№ TYPES OF WORK NAME OF FACILITY,
CITY
NAME OF
CUSTOMER
START AND
END DATES
OF WORK
1 Major overhaul of the central power distribution station of Verkhovtsevo power
supply division located in Verkhn'odniprovs'kyi district of Dnipropetrovsk Oblast
with the replacement of the following equipment:
- 14 6 kV KSO chambers to 14 6 kV MVC of EDS production;
- 20 switchboard panels ShchO 90 0,4 kV to 9 input-distribution panels 0.4 kV
PowerLine of EDS production;
- current system of external lighting of the facility to Sh30 cabinet of EDS production.
Verkhovtsevo power
supply division,
Verkhn'odniprovs'kyi
district,
Dnipropetrovsk Oblast
JSC
«Ukrzaliznytsia» 2019 year
2 Modernization of the traction electrical substation "Fedorovka" 150/35/10 / 3.3 kV
in Zaporizhia Oblast.
During the modernization, the following work was carried out:
RECONSTRUCTION OF ORU-150 KV (outdoor switchgear):
- The replacement of power equipment in the chambers T-1, T-2, S-1 was carried out.
- In cchambers T1, T2, the OD-KZ-150 was replaced with SF6 circuit breaker ABB LTB-170. In
S-1 chamber, the U-220 dead-tank oil circuit breaker was replaced with ABB LTB-170 SF6
circuit breaker. In ORU-150 (outdoor switchgear), 150 kV disconnectors with a manual drive
were replaced with disconnectors with a motor drive and remote control in the amount of 6
sets, the replacement of 3 sets of 150 kV current transformers with the possibility of
commercial electric power metering was carried out, morally and physically obsolete 150 kV
surge arresters were replaced by surge arresters OPN-150 kV.
RECONSTRUCTION OF ORU-35 KV (outdoor switchgear):
- Replacement of power equipment in T-1, T-2, SV-35 chambers.
- 3 sets of oil circuit breakers were replaced with vacuum VR-35NSM, current transformers
and disconnectors were replaced.
RECONSTRUCTION OF ZRU-10 KV (indoor switchgear):
- The power equipment in the T-11, T-12, SV-10 chambers was replaced with vacuum one of
Schneider Electric production, and nine modern current transformers were installed.
Zaporizhia Oblast JSC
«Ukrzaliznytsia» 2019 year
3 Reconstruction of the power supply system of Dnipro starch plant with the
installation of new equipment at 35 kV electric substation.
RECONSTRUCTION OF ORU 35 KV (outdoor switchgear):
- installation of an additional power transformer TM6300/35 with an increase in power;
- replacement of 35 kV power equipment with 6 VR 35NSM vacuum circuit breakers, 11 sets
of disconnectors, 5 sets of surge arresters OPN 35 kV, 6 sets of 35 kV current transformers, 2
sets of 35 kV voltage transformers;
- installation of 3 KRUN 6 kV of EDS production.
- installation of 8 automation and control panels for ORU 35 kV and ZRU 6 kV, as well as
signal panel (all equipment was manufactured at EDS-ENGINEERING facilities).
RECONSTRUCTION OF ZRU 6 KV (indoor switchgear):
- installation of 13 6 kV chambers,
- modernization of RZiA (RPEA) in 12 previously installed chambers.
Dniprovs'ke village,
Dnipropetrovsk Oblast
PrJSC
«Dneprovsky
starch and syrup
integrated works»
2019 year
4 Technical re-equipment of ORU 10 kV (outdoor switchgear) L-45 chamber of
electrical substation SS «Chaplinka» 35/10 kV and SS «Mayevka» 150/35/10 kV
- on the 10 kV side a BB/TEL 10 kV vacuum circuit breaker manufactured by «Tavrida
Electric Ukraine» was installed instead of the old one, as well as two 10 kV current
transformers manufactured by Beontop and a set of voltage indication system
manufactured by KUVAG;
- technical re-equipment of L-45 chamber of 10 kV RP of SS «Chaplinka» 35/10 kV was
completed, a 3.5 MW SPS was connected to the L-45 power line;
- at the SS «Chaplinka» 35/10 kV the whole range of works on setting the RZiA system
(RPEA) was completed;
- at the SS «Mayevka» 150/35/10 kV was carried out the organization of busbar
disconnectors fork 35 kV «L-566-1» and «L-566-2» to enable the switching of 35 kV L-566
overhead lines from ІІ busbar section to І busbar section 35 kV for balanced load of SS
power transformers;
- a new disconnector was connected to ORU 35 kV with a help of busbar arrangement of
flexible steel-aluminum wire to the І busbar section of 35 kV.
Petrykivs'kyi district,
Dnipropetrovsk Oblast
JSC «DTEK Dnipro
grids» 2019 year
3
№ TYPES OF WORK NAME OF FACILITY,
CITY
NAME OF
CUSTOMER
START AND
END DATES
OF WORK
5 Reconstruction of 110/10 kV SS «Porshen'»:
1. Complete reconstruction of the construction part of the outdoor switchgear ORU-110 kV
was performed:
– dismantling works (dismantling the foundations of power transformers, dismantling
existing oil receivers, oil retainer, oil pipelines for emergency discharge of transformer oil,
dismantling reinforced concrete portals and 110 kV busbars, dismantling cable reinforced
concrete trays, dismantling of reinforced concrete racks of high-voltage equipment,
dismantling of old railway temporary transportation ways);
– assembly and installation of new foundations with oil receivers for power transformers,
new oil pipelines for emergency discharge of oil, installation of new portals on ORU-110 kV,
installation of new reinforced concrete cable consoles, installation of new racks of USO type
for high-voltage equipment, as well as foundations for 110 kV SF6 circuit breakers. One of
the new works that EDS-ENGINEERING specialists mastered during the implementation of
the project is the construction of railway tracks for rerolling transformers to ORU 110 kV
(outdoor switchgear).
2. Electrical installation work was carried out on outdoor switchgear ORU-110 kV:
– assembly of 2 power transformers of type TRDN 25000/110 kV manufactured by ZTR
(transportation, unloading, assembly and testing);
– assembly of 2 SF6 circuit breakers 110 kV manufactured by Siemens;
– assembly of 6 current transformers 110 kV manufactured by Arteche on prepared metal
structures;
– assembly of 6 disconnectors 110 kV manufactured by HVT;
– assembly of 8 surge protection devices 110 kV manufactured by ABB;
– busbar arrangement of ORU-110 kV (outdoor switchgear) with AS 185/19 wire with a total
length of 560 meters.
3. Electrical installation works were performed on the indoor switchgear ZRU-10 kV:
– replacement of 6 10 kV oil circuit breakers with vacuum VR-35 manufactured by RZVA
with adaptation for draw-out elements;
– installation of current transformers VC 10 kV, voltage transformers VC 10 kV in the
amount of 24 pcs., reconstruction of the rigid busbar 10 kV;
– installation of cabinet equipment manufactured by EDS-ENGINEERING: 8 panels of relay
cabinets, 2 TM cabinets, 8 terminal-block cabinets of YaZV-90, YaZV-120 types;
– laying of cabling and wiring products with a total length of about 22 km through cable
channels and substation equipment, followed by allocation and termination;
– reconstruction of the heating system of the indoor switchgear 10 kV, assembly of lighting
of ZRU-10 kV and ORU-110 kV;
– complete reconstruction of the grounding contour of 110/10 kV SS «Porshen'» at ORU-110
kV.
Konotop city, Sumy
Oblast
PJSC
«Sumyoblenergo» 2019 year
6 Reconstruction of 15 35 kV surge arresters with replacement of disconnectors:
Krivorozhskiy RES (Power Distribution Zone)
Replacement of 35 kV RV (indoor isolator) with OPN (surge arrester) SS «Khristoforovskiy
GPPZ» in RVD-31, RVD-32 chambers
Pyatikhatskiy RES (Power Distribution Zone)
Replacement of 35 kV RV (indoor isolator) with OPN (surge arrester) SS «Trudolyubovka» in
RVD-31, RVD-32 chambers
Replacement of 35 kV RV (indoor isolator) with OPN (surge arrester) SS «Pyatikhatskaya
PTF» in RVD-31, RVD-32 chambers
Sinel'nikovskiy RES (Power Distribution Zone)
Replacement of 35 kV RV (indoor isolator) with OPN (surge arrester) SS «Varvarovka» in
RVD-31, RVD-32 chambers
Pavlohradskiy РЭС RES (Power Distribution Zone)
Replacement of 35 kV RV (indoor isolator) with OPN (surge arrester) SS «Stroitel'naya» in
RVD-31, RVD-32 chambers
Replacement of 35 kV RV (indoor isolator) with OPN (surge arrester) SS «Vodnaya» in RVD-
31, RVD-32 chambers
Replacement of 35 kV RV (indoor isolator) with OPN (surge arrester) SS
«Santekhnicheskaya» in RVD-31, RVD-32 chambers
Verkhnedneprovskiy RES (Power Distribution Zone)
Replacement of 35 kV RV (indoor isolator) with OPN (surge arrester) SS «Bummash» in RVD-
31, RVD-32 chambers
Replacement of 35 kV RV (indoor isolator) with OPN (surge arrester) SS «Mosty» in RVD-31,
RVD-32 chambers
Dnipropetrovsk Oblast JSC «DTEK Dnipro
grids» 2019
4
Replacement of 35 kV RV (indoor isolator) with OPN (surge arrester) SS «Bratskaya» in RVD-
31, RVD-32 chambers
Replacement of 35 kV RV (indoor isolator) with OPN (surge arrester) SS «Travy» in RVD-31,
RVD-32 chambers
Replacement of 35 kV RV (indoor isolator) with OPN (surge arrester) SS «Mishurin Roh» in
RVD-31, RVD-32 chambers
Novomoskovskiy RES (Power Distribution Zone)
Replacement of 35 kV RV (indoor isolator) with OPN (surge arrester) SS «Novomoskovskaya
horodskaya» in RVD-31, RVD-32 chambers
Replacement of 35 kV RV (indoor isolator) with OPN (surge arrester) SS «Zoovettekhnikum»
in RVD-31, RVD-32 chambers
Replacement of 35 kV RV (indoor isolator) with OPN (surge arrester) SS «Peschanka» in RVD-
31, RVD-32 chambers
7 Reconstruction of ZRU-110kV of Cherkasy TPP - replacement of oil circuit breakers by
SF6 Cherkasy city Cherkasy TPP
january
2018.
8 Construction of open transformer substations 0.4 / 35kV 1600kVA (10 pcs.), RP-35kV,
reconstruction of SS "Veseloye" (installation of 35kV switches)
Vesele village,
Zaporizhia Oblast
LLC "Uкrainian
system Solar"
january
2018.
9 Reconstruction of SS “DBK”: a reactor was installed; reconstruction of existing
chambers was completed.
Two chambers of KSO-393-11M type were additionally installed in the user
transformer substation.
Krasylivka village,
Brovars'kyi district,
Kyiv Oblast
PJSC
“Kyivoblenergo”
january
2018
10 Reconstruction of substation “Horodskaya” 35/10kV in Nizhyn city Chernihiv Oblast,
namely the installation of new relay panels, automation panels, control current
cabinets, commissioning works
Nizhyn city Chernihiv
Oblast
PJSC
«Chernigovoblene
rgo»
September
2018
11
Installation of step-up KTP-1000 (packaged transformer substation) 0.4/6kV - 2pcs
2 MW solar power
station in Pidhorodne
city, Dnipropetrovsk
Oblast
LLC"Sun Energy" august
2017
12
Reconstruction of SS "Solenaya" 150/10kV. Replacement of oil circuit breakers with
vacuum ones - 9 pcs.
Solone village,
Dnipropetrovsk Oblast
PJSC "DTEK
Dneprooblenergo
"
2017
13
Reconstruction of SS "Surskaya" 35/10kV - installation of 35kV circuit breakers,
installation of relay panels
Brats'ke village,
Dnipropetrovsk Oblast
PJSC "DTEK
Dneprooblenergo
"
2017
14
Technical re-equipment of RZA (relay protection and automation devices) and
secondary switching schemes in the chambers of SS “Ochistnyye”
Novoaleksandrovskaja
Village Council
Dnipropetrovsk Oblast
High voltage
Union-RZVA 2017
15
Construction of SS-35/10 with the installation of 4 transformers TM-6300kVA
Greenhouse complex,
Novooleksandrivka
(Dnipro city)
LLC "Realty
Estate" 2016
16
Installation of 10 KTP-1000/10 and one 2xKTP-1000/10 (packaged transformer
substation)
Greenhouse complex,
Novooleksandrivka
(Dnipro city)
LLC "Realty
Estate" 2016
17 Installation of two KTP-630/6 (packaged transformer substation) - 2 units,
reconstruction of SS "ITsKK" - 150 / 6kV - replacement of circuit breakers with vacuum
ones in RU-6kV (switchgear)
Gas filling station,
Izmail city
LLC
"Ukrrezervuarserv
is"
11.2015-
11.2016
18 Organization of external power supply for ATB stores - according to the technical
conditions of power transmission organizations, reconstruction was made of PS-35kV -
1 unit, TP-10 / 0.4kV - 150 units.
Trade network,
Ukraine LLC "АTB-Market"
2011- till
present.
19 Production, supply and assembly of medium voltage chambers (6 kV) of KSO393 type
complete with LS 1000 A vacuum circuit breakers for the reconstruction of port
transformer substations.
Berdyansk sea port Ukrainian Sea
Ports Authority
11.2016 -
12.2016
5
№ TYPES OF WORK NAME OF FACILITY,
CITY
NAME OF
CUSTOMER
START AND
END DATES
OF WORK
20 Repair and construction works at the SS 150/35/6 kV:
- replacement of current transformers 150 kV;
- replacement and installation of additional TSN (auxiliary transformer);
- relay protection reconstruction
Electricity
Transmission
organization
Dnipropetrovsk Oblast
PJSC “ENE”
Central Energy
Company””
2016
21 KTP-10/0.4kV (packaged transformer substation) installation for power supply of oil
depot Neftebaza, Dnipro city "AMIC ENERGY"
08.2016-
12.2016
22
Reconstruction of RU-10kV TP warehouse - assembly of medium voltage chambers of
the KSO393 type completed with LS 1000 A vacuum circuit breakers
Pharmaceutical
company, Udarnykiv
St. 27, Dnipro city
“BaDM” LLC 12.2016 -
02.2017
23 Reconstruction of 35-10 kV electric grids of PJSC "Nikopol Pipe Fittings Plant": -
replacement of power transformers, RU-10kV (switchgear), ORU-35kV (outdoor
switchgear).
Pipeline Fittings Plant,
Nikopol' city PJSC "NPFP"
05.2015-
08.2015
24
Construction of a transformer substation with 2xTM-2500/10 transformers.
Reconstruction of existing transformer substations in the part of RU-10kV
(switchgear).
Oil refinery, Feodosia
city
Feodosiya
enterprise on
providing oil
products
2013
25 Construction of two transformer substations with two transformers of TM-1600/10
type each.
Logistics center,
Dnipro city
LLC “Master Profi
Plant Ukraine”
09.2012-
09.2013
26
Modernization of relay protection KRU-6kV Zuevskaya TPP
Zuhres city, 60 rokiv
Zhovtnia St, Donetsk
Oblast
DTEK
Vostokenergo 2012
27 Reconstruction of SS-150/35 /6kV with the replacement of 150kV air circuit breakers
with SF6 of ABB production. Replacement of electromagnetic RZiA (RPEA) with
microprocessor based on the equipment "Diamant" manufactured by "Hartron Incor".
Ordzhonikidze city,
Dnipropetrovsk
Oblast, Ukraine
Procter&Gamble 2011
Director ______Zapishniy О.О._______ ______________ ______________ (Name of the head / director / owner) (signature) (date)