reference object kicevo-ohrid twin tube motorway tunnel … · 2019. 8. 9. · kicevo-ohrid twin...

1
Häny AG - Mixing and Injection Technology Häny AG - Misch- und Injektionstechnik Häny SA - Technique de mélange et d‘injection Buechstrasse 20 CH-8645 Jona Tel. +41 44 925 41 11 Fax +41 44 923 62 45 [email protected] www.haeny.com Reference object Subject to changes PM4-101442 00 / 12.2015 Kicevo-Ohrid twin tube motorway tunnel Macedonia In four years’ time traveling to Ohrid, Macedonia will be a true pleasure. The construction of the highway from Kicevo to Ohrid is well underway. Construction workers, communicating in Macedonian, English and Chinese could be seen at the site, as well as a huge mechanization. The highway is being built by Chinese company Sinohydro Corporation Limited. The 2 km twin tube Preseka tunnel is part of the 57 km long highway project. Investment for this major project is estimated at around EUR 375 million, the highest infra- structural investments in the past 50 years in Macedonia. Looking for a solution to reinforce the weak rock formations the tunnel is passing through, Chinese from Synohydro chose Häny to supply a grout plant for self-drilling anchor injection application. Scope of supply: 1 x HRW 350 l agitator for the ready cement mix 1 x ZMP610 V plunger pump with max capacity of 2 cbm and max. pressure of 100 Bars (Water / Cement ratio: 1) Year of Delivery: 2015 Häny HRW350 / ZMP610 V, on the north entrance of the tunnel.

Upload: others

Post on 30-Jan-2021

16 views

Category:

Documents


0 download

TRANSCRIPT

  • Häny AG - Mixing and Injection Technology – Häny AG - Misch- und Injektionstechnik – Häny SA - Technique de mélange et d‘injectionBuechstrasse 20 • CH-8645 Jona • Tel. +41 44 925 41 11 • Fax +41 44 923 62 45 • [email protected] • www.haeny.com

    Reference object

    Subject to changes

    PM4-101442 00 / 12.2015

    Kicevo-Ohrid twin tube motorway tunnel Macedonia

    In four years’ time traveling to Ohrid, Macedonia will be a true pleasure. The construction of the highway from Kicevo to Ohrid is well underway. Construction workers, communicating in Macedonian, English and Chinese could be seen at the site, as well as a huge mechanization. The highway is being built by Chinese company Sinohydro Corporation Limited. The 2 km twin tube Preseka tunnel is part of the 57 km long highway project. Investment for this major project is estimated at around EUR 375 million, the highest infra-structural investments in the past 50 years in Macedonia.

    Looking for a solution to reinforce the weak rock formations the tunnel is passing through, Chinese from Synohydro chose Häny to supply a grout plant for self-drilling anchor injection application.

    Scope of supply:1 x HRW 350 l agitator for the ready cement mix1 x ZMP610 V plunger pump with max capacity of 2 cbm and max. pressure of 100 Bars (Water / Cement ratio: 1)

    Year of Delivery:2015

    Häny HRW350 / ZMP610 V, on the north entrance of the tunnel.