![Page 1: Renewable Energy and PGE 3-16 - Green Technology · 10 PG&E’s New PV Program • 5-Year Program starting in January 2010 • 500 MW (AC) of 1 to 20 MW photovoltaic generation installations](https://reader033.vdocuments.mx/reader033/viewer/2022050406/5f8319a4b885fa024e76ff3f/html5/thumbnails/1.jpg)
PG&E and Renewable Energy
Chuck HornbrookSenior Manager
Solar and Customer Generation
![Page 2: Renewable Energy and PGE 3-16 - Green Technology · 10 PG&E’s New PV Program • 5-Year Program starting in January 2010 • 500 MW (AC) of 1 to 20 MW photovoltaic generation installations](https://reader033.vdocuments.mx/reader033/viewer/2022050406/5f8319a4b885fa024e76ff3f/html5/thumbnails/2.jpg)
2
PG&E and our Business
What we do:
• Deliver safe, reliable, and environmentally responsible gas and electricity to approximately 15 million Californians
6,000 MWElectric generation capacity
6,136 milesGas transmission backbone
18,610 milesElectric transmission circuits
5.1 MM electric 4.2 MM gas
Electric and gas distribution customers
![Page 3: Renewable Energy and PGE 3-16 - Green Technology · 10 PG&E’s New PV Program • 5-Year Program starting in January 2010 • 500 MW (AC) of 1 to 20 MW photovoltaic generation installations](https://reader033.vdocuments.mx/reader033/viewer/2022050406/5f8319a4b885fa024e76ff3f/html5/thumbnails/3.jpg)
3
PG&E as a Partner and Solutions Provider
PG&E Portfolio Solution
Reduce Energy
Use
Renewable Power Supply
ClimateSmart
Partnership
Education
Outreach
![Page 4: Renewable Energy and PGE 3-16 - Green Technology · 10 PG&E’s New PV Program • 5-Year Program starting in January 2010 • 500 MW (AC) of 1 to 20 MW photovoltaic generation installations](https://reader033.vdocuments.mx/reader033/viewer/2022050406/5f8319a4b885fa024e76ff3f/html5/thumbnails/4.jpg)
4
PG&E’s 2008 Electric Delivery Mix--on average over 50% of the energy PG&E delivers comes from sources that emit almost no carbon dioxide
![Page 5: Renewable Energy and PGE 3-16 - Green Technology · 10 PG&E’s New PV Program • 5-Year Program starting in January 2010 • 500 MW (AC) of 1 to 20 MW photovoltaic generation installations](https://reader033.vdocuments.mx/reader033/viewer/2022050406/5f8319a4b885fa024e76ff3f/html5/thumbnails/5.jpg)
5
We’re Committed to Energy Efficiency
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
1960
1962
1964
1966
1968
1970
1972
1974
1976
1978
1980
1982
1984
1986
1988
1990
1992
1994
1996
1998
2000
2002
2004
2006
2008
CaliforniaUnited States
Over the past 30 years, California per capita energy use has remained relatively flat compared to the 50% increase in U.S. per capita energy use.
Source: California Energy Commission
![Page 6: Renewable Energy and PGE 3-16 - Green Technology · 10 PG&E’s New PV Program • 5-Year Program starting in January 2010 • 500 MW (AC) of 1 to 20 MW photovoltaic generation installations](https://reader033.vdocuments.mx/reader033/viewer/2022050406/5f8319a4b885fa024e76ff3f/html5/thumbnails/6.jpg)
6
Support of Renewables
• Large systems
– RPS procurement
– 500 MW Solar Program
• Small Systems
– Small Generator Feed in Tariff
• Self Generation
– CSI/SGIP/NEM
– AB 811
• Testing Services
![Page 7: Renewable Energy and PGE 3-16 - Green Technology · 10 PG&E’s New PV Program • 5-Year Program starting in January 2010 • 500 MW (AC) of 1 to 20 MW photovoltaic generation installations](https://reader033.vdocuments.mx/reader033/viewer/2022050406/5f8319a4b885fa024e76ff3f/html5/thumbnails/7.jpg)
7
Greening our Energy Supply: Existing Renewable Resources
Biomass Energy Wind Energy
Small Hydropower (<30MW) Geothermal Energy
![Page 8: Renewable Energy and PGE 3-16 - Green Technology · 10 PG&E’s New PV Program • 5-Year Program starting in January 2010 • 500 MW (AC) of 1 to 20 MW photovoltaic generation installations](https://reader033.vdocuments.mx/reader033/viewer/2022050406/5f8319a4b885fa024e76ff3f/html5/thumbnails/8.jpg)
8
Bio-methane Capture
Greening our Future Energy Supply: Emerging Renewable Technologies
Solar Power Tower
Wave Energy Tidal Energy
Solar TroughSolar Dish
![Page 9: Renewable Energy and PGE 3-16 - Green Technology · 10 PG&E’s New PV Program • 5-Year Program starting in January 2010 • 500 MW (AC) of 1 to 20 MW photovoltaic generation installations](https://reader033.vdocuments.mx/reader033/viewer/2022050406/5f8319a4b885fa024e76ff3f/html5/thumbnails/9.jpg)
9
Aggressive Contracting for Renewables
0
500
1000
1500
2000
2500
3000
3500
4000
2002 2003 2004 2005 2006 2007 2008
MW
Annual Cumulative
33 2 4
15
3 6 8
12
27 30
34
Solar
# of Contracts
4
8
4
3
4
4
![Page 10: Renewable Energy and PGE 3-16 - Green Technology · 10 PG&E’s New PV Program • 5-Year Program starting in January 2010 • 500 MW (AC) of 1 to 20 MW photovoltaic generation installations](https://reader033.vdocuments.mx/reader033/viewer/2022050406/5f8319a4b885fa024e76ff3f/html5/thumbnails/10.jpg)
10
PG&E’s New PV Program• 5-Year Program starting in January 2010• 500 MW(AC) of 1 to 20 MW photovoltaic generation installations in
northern California. – Up to 250 MW (305 MW(DC)) utility-owned generation (UOG),
with an anticipated capital cost of $1.45 billion, and – Up to 250 MW of PPAs with renewable resource developers
• Capital cost of $4.28 per Watt(DC) assumed• PG&E-owned projects would be mounted primarily on the
ground, but possibly also on rooftops. • Where feasible, projects developed and owned by PG&E would
be built on land already owned by the utility or near its substations to minimize the cost and delays of interconnecting them to the power grid.
![Page 11: Renewable Energy and PGE 3-16 - Green Technology · 10 PG&E’s New PV Program • 5-Year Program starting in January 2010 • 500 MW (AC) of 1 to 20 MW photovoltaic generation installations](https://reader033.vdocuments.mx/reader033/viewer/2022050406/5f8319a4b885fa024e76ff3f/html5/thumbnails/11.jpg)
11
PG&E’s New PV Program (cont.)
• PG&E may hire contractors to build the projects or choose to build them on its own.
• PG&E would finance half of the overall project's costs through debt, and the other half with equity.
• Pricing for the PPAs will be derived from the cost-of-service of the UOG PV projects, currently assumed to be $246 per MWhwith Time of Delivery pricing adjustments.
• The terms and pricing of the PPAs will be pre-approved by the Commission, enabling a developer to execute the form contract with streamlined regulatory review, avoid the need for negotiations, and immediately commence development.
• 2 MW pilot UOG PV project starting in 2009, to speed deployment of the larger PV Program once approved.
![Page 12: Renewable Energy and PGE 3-16 - Green Technology · 10 PG&E’s New PV Program • 5-Year Program starting in January 2010 • 500 MW (AC) of 1 to 20 MW photovoltaic generation installations](https://reader033.vdocuments.mx/reader033/viewer/2022050406/5f8319a4b885fa024e76ff3f/html5/thumbnails/12.jpg)
12
PG&E Program Schedule
• Regulatory Filing: February 24, 2009• Regulatory Decision: September 2009 requested (later date
possible)
If approved:• First request for supplier information in 2009• 2-MW pilot project operational in 2010• 25 MW operational by the end of 2010• Install 50 MW per year in 2011 through 2014 • Finish with 75 megawatts in 2015.• The independent developer portion of the program would be
implemented over five years, with an annual allocation determined by the strength of the submissions to an annual request for offers.
• Expect to issue the first request for developer offers in early 2010.
![Page 13: Renewable Energy and PGE 3-16 - Green Technology · 10 PG&E’s New PV Program • 5-Year Program starting in January 2010 • 500 MW (AC) of 1 to 20 MW photovoltaic generation installations](https://reader033.vdocuments.mx/reader033/viewer/2022050406/5f8319a4b885fa024e76ff3f/html5/thumbnails/13.jpg)
13
What are the Feed-in Tariffs?• Effective February 14, 2008, PG&E can purchase power from
eligible renewable generators with a total effective generation capacity of not more than 1.5 MW.
• Examples of Eligible Renewable Resources*:• Solar PV or thermal• Biomass• Wind• Geothermal• Fuel cells using renewable fuels• Small hydroelectric• Digester or landfill gas, municipal solid waste, and others
* PU Code Section 399.12 and Public Resources Code 25741
![Page 14: Renewable Energy and PGE 3-16 - Green Technology · 10 PG&E’s New PV Program • 5-Year Program starting in January 2010 • 500 MW (AC) of 1 to 20 MW photovoltaic generation installations](https://reader033.vdocuments.mx/reader033/viewer/2022050406/5f8319a4b885fa024e76ff3f/html5/thumbnails/14.jpg)
14
Introduction to the Feed-in Tariffs (cont.)
• An eligible renewable generator may:
– Sell ALL his/her power to PG&E, or
– Sell only his/her excess power, after serving own load first
• In either case, PG&E will pay the customer the CPUC-determined Market Price Referent, times a Time of Delivery Factor for the power it buys
![Page 15: Renewable Energy and PGE 3-16 - Green Technology · 10 PG&E’s New PV Program • 5-Year Program starting in January 2010 • 500 MW (AC) of 1 to 20 MW photovoltaic generation installations](https://reader033.vdocuments.mx/reader033/viewer/2022050406/5f8319a4b885fa024e76ff3f/html5/thumbnails/15.jpg)
15
Introduction to the Feed-in Tariffs (cont.)
• There are 2 tariff schedules available, depending on the type of customer
• E-PWF: for public water and wastewater customers
• E-SRG: for all other eligible customers
• Service on either schedule is on a first-come-first-served basis and shall be closed to new customers once the combined generating capacity reaches 104.6 MW (per CPUC).
![Page 16: Renewable Energy and PGE 3-16 - Green Technology · 10 PG&E’s New PV Program • 5-Year Program starting in January 2010 • 500 MW (AC) of 1 to 20 MW photovoltaic generation installations](https://reader033.vdocuments.mx/reader033/viewer/2022050406/5f8319a4b885fa024e76ff3f/html5/thumbnails/16.jpg)
16
How Do Feed-in Tariff Power Sales Work?
• Electricity imports and exports measured separately
– Imported power: customer pays regular tariff rate
– Exported power: customer (seller) is paid TOD-adjusted MPR for generation exported to grid (in excess of usage)
• Contract terms:
– 10, 15, or 20 years
• Contracts to date
– 9.6 MW
– Wind/biomass/hydro
![Page 17: Renewable Energy and PGE 3-16 - Green Technology · 10 PG&E’s New PV Program • 5-Year Program starting in January 2010 • 500 MW (AC) of 1 to 20 MW photovoltaic generation installations](https://reader033.vdocuments.mx/reader033/viewer/2022050406/5f8319a4b885fa024e76ff3f/html5/thumbnails/17.jpg)
17
RECs, Rebates, and Rules…• Who owns the Renewable Energy Credits? (RECs)
– The customer owns the RECs for the power generated and used at his/her own site
– PG&E owns the RECs for the power it buys
• Rebates & Incentives not eligible
– Customers may not obtain or have obtained benefits from SGIP or CSI
• Other Rules
– For E-SRG, customers may not have had another contract/PPA with PG&E in prior 3 years, unless allowed under PG&E’s sole discretion.
![Page 18: Renewable Energy and PGE 3-16 - Green Technology · 10 PG&E’s New PV Program • 5-Year Program starting in January 2010 • 500 MW (AC) of 1 to 20 MW photovoltaic generation installations](https://reader033.vdocuments.mx/reader033/viewer/2022050406/5f8319a4b885fa024e76ff3f/html5/thumbnails/18.jpg)
18
Interconnection/Metering/Contacts
• Interconnections for the small renewable PPAs are under Federal Energy Regulatory Commission (FERC) jurisdiction– PG&E has a FERC-approved Small Generator
Interconnection Agreement (SGIA)
– All documents and requirements can be found on website
• Revenue-quality interval meter to account for hourly exports (for TOD adjustments)
• More information– www.pge.com/feedintariffs
![Page 19: Renewable Energy and PGE 3-16 - Green Technology · 10 PG&E’s New PV Program • 5-Year Program starting in January 2010 • 500 MW (AC) of 1 to 20 MW photovoltaic generation installations](https://reader033.vdocuments.mx/reader033/viewer/2022050406/5f8319a4b885fa024e76ff3f/html5/thumbnails/19.jpg)
19
PG&E Other Solar Activities
• Management of the California Solar Initiative
– General market, Low Income
• Management of the New Solar Homes Partnership
• Partnering with Habitat for Humanity to build solar communities
• Teaching children through our Solar Schools program
• Creating clean solar energy at our own facilities
• Helping create Major League Baseball’s first solar ballpark
• Connected more solar customers than any other utility in the county – more than 40% of total solar installed
![Page 20: Renewable Energy and PGE 3-16 - Green Technology · 10 PG&E’s New PV Program • 5-Year Program starting in January 2010 • 500 MW (AC) of 1 to 20 MW photovoltaic generation installations](https://reader033.vdocuments.mx/reader033/viewer/2022050406/5f8319a4b885fa024e76ff3f/html5/thumbnails/20.jpg)
20
Cumulative PG&E Solar Interconnections Customer Side of the Meter
• Almost 29,000 grid tied solar installations2006 = 6,3002007 = 8,4982008 = 8,4872009 = 1,970 (through Feb)
*as of February 2009
0
5000
10000
15000
20000
25000
30000
35000
2001 2002 2003 2004 2005 2006 2007 2008 2009
• More than 40% of all grid tied in US
• More than 290 MW
![Page 21: Renewable Energy and PGE 3-16 - Green Technology · 10 PG&E’s New PV Program • 5-Year Program starting in January 2010 • 500 MW (AC) of 1 to 20 MW photovoltaic generation installations](https://reader033.vdocuments.mx/reader033/viewer/2022050406/5f8319a4b885fa024e76ff3f/html5/thumbnails/21.jpg)
21
Support for Solar
• Net Metering
– Exports to utility grid are valued at retail electricity rate
– Capped at 2.5% of utility peak
• No standby charges
• No interconnection study fees
• Exemption from Nonbypassable Charges
• Renewable Energy Credits
![Page 22: Renewable Energy and PGE 3-16 - Green Technology · 10 PG&E’s New PV Program • 5-Year Program starting in January 2010 • 500 MW (AC) of 1 to 20 MW photovoltaic generation installations](https://reader033.vdocuments.mx/reader033/viewer/2022050406/5f8319a4b885fa024e76ff3f/html5/thumbnails/22.jpg)
22
California Solar Initiative - www.pge.com/csi
• PG&E began administering in 2007
• $950 million in PG&E solar incentives over the next decade
• Statewide goal is to install 3,000 MW by 2016
• Customers must perform energy efficiency audit to be eligible for incentives
PG&E has connected roughly 28,500solar-generating customers to the
grid.
![Page 23: Renewable Energy and PGE 3-16 - Green Technology · 10 PG&E’s New PV Program • 5-Year Program starting in January 2010 • 500 MW (AC) of 1 to 20 MW photovoltaic generation installations](https://reader033.vdocuments.mx/reader033/viewer/2022050406/5f8319a4b885fa024e76ff3f/html5/thumbnails/23.jpg)
23
CSI Snapshot
RECEIVED
• 12,987 applications
COMPLETED
• 8,988 applications
• Represents 87 MW
• Garnering $207,000 in incentives
• Offsetting roughly 39,000 tons of CO2
TOTAL CSI APPLICATIONS
Non-Residential,
1,072, 8%
Residential, 11,915, 92%
![Page 24: Renewable Energy and PGE 3-16 - Green Technology · 10 PG&E’s New PV Program • 5-Year Program starting in January 2010 • 500 MW (AC) of 1 to 20 MW photovoltaic generation installations](https://reader033.vdocuments.mx/reader033/viewer/2022050406/5f8319a4b885fa024e76ff3f/html5/thumbnails/24.jpg)
24
Solar and PPAs/Solar leases
• Popular mechanism to finance solar
• Predominately used with non-residential systems
– 76 MW of non-res owned by third party
– 316 systems
– Total non-res 156 MW and 1,072 systems
• Residential
– 9% of total systems under PPA or lease
– Higher percentage recently than at beginning of CSI program
![Page 25: Renewable Energy and PGE 3-16 - Green Technology · 10 PG&E’s New PV Program • 5-Year Program starting in January 2010 • 500 MW (AC) of 1 to 20 MW photovoltaic generation installations](https://reader033.vdocuments.mx/reader033/viewer/2022050406/5f8319a4b885fa024e76ff3f/html5/thumbnails/25.jpg)
25
Low Income Solar Programs: Single and Multifamily
• $216 million (10% of CSI Budget) set aside for Low Income, split between single family and multifamily
• PG&E, SCE, SDG&E ratepayer funded
• GOAL -
Promote participation by low income households living in existing housing structures
• PURPOSE -
Provide incentives for and education about installing eligible solar photovoltaic systems on existing low income homes
![Page 26: Renewable Energy and PGE 3-16 - Green Technology · 10 PG&E’s New PV Program • 5-Year Program starting in January 2010 • 500 MW (AC) of 1 to 20 MW photovoltaic generation installations](https://reader033.vdocuments.mx/reader033/viewer/2022050406/5f8319a4b885fa024e76ff3f/html5/thumbnails/26.jpg)
26
MASH Overview
• Budget of $108 million
• PG&E, SCE and CCSE
• Higher incentives available to low income building owners –
– $3.30/watt to offset common load (Track 1a)
– $4.00/watt to offset tenant load (Track 1b)
– Third incentive type that offers grants to building owners who can demonstrate significant tenant benefit
• Virtual Net Metering -- allows credits from one solar system to be applied to multi-tenant low income accounts
![Page 27: Renewable Energy and PGE 3-16 - Green Technology · 10 PG&E’s New PV Program • 5-Year Program starting in January 2010 • 500 MW (AC) of 1 to 20 MW photovoltaic generation installations](https://reader033.vdocuments.mx/reader033/viewer/2022050406/5f8319a4b885fa024e76ff3f/html5/thumbnails/27.jpg)
27
New Solar Homes Partnership (NSHP)
• Incentive program for installing eligible solar photovoltaic systems on new homes;
• 400 MW; Budget of $400 million
• Goal to create a self sustaining market for solar homes where builders incorporate high levels of energy efficiency and high performing solar systems
• Begun January 2007, ends December 2016
• PG&E; SCE; SDG&E and BVES Electric
![Page 28: Renewable Energy and PGE 3-16 - Green Technology · 10 PG&E’s New PV Program • 5-Year Program starting in January 2010 • 500 MW (AC) of 1 to 20 MW photovoltaic generation installations](https://reader033.vdocuments.mx/reader033/viewer/2022050406/5f8319a4b885fa024e76ff3f/html5/thumbnails/28.jpg)
28
NSHP Incentives
• One time, up-front, expected performance based incentive payment
• Levels decline over 10 years as MWs achieved
• Higher incentives available for affordable housing
--Start at $3.50/watt for residential units and systems servicing common areas
• Market rate base incentive
--2.50/watt; $2.60/watt – production housing with solar standard
![Page 29: Renewable Energy and PGE 3-16 - Green Technology · 10 PG&E’s New PV Program • 5-Year Program starting in January 2010 • 500 MW (AC) of 1 to 20 MW photovoltaic generation installations](https://reader033.vdocuments.mx/reader033/viewer/2022050406/5f8319a4b885fa024e76ff3f/html5/thumbnails/29.jpg)
29
Self Generation Incentive Program (SGIP)
• Program initiated in 2001
• Scheduled to continue accepting applications through 2012 – with modifications beginning in 2008
• Provides incentives for the installation of new, qualifying self-generation equipment installed to meet all or a portion of the electric energy needs of a facility (advanced energy storage, small wind and fuel cell)
• PG&E, SCE, SoCal Gas, California Center for Sustainable Energy (CCSE) for SDG&E
![Page 30: Renewable Energy and PGE 3-16 - Green Technology · 10 PG&E’s New PV Program • 5-Year Program starting in January 2010 • 500 MW (AC) of 1 to 20 MW photovoltaic generation installations](https://reader033.vdocuments.mx/reader033/viewer/2022050406/5f8319a4b885fa024e76ff3f/html5/thumbnails/30.jpg)
30
• ATS has unique capabilities for testing and evaluating distributed generation and storage equipment and their interactions with a utility grid
• Our facility is designed for testing grid-connected and off-grid power generation and storage technologies
• It complies with all PG&E interconnection requirements for an independent power producer (IPP) at its 500 kVA facility rating
• Measurement systems are designed based on the needs of the system under test and can include temperature, pressure, flow, electrical properties, power quality, vibration, acoustics, and emissions.
• Contact www.pge.com/b2b or [email protected]
Applied Technology Services:Modular Generation Test Facility