SCHNEIDER-KESSEL BERLIN ®  STEAM BOILER AND HOT -W ATER BOILER Oleochemical Industry, Malaysia 8.0 t/h High Pressure Water Tube Boiler ERK-HP 8000/73 Doc.: Referenzblatt_eng (SE) - 1106-1.doc SCHNEIDER Engineering GmbH Email / Internet  Hildburghauser Strasse 79 info@schneider-kesse l.com 12249 Berlin, Germany www.schneider-kesse l.com Tel.: +49-30-75 44 93 99-0 Fax: +49-30-75 44 93 99-21 PERFORMANCE  Engineering, manufacturing, shipment and commissioning of a high pressure steam generator in water tube design (ECKROHR- KESSEL) incl. complete equip- ment, control system and high pressure feed pump systems (HP pumps with booster pumps) PROJECT SPECIFICATION  Customer : OLEON Bhd. Sdn. / LIPICO Technologies Pte. Ltd.  Location : Westport (Malaysia)  Aplication : Process steam for the production of Ester  Delivery : September 2008  Steam generation : 8.0 t/h 73 barg – 289°C  Dimension : 5.5 x 3.8 x 5.0 m (L x W x H)  Operation weight app. : 24.0 t  Firing system : Dual fuel system for natural gas and LPG

Upload: ycwei8179

Post on 07-Jan-2016

5 views

Category:

Documents


0 download

DESCRIPTION

Referenzblatt Eng SE - 1106-1

TRANSCRIPT

Page 1: Referenzblatt Eng SE - 1106-1

7/17/2019 Referenzblatt Eng SE - 1106-1

http://slidepdf.com/reader/full/referenzblatt-eng-se-1106-1 1/1

SCHNEIDER-KESSEL BERLIN® 

STEAM BOILER AND HOT-WATER BOILER 

Oleochemical Industry, Malaysia

8.0 t/h High Pressure Water Tube Boiler ERK-HP 8000/73

Doc.: Referenzblatt_eng (SE) - 1106-1.doc 

SCHNEIDER Engineering GmbH Email / Internet 

Hildburghauser Strasse 79 [email protected] Berlin, Germany www.schneider-kessel.comTel.: +49-30-75 44 93 99-0Fax: +49-30-75 44 93 99-21

PERFORMANCE 

  Engineering, manufacturing,

shipment and commissioning of a

high pressure steam generator in

water tube design (ECKROHR-

KESSEL) incl. complete equip-

ment, control system and high

pressure feed pump systems (HP

pumps with booster pumps)

PROJECT SPECIFICATION 

  Customer : OLEON Bhd. Sdn. / LIPICO Technologies Pte. Ltd.

  Location : Westport (Malaysia)

  Aplication : Process steam for the production of Ester

  Delivery : September 2008

  Steam generation : 8.0 t/h – 73 barg – 289°C

  Dimension : 5.5 x 3.8 x 5.0 m (L x W x H)

  Operation weight app. : 24.0 t

  Firing system : Dual fuel system for natural gas and LPG