report 190111

10
Project FSO. URWASI PT. ARPENI PRATAMA OCEAN LINE, Tbk. Document Number AP-TH/1-I-2011 Discipline ENGINEERING Doc. Type SURVEY REPORT Originator APOL Revision Date January 19 th 2011 KODECO Energy Temporary Ship Tanker Page 1 of 9 SITE SURVEY REPORT KODECO ENERGY TEMPORARY SHIP TANKER Rev Date Description Prep. Review App Jan-19-11 Site Survey at Keppel Tuas Shipyard Yannes

Upload: fuad-umar

Post on 02-Dec-2014

41 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Report 190111

Project FSO. URWASI

PT. ARPENI PRATAMA OCEAN LINE, Tbk.

Document Number AP-TH/1-I-2011

Discipline ENGINEERING

Doc. Type SURVEY REPORT

Originator APOL

Revision Date January 19

th 2011

KODECO Energy Temporary Ship Tanker Page 1 of 9

SITE SURVEY REPORT

KODECO ENERGY TEMPORARY SHIP TANKER

Rev Date Description Prep. Review App

Jan-19-11 Site Survey at Keppel Tuas Shipyard Yannes

Page 2: Report 190111

Project FSO. URWASI

PT. ARPENI PRATAMA OCEAN LINE, Tbk.

Document Number AP-TH/1-I-2011

Discipline ENGINEERING

Doc. Type SURVEY REPORT

Originator APOL

Revision Date January 19

th 2011

KODECO Energy Temporary Ship Tanker Page 2 of 9

ACCOMMODATION

Figure 1: Provide accommodation for min. 72 Persons from Company, will be

modified on existing room at the vessel.

Page 3: Report 190111

Project FSO. URWASI

PT. ARPENI PRATAMA OCEAN LINE, Tbk.

Document Number AP-TH/1-I-2011

Discipline ENGINEERING

Doc. Type SURVEY REPORT

Originator APOL

Revision Date January 19

th 2011

KODECO Energy Temporary Ship Tanker Page 3 of 9

MOORING EQUIPMENTS

Figure 2: Additional chain stopper and Quick Release Hook will be add at aft and fwd

area and shall be providing with tensions meter.

Page 4: Report 190111

Project FSO. URWASI

PT. ARPENI PRATAMA OCEAN LINE, Tbk.

Document Number AP-TH/1-I-2011

Discipline ENGINEERING

Doc. Type SURVEY REPORT

Originator APOL

Revision Date January 19

th 2011

KODECO Energy Temporary Ship Tanker Page 4 of 9

METERING SKID

Figure 3: Location for metering skid shall be provide, there is free space on fr. 52 near

from ladder area.

CRUDE OIL IMPORT & EXPORT

Figure 4: Cargo line for import and export shall be redesign due to modification on

Ballast Tank 1 & 5.

Page 5: Report 190111

Project FSO. URWASI

PT. ARPENI PRATAMA OCEAN LINE, Tbk.

Document Number AP-TH/1-I-2011

Discipline ENGINEERING

Doc. Type SURVEY REPORT

Originator APOL

Revision Date January 19

th 2011

KODECO Energy Temporary Ship Tanker Page 5 of 9

CARGO CONTROL ROOM

Figure 5: Cargo control room shall have full visibility of the deck forward.

CARGO OIL WASHING

Figure 6: Crude Oil Washing shall be suitable with sufficient viscosity of crude oil

and will be use in waxy crude service need to be added due to modification on Water

Ballast Tank 1 & 5 wing.

Page 6: Report 190111

Project FSO. URWASI

PT. ARPENI PRATAMA OCEAN LINE, Tbk.

Document Number AP-TH/1-I-2011

Discipline ENGINEERING

Doc. Type SURVEY REPORT

Originator APOL

Revision Date January 19

th 2011

KODECO Energy Temporary Ship Tanker Page 6 of 9

HEATING COIL

Figure 7: Heating coils need to be re-calculate and required in Cargo Oil Tanks and

Slop tanks to maintain cargo temperature, and need to be added on WBT 1 & 5 due to

modify to Cargo Oil Tank. Also for heating coil manifold and hydraulics valve on

new Cargo Oil Tanks.

Page 7: Report 190111

Project FSO. URWASI

PT. ARPENI PRATAMA OCEAN LINE, Tbk.

Document Number AP-TH/1-I-2011

Discipline ENGINEERING

Doc. Type SURVEY REPORT

Originator APOL

Revision Date January 19

th 2011

KODECO Energy Temporary Ship Tanker Page 7 of 9

STRIPPING LINE & CARGO LINE

Figure 8: Modification on Ballast line, Cargo line & Stripping line inside the tanks

due to modification on Water Ballast Tank 1 & 5 wing.

CAFETARIA ROOM

Page 8: Report 190111

Project FSO. URWASI

PT. ARPENI PRATAMA OCEAN LINE, Tbk.

Document Number AP-TH/1-I-2011

Discipline ENGINEERING

Doc. Type SURVEY REPORT

Originator APOL

Revision Date January 19

th 2011

KODECO Energy Temporary Ship Tanker Page 8 of 9

Figure 9: Existing recreation room and officer’s room shall be modified for

accommodation and cafeteria for more than 34 persons of FSO crew.

HELIDECK

Page 9: Report 190111

Project FSO. URWASI

PT. ARPENI PRATAMA OCEAN LINE, Tbk.

Document Number AP-TH/1-I-2011

Discipline ENGINEERING

Doc. Type SURVEY REPORT

Originator APOL

Revision Date January 19

th 2011

KODECO Energy Temporary Ship Tanker Page 9 of 9

Figure 10: Location for heli-deck will be positioning at aft area, also need to be

consider about gangway and ladder. Aft construction on below main deck also needs

to be analyzed whether it needs to be reinforced or not.

SEWAGE TREATMENT PLAN

Figure 11: Sewage Treatment Plan shall be modify for additional FSO crew, also need

to be consider to give additional sewage system onboard.

Page 10: Report 190111
Admin
Text Box
Engineering Plan for off loading pipe, existing off loading pipe (12") will be replaced to fr. 52. Metering specification need to be verified due to foundation detail design and positioning at main deck.