! ( ! l ! ( ! ( Tower 56 E-519255, N-6072788 ¾ À 373 19 N2-S26 N2-S25 19R N2-Wild-200 434 437 * MAP SHEET FULLY WITHIN THE N2-WILD-200 FEATURE Coordinate System: UTM Zone 14N NAD83 Data Source: MB Hydro, ProvMB, NRCAN Date Created: December 02, 2013 ± 1:10,000 0 240 480 120 Metres Map 105 Bipole III Transmission Project Construction Environmental Protection Plan Construction Section N2 Environmentally Sensitive Site Locations DOCUMENT PATH: G:\_GIS_PROJECT_FOLDER\00_HYDRO\111440054_BPIII_EPP\ARCMAP\ESS_N2\BPIII_CENVPP_N1N2N3N4C1SECTIONBASEMAP_MAPBOOK_BTB_STANTEC_20131201.MXD ESS Features Wildlife Mammals and Habitat Soils and Terrain Permafrost Points of Access* ! ( Proposed Access Point ! ( Major Stream Crossing Abandoned Rail Crossing Rail Crossing " ) Transmission Line Crossing Project Infrastructure Proposed Access Route Land Base 66 m Right of Way BPIII Final Preferred Route Angle Tower Locations # # *Labels correspond to BPIII Access Management Database Mining ! ! Transmission Line Highway Major Road Local Road Winter Road Railway (Operational) Railway (Discontinued) Provincial Park

Upload: others

Post on 19-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: rep BPIII CENVPP N2 20131202 - Province of Manitoba · 442 41 48 447 438 444 43 452 451 450 49 45 4 5 3 4 9 * M AP S H ETF ULY WIN 2-D 0 R * M AP S H ETF ULY WIN 2-D 0 R * MAP SHEET

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!(

! l

! l

!( !(!(

!(

!(

!(

!(

!(

!(

Tower 56E-519255, N-6072788

¾À373

19

N2-S25N2-S26

N2-S2519R

N2-Wild-200

N2-Wild-200

434

437

* MAP SHEET FULLY WITHIN THE N2-WILD-200 FEATURE

* MAP SHEET FULLY WITHIN THE N2-WILD-200 FEATURE

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: December 02, 2013

±

1:10,000

0 240 480120Metres

Map 105

Bipole III Transmission ProjectConstruction Environmental Protection Plan

Construction Section N2Environmentally Sensitive Site Locations

DOCU

MENT

PAT

H: G

:\_GI

S_PR

OJEC

T_FO

LDER

\00_

HYDR

O\11

1440

054_

BPIII

_EPP

\ARC

MAP\

ESS_

N2\B

PIII_

CENV

PP_N

1N2N

3N4C

1SEC

TION

BASE

MAP_

MAPB

OOK_

BTB_

STAN

TEC_

2013

1201

.MXD

ESS FeaturesWildlife

Mammals and HabitatSoils and Terrain

Permafrost

Points of Access*!( Proposed Access Point!( Major Stream Crossing

Abandoned Rail CrossingRail Crossing

") Transmission Line Crossing

Project Infrastructure

Proposed Access Route

Land Base

66 m Right of WayBPIII Final Preferred RouteAngle Tower Locations

#

#

*Labels correspond to BPIII Access Management Database

Mining

! ! Transmission LineHighwayMajor RoadLocal RoadWinter RoadRailway (Operational)Railway (Discontinued)

Provincial Park

Page 2: rep BPIII CENVPP N2 20131202 - Province of Manitoba · 442 41 48 447 438 444 43 452 451 450 49 45 4 5 3 4 9 * M AP S H ETF ULY WIN 2-D 0 R * M AP S H ETF ULY WIN 2-D 0 R * MAP SHEET

MAP NUMBER : 105

ESS Group : Mammals

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

N2-S25 N2-Wild-200 MCWS Caribou Sensitive Area Site: 433 to 434 E- 522779 N-6074015

E-519255 N-6072788 14N 3731 m

N2-S26 N2-Wild-200 MCWS Caribou Sensitive Area Site: 437 to 438 E- 519255 N-6072788

E-513131 N-6072016 14N 6173 m

Potential Effects:

Potential disturbance to and loss of sensitive caribou habitat Specific Mitigation:

Harvest within caribou range boundary will not include shear blading except for access, conductor stringing trails, and tower footprints.

No shear blading to clear the right of way (ROW) in the sensitive range. Selective cutting methods will only be used to remove danger trees, vegetation within tower footprint, access route, and helicopter access points, to maintain low tree, shrub and herb plant communities on the ROW. Use existing access roads and trails to the extent possible

Maintenance trails to be maintained to reduce line of sight for hunters and predators. Remove trees by low-disturbance methods

Annual ground inspection of towers to occur late in winter season to avoid creating packed snow trails that facilitate predator use of the ROW.

Any Manitoba Hydro constructed or improved access routes used to access the ROW for construction that will not be needed for future maintenance will be decommissioned on completion of construction. Any culverts or road improvements will be removed and the first 100 m from of the trail dug up to the extent possible. Available slash <1 m in height will also be evenly distributed over the access route to reduce the possibility of use by ATV traffic.

Page 3: rep BPIII CENVPP N2 20131202 - Province of Manitoba · 442 41 48 447 438 444 43 452 451 450 49 45 4 5 3 4 9 * M AP S H ETF ULY WIN 2-D 0 R * M AP S H ETF ULY WIN 2-D 0 R * MAP SHEET

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!( ! l! l !( !(!( !(!(

!(

!(

!(

!(!(

Tower 57

E-513131, N-6072016¾À373

¾À373

[\6

¾À373

[\6

N2-S26N2-S26N2-S2689RT

N2-Wild-200

N2-Soils-176

N2-Soils-175

N2-Soils-

176

440

439

442

441438444

443

445

* MAP SHEET FULLY WITHIN THE N2-WILD-200 FEATURE

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: December 02, 2013

±

1:10,000

0 240 480120Metres

Map 106

Bipole III Transmission ProjectConstruction Environmental Protection Plan

Construction Section N2Environmentally Sensitive Site Locations

DOCU

MENT

PAT

H: G

:\_GI

S_PR

OJEC

T_FO

LDER

\00_

HYDR

O\11

1440

054_

BPIII

_EPP

\ARC

MAP\

ESS_

N2\B

PIII_

CENV

PP_N

1N2N

3N4C

1SEC

TION

BASE

MAP_

MAPB

OOK_

BTB_

STAN

TEC_

2013

1201

.MXD

ESS FeaturesWildlife

Mammals and HabitatSoils and Terrain

Permafrost

Points of Access*!( Proposed Access Point!( Major Stream Crossing

Abandoned Rail CrossingRail Crossing

") Transmission Line Crossing

Project Infrastructure

Proposed Access Route

Land Base

66 m Right of WayBPIII Final Preferred RouteAngle Tower Locations

#

#

*Labels correspond to BPIII Access Management Database

Mining

! ! Transmission LineHighwayMajor RoadLocal RoadWinter RoadRailway (Operational)Railway (Discontinued)

Provincial Park

Page 4: rep BPIII CENVPP N2 20131202 - Province of Manitoba · 442 41 48 447 438 444 43 452 451 450 49 45 4 5 3 4 9 * M AP S H ETF ULY WIN 2-D 0 R * M AP S H ETF ULY WIN 2-D 0 R * MAP SHEET

MAP NUMBER : 106

ESS Group : Mammals

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

N2-S26 N2-Wild-200 MCWS Caribou Sensitive Area Site: 437 to 438 E- 519255 N-6072788

E-513131 N-6072016 14N 6173 m

Potential Effects:

Potential disturbance to and loss of sensitive caribou habitat Specific Mitigation:

Harvest within caribou range boundary will not include shear blading except for access, conductor stringing trails, and tower footprints.

No shear blading to clear the right of way (ROW) in the sensitive range. Selective cutting methods will only be used to remove danger trees, vegetation within tower footprint, access route, and helicopter access points, to maintain low tree, shrub and herb plant communities on the ROW. Use existing access roads and trails to the extent possible

Maintenance trails to be maintained to reduce line of sight for hunters and predators. Remove trees by low-disturbance methods

Annual ground inspection of towers to occur late in winter season to avoid creating packed snow trails that facilitate predator use of the ROW.

Any Manitoba Hydro constructed or improved access routes used to access the ROW for construction that will not be needed for future maintenance will be decommissioned on completion of construction. Any culverts or road improvements will be removed and the first 100 m from of the trail dug up to the extent possible. Available slash <1 m in height will also be evenly distributed over the access route to reduce the possibility of use by ATV traffic.

ESS Group : Permafrost

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

N2-S26 N2-Soils-175 Permafrost Site: 439 to 440 E-514496 N-6072188

E-514193 N-6072150 14N 305 m

Potential Effects: Melting or loss of permafrost due to disturbance of the active layer Specific Mitigation:

Carry out construction activities on frozen ground to minimize surface damage and rutting Use existing trails, roads or cut lines whenever possible as access routes Avoid organic soils containing permafrost to the extent possible Maintain shrub and herbaceous vegetation to the extent possible Remove trees by low-disturbance methods Confine vehicle traffic to established trails to the extent possible Implement erosion protection before commencing construction in accordance with Erosion/Sediment Control

Plan

Page 5: rep BPIII CENVPP N2 20131202 - Province of Manitoba · 442 41 48 447 438 444 43 452 451 450 49 45 4 5 3 4 9 * M AP S H ETF ULY WIN 2-D 0 R * M AP S H ETF ULY WIN 2-D 0 R * MAP SHEET

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!(

!l

!(

!(

!(

!(

!(

!(

!(

!( !(

!(

!(

!(

!(

!(

!(

Tower 57E-513131, N-6072016

¾À373

[\6

¾À373

[\6

[\6

P19W

P19W

N2-S26

N2-S26

N2-S27

89RTN2-Wild-200

N2-Soils-176

N2-Soils-175

N2-Wild-200

N2-Soils-176

N2-Soils-177

N2-Soils-177

440

439

442

441

438448 447444

443

452451

450 449

445

453

449

* MAP SHEET FULLY WITHIN THE N2-WILD-200 FEATURE

* MAP SHEET FULLY WITHIN THE N2-WILD-200 FEATURE

* MAP SHEET FULLY WITHIN THE N2-WILD-200 FEATURE

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: December 02, 2013

±

1:10,000

0 240 480120Metres

Map 107

Bipole III Transmission ProjectConstruction Environmental Protection Plan

Construction Section N2Environmentally Sensitive Site Locations

DOCU

MENT

PAT

H: G

:\_GI

S_PR

OJEC

T_FO

LDER

\00_

HYDR

O\11

1440

054_

BPIII

_EPP

\ARC

MAP\

ESS_

N2\B

PIII_

CENV

PP_N

1N2N

3N4C

1SEC

TION

BASE

MAP_

MAPB

OOK_

BTB_

STAN

TEC_

2013

1201

.MXD

ESS FeaturesWildlife

Mammals and HabitatSoils and Terrain

Permafrost

Points of Access*!( Proposed Access Point!( Major Stream Crossing

Abandoned Rail CrossingRail Crossing

") Transmission Line Crossing

Project Infrastructure

Proposed Access Route

Land Base

66 m Right of WayBPIII Final Preferred RouteAngle Tower Locations

#

#

*Labels correspond to BPIII Access Management Database

Mining

! ! Transmission LineHighwayMajor RoadLocal RoadWinter RoadRailway (Operational)Railway (Discontinued)

Provincial Park

Page 6: rep BPIII CENVPP N2 20131202 - Province of Manitoba · 442 41 48 447 438 444 43 452 451 450 49 45 4 5 3 4 9 * M AP S H ETF ULY WIN 2-D 0 R * M AP S H ETF ULY WIN 2-D 0 R * MAP SHEET

MAP NUMBER : 107

ESS Group : Mammals

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

N2-S26 N2-Wild-200 MCWS Caribou Sensitive Area Site: 437 to 438 E- 519255 N-6072788

E-513131 N-6072016 14N 6173 m

N2-S27 N2-Wild-200 MCWS Caribou Sensitive Area Site: 445 to 446 E- 513131 N-6072016

E-504973 N-6059662 14N 14805 m

Potential Effects:

Potential disturbance to and loss of sensitive caribou habitat Specific Mitigation:

Harvest within caribou range boundary will not include shear blading except for access, conductor stringing trails, and tower footprints.

No shear blading to clear the right of way (ROW) in the sensitive range. Selective cutting methods will only be used to remove danger trees, vegetation within tower footprint, access route, and helicopter access points, to maintain low tree, shrub and herb plant communities on the ROW. Use existing access roads and trails to the extent possible

Maintenance trails to be maintained to reduce line of sight for hunters and predators. Remove trees by low-disturbance methods

Annual ground inspection of towers to occur late in winter season to avoid creating packed snow trails that facilitate predator use of the ROW.

Any Manitoba Hydro constructed or improved access routes used to access the ROW for construction that will not be needed for future maintenance will be decommissioned on completion of construction. Any culverts or road improvements will be removed and the first 100 m from of the trail dug up to the extent possible. Available slash <1 m in height will also be evenly distributed over the access route to reduce the possibility of use by ATV traffic.

ESS Group : Permafrost

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

N2-S26 N2-Soils-176 Permafrost Site: 441 to 442 E-513441 N-6072056

E-513131 N-6072016 14N 313 m

N2-S27 N2-Soils-176 Permafrost Site: 443 to 444 E-513131 N-6072016

E-513087 N-6071950 14N 80 m

N2-S27 N2-Soils-176 Permafrost Site: 447 to 448 E-512826 N-6071556

E-512748 N-6071437 14N 142 m

N2-S27 N2-Soils-177 Permafrost Site: 449 to 450 E-511543 N-6069613

E-511500 N-6069547 14N 79 m

N2-S27 N2-Soils-177 Permafrost Site: 451 to 452 E-511386 N-6069374

E-511232 N-6069141 14N 279 m

Potential Effects: Melting or loss of permafrost due to disturbance of the active layer

Specific Mitigation:

Carry out construction activities on frozen ground to minimize surface damage and rutting Use existing trails, roads or cut lines whenever possible as access routes Avoid organic soils containing permafrost to the extent possible Maintain shrub and herbaceous vegetation to the extent possible Remove trees by low-disturbance methods Confine vehicle traffic to established trails to the extent possible Implement erosion protection before commencing construction in accordance with Erosion/Sediment Control

Plan

Page 7: rep BPIII CENVPP N2 20131202 - Province of Manitoba · 442 41 48 447 438 444 43 452 451 450 49 45 4 5 3 4 9 * M AP S H ETF ULY WIN 2-D 0 R * M AP S H ETF ULY WIN 2-D 0 R * MAP SHEET

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

!!

!!

!!

!!

!!

!!

!!

!!

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

!(

!(

!(

!l

!( !( !( !( !( !(!( !( !( !(

[\6[\6[\6

52

20

P19WP19W

N2-S27N2-S27

20R

90T

90R

N2-Soils-177

N2-Wild-200

N2-Soils-177

N2-Soils-177

N2-Wild-144 452 451 450 449454 453

449

454

L90 L89

* MAP SHEET FULLY WITHIN THE N2-WILD-200 FEATURE * MAP SHEET FULLY WITHIN THE N2-WILD-200 FEATURE * MAP SHEET FULLY WITHIN THE N2-WILD-200 FEATURE

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: December 02, 2013

±

1:10,000

0 240 480120Metres

Map 108

Bipole III Transmission ProjectConstruction Environmental Protection Plan

Construction Section N2Environmentally Sensitive Site Locations

DOCU

MENT

PAT

H: G

:\_GI

S_PR

OJEC

T_FO

LDER

\00_

HYDR

O\11

1440

054_

BPIII

_EPP

\ARC

MAP\

ESS_

N2\B

PIII_

CENV

PP_N

1N2N

3N4C

1SEC

TION

BASE

MAP_

MAPB

OOK_

BTB_

STAN

TEC_

2013

1201

.MXD

ESS FeaturesWildlife

Mammals and HabitatSoils and Terrain

Permafrost

Points of Access*!( Proposed Access Point!( Major Stream Crossing

Abandoned Rail CrossingRail Crossing

") Transmission Line Crossing

Project Infrastructure

Proposed Access Route

Land Base

66 m Right of WayBPIII Final Preferred RouteAngle Tower Locations

#

#

*Labels correspond to BPIII Access Management Database

Mining

! ! Transmission LineHighwayMajor RoadLocal RoadWinter RoadRailway (Operational)Railway (Discontinued)

Provincial Park

Page 8: rep BPIII CENVPP N2 20131202 - Province of Manitoba · 442 41 48 447 438 444 43 452 451 450 49 45 4 5 3 4 9 * M AP S H ETF ULY WIN 2-D 0 R * M AP S H ETF ULY WIN 2-D 0 R * MAP SHEET

MAP NUMBER : 108

ESS Group : Mammals

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

N2-S27 N2-Wild-200 MCWS Caribou Sensitive Area Site: 445 to 446 E- 513131 N-6072016

E-504973 N-6059662 14N 14805 m

Potential Effects:

Potential disturbance to and loss of sensitive caribou habitat Specific Mitigation:

Harvest within caribou range boundary will not include shear blading except for access, conductor stringing trails, and tower footprints.

No shear blading to clear the right of way (ROW) in the sensitive range. Selective cutting methods will only be used to remove danger trees, vegetation within tower footprint, access route, and helicopter access points, to maintain low tree, shrub and herb plant communities on the ROW. Use existing access roads and trails to the extent possible

Maintenance trails to be maintained to reduce line of sight for hunters and predators. Remove trees by low-disturbance methods

Annual ground inspection of towers to occur late in winter season to avoid creating packed snow trails that facilitate predator use of the ROW.

Any Manitoba Hydro constructed or improved access routes used to access the ROW for construction that will not be needed for future maintenance will be decommissioned on completion of construction. Any culverts or road improvements will be removed and the first 100 m from of the trail dug up to the extent possible. Available slash <1 m in height will also be evenly distributed over the access route to reduce the possibility of use by ATV traffic.

ESS Group : Permafrost

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

N2-S27 N2-Soils-177 Permafrost Site: 453 to 454 E-510866 N-6068587

E-508885 N-6065587 14N 3594 m

Potential Effects: Melting or loss of permafrost due to disturbance of the active layer Specific Mitigation:

Carry out construction activities on frozen ground to minimize surface damage and rutting Use existing trails, roads or cut lines whenever possible as access routes Avoid organic soils containing permafrost to the extent possible Maintain shrub and herbaceous vegetation to the extent possible Remove trees by low-disturbance methods Confine vehicle traffic to established trails to the extent possible Implement erosion protection before commencing construction in accordance Erosion/Sediment Control Plan

Page 9: rep BPIII CENVPP N2 20131202 - Province of Manitoba · 442 41 48 447 438 444 43 452 451 450 49 45 4 5 3 4 9 * M AP S H ETF ULY WIN 2-D 0 R * M AP S H ETF ULY WIN 2-D 0 R * MAP SHEET

!!

!

!!

!!

!

!!

!

!!

!!

!

!!

!

!!

!!

!

!!

!!

!!

!!

!!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !!

!!

!!

!!

!!

!!

!!

!!

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

!

!(

!(

!(

!l!l

!(

!(

!(!( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !(

[\6[\6

[\6

52

20

P19WP19W

N2-S27N2-S27

20R

90T

90R

N2-Wild-200

N2-Soils-178

N2-Soils-177N2-Soils-179

N2-Soils-178

N2-Wild-144 454454462 461 460

459

458 457 456 455464 463467 466 465L90 L89

* MAP SHEET FULLY WITHIN THE N2-WILD-200 FEATURE

* MAP SHEET FULLY WITHIN THE N2-WILD-200 FEATURE * MAP SHEET FULLY WITHIN THE N2-WILD-200 FEATURE

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: December 02, 2013

±

1:10,000

0 240 480120Metres

Map 109

Bipole III Transmission ProjectConstruction Environmental Protection Plan

Construction Section N2Environmentally Sensitive Site Locations

DOCU

MENT

PAT

H: G

:\_GI

S_PR

OJEC

T_FO

LDER

\00_

HYDR

O\11

1440

054_

BPIII

_EPP

\ARC

MAP\

ESS_

N2\B

PIII_

CENV

PP_N

1N2N

3N4C

1SEC

TION

BASE

MAP_

MAPB

OOK_

BTB_

STAN

TEC_

2013

1201

.MXD

ESS FeaturesWildlife

Birds and HabitatWildlife

Mammals and HabitatSoils and Terrain

Permafrost

Points of Access*!( Proposed Access Point!( Major Stream Crossing

Abandoned Rail CrossingRail Crossing

") Transmission Line Crossing

Project Infrastructure

Proposed Access Route

Land Base

66 m Right of WayBPIII Final Preferred RouteAngle Tower Locations

#

#

*Labels correspond to BPIII Access Management Database

Mining

! ! Transmission LineHighwayMajor RoadLocal RoadWinter RoadRailway (Operational)Railway (Discontinued)

Provincial Park

Page 10: rep BPIII CENVPP N2 20131202 - Province of Manitoba · 442 41 48 447 438 444 43 452 451 450 49 45 4 5 3 4 9 * M AP S H ETF ULY WIN 2-D 0 R * M AP S H ETF ULY WIN 2-D 0 R * MAP SHEET

MAP NUMBER : 109

ESS Group : Mammals

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

N2-S28 N2-Wild-200 MCWS Caribou Sensitive Area Site: 445 to 446 E- 513131 N-6072016

E-504973 N-6059662 14N 14805 m

Potential Effects:

Potential disturbance to and loss of sensitive caribou habitat Specific Mitigation:

Harvest within caribou range boundary will not include shear blading except for access, conductor stringing trails, and tower footprints.

No shear blading to clear the right of way (ROW) in the sensitive range. Selective cutting methods will only be used to remove danger trees, vegetation within tower footprint, access route, and helicopter access points, to maintain low tree, shrub and herb plant communities on the ROW. Use existing access roads and trails to the extent possible

Maintenance trails to be maintained to reduce line of sight for hunters and predators. Remove trees by low-disturbance methods

Annual ground inspection of towers to occur late in winter season to avoid creating packed snow trails that facilitate predator use of the ROW.

Any Manitoba Hydro constructed or improved access routes used to access the ROW for construction that will not be needed for future maintenance will be decommissioned on completion of construction. Any culverts or road improvements will be removed and the first 100 m from of the trail dug up to the extent possible. Available slash <1 m in height will also be evenly distributed over the access route to reduce the possibility of use by ATV traffic.

ESS Group : Permafrost

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

N2-S27 N2-Soils-177 Permafrost Site: 453 to 454 E-510866 N-6068587

E-508885 N-6065587 14N 3594 m

N2-S27 N2-Soils-178 Permafrost Site: 455 to 456 E-507866 N-6064043

E-507427 N-6063379 14N 796 m

N2-S27 N2-Soils-178 Permafrost Site: 457 to 458 E-507245 N-6063103

E-507181 N-6063006 14N 116 m

N2-S27 N2-Soils-178 Permafrost Site: 459 to 460 E-507097 N-6062879

E-508885 N-6065587 14N 40 m

N2-S27 N2-Soils-178 Permafrost Site: 461 to 462 E-507025 N-6062770

E-506852 N-6062509 14N 313 m

Potential Effects: Melting or loss of permafrost due to disturbance of the active layer

Specific Mitigation:

Carry out construction activities on frozen ground to minimize surface damage and rutting Use existing trails, roads or cut lines whenever possible as access routes Avoid organic soils containing permafrost to the extent possible Maintain shrub and herbaceous vegetation to the extent possible Remove trees by low-disturbance methods Confine vehicle traffic to established trails to the extent possible Implement erosion protection before commencing construction in accordance with Erosion/Sediment Control

Plan

ESS Group : Birds and Habitat

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

N2-S24 N2-Wild-144 Waterfowl sensitivity area Site: L89 to L90 E- 508653 N-6065236

E-508621 N-6065187 14N 201 m

Potential Effects:

Higher risk of wire collision, disturbance during breeding and nesting, risk of wire collision is localized to the right-of-way while construction disturbance can effect colonies up to 400 meters away

Specific Mitigation:

Adhere to reduced risk timing windows for protection of birds (August 1- April 30) Maintain setback during timing window Conduct priority assessment for bird diverters and other measures prior to transmission line stringing Install bird diverters or other measures at high priority sites