report 5c - sse renewables...sse renewables strathy south wind farm yellow bog access track mapped...

2
Rev Description CB By Date Project Number Scale @ A3 Date Created Client Project Status Title Drawn By PM/Checked By Rev Figure Number 12 11 10 13 14 15 9 279500 KAG - 0 10 5 m W:\8591SEC - SSE, Strathy South, Yellow Bog Track Assessment\Technical\Graphics\GIS\MXDs\Figures\20191108 Track Assessment\8591sec_fig3 - MappedHabitats.mxd SSE Renewables Strathy South Wind Farm Yellow Bog Access Track Mapped Habitats with Target Notes SEC8591 SL Legend Site boundary Mapped habitats with target note references (1-22) NOV 2019 1:650 FINAL 3a ± © 2019 RPS Group Notes 1. This drawing has been prepared in accordance with the scope of RPS s appointment with its client and is subject to the terms and conditions of that appointment. RPS accepts no liability for any use of this document other than by its client and only for the purposes for which it was prepared and provided. 2. If received electronically it is the recipients responsibility to print to correct scale. Only written dimensions should be used. rpsgroup.com Belford House, 3rd Floor, 59 Belford Road, Edinburgh, EH4 3DE T: +44(0)131 555 5011 E: [email protected] a e c b d Contains Ordnance Survey data © Crown copyright and database right 2019. ± 1:15,000

Upload: others

Post on 08-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Report 5c - SSE Renewables...SSE Renewables Strathy South Wind Farm Yellow Bog Access Track Mapped Habitats with Target Notes SEC8591 SL Legend Site boundary ... Rev Description By

Rev Desc ription CBBy Da te

Projec t Num b er Sc a le @ A3 Date Crea ted

Clien t

Projec t

Status

Title

Dra wn By PM /Chec ked By

RevFigure Num b er

12

11

10

13

14

15

9

279500

KAG

-

0 105 m

W:\8591SEC - SSE, Strathy South, Yellow Bog Track Assessment\Technical\Graphics\GIS\MXDs\Figures\20191108 Track Assessment\8591sec_fig3 - MappedHabitats.mxd

SSE Ren ewa b les

Strathy South W in d FarmYellow Bog Ac c ess Tra c kM a pped Ha b ita ts with Target Notes

SEC8591

SL

LegendSite b oun da ryM a pped ha b ita ts withtarget n ote referen c es (1-22)

NOV 20191:650

FINAL

3a

±© 2019 RPS GroupNotes1. This dra win g ha s b een prepa red in a c c orda n c e with the scope ofRPS’s a ppoin tm en t with its c lien t a n d is sub jec t to the term s a n dc on dition s of tha t a ppoin tm en t. RPS a c c epts n o lia b ility for a n y use of thisdoc um en t other tha n b y its c lien t a n d on ly for the purposes for whic h itwa s prepa red a n d provided.2. If rec eived elec tron ic a lly it is the rec ipien ts respon sib ility to prin t tocorrect sc a le. On ly written dim en sion s should b e used.

rpsgroup.com

Belford House, 3rd Floor, 59 Belford Roa d, Edin b urgh, EH4 3DET: +44(0)131 555 5011 E: [email protected]

a

ec

b

d

Con ta in s Ordn a n c e Survey da ta © Crown copyright a n d data b a se right 2019.

±1:15,000

Page 2: Report 5c - SSE Renewables...SSE Renewables Strathy South Wind Farm Yellow Bog Access Track Mapped Habitats with Target Notes SEC8591 SL Legend Site boundary ... Rev Description By

Rev Desc riptio n CBBy Da te

Pro jec t N um b er Sc a le @ A3 Da te Crea ted

Client

Pro jec t

Sta tus

Title

Dra wn By PM/Chec ked By

RevFigure N um b er

7

16

10

14

159

16

KAG

-

0 105 m

W:\8591SEC - SSE, Strathy South, Yellow Bog Track Assessment\Technical\Graphics\GIS\MXDs\Figures\20191108 Track Assessment\8591sec_fig3 - MappedHabitats.mxd

SSE Renewa b les

Stra thy So uth Wind Fa rmY ello w Bo g Ac c ess Tra c kMa pped Ha b ita ts with Ta rget N o tes

SEC8591

SL

LegendSite b o und a ryMa pped ha b ita ts withta rget no te referenc es (1-22)

N OV 20191:650

FIN AL

3b

±© 2019 RPS Gro upN o tes1. This d ra wing ha s b een prepa red in a c c o rd a nc e with the sc o pe o fRPS’s a ppo intm ent with its client a nd is sub jec t to the term s a ndc o nd itio ns o f tha t a ppo intm ent. RPS a c c epts no lia b ility fo r a ny use o f thisd o c um ent o ther tha n b y its client a nd o nly fo r the purpo ses fo r whic h itwa s prepa red a nd pro vid ed .2. If rec eived elec tro nic a lly it is the rec ipients respo nsib ility to print toc o rrect sc a le. Only written d im ensio ns sho uld b e used .

rpsgroup.com

Belfo rd Ho use, 3rd Flo o r, 59 Belfo rd Ro a d , Ed inb urgh, EH4 3DET: +44(0)131 555 5011 E: rpsed 2@rpsgro up.c o m

a

ec

b

d

Co nta ins Ord na nc e Survey d a ta © Cro wn c o pyright a nd d a ta b a se right 2019.

±1:15,000