CITY OF CALGARY RECEIVED IN COUNCIL CH AMBER JUL 3 0 20'!8 ITEM ·i ,~ ~\\ f~ ~ ~O = CITY CLERK'S DEPARTME NT Hotchkiss Timeline Hopewell purchases first parcel Annexation Growth Management Initiated by City South Shepard ASP initiated by City of Calgary Infrastructure constructed for Hotchkiss ($7M)* South Shepard ASP approved Developer Funded ASP's initiated Developer funded ASP's approved Hopewell makes land use application Hotchkiss GMO removal recommended by PFC Hotchkiss GMO removal tabled by Council to Ql 2018 Hotchkiss GMO removal tabled by Council to Q2 2018 If Recommended for Approval July 30, 2018: GMO Removal Public Hearing Land Use Redesignation Stripping and Grading ($9M) Underground and surface construction ($15.4M) Show home construction start ($6M) Lift Station Construction ($7.SM) Show home opening Phase 2 Construction ($13M) Roundabout Construction ($13.SM) 2004 2007 2011 2012 2013 May 2013 December 2013 Sept.2014-Dec.2015 April 2016 June 2017 July 2017 January 2018 September 2018 October 2018 Spring 2019 Summer 2019 Fall 2019 Fall/Winter 2019 Spring 2020 2020 2019/2020 Notes: Assumed absorptions are 300 SF units per year starting in 2021 First residents of Hotchkiss in January 2021 Approx. investment shown in brackets above * lnfratructure previously constructed for Hotchkiss includes the Mahogany Lift Station, Mahogany Storm Trunk and East McKenzie Feedermain. Approximate cost allocated to Hotchkiss is $7M .

Upload: others

Post on 18-Nov-2021

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RECEIVED - eSCRIBE Meetings

CITY OF CALGARY RECEIVED

IN COUNCIL CHAMBER

JUL 3 0 20'!8

ITEM ·i ,~~\\f~~~O = CITY CLERK'S DEPARTMENT

Hotchkiss Timeline

Hopewell purchases first parcel

Annexation

Growth Management Initiated by City

South Shepard ASP initiated by City of Calgary

Infrastructure constructed for Hotchkiss ($7M)*

South Shepard ASP approved

Developer Funded ASP's initiated

Developer funded ASP's approved

Hopewell makes land use application

Hotchkiss GMO removal recommended by PFC

Hotchkiss GMO removal tabled by Council to Ql 2018

Hotchkiss GMO removal tabled by Council to Q2 2018

If Recommended for Approval July 30, 2018:

GMO Removal Public Hearing

Land Use Redesignation

Stripping and Grading ($9M)

Underground and surface construction ($15.4M)

Show home construction start ($6M)

Lift Station Construction ($7.SM)

Show home opening

Phase 2 Construction ($13M)

Roundabout Construction ($13.SM)

2004

2007

2011

2012

2013

May 2013

December 2013

Sept.2014-Dec.2015

April 2016

June 2017

July 2017

January 2018

September 2018

October 2018

Spring 2019

Summer 2019

Fall 2019

Fall/Winter 2019

Spring 2020

2020

2019/2020

Notes: Assumed absorptions are 300 SF units per year starting in 2021

First residents of Hotchkiss in January 2021

Approx. investment shown in brackets above

* lnfratructure previously constructed for Hotchkiss includes the Mahogany Lift

Station, Mahogany Storm Trunk and East McKenzie Feedermain. Approximate

cost allocated to Hotchkiss is $7M.

Page 2: RECEIVED - eSCRIBE Meetings

East Regional Context Study Map2

Future Planning Cells

Legend

City Limits

Railway

LJ Transportation/ Utility Corridor

- • Study Area Boundary

[:i:J Planning Cell

0

Kilometres

As amended by Calgary City Council. Areas do not correspond with maps B, C, F, G and H in Appendix A.

This map is conceptual only No measurements of dislances or areas should be laken from Lhis map

CA'i:GARY LAND USE PLANXING & POLICY

X:\111_Easl_Annexation_Regional_Conlex.t_Sludy\Business_Tech_Serv\GIS\documenl_maps\planning_areas mxd

Part 1 - The East Regional Context Study

Vision 1

Approved: 2009/04/06 Amended:

5

Page 3: RECEIVED - eSCRIBE Meetings

... V,

East Regional Context Study

Map 3

Land Use Concept & Transportation

legend

-·-·- City Limits

----- Railway

LJ Transportation/ Utility Corridor

- Commercial/ Retail

Industrial

Open Space

Residential

Water/ Pond

Cemetery

= Expressway/ Freeway

- Major Street

0 Full Other Interchange

0 Proposed Partial Interchange

0 Full Provincial Fixed Interchange

0 Partial Provincial Fixed Interchange

0 Full Potential Interchange

Possible Future Interchange O (subject to funding and approval

by the Province of Alberta)

® Possible Future Overpass

Interchange Pedestrian/Pathway Crossings

0 No Pedestrian/Pathway Crossing

Cl> Pedestrian/Pathway Overpass

~ Pedestrian/Pathway Underpass

0 North Side Pedestrian/Pathway Crossing

0 South Side Pedestrian/Pathway Crossing

······" Existing Pathway

0 0000= Proposed Pathway Connection

Potential Greenway Alignment ..... (Conceptual Only)

11111111 Potential BRT Route

0

Approved: 2009/0•/06 Amended:

2 3

Kilometres

This map is co11ceptual only. No measuremcnls of distances or Jreas should be laken from this map.

THE CITY OF

CALGARY

4

LAND USE PLANNING & POLICY

5

l -

X:\ 111 _Ea51_ Annexalion _Reglonal_ Context_Sludy\Busil)ess_ Tedl _ Se1V\GIS\document_maps\landuse_1ransport.m)(d

_J

-1-

Page 4: RECEIVED - eSCRIBE Meetings

MARKET SHARE VS. ACTIVE COMMU NITIES 35

90%

30

80%

70% 25

60% 20

- satellites 50%

- Calgary

15 -Active Calgary Communities 40%

30% 10

20%

5

10%

0% 0

2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017