RECORDS, ACIEVEMENTS & AWARDS
• In the History of TSTPP there is never
loss of power generation due toshortage of coal.
• CHP is consistently maintaining higher
availability than target due to
Preventive, Condition based
maintenance & Predictive maintenance.
•
CHP team got the meritorious awardon 15th
August 2000 for designing &
implementing the on line spillage coal
washing tray under conveyor 2A/2B.
This has brought down down-time of
conveyors 2A/2B during monsoon.
• CHP team got the meritorious award
on 26-01-2003 for modification in VGF,resulting in better grizzly action of
VGF by fixing screens on grizzly bed.
• CHP team got the First prize for best
House Keeping on 26-01-2003.
• CHP team got awards in 2002 & 2001
for presentation of tableaus onRepublic Day.
• CHP team got meritorious award on
for modification of water sprinkler
system in stackyard. The modified
-
8/17/2019 Records&Achievements
2/2
system is very easy to operate &
maintain. Earlier it was getting
submerged in coal.
• Maximum coal handled from TrackHopper in a shift, 9000MT on 31-10-
2002.
• Maximum coal handled from Track
Hopper in a day, 24,200 MT on 29-12-
2002.
•
Record coal of 28,400 MT handled(bunkered) in a day on 14/04/2003.
• Record coal of 30,100 MT handled
(bunkered) in a day on 27/06/2003.