100 Climate Solutions Project Campaign ~ 2016 Renewable Energies REGIONS OF CLIMATE ACTION Summary Mandating Authority : Expected project CAPEX : Main stakeholders Location and population Project Type : Social and environmental impact Umuziwabantu Municipality Solar PV Project The success of the solar farm will have significant social impacts because it will increase electricity available on the grid and reduce spending by the municipality, thereby freeing up budget for service de- livery projects. Umuziwabantu Municipality aims to reduce carbon emissions, and has made it a top priority to investigate the opportunity of using renewable energy. We aim to start by utilizing as much of our building rooftops as possible to generate power for own use. Umuziwabantu Municipality 6’000’000 € Umuziwabantu Municipality Harding, South Africa 9 544 inh. Solar

Upload: others

Post on 28-Dec-2021

26 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: REGIONS OF PV Project

100 Climate Solutions Project Campaign ~ 2016100 Climate Solutions Project Campaign ~ 2016

Renewable Energies

REGIONS OFCLIMATE ACTION

Summary

Mandating Authority :

Expected project CAPEX :

Main stakeholders

Location and population

Project Type :

Social and environmental impact

Umuziwabantu Municipality Solar PV Project

The success of the solar farm will have significant social impacts because it will increase electricity available on the grid and reduce spending by the municipality, thereby freeing up budget for service de-livery projects.

Umuziwabantu Municipality aims to reduce carbon emissions, and has made it a top priority to investigate the opportunity of using renewable energy. We aim to start by utilizing as much of our building rooftops as possible to generate power for own use.

Umuziwabantu Municipality

6’000’000 €

Umuziwabantu Municipality

Harding, South Africa9 544 inh.

Solar

Page 2: REGIONS OF PV Project

100 Climate Solutions Project Campaign ~ 2016100 Climate Solutions Project Campaign ~ 2016

Port facilities

Project maturity ( IFC / World Bank Categories )

STAGE 1 : Concept Development, Site identification

Site identified :

Site access :

STAGE 3 : Feasibility Studies

STAGE 2 : Pre-Feasibility Studies

Pre-feasibility study :

Feasibility study :

Expected installed capacity :

Expected type of contract :

Adequate road Rail access

Building permits signed :

STAGE 4 : Permitting / Financing / Contracts

Land concession signed :

Environmental impact study :

Grid Connection :

Power Purchase Agreement Off-Taker :

Tenor : Price of electricity :

Identified sources of fundings

Engineering, Procurement and Construction Contractor :

Operation and Maintenance Contractor :

STAGE 5 : Engineering / Construction / Commercial Operation

Comments

Energy resource data

Technology :

STAGE 1 : Concept Development, Site identification

STAGE 2 : Pre-Feasibility Studies

STAGE 3 : Feasibility Studies

STAGE 4 : Permit t ing / Financing / Contracts

STAGE 5 : Engineering/Construction/Commercial Operation

No

Solar PV. We have not selected a specific brand; we have looked into the various technology providers. We will be looking at the following standards as a guide to selecting the right technology: • Tier 1 Solar Pv Panels • Power Optimizer’s• MPPT’s

No

City owned land

Not applicable

TBD

TBD

No

No

Yes

Umuziwabantu Municipality

TBD No

No

2 MWp

N/A

Engineering Procurement Construction

Yes