Page 1: Reclamation. Goal  Plans for Reclamation  New Requirements

ReclamationReclamation

Page 2: Reclamation. Goal  Plans for Reclamation  New Requirements

GoalGoal

Plans for ReclamationPlans for Reclamation

New RequirementsNew Requirements

Page 3: Reclamation. Goal  Plans for Reclamation  New Requirements

Reclamation OverviewReclamation Overview

Reclamation GoalsReclamation Goals

Plans for Surface ReclamationPlans for Surface Reclamation

Earthwork for Interim and Final Earthwork for Interim and Final ReclamationReclamation

Page 4: Reclamation. Goal  Plans for Reclamation  New Requirements

Reclamation GoalsReclamation Goals

Return to a predisturbed condition as Return to a predisturbed condition as reasonably practicalreasonably practical

Final Reclamation Interim Reclamation

Page 5: Reclamation. Goal  Plans for Reclamation  New Requirements

Plans for Surface Plans for Surface ReclamationReclamation

Item J of the 12-point SUPOItem J of the 12-point SUPO Segregation of spoil materialsSegregation of spoil materials Redistribution of topsoilRedistribution of topsoil Configuration of reshaped topographyConfiguration of reshaped topography Backfill requirements Backfill requirements Surface disturbancesSurface disturbances Proposals for pit/sump closures Proposals for pit/sump closures Drainage systemsDrainage systems Soil treatmentsSoil treatments

Page 6: Reclamation. Goal  Plans for Reclamation  New Requirements

Plans for Surface Plans for Surface ReclamationReclamation

Item J of the 12-point SUPO (cont.)Item J of the 12-point SUPO (cont.) Seeding/steps to reestablish vegetationSeeding/steps to reestablish vegetation Weed control; and Weed control; and Practices necessary to reclaim all Practices necessary to reclaim all

disturbed areas, including any access disturbed areas, including any access roads and pipelines.roads and pipelines.

Page 7: Reclamation. Goal  Plans for Reclamation  New Requirements

ReclamationReclamationInterim and Final ReclamationInterim and Final Reclamation

6 months after well completion or well plugging6 months after well completion or well plugging BLM or FS approval required beyond 6 monthsBLM or FS approval required beyond 6 months

Prior approval required if pits will be air or Prior approval required if pits will be air or chemical driedchemical dried

Pit Closure Recontouring Respread Topsoil

Page 8: Reclamation. Goal  Plans for Reclamation  New Requirements

ConclusionConclusion

Gold Book – Ch. 6Gold Book – Ch. 6Reclamation and Reclamation and

AbandonmentAbandonment

Provides good information Provides good information on BLM’s reclamationon BLM’s reclamation

standardsstandards

www.blm.gov/bmpwww.blm.gov/bmp