    Air Quality Report: Vent Monitoring, August 2012 | Company confidential

    Leighton Contractors Pty Limited ABN 98 000 893 667 www.leightoncontractors.com.au

    M5 East Freeway

    Air Quality Report: In Tunnel Air Quality Monitoring

    Report 6

    August 2012

  • 2 of 9

    Air Quality Report: Vent Monitoring, August 2012 | Company confidential

    Leighton Contractors Pty Limited ABN 98 000 893 667 www.leightoncontractors.com.au

    Document change control

    Confidentiality

    This document is the property of Leighton Contractors Pty Limited. The contents of this document are confidential and copyrighted. You should not read,

    copy, use or disclose the information contained herein without authorisation. Distribution of this document is limited to authorised personnel.

    Reproduction of this document in part or in full in any form, including email and electronic, is not allowed, except by written permission from Leighton

    Contractors Pty Limited obtained by the author.

    Revision history

    Version Issue date Updated by Comments

    001 06/09/2012 Joel Coulton Initial revision

    002

    003

    References

    Document name Version Abbreviation

  • 3 of 9

    Air Quality Report: Vent Monitoring, August 2012 | Company confidential

    Leighton Contractors Pty Limited ABN 98 000 893 667 www.leightoncontractors.com.au

    Summary

    • CCTV was used to monitor conditions within the tunnels and jet fans were used to increase ventilation to ensure tunnel conditions remained within specified limits.

    • There is data missing from the 1st to the 7th of August due to a system error.

  • 4 of 9

    Air Quality Report: Vent Monitoring, August 2012 | Company confidential

    Leighton Contractors Pty Limited ABN 98 000 893 667 www.leightoncontractors.com.au

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    pp

    m

    Main Tunnel Westbound

    CO Level (15min Time Weighted Average)

    CO Limit ACO403 Mainline W/B at Eastern Crossover ACO604 Marsh St entry ramp

    AQS403 Mainline W/B (before exhaust tunnel) AQS404 Mainline W/B (before western X-over)

  • 5 of 9

    Air Quality Report: Vent Monitoring, August 2012 | Company confidential

    Leighton Contractors Pty Limited ABN 98 000 893 667 www.leightoncontractors.com.au

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100p

    pm

    Main Tunnel Eastbound

    CO Level (15min Time Weighted Average)

    AQS301 Mainline E/B (before exhaust tunnel) ACO301 Mainline E/B (before Princes Hwy exit) ACO302 Mainline E/B (before Marsh St exit)

    AQS302 Mainline E/B (before E X-over) CO Limit

  • 6 of 9

    Air Quality Report: Vent Monitoring, August 2012 | Company confidential

    Leighton Contractors Pty Limited ABN 98 000 893 667 www.leightoncontractors.com.au

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    pp

    m

    CRX Tunnel

    CO Level (15min Time Weighted Average)

    AQS305 CRX E/B exit portal AQS406 CRX W/B exit portal CO Limit

  • 7 of 9

    Air Quality Report: Vent Monitoring, August 2012 | Company confidential

    Leighton Contractors Pty Limited ABN 98 000 893 667 www.leightoncontractors.com.au

    0

    0.001

    0.002

    0.003

    0.004

    0.005

    0.006

    0.007

    0.008

    0.009

    0.01

    un

    its/

    mMain Tunnel Westbound

    Visibility (15min Time Weighted Average)

    AQS403 Mainline W/B (before exhaust tunnel) AQS404 Mainline W/B (before Western X-over) Normal Normal Congested Heavy Congestion

  • 8 of 9

    Air Quality Report: Vent Monitoring, August 2012 | Company confidential

    Leighton Contractors Pty Limited ABN 98 000 893 667 www.leightoncontractors.com.au

    0

    0.001

    0.002

    0.003

    0.004

    0.005

    0.006

    0.007

    0.008

    0.009

    0.01

    un

    its/

    m

    Main Tunnel Eastbound

    Visibility (15min Time Weighted Average)

    AQS301 Mainline E/B (before exhaust tunnel) AQS302 Mainline E/B (before E X-over) Normal Congested Heavy Congestion

  • 9 of 9

    Air Quality Report: Vent Monitoring, August 2012 | Company confidential

    Leighton Contractors Pty Limited ABN 98 000 893 667 www.leightoncontractors.com.au

    0

    0.001

    0.002

    0.003

    0.004

    0.005

    0.006

    0.007

    0.008

    0.009

    0.01

    un

    its/

    mCRX Tunnel

    Visibility (15min Time Weighted Average)