RENATER Optical transport network2019 updates
Sept 2019
CEF meeting, CESNET, Prague
Agenda
• Maps and general key figures
• Optical engineering updates
• Dark Fiber/Links part
• Transmission equipment part
• Time/Frequency part
• Discussion : NREN optical skills… what for ?
• RENATER optical transport network is built mostly on dark fiber links.
• With roughly 13000 km, RENATER is one of the NREN with the largest footprint (referto Compendium 2017),
• Pairs of Dark Fiber are procured for a 10 to 13 years range time period with some of the major fiber operators in France/World (SFR, Celeste, Zayo…)
• This network is then divided into two parts :
• A main part (~80 %), so called backbone, which aims at interconnecting the main POPs (major Cities/Universities in France) throughout France territory,
• A second part, so called Metropolitan networks, split in several smaller networks covering big cities (Paris, Paris-Saclay,…) or regions (Britany, Southeastern (PACA) region…) with an heteregenous technologicalenvironnement (equipment type, level of responsabilities,…)
• On the backbone part, RENATER is mainly using INFINERA equipment (ex CORIANT brand) to transmit, to amplify and to receive information.
• This equipment roll out started in 2015 for a 5-8 years time period,
• It is progressively replacing old generation non coherent CIENA equipment.
Maps and key figures
Links renewal project
NR Reims
NR NancyNR Strasbourg
NR Marseille 1
NR Toulouse
NR Bordeaux
NR Nantes
NR Lyon 1
NR Lille
NR Lyon 2
NR Marseille 2
Belnet (Esch)
NR Besançon
NR Grenoble
NR Nice
NR Rennes
NR Caen
NR Clermont
Genève
NR Montpellier
NR Paris 1NR Paris 2
NR Orsay
• Project covered ~80% of links :• 3-4 technicians/engineer involved,
• Started in feb 2017 and still ongoing,
• Main outcomes :• 14% were procured with a new operator,
• Despite this low level of challenger, cost dropped to a better price (around 0,12 €/m/an) because of volume, negociation and longer time range (13 years),
• Main difficulties :• Offers not always realistic leading to roll out
problems :• Several optical budgets were theoritical and came up as
unsatisfied on field,
• Lead time longer due to congestion paths or unpreparedadministrative procedures,
• Poor quality of deliverables leading to re-works,
NR Reims
NR Nancy
2017 dark fiber link renewal project
Link reprocured with same or differentoperator Next dark fiber renewal project
2019 onward
Others
Capacity links
Out of scope
New link
Dismantled link
Equipment renewal status progress
2015
•Contract awarded to CORIANT
•High level design definition (racks design, DCN definition,…)
•Beginning of equipment deployment : Interoperability POC, Pilote project
2016•First mass deployment in North and East regions
2017•Alien lambda over CIENA to speed up capacity delivering thoughout
France territory
2018•First introduction of high density cards : matrix (MFAB2), line cards
(OSM4C/4xOTU4) in order to uncongestion some big nodes
2019
•First introduction of 16QAM modulation line rate card(OSM4F/2x100/150/200 ports) and introduction of HD client interface card (OSM5C/5x 100 GE)
•Packet service introduction on mTera (still not concluding)
•First 100 GE end users
•INFINERA buys out CORIANT
2020
•Evolutions /upgrade projects in North and East regions (first regionsdeployed) ?
•Toward a packet service mode generalization (or not !)
NR Reims
NR NancyNR Strasbourg
NR Marseille 1
NR Toulouse
NR Bordeaux
NR Nantes
NR Lyon 1
NR Lille
NR Lyon 2
NR Marseille 2
Belnet (Esch)
NR Besançon
NR Grenoble
NR Nice
NR Rennes
NR Caen
NR Clermont
Genève
NR Montpellier
NR Paris 1NR Paris 2
NR Orsay
OTN/Coherent transmission network
INFINERA mTera/Hit7300
Non Coherent transmission network
CIENA CN4200
Others
Capacity link
Out of scopeINFINERA Alien lambda over CIENA CN4200
413
341
424
229
289
278
330 597 303
120
306
Time/Frequency network statusprogress
09/09/2019
• Deployment (1384 out of 4 370 km)• By 2019
• Paris to Bordeaux
• Paris to Marseille
• Lyon to Grenoble
• Full network expected in 2020
• Operate T/F signal dissemination as any other service by 2021Future InternationalOperationnal
REFIMEVE project
• 2019 Major milestones• Implementation phase
Standardization of the deployment phase process for T/Fequipment. REFIMEVE project is outsourced to the privatecompany Muquans.
• Operating procedures
24/7 supervision of all metrological equipment integratedwithin standard procedures (outsourced NSOC)
Deploymenton going
NREN optical skills .. What for ?
Threats Opportunities
This slide is my own thinking and responsability.