALDWIN CR 71

Page 64: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

HPP-STPAA-STPNU-RECA-1702(905) BALDWIN 9.13 % 09-002 HOSEA O WEAVE 10,984,893 740 C 122 100 09-30-13 13,762,012 722,835.63 7,912,031 56,163 3,337,541 3,393,704

FINAL PROJECT STATUS - -

STPAA-0042(519) BALDWIN 6.55 % 09-006 ROADS, INC. O 3,045,434 75 W 107 100 09-30-12 3,126,426 260,688.95 3,979,606 16,950 60,826 77,776

FINAL PROJECT STATUS - F09 - DISPUTED FINAL QUANTITIES BY CONTRACTOR

STMOA-STPOA-0210(200) BALDWIN 49.45 % 09-007 ROADS,INC. OF 1,528,731 45 W 100 100 01-27-11 1,683,598 131,055.60 265,000 0 6,706 6,706

FINAL PROJECT STATUS - F09 - DISPUTED FINAL QUANTITIES BY CONTRACTOR

EB-0042(523) BALDWIN SR 42 14.48 % 09-027 HOSEA O. WEAV 467,703 30 W 100 100 04-16-13 438,027 82,775.18 571,310 0 28,978 28,978

FINAL PROJECT STATUS - F08 - FINAL QUAN. FURNISHED TO CONTR. WITH REQUEST FOR DOCUM.

IM-I065(398) BALDWIN 5.75 % 09-028 HOSEA O WEAVE 8,644,876 111 D 100 100 08-08-12 9,011,011 649,764.46 11,296,648 33,348 369,453 402,801

FINAL PROJECT STATUS - F08 - FINAL QUAN. FURNISHED TO CONTR. WITH REQUEST FOR DOCUM.

ACSTPAA-0181(500) BALDWIN 0.27 % 09-029 MOBILE ASPHAL 12,669,867 370 W 096 100 01-02-13 15,639,656 44,892.54 16,078,476 847,974 2,939,789 3,787,763

FINAL PROJECT STATUS - F14 - FINAL ESTIMATE SENT TO CONTRACTOR

EB-1801(202) CONECUH 9.62 % 09-035 WIREGRASS CON 679,453 30 W 080 100 05-04-11 711,304 78,016.54 810,667 0 38,999 38,999

FINAL PROJECT STATUS - F15 - FINAL ESTIMATE SENT TO GENERAL OFFICE

STPAA-0041(506) CONECUH 15.92 % 09-036 HOSEA O. WEAV 3,127,909 140 W 100 100 10-31-12 31,931,460 650,911.26 4,087,380 0 79,825 79,825

FINAL PROJECT STATUS - F09 - DISPUTED FINAL QUANTITIES BY CONTRACTOR

SRTS-SR12(914) CONECUH US 31 0.00 % 09-042 CTS CONSTRUCT 96,842 45 W 084 100 12-31-12 89,195 .00 0 0 4,829 4,829

FINAL PROJECT STATUS - F08 - FINAL QUAN. FURNISHED TO CONTR. WITH REQUEST FOR DOCUM.

STPOA-1809(201) CONECUH CR 20 6.01 % 09-043 MOBILE ASPHAL 398,055 40 W 085 100 12-31-12 407,051 28,573.03 474,925 0 10,388 10,388

FINAL PROJECT STATUS - F08 - FINAL QUAN. FURNISHED TO CONTR. WITH REQUEST FOR DOCUM.

Page 65: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

STPAA-0003(569) ESCAMBIA SR 3 11.24 % 09-050 HOSEA O. WEAV 717,488 40 W 095 100 03-31-13 698,764 99,127.33 881,676 16,250 15,704 31,954

FINAL PROJECT STATUS - F08 - FINAL QUAN. FURNISHED TO CONTR. WITH REQUEST FOR DOCUM.

STPOA-0021(537) ESCAMBIA SR 21 10.43 % 09-061 HOSEA O. WEAV 618,496 30 W 113 100 02-21-13 639,699 79,968.10 766,189 0 73,403 73,403

FINAL PROJECT STATUS - F08 - FINAL QUAN. FURNISHED TO CONTR. WITH REQUEST FOR DOCUM.

99-509-273-015-207 ESCAMBIA SR-15 0.15 % 09-062 ADELPHI, INC. 221,554 50 W 052 100 04-30-13 221,203 365.34 238,171 0 0 0

FINAL PROJECT STATUS - F14 - FINAL ESTIMATE SENT TO CONTRACTOR

ER-8930(917) ESCAMBIA 0.21 % 09-066 WALKER PATTON 1,794,180 1512 D 115 100 06-28-13 1,831,642 5,029.10 2,344,535 -150 57,689 57,539

FINAL PROJECT STATUS - F05 - DIVISION PERSONNEL CHECKING FINAL ESTIMATE DATA

STPAA-0041(507) ESCAMBIA 0.00 % 09-067 HOSEA O WEAVE 779,846 50 W 100 100 10-31-12 770,273 .00 13,782 6,895 40,154 47,049

FINAL PROJECT STATUS - F08 - FINAL QUAN. FURNISHED TO CONTR. WITH REQUEST FOR DOCUM.

99-409-491-000-450 MOBILE SITES 0.00 % 09-085 BENTLEY TURF 204,096 100 W 053 100 12-16-05 404,096 .00 404,852 0 0 0

FINAL PROJECT STATUS - F15 - FINAL ESTIMATE SENT TO GENERAL OFFICE

BRF-0158(501) MOBILE 14.03 % 09-088 RACON, INC. 3,607,127 240 W 103 100 05-31-13 3,547,026 661,465.43 4,713,595 -18,371 252,643 234,272

FINAL PROJECT STATUS - F03 - FINAL QUANTITIES BEING PREPARED BY PROJ./CO. ENGINEER

HSIP-CN11(905) MOBILE 0.35 % 09-090 HOSEA O. WEAV 2,528,244 90 W 086 100 09-14-12 2,515,009 13,126.53 3,676,710 -29,145 -13,234 -42,379

FINAL PROJECT STATUS - F15 - FINAL ESTIMATE SENT TO GENERAL OFFICE

SRTS-SR10(903) BALDWIN SIDEWAL 0.00 % 09-101 JOHN G WALTON 456,252 90 W 091 100 11-13-12 449,499 .00 0 3,820 0 3,820

FINAL PROJECT STATUS - F08 - FINAL QUAN. FURNISHED TO CONTR. WITH REQUEST FOR DOCUM.

SRTS-SR12(904) BALDWIN 0.00 % 09-102 PEAVY CONSTRU 132,638 45 W 100 100 02-25-13 110,342 .00 0 0 -22,296 -22,296

FINAL PROJECT STATUS - F08 - FINAL QUAN. FURNISHED TO CONTR. WITH REQUEST FOR DOCUM.

STPOA-0059(509) BALDWIN SR 59 6.68 % 09-109 MOBILE ASPHAL 1,094,710 40 W 090 100 01-03-13 1,091,779 89,457.88 1,337,213 0 9,291 9,291

FINAL PROJECT STATUS - F14 - FINAL ESTIMATE SENT TO CONTRACTOR

Page 66: REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF · PDF filereport nbr-hdcs0002 ... 01-071 apac mid-sout 881,408 90 w 096 100 09-01-11 894,065 13,884.59 727,055 6,727 12,657 19,384 final

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

SRTS-SR10(913) MOBILE CR 91 0.00 % 09-113 JOHN G. WALTO 116,450 40 W 045 100 01-31-13 125,543 .00 0 0 9,098 9,098

FINAL PROJECT STATUS - F08 - FINAL QUAN. FURNISHED TO CONTR. WITH REQUEST FOR DOCUM.

STMMB-7507(600) MOBILE 23.89 % 09-120 L&A CONTRACTI 3,683,002 331 W 104 100 03-31-13 4,114,471 856,345.52 3,583,781 605,811 752,473 1,358,284

FINAL PROJECT STATUS - F08 - FINAL QUAN. FURNISHED TO CONTR. WITH REQUEST FOR DOCUM.

STPAA-0016(512) BALDWIN SR-16 3.44 % 09-127 MOBILE ASPHAL 982,330 45 W 096 100 09-30-13 984,411 51,732.11 1,502,838 0 3,765 3,765

FINAL PROJECT STATUS - -

STPAA-STPMB-7535(601) MOBILE 12.78 % 09-130 HOSEA O. WEAV 9,800,570 363 W 088 100 10-04-11 12,529,393 1,518,441.33 11,874,332 286,184 2,101,312 2,387,496

FINAL PROJECT STATUS - F08 - FINAL QUAN. FURNISHED TO CONTR. WITH REQUEST FOR DOCUM.

STPAA-0059(507) BALDWIN 15.24 % 09-136 MOBILE ASPHAL 2,045,951 65 W 100 100 04-05-13 2,187,432 381,027.03 2,499,175 0 84,773 84,773

FINAL PROJECT STATUS - F08 - FINAL QUAN. FURNISHED TO CONTR. WITH REQUEST FOR DOCUM.

STPAA-7531(600) MOBILE 23.75 % 09-137 FRANK TURNER 2,661,464 190 W 099 100 06-01-12 2,852,853 772,165.96 3,251,038 26,169 161,429 187,598

FINAL PROJECT STATUS - F12 - AWAITING DOCUMENTATION FROM CONTRACTOR

SRTS-SR11(903) BALDWIN CR 71 4.29 % 09-141 H & L CONSTRU 132,671 45 W 109 100 12-31-12 130,000 5,834.86 135,835 10,790 14,318 25,108

FINAL PROJECT STATUS - F08 - FINAL QUAN. FURNISHED TO CONTR. WITH REQUEST FOR DOCUM. DIVISION TOTALS: 73,220,832 112,003,175 82,699,765 1,862,688 10,417,856 12,280,544 7,183,599.71

STATE WIDE TOTALS: ORIGINAL CONTRACT AMOUNT 824,397,653 AMOUNT PERFORMED TO DATE 934,142,042 E & I CHARGED TO DATE 101,902,479.77 TOTAL CONTRACT BUDGET 961,459,678 SUPPLEMENTAL AGREE 17,225,907 ITEM AND OTHER 34,275,984 TOTAL CONTRACT O/U RUN 51,501,891