  • 8/21/2019 Report (Hamza Abdallat)

    1/35

    Table of content

    Ch 1:

    Introduction

    1.1project

    31.2Training schedule

    .4

    Ch 2:

    Company prole

    2.1company

    prole

    Ch 3:

    !etailed !escription of the Training

    3.1

    "afety

    ..#

    3.2

    slab

    ...$.

    3.2.1shutter of

    slab..$

  • 8/21/2019 Report (Hamza Abdallat)

    2/35

    3.2.2le%el

    sca&olding...'

    3.2.3

    (einforcement

    ..'

    3.3Chec)s before

    concreting...12

    3.4Testing before

    concreting..12

    3.compacting of

    concrete.14

    3.6po*er +oat

    concrete.1

    3.7curing of

    concrete..1#

    3.8sin)ing

    slab.1,

    3.9construction

    joint..1$

    3.10-pansion

    joint....1'

    3.11

    columns.

    21

    3.11.1(einforcement ..21

  • 8/21/2019 Report (Hamza Abdallat)

    3/35

    3.11.2lap length

    21

    3.11.3"pacing bet*een bars..

    .22

    3.11.4shutter of

    column..22

    3.11.5chec)s .

    .23

    3.11.6place concrete....24

    3.11.7dead column.

    24

    3.12segregation.

    2

    3.13"hear *all.

    .2#

    3.14/aterproong..

    .2,

    Ch4

    Conclusion.2$

    Ch1 Introduction:

  • 8/21/2019 Report (Hamza Abdallat)

    4/35

    0roject:11.

    The project called Seraje and locate in Abdalli Amman , which

    executed by Omar Abu Saad contracting company.

    Which conited !rom three building with Total Area "#$%

    m&',

    The project di(ided to !our part A1,A',A#,A"

    )igure *1 +

    ach part ha(e area a !ollowing:

    Area o! A1 - 1"%% m&'

    Area o! A' -1.%% m&'

    Area o! A# - .$% m&'

    Area o! A" - /%% m&'

  • 8/21/2019 Report (Hamza Abdallat)

    5/35

    A10 A' !orm one building, which eparate between two part

    contruction joint, and eparate between three building

    xpanion joint.

    A10A' conit !rom ix torey underground ued a garage !orcar and eight

    Storey abo(e ground ued a Store, Shop, oce.

    A# conit !rom ix torey underground ued a garage !or car

    and twenty one Storey abo(e ground ued a 2otel.

    A" conit !rom ix torey underground ued a garage !or car

    and eight

    Storey abo(e ground ued a Apartment.

    Training "chedule:

    in the 3rt 4 wa trained about how to reading engineering

    plan , then the 5ublic Sa!ety Ocer guide me about a!ety

    be!ore enter the project ite , and ga(e to me 5ublic a!etyclothing, and gi(e me ome o! intruction about a!ety.

    in the ite 4 tart with blac6mith ,and con!ormity

    7ein!orcement in the ite according 7ein!orcement plan.

    Then 4 learned how to contruct hutter and how the ite

    engineer recei(e the !ormwor6 !rom 8arpenter.

    Then 4 tart mo(e in the ite widely, and 6now problem whichhappen in the ite

  • 8/21/2019 Report (Hamza Abdallat)

    6/35

    Company prole:

    Omar Abu Saad and sons contracting company is aJordanian Company registered as a first grade contractor in the fields of

    buildings

    Ever since it started operating in 197! Omar Abu Saad and sons contracting

    company has gro"n to assume a leading role in the field of construction for the

    #uality and timely completion of its pro$ects%

    Omar Abu Saad and sons contracting companywa !ounded in 1/9% in

    Amman ordan

    Today, the company ha grown to become a leading player in

    the growing ucce; o(er the year i the outcome o! a deep

    commitment to the core principle o! deli(ering project the

    highet tandard, on time Some o!

    thee

    5roject ha(e been technically dicult, but 88 ha the

    experience, 6now?how and ophitication to implement them.

    Omar Abu Saad and sons contracting companypoee a (eratility

    that ha been made poible by it highly pro!eional team o!

    manager, engineer, conultant, 6illed wor6er and general

    ta@.

    .-The company ha(e project in ead ea , Amman ,

    A

  • 8/21/2019 Report (Hamza Abdallat)

    7/35

    Chapter 3

    3.1"afety

    Construction sites can be a very dangerous environment to be in with

    many opportunities for injury or fatality. With high voltage areas, debris

    and heavy equipment in the area, its important to ma!e sure that

    construction wor!ers and anyone in or near the construction site are

    made aware of the.

    "ll employees should be trained to understand the proper way to use

    safety systems and to identify ha#ards. $he employee or employer will

    be responsible for providing fall protection systems and to ensure the

    use of safety systems.

  • 8/21/2019 Report (Hamza Abdallat)

    8/35

  • 8/21/2019 Report (Hamza Abdallat)

    9/35

    %igure &' ( %igure &) (

    %igure &* (

  • 8/21/2019 Report (Hamza Abdallat)

    10/35

    "lab3.2

    A hallow, rein!orced?concrete tructural member that i (ery

    wide compared with depth> Spanning between beam, girder,

    or column, lab are ued !or Coor, roo!, and bridge dec6> 4!

    they are cat integrally with beam or girder, they may be

    conidered the top Cange o! thoe member and act with thema a T beam , ta6e the load directly !rom the Coor and

    tranmit it to the beam or to the column.

    Shutter of slabs:3.2.1

    )ormwor6 i a temporary tructural ytem, which pro(ide the

    caing and upporting to the wet concrete to get the re 4t hould be tabled with the weight o! the concrete,

    rein!orcement, and other li(e load during the contruction and

    compacting o! concreting.

    figure&'( figure&)(

  • 8/21/2019 Report (Hamza Abdallat)

    11/35

    *igure&1(

    *igure &7( figure&+(

  • 8/21/2019 Report (Hamza Abdallat)

    12/35

    )igure *.+

    4n Seraje project wa ued ca@olding to upport !air?!aced !orm

    wor6

    -the ca@olding imulate column, the ca@olding braced by

    ledger and tranom

    -the ca@olding carried main o6a, which carry econdary

    o6a, which carry )air?!aced

    Level scaffolding:

  • 8/21/2019 Report (Hamza Abdallat)

    13/35

    figure &9 ( figure&1 (

    Surveyor use leveling instruments to chec, form"or, "hich have true height

    and have the same level

  • 8/21/2019 Report (Hamza Abdallat)

    14/35

    *igure &11(

    All slabs built by situ-cast concrete ! the strength of conceret used in slabs is

    . /pa%

    REINFORE!EN"

    Steel rein!orcement are ued, generally, in the !orm o!

    bar o! circular cro ection in concrete tructure> They

    are li6e a 6eleton in human body> 5lain concretewithout teel or any other rein!orcement i trong in

    compreion but wea6 in tenion> Steel i one o! the

    bet !orm o! rein!orcement, to ta6e care o! thoe

    tree and to trengthen concrete to bear all 6ind o!

    load

  • 8/21/2019 Report (Hamza Abdallat)

    15/35

    hec#s before concreting:

    1-7ein!orcement wor6 mut be properly completed

    according to the drawing, uch a pacing o!rein!orcement bar, anchorage length and diameter o!

    rein!orcement bar.'-But be made ure that !ormwor6 i properly

    upported)-)ormwor6 mut be clean and !ree !rom impuritie

    testing before concreting0

    1-slu$% test:

  • 8/21/2019 Report (Hamza Abdallat)

    16/35

    figure &12 ' figure&13 '

    -the cone wa 3lled in three layer , e(ery layer occupy 1D# o!

    cone , and a!ter 3ll e(ery layer , wa ued metal rod which

    tri6e e(ery layer '. time.

    Wait to concrete topped motion-

    -Eay a traight edge acro the top o! the lump cone> Beaure

    the amount o! lump in inche !rom the bottom o! the traight

    edge to the top o! the lumped concrete.

    '-ta)e temperature of concrete

  • 8/21/2019 Report (Hamza Abdallat)

    17/35

    3gure *1" +

    be!ore concreting, mut be ta6en temperature o! concrete and

    mut not exceed #' 8eliu.

    )-ta)e cubes from concrete

  • 8/21/2019 Report (Hamza Abdallat)

    18/35

    )igure *1. +

    wa ta6en cube !rom concrete be!ore concreting , and curing

    cube a!ter 1day

    in laboratory by uing water , then tet itF trength

    a!ter # day , 9 day,'G day

    Compacting of concrete:

    )igure *1$+

    3gure *19 +The remo(al o! entrapped air

    during production o! concrete and

    the uni!orm, dene arrangement

    o! the contituent o! concrete

    are e@ected during the

    compacting > The denity

    cone 8oncrete

    hould be thoroughly compacted

    during the operation o! placing.

    wa ued in project pipe with '.

    mm diameter to achie(e co(er

    lab-a hown in 3gure& (

  • 8/21/2019 Report (Hamza Abdallat)

    19/35

    0o*er +oated concrete:

    )igure *1G+

    A power trowel *alo 6nown a a Hpower CoatH,

    HhelicopterH or Htrowel machineH+ i a piece o! light

    contruction e Thi i about the time

    that you can begin the 3rt machine?Coat pathe ad%antages use of po*er +oat:

    -to get flat surface-to close crac,s

  • 8/21/2019 Report (Hamza Abdallat)

    20/35

    Curing f Concrete:

    )igure *1/+

    )igure *'%+

  • 8/21/2019 Report (Hamza Abdallat)

    21/35

    8uring i the one o! the mot eential operation in which

    concrete i 6ept continuouly damp !or ome day to enable

    the concrete to gain more trength> 8uring replenihe the lo

    o! moiture !rom the concrete due to e(aporation, aborption

    and heat o! chemical reaction> The period o! curing uing

    water i depend upon atmopheric condition uch a

    temperature, humidity and wind (elocity> The normal period i

    between 9 and 1% day

    in Seraje Late project wa ued chemical curing ,and wa ueda!ter one day !or one time.

    "in)ing slab:

    )igure *'1+

    all lab ha(e the ame depth be!ore any modi3cation , the

    problem appear when the mechanical technician try to

    contruct pipe *lee(e+ , who need depth more than original

  • 8/21/2019 Report (Hamza Abdallat)

    22/35

    depth , that it impoe to modi3cation the depth o! ome o!

    area which called Hin6ing lab+

    Construction joint:

    )igure*'' +

  • 8/21/2019 Report (Hamza Abdallat)

    23/35

    )igure *'# +

    A contruction joint i de3ned by the A84

    a Mthe ur!ace where two uccei(e placement o! concrete

    meet, acro which it may be deirable to achie(e bond and

    through which rein!orcement may be continuou> Lenerally,

    becaue continuity o! tructural action will be re

  • 8/21/2019 Report (Hamza Abdallat)

    24/35

    )igure *'" + 3gure* '.+

    Should be ued water topper a hown in 3gure * +, and hould

    be ued chemical Baterial which called S57 which ued to bond

    between new concrete and old concrete

    8ontruction joint in Coor hall be located within the middle

    third o! pan o! lab, beam, and girder.

  • 8/21/2019 Report (Hamza Abdallat)

    25/35

    -pansion joint:

    )igure * '$+ 3gure *'9 +

    -xpanion joint i an aembly deigned to a!ely aborb the

    heat?induced expanion and contraction o! (ariou contruction

    material, to aborb (ibration, to hold certain part together, or

    to allow mo(ement due to ground ettlement or earth

    They are commonly !ound between two building

    -The joint i 3lled with the ealer compound, Thee compound

    are aid to ha(e a high modulu o! elaticity, that i they can

    tretch and hrin6 more than normal ealer.

  • 8/21/2019 Report (Hamza Abdallat)

    26/35

    Columns:A concrete column i imply a round or The i=e, hape, and placement o! a

    column depend on it purpoe, they are integral to the

    contruction o! building and and other tructure.

    8olumn i an important part o! the tructural integrity o! a

    building> 4n !act, it i common !or a concrete column to carry

    part o! a tructural load> Thi mean that the column i ued to6eep the building !rom collaping or hi!ting in a way that could

    caue damage to the o(erall tructure

    (einforcement column:

    figure(28 ) figure ( 29)

    Lap length

  • 8/21/2019 Report (Hamza Abdallat)

    27/35

    ap length is the length overlap of bars tied to e2tend the reinforcement length

    about . - ) times the diameter of the bar is considered safe%

    Spacing between bars:

    3he minimum clear spacing bet"een parallel bars in a layer shall be0

    larger than 4' mm-

    larger than diameter of bar-

    1%55nominal ma2imum si6e of coarse aggregate-

    Shutter of column:

  • 8/21/2019 Report (Hamza Abdallat)

    28/35

    Figure &3(

    '

    figure &51 ( figure &54 (

    1.hec#s:

    -Surveyor determines four points about columns using 3otal station instrument

    then stretch string bet"een t"o points! and ta,en readings from the face of the

    einforcement! to ensure e2isting enough cover &.mm(%

  • 8/21/2019 Report (Hamza Abdallat)

    29/35

    -After built shutter! the first chec, should be ta,e t"o readings from each face

    of form"or, one at the beginning and another at the end! t"o readings should

    be the same

    -Second chec, should be used Center 8lumb and ta,e readings from the upperthe column and lo"er column! the t"o readings should be the same

    -if found error in readings in the first chec,! the readings ad$ustment using

    lo"er $ac,

    -f found error in readings in the second chec,! the readings ad$ustment using

    upper $ac,

    )lace concrete in colu$n:

    *igure &55 (

    -3he concreting in columns ! the pump should be on the height less than 1%'

    meter%

    -3o prevent segregation and should be used vibrator apparatus%

    *ead colu$n:

  • 8/21/2019 Report (Hamza Abdallat)

    30/35

    -dead column that mean the column do not Continue in rest floors%

    *igure & 5.(

    -in this area "as used one leg stirrup &hoo,s( to avoid t"o "ay shear%

    Segregation:

  • 8/21/2019 Report (Hamza Abdallat)

    31/35

    *igure & 5)( figure &5' (

    Segregation:

    Segregation can be defined as the separation of the constituent materials of

    concrete% A good concrete is one in "hich all the ingredients are properly

    distributed to ma,e a homogeneous mi2ture% 3here are considerable differencesin the si6es and specific gravities of the constituent ingredients of concrete%

    3herefore! it is natural that the materials sho" a tendency to fall apart%

    Segregation may be of three types

    1> Coarse aggregate separating out or settling do"n from the rest of the

    matri2%

    '> 8aste separating a"ay from coarse aggregate%

    #> :ater separating out from the rest of the material being a material oflo"est specific gravity%

  • 8/21/2019 Report (Hamza Abdallat)

    32/35

    3o eliminate segregation! should be carving the areas "hich content segregation

    And spray S8 and fill this areas using material "hich called micro cement *

    Shear +all:

    A shear "all is a "all "hich is designed to resist shear! the lateral force "hich

    causes the bul, of damage in earth#ua,es% /any building codes mandate the

    use of shear "alls to ma,e homes safer and more stable%

    *igure & 57 (

    einforcement of "all0

    ;se vertical steel! hori6ontal steel! and one leg stirrup &hoo,s(-

    -Construct shutter and chec, if the "all shutter in right position and achieve

    enough cover &. mm(! use chec,s as the same in the columns%

  • 8/21/2019 Report (Hamza Abdallat)

    33/35

    ,ater%roofing:

    n building construction! a structure needs "aterproofing since concrete itself

    "ill not be "atertight on its o"n &but note concrete is easily "aterproofed "ith

    additives(% 3he conventional system of "aterproofing involves< primary