Recreation Resources Study Summary
Packwood Lake Hydroelectric ProjectStudy Report MeetingDecember 13, 2006Lacey, Washington
22
Recreation Resources StudyPreliminary Results
nRecreation InventorynUSFS Wilderness Permit DatanOn-Site SurveysnObservations (Packwood Lake/Lake Creek)nEnergy Northwest and Contractor VisitsnTraffic Counts
33
Recreation Study AreaRecreation Study Area
44
Recreation Inventory
nDispersed Overnight Camping AreasnDispersed Day-use Only AreasnTrailsnWilderness StationsnBuildingsnFacilities
55
Dispersed SitesDispersed Sites
nnNonNon--Wilderness Dispersed SitesWilderness Dispersed Sites•• 18 Campsites18 Campsites•• 2 day2 day--use (no camping sign and space use (no camping sign and space
constraints)constraints)nnWilderness SitesWilderness Sites
•• 17 Campsites17 Campsites•• 6 Disturbed areas (stock damage, rocky, 6 Disturbed areas (stock damage, rocky,
flooding, fallen trees)flooding, fallen trees)
66
Inventory MapInventory Map
77
Dispersed SitesDispersed Sites
88
Dispersed SitesDispersed Sites
99
FacilitiesFacilities
nn US Forest Service US Forest Service Guard StationGuard Station
nn Historic Log Ranger Historic Log Ranger StationStation
nn OuthousesOuthouses
1010
USFS Wilderness Permit SystemUSFS Wilderness Permit System
nn2005 (complete) 2005 (complete) •• Day Use/OvernightDay Use/Overnight•• PeakPeak--Season/OffSeason/Off--SeasonsSeasons•• Weekday, Weekend Day and HolidayWeekday, Weekend Day and Holiday•• Visitor DemographicsVisitor Demographics
nn2006 (need from Forest Service)2006 (need from Forest Service)
1111
FS Wilderness Permits (2005)FS Wilderness Permits (2005)
2.43 2.45
2.3
2.64
3.2
2.5
3.33.2
2.7
0.5
0.24
0.430.55
0.8
0.5
0.160.24
0.150.26
0.20.1
0
0.5
1
1.5
2
2.5
3
3.5
Day Use Overnight Day Use Overnight Day Use Overnight
Tot al Peak-Season Of f -Season
Avg # NightsAvg Party SizeAvg # StockAvg. # Dogs
1212
FS Wilderness Permits (2005)FS Wilderness Permits (2005)
75 83 60 7315 10
198
269
150
242
48 27
198
1066
150
973
4893
0
200
400
600
800
1000
1200
Day Use Overnight Day Use Overnight Day Use Overnight
Total Peak-Season Off-Season
# Permit Entries
Total # People
Visitor Days
1313
FS Wilderness Permits (2005)FS Wilderness Permits (2005)
8.49
17.63
5.67
0.33 1.040
0
2
4
6
8
10
12
14
16
18
Peak-Season Off-Seasons
Average Visitor Day
Weekday
WeekendHoliday
577.25528.75
1763.25 77.75
0
0
100
200
300
400
500
600
Peak-Season Off-Seasons
Visitor Days
Weekday
Weekend
Holiday
1414
FS Wilderness Permits (2005)FS Wilderness Permits (2005)
1515
OnOn--Site SurveysSite SurveysnnCompleted Surveys at Packwood Lake Completed Surveys at Packwood Lake
Trailhead Parking Lot (2006)Trailhead Parking Lot (2006)•• April 29 to November 30April 29 to November 30•• Surveys from 8:00 am to 3:00 pmSurveys from 8:00 am to 3:00 pm•• Noon vehicle counts at parking lotNoon vehicle counts at parking lot
nnObtained USFS Survey data at Packwood Obtained USFS Survey data at Packwood Lake Old Ranger Station (2005)Lake Old Ranger Station (2005)•• August 9 to September 5August 9 to September 5
1616
2006 Surveys at Packwood Lake Trailhead2006 Surveys at Packwood Lake Trailheadnn Surveyors surveyed and/or documented all groups at Surveyors surveyed and/or documented all groups at
Trailhead Parking LotTrailhead Parking Lot•• Many driveMany drive--through (documented group size)through (documented group size)•• Some refused survey (documented group size and access Some refused survey (documented group size and access
method)method)•• Detailed questions to groups visiting Packwood LakeDetailed questions to groups visiting Packwood Lake
nn PeakPeak--Season 2006Season 2006•• 19 days/290 groups documented/surveyed between 19 days/290 groups documented/surveyed between
Memorial Day Weekend and Labor DayMemorial Day Weekend and Labor Daynn OffOff--SeasonSeason
•• 4 days/20 groups documented/surveyed in Spring (April 29 4 days/20 groups documented/surveyed in Spring (April 29 ––May 26)May 26)
•• 9 days documented/surveyed in Fall (Sept. 9 9 days documented/surveyed in Fall (Sept. 9 –– Nov.) + 5 Nov.) + 5 days additional vehicle counts. (days additional vehicle counts. (Data input and analysis in Data input and analysis in process)process)
1717
2006 Surveys2006 SurveysPeak Peak -- Travel Routes/MethodsTravel Routes/Methods
Peak-Season Travel Methods
0%5%
10%15%20%25%30%35%40%45%50%
ATV
Mot
or-
cycl
e
Bike
Hik
e
ATV
Mot
or-
cycl
e
Bike
Hik
e
Hor
se/P
ack
Trail #74/Pipeline Trail #78 ParkingLot/Drive
thru
Peak-Season Travel Routes
0%
10%
20%
30%
40%
50%
60%
Trail #74/Pipeline Trail #78 Parking Lot/Drive thru
1818
2006 Surveys2006 SurveysPeak Peak -- Travel Routes/MethodsTravel Routes/Methods
Peak-Season Travel Routes and Methods
0%
5%
10%
15%
20%
25%
ATV
Mot
or-
cycl
e
Bike
Hik
e
ATV
Mot
or-
cycl
e
Bike
Hik
e
Hor
se/P
ack
Trail #74/Pipeline Trail #78 ParkingLot/Drive
thru
Overnight (PWL)Day Use (PWL)Other/Unknown
1919
2006 Surveys 2006 Surveys ––Spring Spring -- Travel Routes/MethodsTravel Routes/Methods
Spring-Season Travel Routes and Methods
0%
10%
20%
30%
40%
50%
60%
ATV Motor-cycle
Bike Hike ATV Motor-cycle
Bike Hike
Trail #74/Pipeline Trail #78 ParkingLot/Drive
thru
Overnight (PWL)
Day Use (PWL)
Other/Unknown
2020
2006 Surveys2006 SurveysPackwood Lake VisitsPackwood Lake Visits
4.7
3.3
2.12
4.3
6
2.6
1
2
0
1
2
3
4
5
6
Day Use Overnight Day Use Overnight
Peak-Season Spring-Season
Avg # NightsAvg # HoursAvg Party Size
2121
2006 Surveys2006 SurveysPackwood Lake VisitsPackwood Lake Visits
Packwood Lake - Seasonal Visits
1521
94 20
4708
94 40
1596 1596
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
Day Use Overnight Day Use Overnight
Peak-Season Spring-Season
# People
Visitor DaysPackwood Lake - Average Daily Visits
16 15.1
3.40.7
16
46.6
3.41.4
0
5
10
15
20
25
30
35
40
45
50
Day Use Overnight Day Use Overnight
Peak-Season Spring-Season
Avg # People/Day
Avg Visitor Day
2222
2006 Surveys2006 SurveysPackwood Lake VisitsPackwood Lake Visits
27.00
5.00
40.00
3.00
40.00
0
0
10
20
30
40
50
60
70
80
Weekday Weekend Holiday
Average # of People/Day
Average # People (Peak-Season)Average # People (Spring-Seasons)
54.08
5.50
80.52
3.00
70.23
0
0
10
20
30
40
50
60
70
80
Weekday Weekend Holiday
Average Visitor Day
Peak-Season
Spring-Seasons
2323
2006 Surveys2006 SurveysPackwood Lake Visitor DestinationsPackwood Lake Visitor Destinations
Packwood Lake - Peak-SeasonVisitor Days/Destination
547 (9%)
2140 (34%)3616 (57%)
Non-WildernessWildernessBoth
Packwood Lake - Spring-Season Visitor Days/Destination
0
40 (30%)
94 (70%)
Non-Wilderness
Wilderness
Both
2424
2006 Surveys2006 SurveysPackwood Lake ActivityPackwood Lake Activity
What activities did you participate in at Packwood Lake during your visit?
0%10%20%30%40%50%60%70%80%90%
100%
CampingPicn
icking
Boat F
ishing
Shore
Fishing
Other B
oatin
gVisit
ing Beac
hWadin
g/Swim
ming
Hiking
Hunting
Picture
s
Peak-SeasonSpring-Season
2525
2006 Surveys2006 SurveysPackwood Lake VisitsPackwood Lake Visits
39%
50%
100%100%
27%
0%
10%
0%
28%
100%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
First Visit Summer Fall Winter Spring
What seasons of the year do you visit Packwood Lake?
Peak-SeasonSpring-Season
16.09
21.67
2.52 3
0
5
10
15
20
25
How many years have you beencoming to Packwood Lake?
How many times a year do youvisit Packwood Lake?
Frequency of Visits to Packwood Lake
Peak-SeasonSpring-Season
2626
2006 Surveys2006 SurveysPackwood Lake Visitor OpinionsPackwood Lake Visitor Opinions
0%
10%
20%
30%
40%
50%
60%
70%
Bad Idea Good Idea No Opinion
Opinions Regarding Moving Camping Areas Away FromPackwood Lake Shoreline
Peak-Season
Spring-Season
0%
10%
20%
30%
40%
50%
60%
70%
Bad Idea Good Idea No Opinion
Opinions Regarding Eliminating ATV/Motorized Vehicles at Packwood Lake
Peak-Season
Spring-Season
2727
2006 Surveys2006 SurveysPackwood Lake Visitor RatingsPackwood Lake Visitor Ratings
Rating Packwood Lake (5 is best)
4.254.46
4.67
5
1
1.5
2
2.5
3
3.5
4
4.5
5
Scale of 1-5, how do you rate Packwood Lake area? Scale of 1-5, how rate recreation experience at PackwoodLake?
Peak-Season
Spring-Season
2828
2006 Surveys2006 SurveysPackwood Lake Crowding/CommentsPackwood Lake Crowding/Comments
Visitor Survey Comments Regarding Visitor Survey Comments Regarding Improvements/Amenities/WantsImprovements/Amenities/Wants
nn Better/Cleaner/More Outhouses (37%)Better/Cleaner/More Outhouses (37%)nn Trash cans/remove trash (12%)Trash cans/remove trash (12%)nn Boat rentals (8%)Boat rentals (8%)nn Horses off trails/less horses/manure cleanHorses off trails/less horses/manure clean--up (5%)up (5%)nn Improve #74 road & gate for ATV access (5%)Improve #74 road & gate for ATV access (5%)nn Trail maintenance/improvements (5%)Trail maintenance/improvements (5%)nn Separate ATV’s Separate ATV’s –– Trail #74 ATV only (3%)Trail #74 ATV only (3%)nn Upgrade Trail 78 for ATV/more ATV trails (3%)Upgrade Trail 78 for ATV/more ATV trails (3%)nn Concession stand/Concession stand/expressoexpresso (3%)(3%)nn More campsites (3%)More campsites (3%)nn Water supply (2%)Water supply (2%)nn Trail around Lake (2%)Trail around Lake (2%)nn No commercialism (2%)No commercialism (2%)nn Open fishing using bait (2%)Open fishing using bait (2%)nn Picnic tables (2%)Picnic tables (2%)nn Cleared livestock areas (2%)Cleared livestock areas (2%)nn Horse camp (2%)Horse camp (2%)nn Lodge (2%)Lodge (2%)nn Disability access (2%)Disability access (2%)
Crowding (1 is not crowded and 5 is overcrowded)
2.3 2.3
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
Scale of 1-5, how w ould you rate crow ding at Packw ood Lake?
Peak-Season
Spring-Season
2929
2006 Surveys2006 SurveysPWL Parking Lot Vehicle CountsPWL Parking Lot Vehicle Counts
0
2
4
6
8
10
12
14
16
18
Ave
rage
# V
ehic
les
Peak-Season Spring-Season
Weather vs # of Vehicles in Packwood Lake Parking Lot (noon counts)
Terrible
Decent
Excellent
3030
2006 Surveys2006 SurveysPackwood Lake Visitor DemographicsPackwood Lake Visitor Demographics
nn Preliminary Results for Spring/PeakPreliminary Results for Spring/Peak--SeasonsSeasons•• Majority of visitors from Pierce and Lewis Majority of visitors from Pierce and Lewis
countiescounties•• Next highest number of visitors from King and Next highest number of visitors from King and
Thurston Counties Thurston Counties •• Updated with all visitors for Peak, and Updated with all visitors for Peak, and
Spring/Fall in ReportSpring/Fall in Report
3131
USFS Surveys at Packwood Lake USFS Surveys at Packwood Lake Old Ranger Station (2005)Old Ranger Station (2005)
nn 25 days/171 Groups Surveyed between August 25 days/171 Groups Surveyed between August 9 and September 5, 20059 and September 5, 2005•• Travel Routes/MethodsTravel Routes/Methods•• Group Size, Destination and Length of StayGroup Size, Destination and Length of Stay•• ActivitiesActivities•• Packwood Lake visits Packwood Lake visits -- Frequency and SeasonFrequency and Season•• Comments regarding improvements/amenities @ Comments regarding improvements/amenities @
Packwood LakePackwood Lake•• DemographicsDemographics
nn Same time as observationsSame time as observationsnn Results included in ReportResults included in Report
3232
USFS SurveysUSFS SurveysPackwood Lake Old Ranger Station (2005)Packwood Lake Old Ranger Station (2005)
5.2
26.88
22
7.13
19.63
8
2.593.98 3.67 3.25 3.93
2.673.16 2.64 2.33 2.49 1.852.67
0
5
10
15
20
25
30
Weekday Weekend Holiday Weekday Weekend Holiday
Day Use Overnight
Avg # People/Day
Avg Party Size
Avg # of Nights
Avg # Hours
3333
ObservationsObservations
nn EN and Contractor ObservationsEN and Contractor Observations•• 2006 at Packwood Lake2006 at Packwood Lake
–– During routine visitsDuring routine visits–– During field workDuring field work
nn FS Observations at Packwood LakeFS Observations at Packwood Lake•• 2005 at Old Log Ranger Station2005 at Old Log Ranger Station•• Route/Method, # People ObservedRoute/Method, # People Observed
–– Same time as surveysSame time as surveys–– Result included in reportResult included in report
nn Observations at Lake Creek (2006)Observations at Lake Creek (2006)•• No people were observed at Lake Creek (June No people were observed at Lake Creek (June –– October)October)
3434
Observational Data (2006)Observational Data (2006)Energy Northwest and ContractorsEnergy Northwest and Contractors
EN and Contractor Observations (Weekdays)(Average Number of People Observed/Day)
0.00.2
0.0
0.50.3 0.3
0.5
1.6
0.50.4
0.0 0.0 0.0
1.8
0.50.8
1.6
0.4 0.4
0.0 0.0
5.6
1.4
3.8
0.5
0.0
1.00.8 0.8 0.8
0.5
1.0
0.0
1.0
2.0
3.0
4.0
5.0
6.0
ATV-Observed Mot orcycle Bicycle Horse Horse/ Pack St ock People on Trail People at Lake Vehicles in ParkingLot
Off-Season SpringJuneJulyAugust
3535
EN Visit RecordsEN Visit Records
10%
0% 0%
50%
0% 0% 0%
10%
0% 0% 0% 0% 0%
20%
0% 0% 0% 0% 0%
10%
0% 0% 0% 0%0%
5%
10%
15%
20%
25%
30%
35%
40%
45%
50%
April 26 - May 8 May 9 - May 25 April 26 - May 8 May 9 - May 25 April 26 - May 8 May 9 - May 25 April 26 - May 8 May 9 - May 25
ATV Walk Snowmobile Vehicle
Energy Northwest Route and Method Spring Off-Season 2006 (10 Trips)
Pipeline Rd/Trail #74
Latch Rd/Trail #74
Trail #78
3636
EN & Contractor Visit RecordsEN & Contractor Visit Records
79%
5%
0
5%11%
0
0%
10%
20%
30%
40%
50%
60%
70%
80%
ATV Walk
Energy Northwest Route and Method Peak-Season 2006 (19 Trips)
Pipeline Rd/Trail #74
Latch Rd/Trail #74
Trail #78
43%
7%
0%
7%
36%
7%
0%
10%
20%
30%
40%
50%
60%
70%
80%
ATV Walk
Contractor Route and Method Peak-Season 2006 (10 Trips)
Pipeline Rd/Trail #74Latch Rd/Trail #74Trail #78
3737
Traffic Counters (2006)Traffic Counters (2006)
nnTwo on Trail #74Two on Trail #74•• Near Diversion, approx. 200 feet apartNear Diversion, approx. 200 feet apart
nnOne on Forest Service Road 1260One on Forest Service Road 1260•• Near FS BoundaryNear FS Boundary
3838
Traffic Counter Data (2006)Traffic Counter Data (2006)
Average Traffic Counts/Day Off-Season (Spring)
22
66
7No Data
0
20
40
60
80
100
120
Average Counts/Day (USFS Rd 1260) Average Counts/Day (Trail #74)
Early Spring 4/26 - 5/9
Late Spring 5/9 - 5/25
Average Traffic Counts/Day (Peak-Season)
97
47
7161
81
11 714 12 10
0
20
40
60
80
100
120
5/25 - 5/30 5/30 - 6/28 6/28 - 7/29 7/29 - 8/29 8/29 - 9/7
Memorial DayWeek
June July August Labor Day Week
Average Counts/Day (USFS Rd 1260)
Average Counts/Day (Trail #74)
3939
ScheduleSchedule
nn Draft ReportDraft Report•• February 1, 2007February 1, 2007
nn 3030--Day ReviewDay Reviewnn Final ReportFinal Report
•• March/April 2007March/April 2007nn Needs AnalysisNeeds Analysis
•• 20072007