JACKSON READINESS CENTER
OWNER: STATE OF MISSOURIMICHAEL L. PARSON,GOVERNOR
PROJECTMANAGEMENT:
OFFICE OF ADMINISTRATIONDIVISION OF FACILITIES MANAGEMENT,DESIGN AND CONSTRUCTION
DESIGNER: Farnsworth Group, Inc.
PROJECT NUMBER: T1931-01
SITE NUMBER: 6312ASSET NUMBER: 8136312001
JACKSON, MISSOURI
REPAIR STORM DAMAGE & REPLACE ROOF
SHEET NUMBER:
G0011 OF 12 SHEETSAugust 1, 2019
DEPARTMENT OF PUBLIC SAFETYMISSOURI NATIONAL GUARDOFFICE OF THE ADJUTANT GENERALFACILITIES DIVISION
Farnsworth Group, Inc.
Missouri State Certificate of Authority #000744
SHEET INDEX SHEET TITLEG001 COVERG002 GENERAL NOTESS100 ROOF FRAMING PLANA101 FLOOR PLAN - DEMOA102 ROOF PLAN - DEMOA103 FLOOR PLANA104 ROOF PLANA201 EXTERIOR ELEVATIONSA501 ROOF DETAILSA701 REFLECTED CEILING PLANI101 INTERIOR FINISH PLANI601 INTERIOR FINISH SCHEDULE
PROJECT LOCATION
GROUP
www.f-w.comEngineers | Architects | Surveyors | Scientists
20 ALLEN AVENUE, SUITE 200ST LOUIS, MISSOURI 63119(314) 962-7900 / [email protected]
DATE: 8/1/19EXP: 12/31/20
DESCRIPTION OF EXISTING CONDITIONS AND SCOPE OF WORK
A.EXISTING CONDITIONS:
1. THE EXISTING ROOFING COMPOSITION IS BELIEVED TO CONSIST OF A FULLY
ADHERED EPDM SINGLE-PLY MEMBRANE OVER POLYISOCYANURATE INSULATION
BOARD OVER AN EXISTING LIGHTWEIGHT GYPSUM CONCRETE ROOF DECK OVER
AN EXISTING METAL ROOF FORM DECK OVER A STEEL BAR JOIST ROOF
STRUCTURE. THERE ARE EXISTING METAL ROOF FLASHINGS, GUTTERS AND
DOWNSPOUTS PRESENT.
2. THE EXISTING MATERIALS HAVE BEEN TESTED FOR ASBESTOS CONTAINING
MATERIALS (ACM). SEE SPECIFICATION FOR TESTING REPORT. FOLLOW METHODS
OF REMOVAL AS SPECIFIED.
3. OWNER WILL REMOVE FURNITURE FROM THE OFFICE AREAS.
B. WORK INCLUDES THE FOLLOWING:
1. REMOVAL OF ALL EXISTING ROOFING SYSTEM COMPONENTS INCLUDING EPDM
MEMBRANE, INSULATION ASSEMBLIES, ADHESIVES, FASTENERS, ETC. DOWN TO
THE EXISTING LIGHTWEIGHT GYPSUM CONCRETE ROOF DECK. IF NECESSARY,
SELECTIVE METAL ROOF DECKING REPLACEMENT MAY BE REQUIRED IN THE
SPECIFIC AREAS INDICATED ON THE ROOF PLAN. THIS INCLUDES ALL EXISTING
METAL ROOF FLASHINGS, GUTTERS AND DOWNSPOUTS.
2. REPAIR AND REPLACEMENT OF ANY DETERIORATED LIGHTWEIGHT GYPSUM
CONCRETE.
3. INSTALLATION OF NEW TREATED WOOD BLOCKING (PERIMETER, CURBS, ETC.).
4. INSTALLATION OF GYPSUM BOARD SHEATHING MECHANICALLY FASTENED TO
LIGHTWEIGHT GYPSUM CONCRETE ROOF DECK.
5. INSTALLATION OF NEW POLYISOCYANURATE ROOF INSULATION UTILIZING ROOFING
MANUFACTURER'S APPROVED BONDING ADHESIVE.
6. INSTALLATION OF A NEW FULLY ADHERED TPO ROOFING MEMBRANE ASSEMBLY
INCLUDING FLASHINGS, GUTTERS.
7. REPAIRS TO INTERIOR FINISHES DUE TO WATER DAMAGE INCLUDING FLOOR AND
WALL FINISHES, PAINTING, AND CEILING REPAIR.
GENERAL NOTES FOR ROOFING WORK (NOTES APPLY TO ENTIRE PROJECT)
1. THESE DRAWINGS HAVE BEEN PREPARED ON THE COMBINED BASIS OF PLANS
AND INFORMATION PROVIDED TO OUR OFFICE BY THE USING AGENCY AS WELL
AS OBSERVATIONS WE HAVE CONDUCTED AT THE PROJECT SITE. THE GENERAL
INTENT OF THESE BIDDING DOCUMENTS (I.E. DRAWINGS AND SPECIFICATIONS) IS
TO ILLUSTRATE THE PHYSICAL CONDITIONS PRESENT AT THE PROJECT SITE.
2. PRIOR TO SUBMITTING THEIR BID, EACH CONTRACTOR IS REQUIRED TO VERIFY
ALL CONDITIONS AT THE PROJECT SITE AND FULLY INFORM THEMSELVES OF ALL
EXISTING CONDITIONS THAT MAY AFFECT THEIR WORK. EACH CONTRACTOR
SHALL INSPECT ALL AREAS WHERE RE-ROOFING WORK IS SCHEDULED TO BE
PERFORMED AND SHALL INCLUDE IN THEIR BIDS ANY ADDITIONAL WORK THAT
MAY BE REQUIRED IN ORDER TO PERFORM THE SPECIFIED WORK.
3. THE CONTRACTOR IS RESPONSIBLE FOR CORRECTION OF ANY AND ALL DAMAGES
TO THE SITE, BUILDING AND/OR CONTENTS INCURRED AS A RESULT OF THE
CONTRACTOR'S (OR SUB-CONTRACTOR'S, SUPPLIERS, ETC.) WORK OPERATIONS
TO THE SATISFACTION OF THE USING AGENCY AND ARCHITECT. SUCH
CORRECTIVE WORK MUST BE PERFORMED AT NO ADDITIONAL COST TO THE
USING AGENCY OR ARCHITECT.
4. THE CONTRACTOR SHALL CONFINE THEIR WORK OPERATIONS TO THOSE AREAS
WHICH ARE SPECIFICALLY SCHEDULED FOR RE-ROOFING WORK AND MUST
COORDINATE ALL WORK WITH THE USING AGENCY IN ORDER TO AVOID AND/OR
MINIMIZE THE DISRUPTION OF NORMAL BUILDING OPERATION.
5. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ALL AREAS OF WORK
WATERTIGHT AT ALL TIMES THROUGHOUT THE DURATION OF THE ENTIRE
PROJECT.
6. THE USING AGENCYS MAINTENANCE PERSONNEL, STAFF AND ADMINISTRATION
WILL OCCUPY THE BUILDING DURING THE RE-ROOFING CONSTRUCTION PERIOD.
WHEREVER WORK OPERATIONS OCCUR NEXT TO A BUILDING ENTRANCE, THE
CONTRACTOR MUST PROVIDE PROTECTIVE BARRIERS OR BARRICADES TO
ALLOW PROPER AND ADEQUATE BUILDING ACCESS AND UNOBSTRUCTED
EGRESS.
7. THE CONTRACTOR IS REQUIRED TO COMMUNICATE WITH BOTH THE USING
AGENCY AND THE ARCHITECT ON A DAILY BASIS OF THE CURRENT WORK
SCHEDULE SO PROPER COORDINATION AND SCHEDULING FOR OBSERVATION OF
WORK AND COORDINATION WITH AGENCY ACTIVITIES CAN OCCUR.
8. ALL RE-ROOFING WORK SHALL BE EXECUTED IN ACCORDANCE WITH THE
DRAWINGS AND SPECIFICATIONS PREPARED BY THE ARCHITECT; HOWEVER, IN
NO CASE SHALL RE-ROOFING INSTALLATION DEVIATE FROM THE ROOFING
SYSTEM MANUFACTURER'S MINIMUM WARRANTY REQUIREMENTS. IF ANY SUCH
DISCREPANCIES OCCUR, THE CONTRACTOR MUST NOTIFY THE ARCHITECT
IMMEDIATELY. RESOLUTION MUST BE MADE BEFORE PROCEEDING WITH ANY
SUCH WORK.
9. UNLESS NOTED OTHERWISE, ALL NEW SHEET METAL WORK ASSOCIATED WITH
RE-ROOFING WORK SHALL COMPLY WITH RECOMMENDATIONS AND DETAILS IN
THE MOST CURRENT EDITION OF "ARCHITECTURAL SHEET METAL MANUAL"
PUBLISHED BY SMACNA. SEE DETAILS FOR TYPE, GAUGE AND FINISH OF NEW
SHEET METAL COMPONENTS.
10. THE CONTRACTOR SHALL CAREFULLY EXAMINE THE EXISTING ROOF DECK
SURFACE AT EACH ROOF AREA JUST PRIOR TO THE INSTALLATION OF THE NEW
ROOFING SYSTEM AND REMOVE ALL NAILS, FASTENERS AND OTHER FOREIGN
MATERIAL, WHEREAS TO PROVIDE A REASONABLY SMOOTH SURFACE FOR THE
APPLICATION OF NEW ROOFING MATERIALS.
11. ALL NEW TAPERED INSULATION CRICKETS AND ROOF SADDLES INDICATED ON
THE DRAWINGS SHALL UTILIZE A 1/2" PER FOOT TAPERED POLYISOCYANURATE
INSULATION SYSTEM (POLYISO).
12. EXCEPT AS OTHERWISE INDICATED ON THE DRAWINGS, ALL WOOD BLOCKING
AND PLYWOOD SHALL BE PRESSURE TREATED. ALL FASTENERS INSTALLED
EITHER IN CONTACT OR FOR INSTALLATION OF PRESSURE TREATED WOOD SHALL
BE STAINLESS STEEL OR HAVE A CORROSION-RESISTANT COATING SPECIFICALLY
DESIGNED AND SUITABLE FOR USE WITH PRESSURE TREATED WOOD.
13. SEALANT FOR EXTERIOR JOINTS SHALL BE ONE AND/OR TWO PART
POLYURETHANE, SOFT CURING, NON-STAINING, OF GUN CONSISTENCY IN COLOR
TO CLOSELY MATCH ADJACENT MATERIALS. CLEAN AND PRIME ALL JOINTS AS
REQUIRED PRIOR TO SEALANT INSTALLATION.
14. CONTRACTOR SHALL RAISE AND EXTEND ALL EXISTING EXHAUST FANS, AND
EQUIPMENT CURBS TO PROVIDE A MINIMUM CLEARANCE OF 12" ABOVE FINISHED
ROOF LEVEL. THE CONTRACTOR SHALL INCLUDE IN THEIR BID THE EXTENSION
OF ALL EXISTING, PIPING, DUCTWORK AND/OR ELECTRICAL WORK AS MAY BE
REQUIRED TO ACCOMMODATE THE ADDITIONAL CURB HEIGHTS. PROVIDE A
CONTINUOUS SEAL STRIP ON TOP OF LEVEL CURBS PRIOR TO RESETTING UNITS.
NEW CURB EXTENSIONS SHALL MATCH EXISTING CURB PROFILES AND BLOCKING
THICKNESS. THE CONTRACTOR SHALL TEST RUN EACH POWER ROOF EXHAUST
AND/OR HANDLING UNIT, IN THE PRESENCE OF THE ARCHITECT'S
REPRESENTATIVE OR USING AGENCY PRIOR TO DISCONNECTING AND RAISING
THE UNIT AND EXTENDING THE CURBS. THIS INCLUDES BUT IS NOT LIMITED TO
ALL ANCILLARY GAS PIPING, ELECTRICAL CONNECTIONS, DUCTWORK, ETC.
15. RAISE AND EXTEND EXISTING ALL PLUMBING VENTS AS REQUIRED TO OBTAIN A
MINIMUM CLEARANCE OF 12" FROM THE TOP OF THE PLUMBING VENT FLASHING
TO TOP OF THE NEW ROOF (I.E. ABOVE FINISHED ROOF LEVEL).
16. THE CONTRACTOR SHALL NOT TRAFFIC UPON, OR STORE MATERIALS ON ANY
EXISTING ROOF AREAS WHICH ARE NOT A PART OF THIS CONTRACT.
SYMBOLS / ABBREVIATIONS
AFF ABOVE FINISHED FLOOR
ACP/APC ACOUSTIC CEILING PANEL/
ACOUSTIC PANEL CEILING
ACT ACOUSTIC(AL) TILE
ADJ ADJUSTABLE
ADT'L ADDITIONAL
AGG AGGREGATE
ALT ALTERNATE
AL ALUMINUM
APPROX APPROXIMATE(LY)
ASPH ASPHALT
AUTO AUTOMATIC
B/O BOTTOM OF
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BOT BOTTOM
BRG BEARING
CENTERLINE
C/C CENTER TO CENTER
CJ CONTROL JOINT
CLL CONTRACT LIMIT LINE
CEM CEMENT(ITIOUS)
CMU CONCRETE MASONRY UNIT
CLG CEILING
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
CTR CENTER(ED)
DF DRINKING FOUNTAIN
DS DOWNSPOUT
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DET/DTL DETAIL
DIA DIAMETER
DIM DIMENSION
DN DOWN
DWG(S) DRAWING(S)
E EAST
EC ELECTRICAL CONTRACTOR
EHO ELECTRICAL HOLD OPEN
EJ EXPANSION JOINT
EW EACH WAY
EA EACH
EIFS EXTERIOR INSULATION
FINISH SYSTEM
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EMER EMERGENCY
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXT EXTERIOR
EWC ELECTRIC WATER COOLER
FD
FE FIRE EXTINGUISHER
FFE FINISH FLOOR ELEVATION
FV FIELD VERIFY
FEC FIRE EXTINGUISHER CABINET
FDN FOUNDATION
FIN FINISH
FLSHG FLASHING
FLR FLOOR
FRMG FRAMING
FT FOOT/FEET
FTG FOOTING
GC GENERAL CONTRACTOR
GA GAUGE
GALV GALVANIZED
GEN GENERAL
GYP GYPSUM
HM HOLLOW METAL
HDWR HARDWARE
HOL HOLLOW
HOR HORIZONTAL
HT HEIGHT
HVAC HEATING/VENTILATION/AIR
CONDITIONING
IDPH ILLINOIS DEPARTMENT OF
PUBLIC HEALTH
ID INSIDE DIAMETER
IN INCH
INCL INCLUDING
INSUL INSULATION
INT INTERIOR
JAN JANITOR
JT JOINT
LAV LAVATORY
LB(S) POUND(S)
L/S LANDSCAPE
LT LIGHT
MO MASONRY OPENING
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NOM NOMINAL
OC ON CENTER
OD OUTSIDE DIAMETER
O TO O OUT TO OUT
OPNG OPENING
OPP OPPOSITE
OVHD OVERHEAD
PEB PRE-ENGINEERED BUILDING
PJF PREFORMED JOINT FILLER
PT PRESSURE TREATED
PERIM PERIMETER
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PNT PAINT
PR PAIR
PTD PAINTED
PWR POWER
RB RUBBER BASE
RD ROOF DRAIN
RO ROUGH OPENING
RAD RADIUS
REC RECESSED
REINF REINFORCED
REQ'D REQUIRED
REV REVISED (REVISION)
RM ROOM
S SOUTH
SB SPLASH BLOCK
SF SQUARE FEET
SS STAINLESS STEEL
SIM SIMILAR
SPEC SPECIFICATIONS
SQ SQUARE
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
T&G TONGUE AND GROOVE
T/O TOP OF
TELE TELEPHONE
TRTD TREATED
TS TUBE STEEL
TYP TYPICAL
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VERT VERTICAL
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WWF WELDED WIRE FABRIC
WD WOOD
WH WATER HEATER
WT WEIGHT
C
L
X
A-XXX
SCALE: 1/8" = 1'-0"
ROOF PLAN
X
A-XXX
NORTH ARROW
DETAIL TITLE
SECTION CUT CALL OUT
X
A-XXX
DETAIL REFERENCE CALL OUT
14
KEYNOTE
FLOOR DRAIN
ISSUE DATE:
SHEET NUMBER:
CHECKED BY:DRAWN BY:
DESIGNED BY:
DATE:REVISION:
SHEET TITLE:
REVISION:DATE:
REVISION:DATE:
STATE OF MISSOURIMICHAEL L. PARSON,
GOVERNOR
NWKNRBBTW
GENERAL NOTES
G0022 OF 12 SHEETSAugust 1, 2019
CAD DWG FILE:
REPAIR STORM DAMAGE
T1931-016312
08/01/2019
T1931-01.6312A-002
8136312001
JACKSON
JACKSON, MISSOURI
READINESS CENTER224 W PARK ST.
63755
& REPLACE ROOF
OFFICE OFADMINISTRATIONDIVISION OF FACILITIESMANAGEMENT, DESIGNAND CONSTRUCTION
DEPARTMENT OFPUBLIC SAFETYMISSOURI NATIONALGUARD OFFICE OF THEADJUTANT GENERALFACILITIES DIVISION
SITE # ASSET #
PROJECT #
GROUP
www.f-w.comEngineers | Architects | Surveyors | Scientists
20 ALLEN AVENUE, SUITE 200ST LOUIS, MISSOURI 63119(314) 962-7900 / [email protected]
DATE: 8/1/19EXP: 12/31/20
SEALED DATE: 08/05/2019
EXPIRATION DATE: 12/31/19
1
1
1
2
2
2
3
3
5
3
3
2
4
64
4
4
2
4
22'-8 1/2" 18'-4"
12'-3"
19'-4"
10'-0"
9'-11"
10'-0"
8'-9 1/2"
5'-2"
14'-8"
21'-4" 90'-0"
61'-0"
7
19'-3 1/4"
82'-5 1/2"
11'-7 3/4"
10'-0"22'-8 1/2" 19'-2"
22'-4"
53'-8"
20'-2"
9'-2 1/2"
12'-4 1/2"
103'-4"
136'-4"
106AREA
EXERCISE
105OFFICE
103OFFICE
101ENTRY
104OFFICE
107ROOM
LOCKER
102HALLDRILL
111VAULT
108OFFICE
109SUPPLY
110SUPPLY
112MAINTENANCE
113ACLASSROOM
113BCLASSROOM
114AFOOD PREP.
114CFOOD STOR.
114BSCULLERY
116JAN.
115FEMALE
117MALE
118CFURN.
118ROOMBUNK
119TRAINING
120OFFICE
120AEQUIP.
4
4
4
13'-5 1/2"
21'-4"
2
6
1
A101
SCALE: 1/8" = 1'-0"
FLOOR PLAN DEMO
REMOVE GYP. BD. UP TO 2'-0" .
REMOVE WALL BASE.
PREP. WALL FOR PAINT.
REMOVE FLOORING - PREP FOR NEW FLOOR FINISH - SEE INTERIOR DRAWINGS.
REMOVE EXISTING OVERHEAD DOOR, TRACK, AND DOOR OPENER.
REMOVE WALL PANEL FOR INSPECTION.
PREP FOR DECK/ STRUCTURE PAINT.
ISSUE DATE:
SHEET NUMBER:
SITE #
CHECKED BY:DRAWN BY:
DESIGNED BY:
DATE:REVISION:
ASSET #
PROJECT #
SHEET TITLE:
REVISION:DATE:
REVISION:DATE:
STATE OF MISSOURIMICHAEL L. PARSON,
GOVERNOR
NWKNRBBTW
DEMO
A1014 OF 12 SHEETSAugust 1, 2019
1
2
3
4
5
KEYNOTES
6
7
CAD DWG FILE:
REPAIR STORM DAMAGE
T1931-016312
08/01/2019
T1931-01.6312.A101
8136312001
JACKSON
JACKSON, MISSOURI
READINESS CENTER224 W PARK ST.
63755
& REPLACE ROOF
OFFICE OFADMINISTRATIONDIVISION OF FACILITIESMANAGEMENT, DESIGNAND CONSTRUCTION
DEPARTMENT OFPUBLIC SAFETYMISSOURI NATIONALGUARD OFFICE OF THEADJUTANT GENERALFACILITIES DIVISION
FLOOR PLAN -
GROUP
www.f-w.comEngineers | Architects | Surveyors | Scientists
20 ALLEN AVENUE, SUITE 200ST LOUIS, MISSOURI 63119(314) 962-7900 / [email protected]
DATE: 8/1/19EXP: 12/31/20
1
2
2
2
7
11
3
7
3
3
3
3
1
11
1
1
1 1
1
1
1
2
3 3
22
9
3
9
4
44
4
5 6
5 6
5
6
5
6
5
6
5
6
5 65 6
5 6
2
1A
A501
1A
A501
1A
A501
1A
A501
1A
A501
2A
A501
1A
A501
4A
A501
1A
A501
1A
A501
1A
A501
2
2
2
2
3
22'-4"92'-0"23'-10"
19
'-1
0"
63
'-0
"20'-4"
31
'-2
"
70'-10 1/4"
10
3'-2
"
29'-4"
20'-4"
10'-0"57'-3 3/4"
4'-0"
8
8
1A
A501
1A
A501
4A
A501
4A
A501
3
3
3
4A
A501
10
11
12
1 1
1
1
A102
SCALE: 1/8" = 1'-0"
ROOF PLAN DEMO
ISSUE DATE:
SHEET NUMBER:
CHECKED BY:DRAWN BY:
DESIGNED BY:
DATE:REVISION:
SHEET TITLE:
REVISION:DATE:
REVISION:DATE:
STATE OF MISSOURIMICHAEL L. PARSON,
GOVERNOR
NWKNRBBTW
ROOF PLAN -
A1025 OF 12 SHEETSAugust 1, 2019
GENERAL NOTES:
1. CONTRACTOR SHALL FIELD VERIFY ALL BUILDING CONDITIONS AND DIMENSIONS
2. THE CONSTRUCTION DETAILS ON THE FOLLOWING SHEETS ARE FOR REFERENCE ONLY
3. THE TAPERED INSULATION LAYOUT IS FOR REFERENCE ONLY. THE SUBMITTED TAPERED LAYOUT
MUST MEET ASHRAE REQUIREMENTS BASED ON STATE OF MISSOURI ROOF PROJECT MANUAL.
4. THE NEW ROOF SHALL HAVE A MINIMUM SLOPE OF 1/4" PER FOOT UNLESS NOTED OTHERWISE
5. THE NEW ROOF SHALL HAVE A 15 YEAR WARRANTY.
6. EXISTING ROOFING AND INSULATION SHALL BE REMOVED DOWN TO THE EXISTING
METAL/CONCRETE DECK AND REPLACED WITH TAPERED INSULATION AND FULLY ADHERED TPO
SINGLE PLY ROOF MEMBRANE.
7. EXISTING ANTENNA TO BE REMOVED.
8. THE CAULKING, GLAZING, AND ROOFING MATERIALS CONTAIN ASBESTOS. TESTING PENDING.
9. 1/2" PER 1" SLOPE CRICKETS, REQUIRES TO SHED WATER AT MECHANICAL UNITS, REFERENCE
STATE OF MISSOURI ROOF PROJECT MANUAL
1
2
3
5
6
4
KEYNOTES
REMOVE EXISTING ROOF GUTTER AND DOWNSPOUT ASSEMBLY.
DISCONNECT AND TEMPORARILY REMOVE EXISTING MECHANICAL UNIT OR FAN
ASSEMBLY ATOP CURB TO ACCOMMODATE NEW WORK. SEE DETAIL 3A/A501 FOR
CURB DEMO INFORMATION.
PROTECT EXISTING PIPING THRU ROOF
REMOVE DOWNSPOUT SPLASHPAD.
REMOVE EXISTING INSULATION.
REMOVE EXISTING MEMBRANE ROOF ASSEMBLY.
REMOVE EXISTING EQUIPMENT.
REMOVE EXISTING COAX CABLE.
REINSTALL PIPING AS REQUIRED FOR EXISTING HEATERS.
REMOVE EXISTING ROOF POP-UP AND PATCH HOLE.
REMOVE DOWNSPOUT
REMOVE EXISTING ANTENNA AND ALL ASSOCIATED ITEMS
7
8
9
10
DEMO
CAD DWG FILE:
REPAIR STORM DAMAGE
T1931-016312
08/01/2019
T1931-01.6312.A102
8136312001
JACKSON
JACKSON, MISSOURI
READINESS CENTER224 W PARK ST.
63755
& REPLACE ROOF
OFFICE OFADMINISTRATIONDIVISION OF FACILITIESMANAGEMENT, DESIGNAND CONSTRUCTION
DEPARTMENT OFPUBLIC SAFETYMISSOURI NATIONALGUARD OFFICE OF THEADJUTANT GENERALFACILITIES DIVISION
SITE # ASSET #
PROJECT #
GROUP
www.f-w.comEngineers | Architects | Surveyors | Scientists
20 ALLEN AVENUE, SUITE 200ST LOUIS, MISSOURI 63119(314) 962-7900 / [email protected]
11
12
DATE: 8/1/19EXP: 12/31/20
2
1
1
1
3
3
1
23
1
5
4
2
4
6
18'-4"
12'-3"
19'-4"
10'-0"
9'-11"
10'-0"
8'-9 1/2"
5'-2"
21'-4" 90'-0"
61'-0"
19'-3 1/4"
82'-5 1/2"
11'-7 3/4"
10'-0"22'-8 1/2" 19'-2"
22'-4"
53'-8"
20'-2"
9'-2 1/2"
12'-4 1/2"
103'-4"
106AREA
EXERCISE
105OFFICE
103OFFICE
101ENTRY
104OFFICE
107ROOM
LOCKER
102HALLDRILL
111VAULT
108OFFICE
109SUPPLY
110SUPPLY
112MAINTENANCE
113ACLASSROOM
113BCLASSROOM
114AFOOD PREP.
114CFOOD STOR.
114BSCULLERY
116JAN.
115FEMALE
117MALE
118CFURN.
118ROOMBUNK
119TRAINING
120OFFICE
120AEQUIP.
4
3 4
4
4
2
4
6
3
4
1
A-002
SCALE: 1/8" = 1'-0"
FLOOR PLAN
INSTALL GYP. BD. UP TO 2'-0"
PAINT WALL - SEE INTERIOR DRAWINGS
INSTALL NEW WALL BASE - SEE INTERIOR DRAWINGS
INSTALL NEW FLOORING - SEE INTERIOR DRAWINGS
INSTALL NEW GARAGE DOOR AND DOOR OPENER
REINSTALL OR REPLACE PANELING
ISSUE DATE:
SHEET NUMBER:
SITE #
CHECKED BY:DRAWN BY:
DESIGNED BY:
DATE:REVISION:
ASSET #
PROJECT #
SHEET TITLE:
REVISION:DATE:
REVISION:DATE:
STATE OF MISSOURIMICHAEL L. PARSON,
GOVERNOR
NWKNRBBTW
FLOOR PLAN
A1036 OF 12 SHEETSAugust 1, 2019
1
2
3
4
KEYNOTES
5
6
CAD DWG FILE:
REPAIR STORM DAMAGE
T1931-016312
08/01/2019
T1931-01.6312.A103
8136312001
JACKSON
JACKSON, MISSOURI
READINESS CENTER224 W PARK ST.
63755
& REPLACE ROOF
OFFICE OFADMINISTRATIONDIVISION OF FACILITIESMANAGEMENT, DESIGNAND CONSTRUCTION
DEPARTMENT OFPUBLIC SAFETYMISSOURI NATIONALGUARD OFFICE OF THEADJUTANT GENERALFACILITIES DIVISION
GROUP
www.f-w.comEngineers | Architects | Surveyors | Scientists
20 ALLEN AVENUE, SUITE 200ST LOUIS, MISSOURI 63119(314) 962-7900 / [email protected]
DATE: 8/1/19EXP: 12/31/20
1B
A501
1B
A501
1B
A501
1B
A501
1
12
11
1111
1
1
1 1 1
1
4
4
4
44
4
3
4
4
3
5
55
66
6
6
6
6
22'-4"92'-0"23'-10"
19
'-1
0"
63
'-0
"2
0'-4
"
31
'-2
"
10
3'-2
"
29
'-4
"2
0'-4
"
2B
A501
1C
A501
1C
A501
1B
A501
1B
A501
4
4
11
1313
1313
3
7
3
7
3
11
77
3
3
3
8
1 1
1
26
9 10
14
14
14
3B
A501
1B
A501
3B
A501
3
SEE DETAIL
2/A104
SEE DETAIL
3/A104
SEE DETAIL
3/A104
SEE DETAIL
3/A104
SEE DETAIL
3/A104
SIM.
1B
A501
3C
A501
2B
A501
1B
A501
4B
A501
14
14
14
14
3
3
4
3
4
3
1B
A501
EXISTING ROOF
NO WORK
GENERAL NOTE: ALL STRUCTURE
ASSUEMED TO BE FLAT THUS
TAPERED ISNTULATION TO PROVIDE
MIN. ROOF SLOPE OF
1
4
" PER 1'-0"
18
17
15
19
16
20
25
27
27
12" x 12" TARGET PATCH
21
24
22
25
23
1
A104
SCALE: 1/8" = 1'-0"
ROOF PLAN
KEYNOTES
1
ISSUE DATE:
SHEET NUMBER:
SITE #
CHECKED BY:DRAWN BY:
DESIGNED BY:
DATE:REVISION:
ASSET #
PROJECT #
SHEET TITLE:
REVISION:DATE:
REVISION:DATE:
CAD DWG FILE:
STATE OF MISSOURIMICHAEL L. PARSON,
GOVERNOR
REPAIR STORM DAMAGE
T1931-016312
08/01/2019
T1931-01.6312.A104NWKNRBBTW
ROOF PLAN
A1047 OF 12 SHEETSAugust 1, 2019
8136312001
JACKSON
JACKSON, MISSOURI
READINESS CENTER224 W PARK ST.
63755
& REPLACE ROOF
NEW GUTTER AND DOWNSPOUT ASSEMBLY - MATCH EXISTING
EXISTING MECHANICAL UNIT ASSEMBLY ATOP CURB
NEW PIPE SEAL AT EXISTING PIPING THRU ROOF
EXISTING PIPING THRU ROOF
REINSTALL EXISTING MECHANICAL UNIT ASSEMBLY ATOP NEW ROOFING OVER
CURB.
REINSTALL EXISTING EXHAUST FAN ASSEMBLY ATOP NEW ROOFING OVER CURB
NEW DOWNSPOUT PRE-CAST CONCRETE SPLASHPAD
PROTECT EXISTING ROOF GUTTER AND DOWNSPOUT ASSEMBLY TO REMAIN
INFILL EXISTING ROOF POP-UP
HATCH INDICATES CONCRETE DECK ABOVE VAULT AREA BELOW (FIELD VERIFY) -
PROTECT EXISTING CONCRETE
1" DIA. 12'-0" ALUM. ANTENNA POLE, NEW PIPE SEAL, INSTALL PER
MANUFACTURER'S INSTRUCTIONS
GUY WIRE ANCHORS SPACED EVENLY FROM CENTER ON 4' RADIUS - ANCHOR TO
STRUCTURE - INSTALL PER OWNER'S INSTRUCTIONS
ANTENNA ANCHORS SPACED EVENLY - ANCHOR TO STRUCTURE
NEW FULLY ADHERED TPO ROOFING ASSEMBLY
2" GALV. STEEL PIPE
1" ALUM. POLE
WEATHER HEAD
GUY WIRE
STAINLESS STEEL PIPE CLAMPS
BOOT/FLASH COMPATIBLE WITH ROOF MATERIAL
STAINLESS STEEL BRACKET
THREADED BOLT W/ NEOPRENE WASHER AND NUT
MANUFACTURER ACCEPTABLE SEALANT (TYP.)
STAINLESS STEEL BASE PLATE
ROOF MEMBRANE
EXISTING ROOF CRICKET TO BE REPLACED - TIE NEW ROOFING INTO EXISTING
EXPANSION JOINT
SECURE WITH U-CLAMPS AT TOP AND BOTTOM OF BAR JOIST
2
3
4
5
6
13
14
12
11
10
9
8
7
3
A104
SCALE: 1/8" = 1'-0"
ANTENNA ROOF PENETRATION DETAIL2
A104
SCALE: 1/8" = 1'-0"
HF ANTENNA MAST DETAIL
OFFICE OFADMINISTRATIONDIVISION OF FACILITIESMANAGEMENT, DESIGNAND CONSTRUCTION
DEPARTMENT OFPUBLIC SAFETYMISSOURI NATIONALGUARD OFFICE OF THEADJUTANT GENERALFACILITIES DIVISION
17
18
16
15
19
20
21
22
23
24
25
26
GROUP
www.f-w.comEngineers | Architects | Surveyors | Scientists
20 ALLEN AVENUE, SUITE 200ST LOUIS, MISSOURI 63119(314) 962-7900 / [email protected]
27
DATE: 8/1/19EXP: 12/31/20
2A/1B
A501
2A/1B
A501
2A/1B
A501
2A/1B
A501
1A/1C
A501
22
1
23
1
2
1A
A201
1A
A201
1
23
1
2
1
2
1
2
1
2
1
2
222
1
2
1
2
1
2
1
2
2B
A501
2A/1B
A501
2B
A501
2A/1B
A501
3
3
3
3
8
8
10
10
10
10
2
1
SIM.
12
13
11
1A
A201
SCALE: 3" = 1'-0"
ROOF EDGE REPLACEMENT DETAIL
4
5
1
8
9
7
3"
2" M
IN
.
6
ISSUE DATE:
SHEET NUMBER:
CHECKED BY:DRAWN BY:
DESIGNED BY:
DATE:REVISION:
SHEET TITLE:
REVISION:DATE:
REVISION:DATE:
STATE OF MISSOURIMICHAEL L. PARSON,
GOVERNOR
NWKNRBBTW
EXTERIOR
A2018 OF 12 SHEETSAugust 1, 2019
ELEVATIONS
KEYNOTES
1 NEW FULLY ADHERED TPO ROOFING ASSEMBLY
REPLACE EXISTING ROOF GUTTER AND DOWNSPOUT ASSEMBLY
REPLACED DAMAGED BRICK - HATCH INDICATES APPROXIMATE EXTENT OF DAMAGE
PROTECT EXISTING METAL ROOF DECK
NEW TAPERED INSULATION - 3" MIN. AT ROOF EDGE
COVER BOARD OVER TAPERED INSULATION ON 1/4" GYP. SHEATHING
TREATED WOOD BLOCKING. MIN. 2X10 - WRAP ALL EXPOSED WOOD WITH METAL
CLADDING
NEW ROOF EDGE COPING
REPAIR EXISTING BRICK AS REQUIRED - REFER TO ELEVATIONS FOR APPROXIMATE
EXTENT OF DAMAGE
NEW ANTENNA - SEE DETAILS 2/A104 AND 3/A104
REMOVE EXISTING ANTENNA, BRACKETS, AND ALL ASSOCIATED ITEMS - PATCH
MASONRY.
REMOVE DOWNSPOUT AND RELOCATE
NEW DOWNSPOUT LOCATION
2
3
4
A201
SCALE: 1/8" = 1'-0"
SOUTH ELEVATION
3
A201
SCALE: 1/8" = 1'-0"
NORTH ELEVATION
2
A201
SCALE: 1/8" = 1'-0"
EAST ELEVATION
1
A201
SCALE: 1/8" = 1'-0"
WEST ELEVATION
CAD DWG FILE:
REPAIR STORM DAMAGE
T1931-016312
08/01/2019
T1931-01.6312.A201
8136312001
JACKSON
JACKSON, MISSOURI
READINESS CENTER224 W PARK ST.
63755
& REPLACE ROOF
OFFICE OFADMINISTRATIONDIVISION OF FACILITIESMANAGEMENT, DESIGNAND CONSTRUCTION
DEPARTMENT OFPUBLIC SAFETYMISSOURI NATIONALGUARD OFFICE OF THEADJUTANT GENERALFACILITIES DIVISION
4
5
6
7
8
9
10
SITE # ASSET #
PROJECT #
GROUP
www.f-w.comEngineers | Architects | Surveyors | Scientists
20 ALLEN AVENUE, SUITE 200ST LOUIS, MISSOURI 63119(314) 962-7900 / [email protected]
11
12
13
DATE: 8/1/19EXP: 12/31/20
2C
A501
SCALE: 3" = 1'-0"
HVAC CURB FLASHING DETAIL ON CONC. DECK
1C
A501
SCALE: 3" = 1'-0"
ROOF EDGE AND GUTTER DETAIL ON CONC. DECK
3C
A501
SCALE: 3" = 1'-0"
FLASHING AT BRICK DETAIL ON CONC. DECK
12
" M
IN
IM
UM
- H
EIG
HT
V
AR
IE
S
24
" M
IN
IM
UM
P
ER
W
AR
RA
NT
Y R
EQ
UIR
EM
EN
TS
1
2
3
4
5
6
7
8
15
10
11
12
13
14
4
GENERAL REMOVE OR REPLACE NOTE:
IF EXISTING CURB CONDITIONS MEET
MANUFACTURER'S WARRANTY
REQUIREMENTS, PROTECT AND REPLACE
OR ADJUST TO MEET REQUIREMENTS
2
1 3
16
1415
17
6
19
12
4
3
2
3
4
6
7
8
17
5
VA
RIE
S 8
" M
IN
.
6
3
4
17
1B
A501
SCALE: 3" = 1'-0"
ROOF EDGE AND GUTTER DETAIL ON MTL DECK
3B
A501
SCALE: 3" = 1'-0"
FLASHING AT BRICK DETAIL ON MTL DECK
2
3
4
6
7
8
5
6"
2B
A501
SCALE: 3" = 1'-0"
ROOF EDGE AND GUTTER DETAIL ON MTL DECK
SLOPE
SLOPE
6"
3A
A501
SCALE: 3" = 1'-0"
(DEMO)
HVAC CURB FLASHING DETAIL2A
A501
SCALE: 3" = 1'-0"
(DEMO)
ROOF EDGE AND EXISTING GUTTER DETAIL
FIE
LD
V
ER
IF
Y
GENERAL REMOVE OR REPLACE NOTE:
CONFIRM NEW INSULATION THICKNESS
DOES NOT EXCEED MINIMUM DIMENSION
FOR CURB FLASHING REQUIREMENTS
27
28
21
34
21
29
30
2
20
21
22
23
24
25
26
SLOPE
SLOPE
SLOPE
6"
VA
RIE
S
6"
33
2
1A
A501
SCALE: 3" = 1'-0"
(DEMO)
ROOF EDGE AND EXISTING GUTTER DETAIL
2
20
21
22
23
24
25
3"
3"
3"
1514
1
1
34
34
35
35
4A
A501
SCALE: 3" = 1'-0"
(DEMO)
PARAPET FLASHING DETAIL
17
23
32
28
21
29
2
KEYNOTES
1
ISSUE DATE:
SHEET NUMBER:
CHECKED BY:DRAWN BY:
DESIGNED BY:
DATE:REVISION:
SHEET TITLE:
REVISION:DATE:
REVISION:DATE:
STATE OF MISSOURIMICHAEL L. PARSON,
GOVERNOR
NWKNRBBTW
ROOF DETAILS
A5019 OF 12 SHEETSAugust 1, 2019
1/4" GYPSUM SHEATHING (MECHANICALLY FASTENED)
PROTECT EXISTING TOP OF METAL PAN ON BAR JOIST
1/2" COVER BOARD OVER MINIMUM 3" TAPERED INSULATION AT ROOF EDGE
NEW FULLY ADHERED TPO ROOFING ASSEMBLY
REPLACE ALL EXISTING WOOD WITH TREATED 2x BLOCKING. ATTACH TO EXISTING
STRUCTURE - EXISTING STRUCTURE TO BE FIELD VERIFIED, SEE DETAILS ON SHEET
S100 - WRAP ALL EXPOSED WOOD WITH METAL CLADDING
NEW T-BAR AND SEALANT
NEW GUTTER STRAP
NEW METAL GUTTER AND DOWNSPOUT TO MATCH EXISTING SIZE, PROFILE, AND COLOR.
EXTEND EXISTING METAL CURB (VERIFY HEIGHT ABOVE ROOF REQUIREMENTS WITH HVAC
UNIT MANUFACTURERS WARRANTY - ADJUST TO MEET MANUFACTURERS
REQUIREMENT)
REPLACE EXISTING TREATED WOOD NAILER WITH NEW
NEW GALVANIZED COUNTER FLASHING FASTENED 24” OC
REINFORCED FASTENING STRIP
REPLACE EXISTING 1” RIGID INSULATION
PROTECT TOP OF BAR JOIST
PROTECT EXISTING CONCRETE
PROTECT EXISTING 4” STEEL ANGLE
PROTECT EXISTING BRICK WALL
NOT USED.
NEW CONTINUOUS PREFINISHED METAL COUNTERFLASHING
REMOVE EXISTING INSULATION (MECHANICALLY FASTENED)
REMOVE EXISTING MEMBRANE ROOF ASSEMBLY
REMOVE ALL EXISTING WOOD WITH METAL CLADDING
REMOVE EXISTING T-BAR AND SEALANT
REMOVE EXISTING METAL GUTTER ASSEMBLY
PROTECT EXISTING FACE BRICK TO REMAIN
PROTECT EXISTING CONCRETE
REMOVE OR REPLACE EXISTING TREATED WOOD NAILER WITH NEW
REMOVE OR REPLACE EXISTING 2" SEAM PLATE AND FASTENER
REMOVE EXISTING INSULATION (MECHANICALLY FASTENED)
PROTECT EXISTING 4” STEEL ANGLE
REMOVE BLOCKING
REMOVE REINFORCED FASTENING STRIP
EXTEND EXISTING METAL CURB TO ACCOMMODATE NEW ROOF INSULATION (VERIFY HEIGHT
ABOVE ROOF REQUIREMENTS WITH HVAC UNIT MANUFACTURERS WARRANTY - AJUST
TO MEET MANUFACTURERS REQUIREMENT)
REPAIR BRICK AS REQUIRED - REFER TO ELEVATIONS ON A-201 FOR APPROXIMATE EXTENT
OF DAMAGE
REPLACE EXISTING WOOD FASCIA BOARD WITH 2X TREATED WOOD FASCIA BOARD - WRAP
IN METAL CLADDING
2
3
4
5
6
13
14
12
11
10
9
8
7
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
CAD DWG FILE:
REPAIR STORM DAMAGE
T1931-016312
08/01/2019
T1931-01.6312.A501
8136312001
JACKSON
JACKSON, MISSOURI
READINESS CENTER224 W PARK ST.
63755
& REPLACE ROOF
OFFICE OFADMINISTRATIONDIVISION OF FACILITIESMANAGEMENT, DESIGNAND CONSTRUCTION
DEPARTMENT OFPUBLIC SAFETYMISSOURI NATIONALGUARD OFFICE OF THEADJUTANT GENERALFACILITIES DIVISION
34
35
SITE # ASSET #
PROJECT #
GROUP
www.f-w.comEngineers | Architects | Surveyors | Scientists
20 ALLEN AVENUE, SUITE 200ST LOUIS, MISSOURI 63119(314) 962-7900 / [email protected]
DATE: 8/1/19EXP: 12/31/20
3
1
1
1
1
1
1
2
4
6
6
TYP
5
106AREA
EXERCISE
105OFFICE
103OFFICE
101ENTRY
104OFFICE
107ROOM
LOCKER
102HALLDRILL
111VAULT
108OFFICE
109SUPPLY
110SUPPLY
112MAINTENANCE
113ACLASSROOM
113BCLASSROOM
114AFOOD PREP.
114CFOOD STOR.
114BSCULLERY
116JAN.
115FEMALE
117MALE
118CFURN.
118ROOMBUNK
119TRAINING
120OFFICE
120AEQUIP.
1
A701
SCALE: 1/8" = 1'-0"
REFLECTED CEILING PLAN
ISSUE DATE:
SHEET NUMBER:
CHECKED BY:DRAWN BY:
DESIGNED BY:
DATE:REVISION:
SHEET TITLE:
REVISION:DATE:
REVISION:DATE:
STATE OF MISSOURIMICHAEL L. PARSON,
GOVERNOR
NWKNRBBTW
REFLECTED
A70110 OF 12 SHEETSAugust 1, 2019
CEILING PLAN
REPLACE CEILING TILE - HATCH INDICATES DAMAGED TILES TO
BE REPLACED
PATCH AND REPAIR HARD CEILING - PAINT
PAINT CEILING/EXPOSED BRICK - SEE INTERIOR DRAWINGS
REINSTALL SMOKE DETECTOR
INSTALL NEW GARAGE DOOR AND DOOR OPENER
UNIT HEATER - RECONNECT UNIT AND REPLACE FLUE. ROUTE
THROUGH EXISTING OPENING IN ROOF DECK ABOVE
1
2
3
4
KEYNOTES
5
6
CAD DWG FILE:
REPAIR STORM DAMAGE
T1931-016312
08/01/2019
T1931-01.6312.A701
8136312001
JACKSON
JACKSON, MISSOURI
READINESS CENTER224 W PARK ST.
63755
& REPLACE ROOF
OFFICE OFADMINISTRATIONDIVISION OF FACILITIESMANAGEMENT, DESIGNAND CONSTRUCTION
DEPARTMENT OFPUBLIC SAFETYMISSOURI NATIONALGUARD OFFICE OF THEADJUTANT GENERALFACILITIES DIVISION
1. REINSTALL ANY CEILING FIXTURES AS REQUIRED BY
REPAIR WORK AND REPLACEMENT OF CEILING TILE
GENERAL NOTES
SITE # ASSET #
PROJECT #
GROUP
www.f-w.comEngineers | Architects | Surveyors | Scientists
20 ALLEN AVENUE, SUITE 200ST LOUIS, MISSOURI 63119(314) 962-7900 / [email protected]
DATE: 8/1/19EXP: 12/31/20
PNT-1
CPT-1
RB-1
PNT-1
CPT-1
RB-1
PNT-1
CPT-1
RB-1
PNT-1
106AREA
EXERCISE
105OFFICE
103OFFICE
101ENTRY
104OFFICE
107ROOM
LOCKER
102HALLDRILL
111VAULT
108OFFICE
109SUPPLY
110SUPPLY
112MAINTENANCE
113ACLASSROOM
113BCLASSROOM
114AFOOD PREP.
114CFOOD STOR.
114BSCULLERY
116JAN.
115FEMALE
117MALE
118CFURN.
118ROOM
STORAGE
119TRAINING
120OFFICE
120AEQUIP.
PNT-2
PNT-1
RB-1
PNT-1
CPT-1
RB-1
PNT-2
CPT-1
RB-1
VCT-1
RB-1
PNT-1
VCT-1
RB-1
VCT-1
SLVBTWSLV
INTERIOR
I10111 OF 12 SHEETS
FINISH PLAN
1
I-101
SCALE: 1/16" = 1'-0"
FIRST FLOOR INTERIOR FINISH PLAN
ISSUE DATE:
SHEET NUMBER:
SITE #
CHECKED BY:DRAWN BY:
DESIGNED BY:
DATE:REVISION:
ASSET #
PROJECT #
SHEET TITLE:
REVISION:DATE:
REVISION:DATE:
CAD DWG FILE:
STATE OF MISSOURIMICHAEL L. PARSON,
GOVERNOR
REPAIR STORM DAMAGE
T1931-016312
08/01/2019
T1931-01.6312.I101
August 1, 2019
8136312001
JACKSON
JACKSON, MISSOURI
READINESS CENTER224 W PARK ST.
63755
& REPLACE ROOF
GROUP
www.f-w.comEngineers | Architects | Surveyors | Scientists
20 ALLEN AVENUE, SUITE 200ST LOUIS, MISSOURI 63119(314) 962-7900 / [email protected]
OFFICE OFADMINISTRATIONDIVISION OF FACILITIESMANAGEMENT, DESIGNAND CONSTRUCTION
DEPARTMENT OFPUBLIC SAFETYMISSOURI NATIONALGUARD OFFICE OF THEADJUTANT GENERALFACILITIES DIVISION
DATE: 8/1/19EXP: 12/31/20
INTERIOR
I60112 OF 12 SHEETSAugust 1, 2019
FINISH SCHEDULE
FINISH ABBREVIATION LEGEND
AB ALUMINUM WALL BASE
ACT ACOUSTICAL CEILING TILE
ADJ ADJACENT
AFF ABOVE FINISHED FLOOR
AL ALUMINUM
AP ACOUSTIC WALL PANEL
BBT BIOBASED TILE
CG CORNER GUARD
CJ CONTROL JOINT
CMU CONCRETE MASONRY UNIT
CON CONCRETE FLOORING
CR CARD READER
CPT CARPET
CS CULTURED STONE
CT CERAMIC TILE
DG DOOR FRAME GUARD
EG END WALL GUARD
EM ENTRY MAT SYSTEM
EPX EPOXY FLOORING
EX EXISTING
EXJ EXPANSION JOINT
EXP EXPOSED
F FABRIC
FRP FIBERGLASS REINFORCED PANELS
GLS DECORATIVE GLASS
G GROUT
GYP GYPSUM WALL BOARD
HR HAND RAIL
LAM PLASTIC LAMINATE
LF LINEAR FEET (FOOT)
LIN LINOLEUM SHEET / TILE
LVT LUXURY VINYL TILE
MB MOLDED WALL BASE
MTL METAL
MISC MISCELLANEOUS
NA NOT APPLICABLE
NS NATURAL STONE
PNT PAINT
PFIN PREFINISHED
QTZ QUARTZ COUNTERTOP
RB RESILIENT WALL BASE
RPS RESIN PANEL SYSTEM
RM ROCK MULCH
RVT RESILIENT VINYL TILE
SF SQUARE FEET (FOOT)
SS SOLID SURFACE
SST STAINLESS STEEL
SSV SPECIALTY SHEET VINYL
ST STAIN
SV SHEET VINYL
SVT SPECIALTY VINYL TILE
T TILE FLOORING/ WALL / WALL
BASE (CERAMIC, PORCELAIN,
GLASS)
TP TOLIET PARTITION
TR DECORATIVE WOOD TRIM /
CROWN / BASE MOLDING
TS TRANSITION STRIP
TYP TYPICAL
TZ TERAZZO FLOORING
UFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VET VINYL ENCHANCED TILE
VIF VERIFY IN FIELD
VWC VINYL WALL COVERING
WD WOOD FLOORING
WDP WOOD PANELING / WAINSCOT
WP WALL PROTECTION
WR WHITEROCK
WINDOW TREATMENT
ABBREVIATIONS
CC CUBICLE CURTAIN
CCT CUBICLE CURTAIN TRACK
CUR DECORATIVE CURTAIN
HBL HORIZONTAL BLIND
RBL ROLLER SHADE
ROD CURTAIN ROD
SHC SHOWER CURTAIN
SHR SHOWER CURTAIN ROD
SHT SHUTTER
VBL VERTICAL BLIND
VAL VALANCE / CORNICE
WF WINDOW FILM
FF&E ABBREVIATIONS
B BENCH
BED BED
CH CHAIR
CR COAT RACK
D DESK
FL FLOOR LAMP
KB KEYBOARD TRAY
MAT MATTRESS
MIR MIRROR
NS NIGHTSTAND
OT OTTOMAN
S SOFA / LOVESEAT
SH SHELVING
ST STORAGE UNIT
T TABLE
TL TABLE LAMP
TR TRASH RECEPTACLE
TV TV
UM PATIO UMBRELLA
INTERIOR SYMBOL LEGEND
WALL FINISH
ACCENT WALL FINISH
WALL BASE
FLOOR FINISH
FLOOR MATERIAL TRANSITION
ALIGN TRANSITION WITH ADJACENT ITEM
PATTERN/LINEAR DIRECTION
CASEWORK COUNTER/TRANSITION TOP FINISH
CASEWORK BASE AND UPPER CABINET FINISH
MISCELLANEOUS FINISH
INTERIOR SIGNAGE
CORNER GUARD / END WALL GUARD
WINDOW TREATMENT
ROLLER SHADE
DRAPERY / DECORATIVE CURTAIN
VALANCE / CORNICE
CUBICLE CURTAIN & TRACK
X-#
X-#
X-#
XXX-#
XXX-#
X-#
X-#
X-#
XXX
#X
ALIGN
X-#
BASIS OF DESIGN FLOORING FINISH
TAG DESCRIPTION MANUFACTURER PRODUCT LINE / MODEL NUMBER SIZE COLOR FINISH
GROUT
LOCATION
SUPPLIER /
INSTALLERREMARKS / NOTESTYPE COLOR
VCT-1
VINYL COMPOSITION
TILE
ARMSTRONG WORLD
INDUSTRIES
STANDARD EXCELON IMPERIAL TEXTURE 12"X12" TBD - - - - - -
BASIS OF DESIGN MISCELLANEOUS FINISH
TAG DESCRIPTION MANUFACTURER PRODUCT LINE / MODEL NUMBER SIZE COLOR FINISH
GROUT
LOCATION
SUPPLIER /
INSTALLERREMARKS / NOTESTYPE COLOR
ACT-1 ACOUSTIC CEILING TILE ARMSTRONG ULTIMA 24" x 48" WHITE - - - - - -
BASIS OF DESIGN WALL FINISH
TAG DESCRIPTION MANUFACTURER PRODUCT LINE / MODEL NUMBER SIZE COLOR FINISH
GROUT
LOCATION
SUPPLIER /
INSTALLERREMARKS / NOTESTYPE COLOR
BASIS OF DESIGN WALL BASE FINISH
TAG DESCRIPTION MANUFACTURER PRODUCT LINE / MODEL NUMBER SIZE COLOR FINISH
GROUT
LOCATION
SUPPLIER /
INSTALLERREMARKS / NOTESTYPE COLOR
RB-1 RUBBER BASE JOHNSONITE 4" COVE ROLL TBD - - - - - -
PNT-1 PAINT SHERWIN WILLIAMS - - TBD - - - - -
PNT-2 PAINT SHERWIN WILLIAMS - - - - - - -
ROOM FINISH SCHEDULE
ROOM NO. NAME FLOOR BASE
WALLS CEILING
REMARKS
EAST NORTH SOUTH WEST
FIN HEIGHTMAT'L FIN MAT'L FIN MAT'L FIN MAT'L FIN
FIRST FLOOR
101 ENTRY - - PNT-1 - -
DRILL HALL -102
OFFICE CPT-1103
104
105
EXERCISE AREA106
LOCKER ROOM107
OFFICE108
SUPPLY109
SUPPLY110
VAULT111
MAINTENANCE112
CLASSROOM113A
114A FOOD PREP.
114B SCULLERY
FINISH SCHEDULE
TBD
TBD
TBD
113B CLASSROOM
114C
115
116
117
118
118C
120
120A
119
FOOD STOR.
FEMALE
JAN.
MALE
STORAGE ROOM
FURN.
TRAINING
OFFICE
EQUIP.
OFFICE
OFFICE
CPT-1
CPT-1
CPT-1
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
RB-1
RB-1
RB-1
RB-1
RB-1
-PNT-1
- PNT-1 - PNT-1 - PNT-1
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- PNT-1 - PNT-1 - PNT-1 - PNT-1
- PNT-1 - PNT-1 - PNT-1 - PNT-1
- PNT-1 - PNT-1 - PNT-1 - PNT-1
- PNT-1 - PNT-1 - PNT-1 - PNT-1
- EXISTING - EXISTING - EXISTING - EXISTING
- PNT-1 - PNT-1 - PNT-1 - PNT-1
- - -- --
- - -- - - - -
- - -- - - - -
- - -- - - - -
- - -- - - - -
- - -- - - - -
- - -- - - - -
- - -- - - - -
- - -- - - - -
- - -- - - - -
- - -- - - - -
- - -- - - - -
- - -- - - - -
- - -- - - - -
- - -- - - - -
- - -- - - - -
- - -- - - - -
PNT-2
ACT-1
ACT-1
ACT-1
ACT-1
ACT-1
ACT-1
ACT-1
ACT-1
ACT-1
-
-
-
-
-
-
-
-
-
-
-
-
-
CEILING TO BE REPLACED IN INDICATED AREAS
CEILING TO BE REPLACED IN INDICATED AREAS
CEILING TO BE REPLACED IN INDICATED AREAS
CEILING TO BE REPLACED IN INDICATED AREAS
CEILING TO BE REPLACED IN INDICATED AREAS
CEILING TO BE REPLACED IN INDICATED AREAS
CEILING TO BE REPLACED IN INDICATED AREAS
CEILING TO BE REPLACED IN INDICATED AREAS
CEILING TO BE REPLACED IN INDICATED AREAS
- - - -
CPT-1 RB-1
PNT-2- - - -
-
CEILING TO BE PATCHED IN INDICATED AREAS
ISSUE DATE:
SHEET NUMBER:
SITE #
CHECKED BY:DRAWN BY:
DESIGNED BY:
DATE:REVISION:
ASSET #
PROJECT #
SHEET TITLE:
REVISION:DATE:
REVISION:DATE:
CAD DWG FILE:
STATE OF MISSOURIMICHAEL L. PARSON,
GOVERNOR
REPAIR STORM DAMAGE
T1931-016312
08/01/2019
T1931-01.6312.I601
8136312001
JACKSON
JACKSON, MISSOURI
READINESS CENTER224 W PARK ST.
63755
& REPLACE ROOF
GROUP
www.f-w.comEngineers | Architects | Surveyors | Scientists
20 ALLEN AVENUE, SUITE 200ST LOUIS, MISSOURI 63119(314) 962-7900 / [email protected]
OFFICE OFADMINISTRATIONDIVISION OF FACILITIESMANAGEMENT, DESIGNAND CONSTRUCTION
DEPARTMENT OFPUBLIC SAFETYMISSOURI NATIONALGUARD OFFICE OF THEADJUTANT GENERALFACILITIES DIVISION
SLVBTWSLV
NOTE: PRODUCTS SHOWN IN SCHEDULE ARE BASIS OF DESIGN UNLESS OTHERWISE NOTED. SEE SPECIFICATIONS FOR ACCEPTABLE ALTERNATE MANUFACTURERS.
CPT-1 CARPET TILE MANNINGTON SCRIPT INFINITY 24"X24" TBD - - - - - -
VCT-1
VCT-1
VCT-1
RB-1
RB-1
DATE: 8/1/19EXP: 12/31/20