![Page 1: REHABILITATING THE NORTH COAST WATER MAIN · 2017-06-01 · TECHNOLOGIES SEMINAR FEBRUARY 23, 2017 PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH REHABILITATING THE NORTH](https://reader036.vdocuments.mx/reader036/viewer/2022070713/5ecf480fef0e483c994b6242/html5/thumbnails/1.jpg)
PUG – 25TH ANNUAL SHARING TECHNOLOGIES SEMINAR
FEBRUARY 23, 2017
PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH
REHABILITATING THE NORTH
COAST WATER MAIN
![Page 2: REHABILITATING THE NORTH COAST WATER MAIN · 2017-06-01 · TECHNOLOGIES SEMINAR FEBRUARY 23, 2017 PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH REHABILITATING THE NORTH](https://reader036.vdocuments.mx/reader036/viewer/2022070713/5ecf480fef0e483c994b6242/html5/thumbnails/2.jpg)
Presentation Outline
03/03/2017 2
1. Overview of Santa Cruz system
2. Planning and design of the North Coast Segment
3. Emergency HDD installation at Lombardi Gulch
1. Design 2. Construction
4. Current status of North Coast Rehabilitation
Speaker: Justin Lianides, PE - Mott MacDonald
25th Annual Sharing Technologies Seminar – PUG | North Coast System Rehabilitation
![Page 3: REHABILITATING THE NORTH COAST WATER MAIN · 2017-06-01 · TECHNOLOGIES SEMINAR FEBRUARY 23, 2017 PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH REHABILITATING THE NORTH](https://reader036.vdocuments.mx/reader036/viewer/2022070713/5ecf480fef0e483c994b6242/html5/thumbnails/3.jpg)
100 Years
03/03/2017 3 25th Annual Sharing Technologies Seminar – PUG | North Coast System Rehabilitation
![Page 4: REHABILITATING THE NORTH COAST WATER MAIN · 2017-06-01 · TECHNOLOGIES SEMINAR FEBRUARY 23, 2017 PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH REHABILITATING THE NORTH](https://reader036.vdocuments.mx/reader036/viewer/2022070713/5ecf480fef0e483c994b6242/html5/thumbnails/4.jpg)
Service Area Characteristics
Areas Served:
Santa Cruz
County
Capitola
Population:
~ 93,000
Employment:
~ 45,000
Governing body: City Council
03/03/2017 4 25th Annual Sharing Technologies Seminar – PUG | North Coast System Rehabilitation
![Page 5: REHABILITATING THE NORTH COAST WATER MAIN · 2017-06-01 · TECHNOLOGIES SEMINAR FEBRUARY 23, 2017 PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH REHABILITATING THE NORTH](https://reader036.vdocuments.mx/reader036/viewer/2022070713/5ecf480fef0e483c994b6242/html5/thumbnails/5.jpg)
03/03/2017 5
2.8-billion gallon Capacity
North Coast Resources
[~32%], Acq. 1884-1913
Total Watershed ≈ 21 mi2
San Lorenzo River
[~47%], Total Watershed ≈ 138 mi2
[~4%]
100% FROM LOCAL RAINFALL
95% SURFACE WATER, 5% WELLS
[~17%]
, Est. 1924
Est. 1976
Est. 1960
25th Annual Sharing Technologies Seminar – PUG | North Coast System Rehabilitation
![Page 6: REHABILITATING THE NORTH COAST WATER MAIN · 2017-06-01 · TECHNOLOGIES SEMINAR FEBRUARY 23, 2017 PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH REHABILITATING THE NORTH](https://reader036.vdocuments.mx/reader036/viewer/2022070713/5ecf480fef0e483c994b6242/html5/thumbnails/6.jpg)
03/03/2017 6
10-YR PRODUCTION BY SOURCE
25th Annual Sharing Technologies Seminar – PUG | North Coast System Rehabilitation
![Page 7: REHABILITATING THE NORTH COAST WATER MAIN · 2017-06-01 · TECHNOLOGIES SEMINAR FEBRUARY 23, 2017 PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH REHABILITATING THE NORTH](https://reader036.vdocuments.mx/reader036/viewer/2022070713/5ecf480fef0e483c994b6242/html5/thumbnails/7.jpg)
Primary Santa Cruz Problem: Lack of Adequate Water Supply During Drought
Additional Challenges: Fish Flows
-
50,000
100,000
150,000
200,000
250,000
300,000
19
21
19
23
19
25
19
27
19
29
19
31
19
33
19
35
19
37
19
39
19
41
19
43
19
45
19
47
19
49
19
51
19
53
19
55
19
57
19
59
19
61
19
63
19
65
19
67
19
69
19
71
19
73
19
75
19
77
19
79
19
81
19
83
19
85
19
87
19
89
19
91
19
93
19
95
19
97
19
99
20
01
20
03
20
05
20
07
20
09
20
11
20
13
20
15
Tota
l An
nu
al R
un
off
(ac
re-f
eet)
Water Year
WATER YEAR CLASSIFICATION SYSTEM San Lorenzo River
Wet Normal Dry Critically Dry
Average Annual Runoff:
93,000 acre-feet
25th Annual Sharing Technologies Seminar – PUG | North Coast System Rehabilitation
![Page 8: REHABILITATING THE NORTH COAST WATER MAIN · 2017-06-01 · TECHNOLOGIES SEMINAR FEBRUARY 23, 2017 PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH REHABILITATING THE NORTH](https://reader036.vdocuments.mx/reader036/viewer/2022070713/5ecf480fef0e483c994b6242/html5/thumbnails/8.jpg)
$0
$5,000,000
$10,000,000
$15,000,000
$20,000,000
$25,000,000
$30,000,000
$35,000,000
$40,000,000
$45,000,000
$50,000,00010-YEAR CIP SUMMARY
Rehab or Replace
Upgrade or Improve
Water Supply Reliability
$169 M $127M
03/03/2017 8 25th Annual Sharing Technologies Seminar – PUG | North Coast System Rehabilitation
![Page 9: REHABILITATING THE NORTH COAST WATER MAIN · 2017-06-01 · TECHNOLOGIES SEMINAR FEBRUARY 23, 2017 PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH REHABILITATING THE NORTH](https://reader036.vdocuments.mx/reader036/viewer/2022070713/5ecf480fef0e483c994b6242/html5/thumbnails/9.jpg)
HISTORY OF THE NORTH COAST SYSTEM
03/03/2017 9
1880’s
First municipal source of water
2000’s
Numerous repairs, and
environmental conditions
prompted planning and EIR for
replacement of entire system.
1950’s
Major sections of the system
were reconstructed (by Granite)
1916
Competing water companies
consolidated under municipal
ownership
Present
25th Annual Sharing Technologies Seminar – PUG | North Coast System Rehabilitation
![Page 10: REHABILITATING THE NORTH COAST WATER MAIN · 2017-06-01 · TECHNOLOGIES SEMINAR FEBRUARY 23, 2017 PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH REHABILITATING THE NORTH](https://reader036.vdocuments.mx/reader036/viewer/2022070713/5ecf480fef0e483c994b6242/html5/thumbnails/10.jpg)
NORTH COAST SYSTEM REHABILITATION PROJECT
Phase 3
(2016-2017)
03/03/2017 10 25th Annual Sharing Technologies Seminar – PUG | North Coast System Rehabilitation
Phase 2
(2012) Phase 1
(2008)
Majors Creek
Laguna
Creek
Liddel
Spring
![Page 11: REHABILITATING THE NORTH COAST WATER MAIN · 2017-06-01 · TECHNOLOGIES SEMINAR FEBRUARY 23, 2017 PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH REHABILITATING THE NORTH](https://reader036.vdocuments.mx/reader036/viewer/2022070713/5ecf480fef0e483c994b6242/html5/thumbnails/11.jpg)
GENERAL NORTH COAST CONDITIONS
03/03/2017 11
Agricultural
Fields
Santa Cruz
Branch Rail Line
Highway 1
Pacific
Ocean
Santa Cruz Mountain
Foothills
Copyright © 2002-2015 Kenneth & Gabrielle Adelman
Land Owners
55% CA State Parks
25% SCCRTC
17% Caltrans
3% Graniterock Inc.
25th Annual Sharing Technologies Seminar – PUG | North Coast System Rehabilitation
![Page 12: REHABILITATING THE NORTH COAST WATER MAIN · 2017-06-01 · TECHNOLOGIES SEMINAR FEBRUARY 23, 2017 PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH REHABILITATING THE NORTH](https://reader036.vdocuments.mx/reader036/viewer/2022070713/5ecf480fef0e483c994b6242/html5/thumbnails/12.jpg)
82%
1%
13%
4%
24-in PVC - 14,835 ft
6-in PVC - 730 ft
16-in PVC - 2,275 ft
18-in PVC - 220 ft
NEW WATER MAIN Phase 3
03/03/2017 12
Total of 18,060 feet
25th Annual Sharing Technologies Seminar – PUG | North Coast System Rehabilitation
![Page 13: REHABILITATING THE NORTH COAST WATER MAIN · 2017-06-01 · TECHNOLOGIES SEMINAR FEBRUARY 23, 2017 PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH REHABILITATING THE NORTH](https://reader036.vdocuments.mx/reader036/viewer/2022070713/5ecf480fef0e483c994b6242/html5/thumbnails/13.jpg)
Lombardi Gulch HDD,
Length 1300 ft
NEW MAIN ALIGNMENT North Coast System Rehabilitation Phase 3
03/03/2017 13
Major’s Line @ Hwy1
HAB, Length 192 ft Service Lateral #1 @ Hwy1
HAB, Length 233 ft
Western Rail Crossing
HAB, Length 127 ft
Eastern Rail Crossing
HAB, Length 82 ft
2000 ft
City of Santa Cruz Project Vicinity
25th Annual Sharing Technologies Seminar – PUG | North Coast System Rehabilitation
![Page 14: REHABILITATING THE NORTH COAST WATER MAIN · 2017-06-01 · TECHNOLOGIES SEMINAR FEBRUARY 23, 2017 PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH REHABILITATING THE NORTH](https://reader036.vdocuments.mx/reader036/viewer/2022070713/5ecf480fef0e483c994b6242/html5/thumbnails/14.jpg)
BIOLOGICALLY SENSITIVE AREAS IN PROJECT VICINITY
03/03/2017 14 25th Annual Sharing Technologies Seminar – PUG | North Coast System Rehabilitation
California red-legged frog
Federally Threatened
Western pond turtle
Species of Concern
Western burrowing owl
Species of Concern
Ohlone tiger beetle
Critically Imperiled
Other Species
Steelhead, Coho Salmon, Tidewater
Goby, and other migratory birds
![Page 15: REHABILITATING THE NORTH COAST WATER MAIN · 2017-06-01 · TECHNOLOGIES SEMINAR FEBRUARY 23, 2017 PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH REHABILITATING THE NORTH](https://reader036.vdocuments.mx/reader036/viewer/2022070713/5ecf480fef0e483c994b6242/html5/thumbnails/15.jpg)
PRINCIPLE GEOLOGIC UNITS
03/03/2017 15
Santa Margarita Sandstone (Tsm) - Miocene-age shelf deposit
Santa Cruz Mudstone (Tsc) - Miocene-age deep calm water deposit
Marine Terrace Deposits (Qcl) - Deposited during retreat of sea during inter-glacial period 75,000 years ago.
Alluvium – backfilled stream valleys beginning 15,000 years ago + Colluvium, Artificial Fill
25th Annual Sharing Technologies Seminar – PUG | North Coast System Rehabilitation
![Page 16: REHABILITATING THE NORTH COAST WATER MAIN · 2017-06-01 · TECHNOLOGIES SEMINAR FEBRUARY 23, 2017 PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH REHABILITATING THE NORTH](https://reader036.vdocuments.mx/reader036/viewer/2022070713/5ecf480fef0e483c994b6242/html5/thumbnails/16.jpg)
EXPLORATORY BORING PROGRAM (Completed Feb. ‘13)
Phase 3
03/03/2017 16
Monterey Bay
Drilling Method Quantity Mud Rotary 5
Mud Rotary/Rock Coring 11
Rock Coring 1
Hollow Stem Auger (HSA) 5
HSA/Rock Coring 1
Hand Auger 2
Average Boring Spacing 780 ft
Average Boring Depth 35 ft
Number of borings 25
Total boring footage 816 ft
Feet drilled / Lpipeline 5%
0
20
40
60
80
100
120
Dep
th (
ft)
Borings Depths
25th Annual Sharing Technologies Seminar – PUG | North Coast System Rehabilitation
+600 ft of Geophysics
![Page 17: REHABILITATING THE NORTH COAST WATER MAIN · 2017-06-01 · TECHNOLOGIES SEMINAR FEBRUARY 23, 2017 PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH REHABILITATING THE NORTH](https://reader036.vdocuments.mx/reader036/viewer/2022070713/5ecf480fef0e483c994b6242/html5/thumbnails/17.jpg)
PROJECT SUMMARY PHASE 3 - North Coast Rehabilitation
03/03/2017 17
ORIGINALLY SCHEDULED
TO BID IN EARLY 2016 $7.2 Million
Engineer’s
Estimate
Phase 3
630 ft
Four Horizontal Auger Bore
(HAB) Installations
1,400 ft
One (1) Horizontal Directional
Drill (HDD) Installation
16,000 ft
Trenched Installations
25th Annual Sharing Technologies Seminar – PUG | North Coast System Rehabilitation
TRENCHLESS
TRENCHED
3.4 MILES OF NEW
WATER MAIN
![Page 18: REHABILITATING THE NORTH COAST WATER MAIN · 2017-06-01 · TECHNOLOGIES SEMINAR FEBRUARY 23, 2017 PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH REHABILITATING THE NORTH](https://reader036.vdocuments.mx/reader036/viewer/2022070713/5ecf480fef0e483c994b6242/html5/thumbnails/18.jpg)
LEAK IN EXISTING PIPELINE Oct. 2015
03/03/2017 18
Lombardi Gulch HDD
Alignment Parallel to Existing Main Existing Steel Pipe
• Occurred several months prior
to planned bidding
• 22 in. welded steel pipe
leaking at 500,000 gallons/day
25th Annual Sharing Technologies Seminar – PUG | North Coast System Rehabilitation
![Page 19: REHABILITATING THE NORTH COAST WATER MAIN · 2017-06-01 · TECHNOLOGIES SEMINAR FEBRUARY 23, 2017 PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH REHABILITATING THE NORTH](https://reader036.vdocuments.mx/reader036/viewer/2022070713/5ecf480fef0e483c994b6242/html5/thumbnails/19.jpg)
BIDDING AND PROCUREMENT
Pipe Rupture
03/03/2017 19
Ph
as
e 3
[1s
t C
on
trac
t] Emergency HDD Installation
LOMBARDI GULCH
$1.27 Million The HDD Company &
Underground Solutions
Trench and HAB
Installations
$5.1 Million Granite Construction
Advertised
Oct. 2015
25th Annual Sharing Technologies Seminar – PUG | North Coast System Rehabilitation
100% DESIGN
@ Lombardi Gulch
*Secured ahead of advertisement
• $190,000 FPVC pipe (~$135/ft w/ fuse)*
• $1,080,000 HDD Installation (~$830/ft)
w/ All-State Boring
(Subcontractor for HAB)
Ph
as
e 3
[2n
d C
on
trac
t]
• ~$307/ft w/ 4 HAB
Advertised
Mar. 2016
CM: The Covello Group
![Page 20: REHABILITATING THE NORTH COAST WATER MAIN · 2017-06-01 · TECHNOLOGIES SEMINAR FEBRUARY 23, 2017 PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH REHABILITATING THE NORTH](https://reader036.vdocuments.mx/reader036/viewer/2022070713/5ecf480fef0e483c994b6242/html5/thumbnails/20.jpg)
LOMBARDI GULCH HDD OVERVIEW
Length
1,320 feet
Final Reamed Diameter
36 inches
Installed Carrier Pipe
24-in DR 18 (235 psi) Fusible PVC |
1.43” wall | 307,000 lb safe pull force
Site Conditions
Alluvium-filled valley with stream
channel inhabited by threatened
California Red-legged frog
03/03/2017 20
Antecedents
Existing pipe rupture required
emergency procurement and
installation
Number of Bids
2
Contract Award
The HDD Company, for $1.27 Million
Installation Duration
~2.5 months (Oct. 2015 – Jan, 2016)
25th Annual Sharing Technologies Seminar – PUG | North Coast System Rehabilitation
![Page 21: REHABILITATING THE NORTH COAST WATER MAIN · 2017-06-01 · TECHNOLOGIES SEMINAR FEBRUARY 23, 2017 PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH REHABILITATING THE NORTH](https://reader036.vdocuments.mx/reader036/viewer/2022070713/5ecf480fef0e483c994b6242/html5/thumbnails/21.jpg)
INTERPRETED GEOLOGIC CONDITIONS
With HDD Alignment
03/03/2017 21
ENTRY PIT EXIT PIT
PLAN
PROFILE
1000 ft
25th Annual Sharing Technologies Seminar – PUG | North Coast System Rehabilitation
![Page 22: REHABILITATING THE NORTH COAST WATER MAIN · 2017-06-01 · TECHNOLOGIES SEMINAR FEBRUARY 23, 2017 PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH REHABILITATING THE NORTH](https://reader036.vdocuments.mx/reader036/viewer/2022070713/5ecf480fef0e483c994b6242/html5/thumbnails/22.jpg)
ROCK IN VICINITY OF LOMBARDI GULCH
03/03/2017 22 25th Annual Sharing Technologies Seminar – PUG | North Coast System Rehabilitation
Mudstone
Overburden
Soils
WEATHERED
BEACH CLIFFS
![Page 23: REHABILITATING THE NORTH COAST WATER MAIN · 2017-06-01 · TECHNOLOGIES SEMINAR FEBRUARY 23, 2017 PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH REHABILITATING THE NORTH](https://reader036.vdocuments.mx/reader036/viewer/2022070713/5ecf480fef0e483c994b6242/html5/thumbnails/23.jpg)
ALLUVIAL DEPOSITS IN LOMBARDI GULCH
03/03/2017 23 25th Annual Sharing Technologies Seminar – PUG | North Coast System Rehabilitation
Gravel w/ clay @ 44-47 FT DEPTH
Gravel w/clay @ 36-44 FT DEPTH
Silty Sand @ 25 FT DEPTH
Sand w/ Silt @ 90 FT DEPTH
![Page 24: REHABILITATING THE NORTH COAST WATER MAIN · 2017-06-01 · TECHNOLOGIES SEMINAR FEBRUARY 23, 2017 PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH REHABILITATING THE NORTH](https://reader036.vdocuments.mx/reader036/viewer/2022070713/5ecf480fef0e483c994b6242/html5/thumbnails/24.jpg)
Layout of Alignment
• Entry and exit locations, Drive length, Geologic and geotechnical considerations, Clearance from existing infrastructure / resources, Land Ownership / Permitting: CA State Parks (Right-of-Entry), US Fish&Wildlife,
Geotechnical Considerations
• Hydraulic Fracturing (aka frac-out) risks: Where drilling fluid pressures in a borehore exceed the strength and confining ground pressures. Results in a loss of fluid into ground mass, possibly to ground surface.
Pipe installation Stresses
• Pull-back, Breakover of PVC
Design Considerations
Subtitle
03/03/2017 24 25th Annual Sharing Technologies Seminar – PUG | North Coast System Rehabilitation
![Page 25: REHABILITATING THE NORTH COAST WATER MAIN · 2017-06-01 · TECHNOLOGIES SEMINAR FEBRUARY 23, 2017 PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH REHABILITATING THE NORTH](https://reader036.vdocuments.mx/reader036/viewer/2022070713/5ecf480fef0e483c994b6242/html5/thumbnails/25.jpg)
CONSTRUCTION
OF THE
LOMBARDI
GULCH
EMERGENCY
HDD CROSSING
03/03/2017 25 25th Annual Sharing Technologies Seminar – PUG | North Coast System Rehabilitation
![Page 26: REHABILITATING THE NORTH COAST WATER MAIN · 2017-06-01 · TECHNOLOGIES SEMINAR FEBRUARY 23, 2017 PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH REHABILITATING THE NORTH](https://reader036.vdocuments.mx/reader036/viewer/2022070713/5ecf480fef0e483c994b6242/html5/thumbnails/26.jpg)
HDD BASICS
03/03/2017 26 25th Annual Sharing Technologies Seminar – PUG | North Coast System Rehabilitation
![Page 27: REHABILITATING THE NORTH COAST WATER MAIN · 2017-06-01 · TECHNOLOGIES SEMINAR FEBRUARY 23, 2017 PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH REHABILITATING THE NORTH](https://reader036.vdocuments.mx/reader036/viewer/2022070713/5ecf480fef0e483c994b6242/html5/thumbnails/27.jpg)
HDD ALIGNMENT AND FRAC-OUT RISKS
03/03/2017 27 25th Annual Sharing Technologies Seminar – PUG | North Coast System Rehabilitation
020,00040,00060,00080,000
100,000120,000140,000160,000
144+00 146+00 148+00 150+00 152+00 154+00 156+00
Station (ft) preq pminFRAC-OUT Risks
Pressure (psf)
Preq - maximum allowable pressure in hole
Pmin – minimum drilling fluid pressure
![Page 28: REHABILITATING THE NORTH COAST WATER MAIN · 2017-06-01 · TECHNOLOGIES SEMINAR FEBRUARY 23, 2017 PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH REHABILITATING THE NORTH](https://reader036.vdocuments.mx/reader036/viewer/2022070713/5ecf480fef0e483c994b6242/html5/thumbnails/28.jpg)
HDD STAGING AREAS
03/03/2017 28 25th Annual Sharing Technologies Seminar – PUG | North Coast System Rehabilitation
Rig
Sid
e
Pip
e S
ide
Two Pipe Strings
![Page 29: REHABILITATING THE NORTH COAST WATER MAIN · 2017-06-01 · TECHNOLOGIES SEMINAR FEBRUARY 23, 2017 PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH REHABILITATING THE NORTH](https://reader036.vdocuments.mx/reader036/viewer/2022070713/5ecf480fef0e483c994b6242/html5/thumbnails/29.jpg)
RIG#1: INITIAL 8-¾” PILOT HOLE AND REAMING
DITCH WITCH JT 80/20 106,000 LBS. (PULLBACK) / 70,000LBS. (THRUST)
03/03/2017 29 25th Annual Sharing Technologies Seminar – PUG | North Coast System Rehabilitation
![Page 30: REHABILITATING THE NORTH COAST WATER MAIN · 2017-06-01 · TECHNOLOGIES SEMINAR FEBRUARY 23, 2017 PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH REHABILITATING THE NORTH](https://reader036.vdocuments.mx/reader036/viewer/2022070713/5ecf480fef0e483c994b6242/html5/thumbnails/30.jpg)
RIG#2: FINAL 36” REAMING, SWAB AND PIPE PULL AMERICAN AUGERS 380,000 LBS. (PUSH&PULL)
03/03/2017 30 25th Annual Sharing Technologies Seminar – PUG | North Coast System Rehabilitation
![Page 31: REHABILITATING THE NORTH COAST WATER MAIN · 2017-06-01 · TECHNOLOGIES SEMINAR FEBRUARY 23, 2017 PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH REHABILITATING THE NORTH](https://reader036.vdocuments.mx/reader036/viewer/2022070713/5ecf480fef0e483c994b6242/html5/thumbnails/31.jpg)
MUD SEPARATION PLANT
03/03/2017 31 25th Annual Sharing Technologies Seminar – PUG | North Coast System Rehabilitation
![Page 32: REHABILITATING THE NORTH COAST WATER MAIN · 2017-06-01 · TECHNOLOGIES SEMINAR FEBRUARY 23, 2017 PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH REHABILITATING THE NORTH](https://reader036.vdocuments.mx/reader036/viewer/2022070713/5ecf480fef0e483c994b6242/html5/thumbnails/32.jpg)
HDD INSTALLATION PROGRESS
03/03/2017 32 25th Annual Sharing Technologies Seminar – PUG | North Coast System Rehabilitation
NTP: 11/3/2015
Estimated Completion Date:
12/17/2015
Actual Completion Date:
1/6/2016
Additional Completion Days:
15 Calendar Days due to
Inadvertant Drilling Fluid
Release (IDFR)
![Page 33: REHABILITATING THE NORTH COAST WATER MAIN · 2017-06-01 · TECHNOLOGIES SEMINAR FEBRUARY 23, 2017 PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH REHABILITATING THE NORTH](https://reader036.vdocuments.mx/reader036/viewer/2022070713/5ecf480fef0e483c994b6242/html5/thumbnails/33.jpg)
IDFR MITIGATION MEASURES
03/03/2017 33 25th Annual Sharing Technologies Seminar – PUG | North Coast System Rehabilitation
TEMPORARY DIVERSION OF LOMBARDI GULCH
Perimeter of silt fences, gravel bags, and wattles, removed from the gulch in several 20-gallon containers; later to separation plant
![Page 34: REHABILITATING THE NORTH COAST WATER MAIN · 2017-06-01 · TECHNOLOGIES SEMINAR FEBRUARY 23, 2017 PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH REHABILITATING THE NORTH](https://reader036.vdocuments.mx/reader036/viewer/2022070713/5ecf480fef0e483c994b6242/html5/thumbnails/34.jpg)
HYDROSTATIC PRESSURE TESTING
03/03/2017 34 25th Annual Sharing Technologies Seminar – PUG | North Coast System Rehabilitation
![Page 35: REHABILITATING THE NORTH COAST WATER MAIN · 2017-06-01 · TECHNOLOGIES SEMINAR FEBRUARY 23, 2017 PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH REHABILITATING THE NORTH](https://reader036.vdocuments.mx/reader036/viewer/2022070713/5ecf480fef0e483c994b6242/html5/thumbnails/35.jpg)
CARRIER PIPE PULLBACK
03/03/2017 35 25th Annual Sharing Technologies Seminar – PUG | North Coast System Rehabilitation
Mid-pullback Fuse
Pull Forces between 48 and 55 kips
![Page 36: REHABILITATING THE NORTH COAST WATER MAIN · 2017-06-01 · TECHNOLOGIES SEMINAR FEBRUARY 23, 2017 PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH REHABILITATING THE NORTH](https://reader036.vdocuments.mx/reader036/viewer/2022070713/5ecf480fef0e483c994b6242/html5/thumbnails/36.jpg)
PULL THROUGH AND TIE-IN
03/03/2017 36 25th Annual Sharing Technologies Seminar – PUG | North Coast System Rehabilitation
Pull-Through
Tie-in
![Page 37: REHABILITATING THE NORTH COAST WATER MAIN · 2017-06-01 · TECHNOLOGIES SEMINAR FEBRUARY 23, 2017 PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH REHABILITATING THE NORTH](https://reader036.vdocuments.mx/reader036/viewer/2022070713/5ecf480fef0e483c994b6242/html5/thumbnails/37.jpg)
RESTORATION OF ECOSYSTEM AT LOMBARDI GULCH
03/03/2017 37 25th Annual Sharing Technologies Seminar – PUG | North Coast System Rehabilitation
Part of Section 1600 Lake and Streambed Alteration Permit
California Department of Fish and Wildlife
+ removal of existing surface pipe
![Page 38: REHABILITATING THE NORTH COAST WATER MAIN · 2017-06-01 · TECHNOLOGIES SEMINAR FEBRUARY 23, 2017 PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH REHABILITATING THE NORTH](https://reader036.vdocuments.mx/reader036/viewer/2022070713/5ecf480fef0e483c994b6242/html5/thumbnails/38.jpg)
CONSTRUCTION OF THE
REMAINING PHASE 3 - NORTH
COAST SYSTEM REHAB PROJECT
03/03/2017 38 25th Annual Sharing Technologies Seminar – PUG | North Coast System Rehabilitation
May 2016 -
Present
![Page 39: REHABILITATING THE NORTH COAST WATER MAIN · 2017-06-01 · TECHNOLOGIES SEMINAR FEBRUARY 23, 2017 PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH REHABILITATING THE NORTH](https://reader036.vdocuments.mx/reader036/viewer/2022070713/5ecf480fef0e483c994b6242/html5/thumbnails/39.jpg)
CONSTRUCTION OF PHASE 3 [2ND CONTRACT] Project Status
03/03/2017 39 25th Annual Sharing Technologies Seminar – PUG | North Coast System Rehabilitation
![Page 40: REHABILITATING THE NORTH COAST WATER MAIN · 2017-06-01 · TECHNOLOGIES SEMINAR FEBRUARY 23, 2017 PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH REHABILITATING THE NORTH](https://reader036.vdocuments.mx/reader036/viewer/2022070713/5ecf480fef0e483c994b6242/html5/thumbnails/40.jpg)
CONSTRUCTION OF PHASE 3 [2ND CONTRACT] Auger Bores (36” Dia.) under Highway 1
03/03/2017 40 25th Annual Sharing Technologies Seminar – PUG | North Coast System Rehabilitation
Crossing 1 (PP1): 192 FT
Crossing 2 (PP2): 233 FT
![Page 41: REHABILITATING THE NORTH COAST WATER MAIN · 2017-06-01 · TECHNOLOGIES SEMINAR FEBRUARY 23, 2017 PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH REHABILITATING THE NORTH](https://reader036.vdocuments.mx/reader036/viewer/2022070713/5ecf480fef0e483c994b6242/html5/thumbnails/41.jpg)
NORTH COAST ACCOMPLISHMENTS
• HDD resulted in fewer environmental disturbances (compared to
trenching), to the sensitive ecosystem along the creek. This is despite
IDFR and remediation work.
• A successful HDD intersect maintained project schedule for the pilot
bore while mitigating surface IDFR. Benefited from the steering tool
system and experience of the steering hand.
• Large volumes of drilling fluid (~2000 gal. over 1,000 - 2,000 ft2) during a
frac-out were effectively contained in accordance with a submitted
Frac-out and Surface Spill Contingency Plan.
• The emergency leak and accelerated construction schedule benefited
from good working relationships between the SCWD, Contractor, CM,
Designer, Biologists, and Agencies. Relationships were tested during
IDFR mitigation.
• The pipeline through Lombardi Gulch was successfully put into
operation following the installation. The site has been restored with
additional riparian-native plants.
• SCWD is nearly complete in rehabilitating a deteriorating water main
for the North Coast sources.
25th Annual Sharing Technologies Seminar – PUG | North Coast System Rehabilitation
![Page 42: REHABILITATING THE NORTH COAST WATER MAIN · 2017-06-01 · TECHNOLOGIES SEMINAR FEBRUARY 23, 2017 PHASE 3 AND THE EMERGENCY INSTALLATION AT LOMBARDI GULCH REHABILITATING THE NORTH](https://reader036.vdocuments.mx/reader036/viewer/2022070713/5ecf480fef0e483c994b6242/html5/thumbnails/42.jpg)
Thank you
PUG 25th Annual Sharing Technologies Seminar
25th Annual Sharing Technologies Seminar – PUG | North Coast System Rehabilitation