repoint phase 2: a.k.a ‘if you think you’re so smart, go ahead and build one…’
DESCRIPTION
Systems Division Mini-conference, 2 Oct 2013. REPOINT Phase 2: a.k.a ‘If you think you’re so smart, go ahead and build one…’. Samuel Bemment Loughborough University Dr. Roger Dixon. UKACC PhD Presentation Showcase. Introduction. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: REPOINT Phase 2: a.k.a ‘If you think you’re so smart, go ahead and build one…’](https://reader035.vdocuments.mx/reader035/viewer/2022062816/56814d07550346895dba375d/html5/thumbnails/1.jpg)
REPOINT Phase 2:a.k.a ‘If you think you’re so smart, go ahead
and build one…’
Samuel BemmentLoughborough University
Dr. Roger Dixon
Systems Division Mini-conference, 2 Oct 2013
UKACC PhD Presentation Showcase
![Page 2: REPOINT Phase 2: a.k.a ‘If you think you’re so smart, go ahead and build one…’](https://reader035.vdocuments.mx/reader035/viewer/2022062816/56814d07550346895dba375d/html5/thumbnails/2.jpg)
Introduction Railway track switch designs
have remained similar since Victorian times
REPOINT (2011-2013) explored benefits of re-engineering
Step change in capacity Junction control rule changes One design very promising 3 patents REPOINT 2 (2013-2014) to build
lab-scale demonstrator
Slide 2
![Page 3: REPOINT Phase 2: a.k.a ‘If you think you’re so smart, go ahead and build one…’](https://reader035.vdocuments.mx/reader035/viewer/2022062816/56814d07550346895dba375d/html5/thumbnails/3.jpg)
Systems Division Mini-conference, 19 Sept 2013
Slide 3
![Page 4: REPOINT Phase 2: a.k.a ‘If you think you’re so smart, go ahead and build one…’](https://reader035.vdocuments.mx/reader035/viewer/2022062816/56814d07550346895dba375d/html5/thumbnails/4.jpg)
Systems Division Mini-conference, 19 Sept 2013
Slide 4
![Page 5: REPOINT Phase 2: a.k.a ‘If you think you’re so smart, go ahead and build one…’](https://reader035.vdocuments.mx/reader035/viewer/2022062816/56814d07550346895dba375d/html5/thumbnails/5.jpg)
Phase 2 Project Plan
15 Months from June 2013, £356k funding from ‘Enabling Innovation Team’ Concept Refinement, Subsystem Design and
Validation, Outline Design
Deliverable: Concept Demonstration in Lab and Outline Designs
![Page 6: REPOINT Phase 2: a.k.a ‘If you think you’re so smart, go ahead and build one…’](https://reader035.vdocuments.mx/reader035/viewer/2022062816/56814d07550346895dba375d/html5/thumbnails/6.jpg)
Building a REPOINT HiTL Demonstrator Start small…
Slide 6
![Page 7: REPOINT Phase 2: a.k.a ‘If you think you’re so smart, go ahead and build one…’](https://reader035.vdocuments.mx/reader035/viewer/2022062816/56814d07550346895dba375d/html5/thumbnails/7.jpg)
Building a REPOINT HiTL Demonstrator Aim Bigger…
Slide 7
![Page 8: REPOINT Phase 2: a.k.a ‘If you think you’re so smart, go ahead and build one…’](https://reader035.vdocuments.mx/reader035/viewer/2022062816/56814d07550346895dba375d/html5/thumbnails/8.jpg)
Summary Capacity of rail networks depends upon
switches Switch technology is the limiting factor We are prototyping a novel switch design The design is simple, but it will need control
engineering to function There are many other knock-on benefits