rena performance review1

24
RENA’S PERFORMANCE REVIEW

Upload: renaae

Post on 13-Jul-2015

1.953 views

Category:

Business


4 download

TRANSCRIPT

RENA’S PERFORMANCE REVIEW

MANUFACTURING ENGINEER FLIGHT TEST VALIDATION /LIASION FOR 747-8 RC501, RC521 AND RC522

WHEELS AND TIRES NLGFOR 747-8 INSTALLATION RC502,RC521 AND 

RC522 FC ROLLS AND REF 

FTWS INTERPETATION AND 

MODIFICATIONS ON FLIGHT TEST 

FUNCTIONAL TESTS 

SMOKE DETECTORS 747-8 INSTALLATION FLIGHT 

TEST  RESTRICTED SMOKE DETECTORS IPs.

CREATIONS OF SMOKE DETECTORS FUNCTIONAL TEST IPS.

CREATIONS OF REFURB FLIGHT TEST REMOVAL RESTRICTED SMOKE DETECTORS IPS. 

Creation of rolls of FCs and IPs.

INTERPETING DWG  PLAN IP LOCATE PARTS AUDIT IPS AUDIT FCS PLAN FLAGE 

NOTES PLAN BACS

SHIP SIDE SUPPORT CREATES NCO 

REPORTS CREATES PARTS  IN DWR CREATES RFA

REDLINE OPERATION AND STEPS IN OWI

SHIP SIDE SUPPORTFACTORY PRODUCTION OF 747-8

SUPPORTS AND IMPLEMENT FLIGHT TEST IPs.

COLLABORATES WITH PRODUCTIONS AND PRODUCTION IPs.

Modify, Redline, audit and trouble shoot production and flight test issues.

Supports Genx  Engine Shake Supports Flight test 

shops. Coordinates with  General Electric Field 

Engineers   Design Engineer  Test Integrations.

CREATES IPs  Installing and removing load 

pins on inboard flap wing on 747- 8.

Implement instructions on installing and removing photoelectric smoke detectors in upper deck of crew 

Developing information for preparation, maintenance and implementing Production Plan

FLIGHT TEST DELIVERY SUPPORTS Everett  Flight Line 

Delivery Operation  of 747-8 to aid in preparing plane in first flight take-off 

747-4  RC501,RC521 AND RC522..FLIGHT TEST DELIVERY Coordinates meeting 

with design engineer, Flight test shop and Flight Test Validation.

Communicates design issues and concerns with engineering.

Orders, tracks and monitor Flight test

   restricted parts.

COORDINATION Engineering changes, 

and spares and retrofit activity  for 777, 747-8, VA511, 737

Coordinates activity between three planes at one time, RC501,RC521and RC522

SUPPORTS ELECTRICAL INSTALLATIONS OF FOLLOWING 747-8  ROSS WIRING AND M-

RACKS FOR RC501,RC521 AND RC522 

INSTALLATION OF ROSS WIRING EMERGENCY CARGO INSTALLATION.

INTERPETS FLIGHT DELIVERY MILESTONE OF DELIVERY

TROUBLE-SHOOT ELECTRICAL DESIGN ISSUES OF 747-8

Coordinates instrumentation engineers, ground operation engineers

Trace and trouble-shoot design issues on Ross Wire application

Modify and redline IPs to adhere design issues.

ME Liaison/Flight Operation Delivery Supports Refurbs  of  777 

WFOO1 AND WFOO2  freighter .

Restoration  of 777/F to production configuration. 

Genx-2B-strut module test configuration procedures. 747-8 

Freighter  737 static tests. and  carbon 

wheels and Brakes

TOC BARG SUPPORT for 737, YH122 

PARTICIPATES In development of the 

Build-to /Buy-off packages.

Ordering of all special tooling and special test equipment.

Creation and maintenance of work instructions,

CAD APPLICATION SOFTWARE Catia V AutoCAD  Pro-E Solid-works

SUPOPORTS FLIGHT READINESS SUPPORTS FLIGHT 

TEST OF RC501FLIGHT ENGINEERS

RESOLVES FLIGHT SQUAWS

SUPPORTS GROUND OPERATIONS.

CREATES AND COORDINATE MANUAL FOR INSTALLING TR FOR AMERICAN AIRLINES  BOEING 777

American Airlines Inc. and other airlines have received word from Boeing Co. that they should begin replacing thrust reversers on wide-body 777 jets, a spokeswoman from Boeing confirmed Friday.

The thrust reversers are attached to 777s with Rolls-Royce engines. Lynn Lunsford, a spokesman for the Federal Aviation Administration, describes the thrust reversers as an engine attachment that helps slow jets on landing by redirecting the plane’s thrust and alleviating some of the burden placed on the aircraft’s brakes. The main issue concerning Boeing is the potential for excessive heat damage to the inner wall of the the reversers.

SUPPORTS 747 BARGE AND SHIPSIDE SUPPORT

CREATES EMERGENCE IP

CORDINATES WITH FLIGHT TEST PERSONNEL

SUPPORT DWR MODIFY AND RED-

LINE IP CREATE AND MODIFY 

NCR.

CREATE 5s  NEWSLETTER/MEETING NOTES

Volunteer to take meeting notes

Created news letter of  5s

Activities and meeting Send notice of 5s 

meetings

COORDINATES GRP FLIGHT TEST IN-BOX

CREATES FOLDERS TPPRS FOR FC INPUT NEW FC IN 

DATABASE INPUT NEW FC IN DWR CREATE/ STEP-UP 

MODULES FOR NEW FC.

GOALS TO OBTAIN MS IN PROJECT 

MANAGEMENT TO BE CERTIFIED IN PROJECT 

PLANNING STRIVE TO IMPROVE MY PLANNING 

SKILLS INCORPORATE MY TECHNICAL SKILLS 

TO BE A BETTER PLANNER