report 190111
TRANSCRIPT
Project FSO. URWASI
PT. ARPENI PRATAMA OCEAN LINE, Tbk.
Document Number AP-TH/1-I-2011
Discipline ENGINEERING
Doc. Type SURVEY REPORT
Originator APOL
Revision Date January 19
th 2011
KODECO Energy Temporary Ship Tanker Page 1 of 9
SITE SURVEY REPORT
KODECO ENERGY TEMPORARY SHIP TANKER
Rev Date Description Prep. Review App
Jan-19-11 Site Survey at Keppel Tuas Shipyard Yannes
Project FSO. URWASI
PT. ARPENI PRATAMA OCEAN LINE, Tbk.
Document Number AP-TH/1-I-2011
Discipline ENGINEERING
Doc. Type SURVEY REPORT
Originator APOL
Revision Date January 19
th 2011
KODECO Energy Temporary Ship Tanker Page 2 of 9
ACCOMMODATION
Figure 1: Provide accommodation for min. 72 Persons from Company, will be
modified on existing room at the vessel.
Project FSO. URWASI
PT. ARPENI PRATAMA OCEAN LINE, Tbk.
Document Number AP-TH/1-I-2011
Discipline ENGINEERING
Doc. Type SURVEY REPORT
Originator APOL
Revision Date January 19
th 2011
KODECO Energy Temporary Ship Tanker Page 3 of 9
MOORING EQUIPMENTS
Figure 2: Additional chain stopper and Quick Release Hook will be add at aft and fwd
area and shall be providing with tensions meter.
Project FSO. URWASI
PT. ARPENI PRATAMA OCEAN LINE, Tbk.
Document Number AP-TH/1-I-2011
Discipline ENGINEERING
Doc. Type SURVEY REPORT
Originator APOL
Revision Date January 19
th 2011
KODECO Energy Temporary Ship Tanker Page 4 of 9
METERING SKID
Figure 3: Location for metering skid shall be provide, there is free space on fr. 52 near
from ladder area.
CRUDE OIL IMPORT & EXPORT
Figure 4: Cargo line for import and export shall be redesign due to modification on
Ballast Tank 1 & 5.
Project FSO. URWASI
PT. ARPENI PRATAMA OCEAN LINE, Tbk.
Document Number AP-TH/1-I-2011
Discipline ENGINEERING
Doc. Type SURVEY REPORT
Originator APOL
Revision Date January 19
th 2011
KODECO Energy Temporary Ship Tanker Page 5 of 9
CARGO CONTROL ROOM
Figure 5: Cargo control room shall have full visibility of the deck forward.
CARGO OIL WASHING
Figure 6: Crude Oil Washing shall be suitable with sufficient viscosity of crude oil
and will be use in waxy crude service need to be added due to modification on Water
Ballast Tank 1 & 5 wing.
Project FSO. URWASI
PT. ARPENI PRATAMA OCEAN LINE, Tbk.
Document Number AP-TH/1-I-2011
Discipline ENGINEERING
Doc. Type SURVEY REPORT
Originator APOL
Revision Date January 19
th 2011
KODECO Energy Temporary Ship Tanker Page 6 of 9
HEATING COIL
Figure 7: Heating coils need to be re-calculate and required in Cargo Oil Tanks and
Slop tanks to maintain cargo temperature, and need to be added on WBT 1 & 5 due to
modify to Cargo Oil Tank. Also for heating coil manifold and hydraulics valve on
new Cargo Oil Tanks.
Project FSO. URWASI
PT. ARPENI PRATAMA OCEAN LINE, Tbk.
Document Number AP-TH/1-I-2011
Discipline ENGINEERING
Doc. Type SURVEY REPORT
Originator APOL
Revision Date January 19
th 2011
KODECO Energy Temporary Ship Tanker Page 7 of 9
STRIPPING LINE & CARGO LINE
Figure 8: Modification on Ballast line, Cargo line & Stripping line inside the tanks
due to modification on Water Ballast Tank 1 & 5 wing.
CAFETARIA ROOM
Project FSO. URWASI
PT. ARPENI PRATAMA OCEAN LINE, Tbk.
Document Number AP-TH/1-I-2011
Discipline ENGINEERING
Doc. Type SURVEY REPORT
Originator APOL
Revision Date January 19
th 2011
KODECO Energy Temporary Ship Tanker Page 8 of 9
Figure 9: Existing recreation room and officer’s room shall be modified for
accommodation and cafeteria for more than 34 persons of FSO crew.
HELIDECK
Project FSO. URWASI
PT. ARPENI PRATAMA OCEAN LINE, Tbk.
Document Number AP-TH/1-I-2011
Discipline ENGINEERING
Doc. Type SURVEY REPORT
Originator APOL
Revision Date January 19
th 2011
KODECO Energy Temporary Ship Tanker Page 9 of 9
Figure 10: Location for heli-deck will be positioning at aft area, also need to be
consider about gangway and ladder. Aft construction on below main deck also needs
to be analyzed whether it needs to be reinforced or not.
SEWAGE TREATMENT PLAN
Figure 11: Sewage Treatment Plan shall be modify for additional FSO crew, also need
to be consider to give additional sewage system onboard.