Ch 1:
Introduction
1.1project
31.2Training schedule
.4
Ch 2:
Company prole
2.1company
prole
Ch 3:
!etailed !escription of the Training
3.1
"afety
..#
3.2
slab
...$.
3.2.1shutter of
slab..$
-
8/21/2019 Report (Hamza Abdallat)
2/35
3.2.2le%el
sca&olding...'
3.2.3
(einforcement
..'
3.3Chec)s before
concreting...12
3.4Testing before
concreting..12
3.compacting of
concrete.14
3.6po*er +oat
concrete.1
3.7curing of
concrete..1#
3.8sin)ing
slab.1,
3.9construction
joint..1$
3.10-pansion
joint....1'
3.11
columns.
21
3.11.1(einforcement ..21
-
8/21/2019 Report (Hamza Abdallat)
3/35
3.11.2lap length
21
3.11.3"pacing bet*een bars..
.22
3.11.4shutter of
column..22
3.11.5chec)s .
.23
3.11.6place concrete....24
3.11.7dead column.
24
3.12segregation.
2
3.13"hear *all.
.2#
3.14/aterproong..
.2,
Ch4
Conclusion.2$
Ch1 Introduction:
-
8/21/2019 Report (Hamza Abdallat)
4/35
0roject:11.
The project called Seraje and locate in Abdalli Amman , which
executed by Omar Abu Saad contracting company.
Which conited !rom three building with Total Area "#$%
m&',
The project di(ided to !our part A1,A',A#,A"
)igure *1 +
ach part ha(e area a !ollowing:
Area o! A1 - 1"%% m&'
Area o! A' -1.%% m&'
Area o! A# - .$% m&'
Area o! A" - /%% m&'
-
8/21/2019 Report (Hamza Abdallat)
5/35
A10 A' !orm one building, which eparate between two part
contruction joint, and eparate between three building
xpanion joint.
A10A' conit !rom ix torey underground ued a garage !orcar and eight
Storey abo(e ground ued a Store, Shop, oce.
A# conit !rom ix torey underground ued a garage !or car
and twenty one Storey abo(e ground ued a 2otel.
A" conit !rom ix torey underground ued a garage !or car
and eight
Storey abo(e ground ued a Apartment.
Training "chedule:
in the 3rt 4 wa trained about how to reading engineering
plan , then the 5ublic Sa!ety Ocer guide me about a!ety
be!ore enter the project ite , and ga(e to me 5ublic a!etyclothing, and gi(e me ome o! intruction about a!ety.
in the ite 4 tart with blac6mith ,and con!ormity
7ein!orcement in the ite according 7ein!orcement plan.
Then 4 learned how to contruct hutter and how the ite
engineer recei(e the !ormwor6 !rom 8arpenter.
Then 4 tart mo(e in the ite widely, and 6now problem whichhappen in the ite
-
8/21/2019 Report (Hamza Abdallat)
6/35
Company prole:
Omar Abu Saad and sons contracting company is aJordanian Company registered as a first grade contractor in the fields of
buildings
Ever since it started operating in 197! Omar Abu Saad and sons contracting
company has gro"n to assume a leading role in the field of construction for the
#uality and timely completion of its pro$ects%
Omar Abu Saad and sons contracting companywa !ounded in 1/9% in
Amman ordan
Today, the company ha grown to become a leading player in
the growing ucce; o(er the year i the outcome o! a deep
commitment to the core principle o! deli(ering project the
highet tandard, on time Some o!
thee
5roject ha(e been technically dicult, but 88 ha the
experience, 6now?how and ophitication to implement them.
Omar Abu Saad and sons contracting companypoee a (eratility
that ha been made poible by it highly pro!eional team o!
manager, engineer, conultant, 6illed wor6er and general
ta@.
.-The company ha(e project in ead ea , Amman ,
A
-
8/21/2019 Report (Hamza Abdallat)
7/35
Chapter 3
3.1"afety
Construction sites can be a very dangerous environment to be in with
many opportunities for injury or fatality. With high voltage areas, debris
and heavy equipment in the area, its important to ma!e sure that
construction wor!ers and anyone in or near the construction site are
made aware of the.
"ll employees should be trained to understand the proper way to use
safety systems and to identify ha#ards. $he employee or employer will
be responsible for providing fall protection systems and to ensure the
use of safety systems.
-
8/21/2019 Report (Hamza Abdallat)
8/35
-
8/21/2019 Report (Hamza Abdallat)
9/35
%igure &' ( %igure &) (
%igure &* (
-
8/21/2019 Report (Hamza Abdallat)
10/35
"lab3.2
A hallow, rein!orced?concrete tructural member that i (ery
wide compared with depth> Spanning between beam, girder,
or column, lab are ued !or Coor, roo!, and bridge dec6> 4!
they are cat integrally with beam or girder, they may be
conidered the top Cange o! thoe member and act with thema a T beam , ta6e the load directly !rom the Coor and
tranmit it to the beam or to the column.
Shutter of slabs:3.2.1
)ormwor6 i a temporary tructural ytem, which pro(ide the
caing and upporting to the wet concrete to get the re 4t hould be tabled with the weight o! the concrete,
rein!orcement, and other li(e load during the contruction and
compacting o! concreting.
figure&'( figure&)(
-
8/21/2019 Report (Hamza Abdallat)
11/35
*igure&1(
*igure &7( figure&+(
-
8/21/2019 Report (Hamza Abdallat)
12/35
)igure *.+
4n Seraje project wa ued ca@olding to upport !air?!aced !orm
wor6
-the ca@olding imulate column, the ca@olding braced by
ledger and tranom
-the ca@olding carried main o6a, which carry econdary
o6a, which carry )air?!aced
Level scaffolding:
-
8/21/2019 Report (Hamza Abdallat)
13/35
figure &9 ( figure&1 (
Surveyor use leveling instruments to chec, form"or, "hich have true height
and have the same level
-
8/21/2019 Report (Hamza Abdallat)
14/35
*igure &11(
All slabs built by situ-cast concrete ! the strength of conceret used in slabs is
. /pa%
REINFORE!EN"
Steel rein!orcement are ued, generally, in the !orm o!
bar o! circular cro ection in concrete tructure> They
are li6e a 6eleton in human body> 5lain concretewithout teel or any other rein!orcement i trong in
compreion but wea6 in tenion> Steel i one o! the
bet !orm o! rein!orcement, to ta6e care o! thoe
tree and to trengthen concrete to bear all 6ind o!
load
-
8/21/2019 Report (Hamza Abdallat)
15/35
hec#s before concreting:
1-7ein!orcement wor6 mut be properly completed
according to the drawing, uch a pacing o!rein!orcement bar, anchorage length and diameter o!
rein!orcement bar.'-But be made ure that !ormwor6 i properly
upported)-)ormwor6 mut be clean and !ree !rom impuritie
testing before concreting0
1-slu$% test:
-
8/21/2019 Report (Hamza Abdallat)
16/35
figure &12 ' figure&13 '
-the cone wa 3lled in three layer , e(ery layer occupy 1D# o!
cone , and a!ter 3ll e(ery layer , wa ued metal rod which
tri6e e(ery layer '. time.
Wait to concrete topped motion-
-Eay a traight edge acro the top o! the lump cone> Beaure
the amount o! lump in inche !rom the bottom o! the traight
edge to the top o! the lumped concrete.
'-ta)e temperature of concrete
-
8/21/2019 Report (Hamza Abdallat)
17/35
3gure *1" +
be!ore concreting, mut be ta6en temperature o! concrete and
mut not exceed #' 8eliu.
)-ta)e cubes from concrete
-
8/21/2019 Report (Hamza Abdallat)
18/35
)igure *1. +
wa ta6en cube !rom concrete be!ore concreting , and curing
cube a!ter 1day
in laboratory by uing water , then tet itF trength
a!ter # day , 9 day,'G day
Compacting of concrete:
)igure *1$+
3gure *19 +The remo(al o! entrapped air
during production o! concrete and
the uni!orm, dene arrangement
o! the contituent o! concrete
are e@ected during the
compacting > The denity
cone 8oncrete
hould be thoroughly compacted
during the operation o! placing.
wa ued in project pipe with '.
mm diameter to achie(e co(er
lab-a hown in 3gure& (
-
8/21/2019 Report (Hamza Abdallat)
19/35
0o*er +oated concrete:
)igure *1G+
A power trowel *alo 6nown a a Hpower CoatH,
HhelicopterH or Htrowel machineH+ i a piece o! light
contruction e Thi i about the time
that you can begin the 3rt machine?Coat pathe ad%antages use of po*er +oat:
-to get flat surface-to close crac,s
-
8/21/2019 Report (Hamza Abdallat)
20/35
Curing f Concrete:
)igure *1/+
)igure *'%+
-
8/21/2019 Report (Hamza Abdallat)
21/35
8uring i the one o! the mot eential operation in which
concrete i 6ept continuouly damp !or ome day to enable
the concrete to gain more trength> 8uring replenihe the lo
o! moiture !rom the concrete due to e(aporation, aborption
and heat o! chemical reaction> The period o! curing uing
water i depend upon atmopheric condition uch a
temperature, humidity and wind (elocity> The normal period i
between 9 and 1% day
in Seraje Late project wa ued chemical curing ,and wa ueda!ter one day !or one time.
"in)ing slab:
)igure *'1+
all lab ha(e the ame depth be!ore any modi3cation , the
problem appear when the mechanical technician try to
contruct pipe *lee(e+ , who need depth more than original
-
8/21/2019 Report (Hamza Abdallat)
22/35
depth , that it impoe to modi3cation the depth o! ome o!
area which called Hin6ing lab+
Construction joint:
)igure*'' +
-
8/21/2019 Report (Hamza Abdallat)
23/35
)igure *'# +
A contruction joint i de3ned by the A84
a Mthe ur!ace where two uccei(e placement o! concrete
meet, acro which it may be deirable to achie(e bond and
through which rein!orcement may be continuou> Lenerally,
becaue continuity o! tructural action will be re
-
8/21/2019 Report (Hamza Abdallat)
24/35
)igure *'" + 3gure* '.+
Should be ued water topper a hown in 3gure * +, and hould
be ued chemical Baterial which called S57 which ued to bond
between new concrete and old concrete
8ontruction joint in Coor hall be located within the middle
third o! pan o! lab, beam, and girder.
-
8/21/2019 Report (Hamza Abdallat)
25/35
-pansion joint:
)igure * '$+ 3gure *'9 +
-xpanion joint i an aembly deigned to a!ely aborb the
heat?induced expanion and contraction o! (ariou contruction
material, to aborb (ibration, to hold certain part together, or
to allow mo(ement due to ground ettlement or earth
They are commonly !ound between two building
-The joint i 3lled with the ealer compound, Thee compound
are aid to ha(e a high modulu o! elaticity, that i they can
tretch and hrin6 more than normal ealer.
-
8/21/2019 Report (Hamza Abdallat)
26/35
Columns:A concrete column i imply a round or The i=e, hape, and placement o! a
column depend on it purpoe, they are integral to the
contruction o! building and and other tructure.
8olumn i an important part o! the tructural integrity o! a
building> 4n !act, it i common !or a concrete column to carry
part o! a tructural load> Thi mean that the column i ued to6eep the building !rom collaping or hi!ting in a way that could
caue damage to the o(erall tructure
(einforcement column:
figure(28 ) figure ( 29)
Lap length
-
8/21/2019 Report (Hamza Abdallat)
27/35
ap length is the length overlap of bars tied to e2tend the reinforcement length
about . - ) times the diameter of the bar is considered safe%
Spacing between bars:
3he minimum clear spacing bet"een parallel bars in a layer shall be0
larger than 4' mm-
larger than diameter of bar-
1%55nominal ma2imum si6e of coarse aggregate-
Shutter of column:
-
8/21/2019 Report (Hamza Abdallat)
28/35
Figure &3(
'
figure &51 ( figure &54 (
1.hec#s:
-Surveyor determines four points about columns using 3otal station instrument
then stretch string bet"een t"o points! and ta,en readings from the face of the
einforcement! to ensure e2isting enough cover &.mm(%
-
8/21/2019 Report (Hamza Abdallat)
29/35
-After built shutter! the first chec, should be ta,e t"o readings from each face
of form"or, one at the beginning and another at the end! t"o readings should
be the same
-Second chec, should be used Center 8lumb and ta,e readings from the upperthe column and lo"er column! the t"o readings should be the same
-if found error in readings in the first chec,! the readings ad$ustment using
lo"er $ac,
-f found error in readings in the second chec,! the readings ad$ustment using
upper $ac,
)lace concrete in colu$n:
*igure &55 (
-3he concreting in columns ! the pump should be on the height less than 1%'
meter%
-3o prevent segregation and should be used vibrator apparatus%
*ead colu$n:
-
8/21/2019 Report (Hamza Abdallat)
30/35
-dead column that mean the column do not Continue in rest floors%
*igure & 5.(
-in this area "as used one leg stirrup &hoo,s( to avoid t"o "ay shear%
Segregation:
-
8/21/2019 Report (Hamza Abdallat)
31/35
*igure & 5)( figure &5' (
Segregation:
Segregation can be defined as the separation of the constituent materials of
concrete% A good concrete is one in "hich all the ingredients are properly
distributed to ma,e a homogeneous mi2ture% 3here are considerable differencesin the si6es and specific gravities of the constituent ingredients of concrete%
3herefore! it is natural that the materials sho" a tendency to fall apart%
Segregation may be of three types
1> Coarse aggregate separating out or settling do"n from the rest of the
matri2%
'> 8aste separating a"ay from coarse aggregate%
#> :ater separating out from the rest of the material being a material oflo"est specific gravity%
-
8/21/2019 Report (Hamza Abdallat)
32/35
3o eliminate segregation! should be carving the areas "hich content segregation
And spray S8 and fill this areas using material "hich called micro cement *
Shear +all:
A shear "all is a "all "hich is designed to resist shear! the lateral force "hich
causes the bul, of damage in earth#ua,es% /any building codes mandate the
use of shear "alls to ma,e homes safer and more stable%
*igure & 57 (
einforcement of "all0
;se vertical steel! hori6ontal steel! and one leg stirrup &hoo,s(-
-Construct shutter and chec, if the "all shutter in right position and achieve
enough cover &. mm(! use chec,s as the same in the columns%
-
8/21/2019 Report (Hamza Abdallat)
33/35
,ater%roofing:
n building construction! a structure needs "aterproofing since concrete itself
"ill not be "atertight on its o"n &but note concrete is easily "aterproofed "ith
additives(% 3he conventional system of "aterproofing involves< primary