Report run on: April 4, 2012 3:05 PM RECAPP Facility Evaluation Report Lake Bonavista Elementary School B2697A Calgary Calgary School District #19

Upload: others

Post on 20-Mar-2020

10 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RECAPP Facility Evaluation Report - AlbertaOverall the mechanical systems in the building are in marginal condition. Electrical Summary: The building has an original 600 Amp, 120/208

Report run on: April 4, 2012 3:05 PM

RECAPP Facility Evaluation Report

Lake Bonavista Elementary SchoolB2697ACalgary

Calgary School District #19

Page 2: RECAPP Facility Evaluation Report - AlbertaOverall the mechanical systems in the building are in marginal condition. Electrical Summary: The building has an original 600 Amp, 120/208

Report run on: April 4, 2012 3:05 PM Page 2 of 38

B2697ABuilding Id:

Lake Bonavista Elementary SBuilding Name:

CalgaryLocation:1015 - 120 Avenue S. E. Address:

2,802.00Gross Area (sq. m): $7,864,000Replacement Cost:1969Construction Year:

Evaluation Date: September 21 2011

Stantec Consulting Evaluation Company:

Karina EdelmuthEvaluator Name:

Lake Bonavista Elementary School is a one storey brick-faced building originally constructed in 1969 encompassingapproximately 2,800 square meters.

General Summary:

Structural Summary:Structural drawings were not available for review; however, the building structure consists of masonry block bearing wallswith open web steel joists supporting steel decking. The floor is poured concrete. The building's structural elements are in acceptable condition.

Envelope Summary:The building envelope consists mainly of brick veneer, with a stucco top portion on the west and south buildingelevations. The flat roof is a modified bitumen membrane roof. Exterior doors are painted wood in a metal frame. Aluminum windows are mainly fixed, and some contain an operableawning. Recommended work includes: - Replacement of deficient sealant on the building perimeter - Replacement skylight glazing with wire mesh or other type of reinforced glass - An upgrade to an automatic door opener for the west entrance. The building envelope is in overall acceptable condition.

Interior Summary:The majority of the interior walls consist of painted gypsum board or painted masonry block, with interior demountablewalls in the southeast and southwest classrooms. The majority of the building has either suspended acoustic ceilingtiles, or acoustic ceiling finishes. Classrooms and corridors typically have either vinyl sheet or vinyl tile flooring.Carpeting is provided in the library, teachers lounge and administration area, while the main boiler room has a sealedconcrete floor. The gymnasium and stage area both have hardwood flooring. The building's interior finishes are in acceptable condition.

Mechanical Summary:Lake Bonavista Elementary School was originally constructed in 1969 with no subsequent major renovations oradditions. The domestic water, sanitary, and rain water drainage piping is original to the construction of the building.There are backflow prevention devices (BFPs) present on the domestic water supply, boiler feed water supply,external irrigation hose bib, and the main fire protection standpipe system. The domestic hot water system includes anatural gas fired domestic hot water heater and a domestic hot water circulation pump. The building is heated by two central hot water boilers. Heating distribution is through original cast iron piping toconvectors, fan coil units, and unit heaters throughout the building. Three inline pumps (two supply and one backup)circulate heating hot water through the building. There is no air conditioning provided to the building. Building exhaust is provided by roof and wall mounted exhaust fans. The entire building is protected by a fire

12.17%5 year Facility Condition Index (FCI):

Facility Details Evaluation Details

Total Maintenance Events Next 5 years: $956,800

Calgary - Lake Bonavista Elementary School (B2697A)

Page 3: RECAPP Facility Evaluation Report - AlbertaOverall the mechanical systems in the building are in marginal condition. Electrical Summary: The building has an original 600 Amp, 120/208

Report run on: April 4, 2012 3:05 PM Page 3 of 38

standpipe system complete with fire hoses throughout the building. The stage is protected by a wet-pipe sprinklersystem. Fire extinguishers are located in fire hose cabinets throughout the building. The following are recommended actions for the next five years, including scheduled replacements: - Repair sanitary vent stacks that have become clogged with roofing tar. - Replace all seized gate isolation valves in boiler room that service domestic water, hot water and fire protectionsystems. - Test and repair natural gas system that was potentially damaged due to vandalism. - Repair air intake screen and dampers on roof that was damaged due to vandalism. - Upgrade building control system to full BMCS to eliminate interface issues that are occurring due to the presence ofconflicting control systems. - Provide a separate thermostat for rooms 7 and 8 (rooms 131 and 132 on CBE building plan) and provide separatehot water supply loop to eliminate under/overheating of the two rooms due to their south facing windows. - Replace finned tube radiation Other elements that will reach or exceed their theoretical lives within the next five years appeared to be in acceptablecondition at the time of the site visit. Overall the mechanical systems in the building are in marginal condition.

Electrical Summary:The building has an original 600 Amp, 120/208 Volt service which feeds lighting, power receptacles, and mechanicalequipment in the building. The electrical sub-panels and wiring are generally original to the construction of thebuilding. All observed wiring was in conduit. The building is protected by a fire protection system that was upgraded in 2010 which controls fire alarm bellsthroughout the building. Initiation in the building is by manual pull stations, heat detectors, and smoke detectors. Interior lighting is provided by T8 fluorescent technology throughout the building. Exterior lighting is provided byincandescent fixtures located at entrances around the building. Emergency lighting has been upgraded in 2010 alongwith fire protection system. The building has a Silent Knight security system, which is externally monitored, a Norstar Meridian telephone system,a Bogen public address system, a Bell fibreoptic internet service, and a hardwired and wireless Local Area Network. The following are recommended actions for the next five years, including scheduled replacements: - Determine cause of premature failure of T8 lamps and ballasts and conduct needed repairs - Enhance motion sensor coverage in the library Other elements that will reach or exceed their theoretical lives within the next five years appeared to be in acceptablecondition at the time of the site visit. Overall the electrical systems in the building are in acceptable condition.

Calgary - Lake Bonavista Elementary School (B2697A)

Condition Rating Performance1 - Critical Unsafe, high risk of injury or critical system failure.2 - Poor Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs.

3 - Marginal Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs.4 - Acceptable Meets present requirements, minor deficiencies. Average operating/maintenance costs.

Rating Guide

5 - Good Meets all present requirements. No deficiencies.6 - Excellent As new/state of the art, meets present and foreseeable requirements.

Page 4: RECAPP Facility Evaluation Report - AlbertaOverall the mechanical systems in the building are in marginal condition. Electrical Summary: The building has an original 600 Amp, 120/208

Report run on: April 4, 2012 3:05 PM Page 4 of 38

A1010 Standard Foundations*

A1030 Slab on Grade*

B1010.01 Floor Structural Frame (Building Frame)*

B1010.02 Structural Interior Walls Supporting Floors (or Roof)*

B1010.07 Exterior Stairs*

B1020.01 Roof Structural Frame*

B1020.03 Roof Decks, Slabs, and Sheathing*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

Rating

Rating

1969

1969

1969

1969

1969

1969

1969

Installed

Installed

Installed

Installed

Installed

Installed

Installed

0

0

0

0

0

0

0

Design Life

Design Life

Design Life

Design Life

Design Life

Design Life

Design Life

APR-12

APR-12

APR-12

APR-12

APR-12

APR-12

APR-12

Updated

Updated

Updated

Updated

Updated

Updated

Updated

Calgary - Lake Bonavista Elementary School (B2697A)S1 STRUCTURAL

The building's foundations most likely consist of cast-in-place concrete foundation walls.

Based on observations in mechanical rooms, the main floor is comprised of a cast-in-place concrete slab-on-grade whichis presumed to have conventional steel reinforcement.

The floor structural frame of the school building is comprised of concrete block bearing walls which support the roof.

Load-bearing interior walls throughout the building are comprised of masonry block.

Exterior concrete stairs are present in front of the main north door to the building.

The roof structural frame for the majority of the building is comprised of steel roof decking supported by open-webbedsteel joists.

A metal roof deck was visible in the mechanical room and the condition rating is based on the visible areas.

Page 5: RECAPP Facility Evaluation Report - AlbertaOverall the mechanical systems in the building are in marginal condition. Electrical Summary: The building has an original 600 Amp, 120/208

Report run on: April 4, 2012 3:05 PM Page 5 of 38

B1020.05 Roof Construction Vapor Retarders, Air Barriers, and Insulation*

B1020.06 Roof Construction Fireproofing*

4 - Acceptable

4 - Acceptable

Rating

Rating

1969

1969

Installed

Installed

0

0

Design Life

Design Life

APR-12

APR-12

Updated

Updated

Calgary - Lake Bonavista Elementary School (B2697A)

A vapour and air barrier as well as roof insulation is assumed to be included in the roof construction but these elementswere not visible.

The metal roof deck and open web steel joists supporting the roof in the east boiler room are protected by a spray-onfireproofing material.

Page 6: RECAPP Facility Evaluation Report - AlbertaOverall the mechanical systems in the building are in marginal condition. Electrical Summary: The building has an original 600 Amp, 120/208

Report run on: April 4, 2012 3:05 PM Page 6 of 38

B2010.01.02.01 Brick Masonry: Ext. Wall Skin*

B2010.01.08 Cement Plaster (Stucco): Ext. Wall*

B2010.01.09 Expansion Control: Ext. Wall*

B2010.01.11 Joint Sealers (caulking): Ext. Wall**

B2010.02.03 Masonry Units: Ext. Wall Const.*

4 - Acceptable

4 - Acceptable

4 - Acceptable

2 - Poor

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

1969

1969

1969

1969

1969

Installed

Installed

Installed

Installed

Installed

0

0

0

20

0

Design Life

Design Life

Design Life

Design Life

Design Life

APR-12

APR-12

APR-12

APR-12

APR-12

Updated

Updated

Updated

Updated

Updated

Replace Caulking (200 m)

Failure Replacement 2012 $4,000 Medium

Caulking in the control joints was completely missing in someareas due to drying and cracking.

Concern:

Replace deficient sealant as needed on the buildingperimeter.

Recommendation:

Calgary - Lake Bonavista Elementary School (B2697A)S2 ENVELOPE

Event:

Type Year Cost Priority

Updated: APR-12

A clay brick veneer is provided on all sides of the building.

Cement plaster (stucco finish) is provided above the brick veneer on the south and west sides of the building.

Control joints are provided at intervals on the brick veneer.

Sealant is provided in construction joints, between cladding types and around window and door units on the schoolperimeter.

Exterior walls are comprised of a concrete masonry block bearing-wall with a brick veneer.

Consequences of Deferral:Potential air and/or moisture infiltration into the buildingenvelope and subsequent moisture damage.

Page 7: RECAPP Facility Evaluation Report - AlbertaOverall the mechanical systems in the building are in marginal condition. Electrical Summary: The building has an original 600 Amp, 120/208

Report run on: April 4, 2012 3:05 PM Page 7 of 38

B2010.03 Exterior Wall Vapour Retarders, Air Barriers, and Insulation*

B2010.05 Parapets*

B2010.09 Exterior Soffits*

B2020.01.01.02 Aluminum Windows (Glass & Frame)**

B2030.01.10 Wood Entrance Door**

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

1969

1969

1969

1969

1969

Installed

Installed

Installed

Installed

Installed

0

0

0

40

30

Design Life

Design Life

Design Life

Design Life

Design Life

APR-12

APR-12

APR-12

APR-12

APR-12

Updated

Updated

Updated

Updated

Updated

Replace approximately 30 windows

Replace approximately 10 doors

Lifecycle Replacement

Lifecycle Replacement

2015

2015

$30,000

$15,000

Unassigned

Unassigned

Calgary - Lake Bonavista Elementary School (B2697A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-12

APR-12

Architectural drawings were not available for review, but the exterior wall is most likely equipped with a vapor barrier andinsulation.

Perimeter walls were mainly metal capped, with low parapets over the front entry also with metal capping.

The only exterior soffit on the building is provided over the main entrance. The soffit is painted stucco.

Exterior windows are either fixed or combination fixed and operable insulating glazed units in aluminum frames.

Exterior doors are painted wood set in painted metal frames.

Page 8: RECAPP Facility Evaluation Report - AlbertaOverall the mechanical systems in the building are in marginal condition. Electrical Summary: The building has an original 600 Amp, 120/208

Report run on: April 4, 2012 3:05 PM Page 8 of 38

B3010.01 Deck Vapour Retarder and Insulation*

B3010.04.04 Modified Bituminous Membrane Roofing (SBS)**

4 - Acceptable

4 - Acceptable

Rating

Rating

1969

2001

Installed

Installed

0

25

Design Life

Design Life

APR-12

APR-12

Updated

Updated

Replace roof (2802 square meters)

Lifecycle Replacement 2026 $469,000 Unassigned

Calgary - Lake Bonavista Elementary School (B2697A)

Event:

Type Year Cost Priority

Updated: APR-12

Roofing assemblies for the building are assumed to include a vapor retarder and insulation.

The roof system contains a modified bituminous membrane (SBS).

Page 9: RECAPP Facility Evaluation Report - AlbertaOverall the mechanical systems in the building are in marginal condition. Electrical Summary: The building has an original 600 Amp, 120/208

Report run on: April 4, 2012 3:05 PM Page 9 of 38

B3020.01 Skylights**

4 - AcceptableRating

1969Installed

25Design Life

APR-12Updated

Replace glazing with Georgian wire glass

Replace skylights (2 units)

Operating Efficiency Upgrade

Lifecycle Replacement

2012

2015

$1,500

$5,000

Low

Unassigned

The site representative indicated that there have been twobreak-ins which have occurred through the skylights. Thebroken glass has been replaced by safety/Georgian wireglass, but some glazing remains which is not reinforced glass.The skylights are directly over the library, and the first break-innecessitated a labour and time-intensive clean up of the entirelibrary including all of the books to ensure that students werenot injured by pieces of glass. Computer equipment was alsostolen when the break-in occurred.

Concern:

Replace glazing with wire mesh or other safety or reinforcedglass.

Recommendation:

Calgary - Lake Bonavista Elementary School (B2697A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-12

APR-12

Vaulted skylights are present on the roof. Each skylight is comprised of a group of three glazed units, and there are twoskylights.

Consequences of Deferral:There is a possibility that another break-in will occur, thuscosting the school money in supplies, a labour and timeintensive clean-up, and the possibility of student injury fromstray pieces of glass.

Page 10: RECAPP Facility Evaluation Report - AlbertaOverall the mechanical systems in the building are in marginal condition. Electrical Summary: The building has an original 600 Amp, 120/208

Report run on: April 4, 2012 3:05 PM Page 10 of 38

C1010.01 Interior Fixed Partitions*

C1010.02 Interior Demountable Partitions*

C1010.07 Interior Partition Firestopping*

C1020.01 Interior Swinging Doors (& Hardware)*

C1020.03 Interior Fire Doors*

C1030.01 Visual Display Boards**

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

Rating

1969

1969

1969

1969

1969

1990

Installed

Installed

Installed

Installed

Installed

Installed

0

0

0

0

0

20

Design Life

Design Life

Design Life

Design Life

Design Life

Design Life

APR-12

APR-12

APR-12

APR-12

APR-12

APR-12

Updated

Updated

Updated

Updated

Updated

Updated

Replace whiteboards (based on 13 classrooms)

Lifecycle Replacement 2015 $13,000 Unassigned

Calgary - Lake Bonavista Elementary School (B2697A)S3 INTERIOR

Event:

Type Year Cost Priority

Updated: APR-12

Interior fixed partitions are comprised of either masonry block or metal stud wall partitions.

Interior demountable partitions are provided to enclose classrooms on the south end of the school.

Interior partitions that are fire walls or fire separations are generally constructed with masonry block or are gypsum boardassemblies. Penetrations were observed to be filled with a fire-rated sealant.

Interior doors are solid core wood doors set in painted wood frames.

Interior fire doors in corridors consist of metals doors set in painted metal frames. They are typically rated 1.5 hours.

Each classroom typically has a blackboard, a whiteboard, a Smart board, and various tackboards.

Page 11: RECAPP Facility Evaluation Report - AlbertaOverall the mechanical systems in the building are in marginal condition. Electrical Summary: The building has an original 600 Amp, 120/208

Report run on: April 4, 2012 3:05 PM Page 11 of 38

C1030.02 Fabricated Compartments (Toilets/Showers)**

C1030.03 Interior Louvers and Vents*

C1030.05 Wall and Corner Guards*

C1030.14 Toilet, Bath, and Laundry Accessories*

C2010 Stair Construction*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

2000

1969

1969

1990

1969

Installed

Installed

Installed

Installed

Installed

30

0

0

0

0

Design Life

Design Life

Design Life

Design Life

Design Life

APR-12

APR-12

APR-12

APR-12

APR-12

Updated

Updated

Updated

Updated

Updated

Replace approximately 18 stalls

Lifecycle Replacement 2030 $15,000 Unassigned

Calgary - Lake Bonavista Elementary School (B2697A)

Event:

Type Year Cost Priority

Updated: APR-12

Pre-finished floor and wall-mounted overhead braced metal toilet partitions are provided in each student washroom in thebuilding.

Interior aluminum HVAC vents.

Metal corner guards on gypsum walls in hallways.

Mirrors, hand towel and soap dispensers.

Stairs adjacent to the gymnasium appear to be poured concrete construction.

Page 12: RECAPP Facility Evaluation Report - AlbertaOverall the mechanical systems in the building are in marginal condition. Electrical Summary: The building has an original 600 Amp, 120/208

Report run on: April 4, 2012 3:05 PM Page 12 of 38

C2020.05 Resilient Stair Finishes**

C2020.08 Stair Railings and Balustrades*

C3010.04 Gypsum Board Wall Finishes (Unpainted)*

C3010.06 Tile Wall Finishes**

C3010.11 Interior Wall Painting*

5 - Good

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

2006

1969

1969

1969

2001

Installed

Installed

Installed

Installed

Installed

20

0

0

40

0

Design Life

Design Life

Design Life

Design Life

Design Life

APR-12

APR-12

APR-12

APR-12

APR-12

Updated

Updated

Updated

Updated

Updated

Replace vinyl sheeting on stairs (18 sqm)

Replace (20 sqm) wall tiles

Lifecycle Replacement

Lifecycle Replacement

2026

2015

$1,500

$4,900

Unassigned

Unassigned

Calgary - Lake Bonavista Elementary School (B2697A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-12

APR-12

Vinyl composite sheet flooring, same as in corridors.

Metal stair railing.

Gypsum board wall finishes were present in some of the classrooms on the south end of the school.

Wall tiles are provided around urinals in the boys' washroom.

Concrete, masonry block and gypsum board walls in the building all have a painted finish.

Page 13: RECAPP Facility Evaluation Report - AlbertaOverall the mechanical systems in the building are in marginal condition. Electrical Summary: The building has an original 600 Amp, 120/208

Report run on: April 4, 2012 3:05 PM Page 13 of 38

C3020.01.02 Painted Concrete Floor Finishes*

C3020.04 Wood Flooring**

C3020.07 Resilient Flooring** - Vinyl sheet

C3020.07 Resilient Flooring** - Vinyl tile

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1969

1969

2006

2006

Installed

Installed

Installed

Installed

0

30

20

20

Design Life

Design Life

Design Life

Design Life

APR-12

APR-12

APR-12

APR-12

Updated

Updated

Updated

Updated

Replace approximately 300 sq.m. of hardwood inthe gym

Replace approximately 600 sq.m. of vinylcomposite sheet flooring

Replace vinyl tile flooring (1200 sqm)

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2015

2026

2026

$75,000

$50,000

$55,000

Unassigned

Unassigned

Unassigned

Calgary - Lake Bonavista Elementary School (B2697A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

APR-12

APR-12

APR-12

A painted concrete floor is provided in the boiler room.

Hardwood flooring is provided in the gymnasium and on the gymnasium stage.

Vinyl composite sheet flooring is present in most of the north section of the building, excluding the gymnasium.

Vinyl composite tile covers most of the south half of the building excluding the library.

Page 14: RECAPP Facility Evaluation Report - AlbertaOverall the mechanical systems in the building are in marginal condition. Electrical Summary: The building has an original 600 Amp, 120/208

Report run on: April 4, 2012 3:05 PM Page 14 of 38

C3020.08 Carpet Flooring**

C3030.06 Acoustic Ceiling Treatment (Susp. T-Bar)**

C3030.09 Other Ceiling Finishes*

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1995

1995

1969

Installed

Installed

Installed

15

25

0

Design Life

Design Life

Design Life

APR-12

APR-12

APR-12

Updated

Updated

Updated

Replace approximately 240 sq.m. of carpet

Replace 204 sqm ceiling tile

Lifecycle Replacement

Lifecycle Replacement

2015

2020

$15,000

$9,000

Unassigned

Unassigned

Calgary - Lake Bonavista Elementary School (B2697A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-12

APR-12

Carpet flooring is provided in the library and portions of the administration offices.

Suspended T-bar grid ceilings with in-laid acoustic panels are provided in the administration offices, staff lounge andgymnasium stage area.

A textured acoustic ceiling finish is present throughout the majority of the building.

Page 15: RECAPP Facility Evaluation Report - AlbertaOverall the mechanical systems in the building are in marginal condition. Electrical Summary: The building has an original 600 Amp, 120/208

Report run on: April 4, 2012 3:05 PM Page 15 of 38

D2010.04 Sinks**

D2010.08 Drinking Fountains/Coolers**

D2010.10 Washroom Fixtures (WC, Lav, Urnl)** - Lavatories

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1969

1969

1969

Installed

Installed

Installed

30

35

35

Design Life

Design Life

Design Life

APR-12

APR-12

APR-12

Updated

Updated

Updated

Replace 13 Sinks

Replace three drinking fountains

Replace 17 lavatories

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2015

2015

2015

$12,200

$4,600

$20,600

Unassigned

Unassigned

Unassigned

Calgary - Lake Bonavista Elementary School (B2697A)S4 MECHANICAL

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

APR-12

APR-12

APR-12

There are approximately 13 miscellaneous sinks in the building. Sinks in the classrooms and staff room are stainlesssteel or enameled steel. The sinks in the classrooms are complete with a drinking fountain faucet. The sinks in thejanitor's rooms are iron and enamel.

There are three non-refrigerated vitreous china drinking fountains in the building.

There are approximately 17 vitreous china lavatories located in the building.

Page 16: RECAPP Facility Evaluation Report - AlbertaOverall the mechanical systems in the building are in marginal condition. Electrical Summary: The building has an original 600 Amp, 120/208

Report run on: April 4, 2012 3:05 PM Page 16 of 38

D2010.10 Washroom Fixtures (WC, Lav, Urnl)** - Urinals

D2010.10 Washroom Fixtures (WC, Lav, Urnl)** - Water Closets

D2020.01.01 Pipes and Tubes: Domestic Water*

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1969

2010

1969

Installed

Installed

Installed

35

35

0

Design Life

Design Life

Design Life

APR-12

APR-12

APR-12

Updated

Updated

Updated

Replace six urinals

Replace 21 water closets

Lifecycle Replacement

Lifecycle Replacement

2015

2045

$9,200

$32,300

Unassigned

Unassigned

Calgary - Lake Bonavista Elementary School (B2697A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-12

APR-12

There are approximately six floor-mounted vitreous china urinals in the building.

There are approximately 21 vitreous china water closets in the building. Replaced recently (estimated 2010).

Domestic water piping is copper throughout the building.

Page 17: RECAPP Facility Evaluation Report - AlbertaOverall the mechanical systems in the building are in marginal condition. Electrical Summary: The building has an original 600 Amp, 120/208

Report run on: April 4, 2012 3:05 PM Page 17 of 38

D2020.01.02 Valves: Domestic Water**

D2020.01.03 Piping Specialties (Backflow Preventers)**

D2020.01.08 Hose Bibbs*

2 - Poor

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1969

1996

1969

Installed

Installed

Installed

40

20

0

Design Life

Design Life

Design Life

APR-12

APR-12

APR-12

Updated

Updated

Updated

Replace 2 Gate Valves

Replace 4 backflow preventors

Failure Replacement

Lifecycle Replacement

2012

2016

$2,200

$11,700

Medium

Unassigned

2 valves have seized.Concern:

Replace 2 Gate Valves.Recommendation:

Calgary - Lake Bonavista Elementary School (B2697A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-12

APR-12

2 gate isolation valves are installed in the boiler room.

There are backflow prevention devices on the domestic water supply, boiler feed water supply, external irrigation hosebib, and the main fire protection standpipe system.

Key required non-freeze hose bibbs installed along perimeter of the building.

Consequences of Deferral:Unable to shut down water system in event of emergency.Seizing indicative of rust which may impair potable watersystem.

Page 18: RECAPP Facility Evaluation Report - AlbertaOverall the mechanical systems in the building are in marginal condition. Electrical Summary: The building has an original 600 Amp, 120/208

Report run on: April 4, 2012 3:05 PM Page 18 of 38

D2020.02.06 Domestic Water Heaters**

D2030.01 Waste and Vent Piping*

D2030.02.04 Floor Drains*

5 - Good

2 - Poor

4 - Acceptable

Rating

Rating

Rating

1998

1969

1969

Installed

Installed

Installed

20

0

0

Design Life

Design Life

Design Life

APR-12

APR-12

APR-12

Updated

Updated

Updated

Replace 1 Domestic Water Heater

Repair 5 Vents

Lifecycle Replacement

Repair

2018

2012

$1,800

$7,500

Unassigned

High

Approximately 5 vent stacks have been partially or completelyplugged with roofing tar.

Concern:

Vent stacks need to be unplugged. Care needs to be taken tonot force the material causing the blockage upstream into thesanitary piping.

Recommendation:

Calgary - Lake Bonavista Elementary School (B2697A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-12

APR-12

Domestic hot water is supplied by a natural gas fired John Wood domestic hot water heater tank (182 L, 120.9 L/hr)located in the main boiler room. The domestic hot water system includes an Armstrong circulation pump.

Waste and vent piping is generally cast iron and original to the construction of the building.

Floor drains are installed in the mechanical room and the bathrooms.

Consequences of Deferral:Lack of proper sanitary vents can cause backflow to sanitaryfixtures. Noxious gases associated with sanitary waste mayalso be vented within the school, which can be harmful tohuman health.

Page 19: RECAPP Facility Evaluation Report - AlbertaOverall the mechanical systems in the building are in marginal condition. Electrical Summary: The building has an original 600 Amp, 120/208

Report run on: April 4, 2012 3:05 PM Page 19 of 38

D2040.01 Rain Water Drainage Piping Systems*

D2040.02.04 Roof Drains*

D3010.02 Gas Supply Systems*

D3020.02.01 Heating Boilers and Accessories: H.W.** - Boilers

4 - Acceptable

5 - Good

2 - Poor

4 - Acceptable

Rating

Rating

Rating

Rating

1969

2001

1969

1969

Installed

Installed

Installed

Installed

0

0

0

35

Design Life

Design Life

Design Life

Design Life

APR-12

APR-12

APR-12

APR-12

Updated

Updated

Updated

Updated

Repair Natural Gas System

Replace 2 heating boilers

Repair

Lifecycle Replacement

2012

2015

$1,400

$102,300

High

Unassigned

Recent vandalism may have compromised the natural gaspiping located on the roof. Proper supports for natural gaspiping located on roof also missing.

Concern:

System should be sniff-tested for potential leaks and repairedas required. Piping support blocks should be installed asrequired. Priced based on replacing 5m of pipe.

Recommendation:

Calgary - Lake Bonavista Elementary School (B2697A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-12

APR-12

The rain water drainage piping system is internal to the building and connects to the municipal storm water system. Thepiping is generally cast iron and original to the building construction.

The roof incorporates roof drains which are each fitted with gravel/debris strainers.

The natural gas supply is provided by below grade on the east side of the building. The piping feeds the central heatingboilers, gym make up air unit, and the domestic hot water tank.

Heating hot water is provided to the building via two original Cleaver-Brooks boilers (model BG2-3000, 2700 MBH)

Consequences of Deferral:Use of leaking natural gas piping may lead to explosion.Natural gas is also harmful to human health if inhaled.

Page 20: RECAPP Facility Evaluation Report - AlbertaOverall the mechanical systems in the building are in marginal condition. Electrical Summary: The building has an original 600 Amp, 120/208

Report run on: April 4, 2012 3:05 PM Page 20 of 38

D3020.02.01 Heating Boilers and Accessories: H.W.** - Expansion Tank

D3040.01.01 Air Handling Units: Air Distribution**

D3040.01.02 Fans: Air Distribution (Remote from AHU)*

D3040.01.04 Ducts: Air Distribution*

5 - Good

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

2002

1969

1969

1969

Installed

Installed

Installed

Installed

35

30

0

0

Design Life

Design Life

Design Life

Design Life

APR-12

APR-12

APR-12

APR-12

Updated

Updated

Updated

Updated

Replace Expansion Tank (946L tank)

Replace (1) Air Handling Unit Serving a GrossFloor Area of 2500m2

Lifecycle Replacement

Lifecycle Replacement

2037

2015

$5,900

$42,600

Unassigned

Unassigned

Calgary - Lake Bonavista Elementary School (B2697A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-12

APR-12

Closed vertical expansion tank located between boilers.

A central EngA air handling unit provides tempered ventilation air to the majority of the building (excluding thegymnasium). The unit includes supply and return air fans, a filter section, and hot water heating coils.

There is a return air fan installed in the air handler mechanical room (Woods Fans, 38" impeller, 860 RPM, 5.0 HP).

The duct distribution system consists of sheet metal insulated supply air ducts, ceiling return air plenums and sheet metalreturn air ducts.

Page 21: RECAPP Facility Evaluation Report - AlbertaOverall the mechanical systems in the building are in marginal condition. Electrical Summary: The building has an original 600 Amp, 120/208

Report run on: April 4, 2012 3:05 PM Page 21 of 38

D3040.01.07 Air Outlets & Inlets: Air Distribution* - Exterior Intake

D3040.01.07 Air Outlets & Inlets: Air Distribution* - Interior

2 - Poor

4 - Acceptable

Rating

Rating

1969

1969

Installed

Installed

0

0

Design Life

Design Life

APR-12

APR-12

Updated

Updated

Repair Air Intake Louvre

Repair 2011 $5,000 High

Repair bird screen and damper damaged from recentvandalism.

Concern:

Calgary - Lake Bonavista Elementary School (B2697A)

Event:

Type Year Cost Priority

Updated: APR-12

Air intake duct complete with bird screen and damper installed on roof.

A combination of square cone diffusers, double deflection diffusers, and egg crate faced return grilles installed throughoutbuilding.

Page 22: RECAPP Facility Evaluation Report - AlbertaOverall the mechanical systems in the building are in marginal condition. Electrical Summary: The building has an original 600 Amp, 120/208

Report run on: April 4, 2012 3:05 PM Page 22 of 38

D3040.03.01 Hot Water Distribution Systems**

D3040.04.01 Fans: Exhaust**

D3040.04.03 Ducts: Exhaust*

3 - Marginal

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1969

1969

1969

Installed

Installed

Installed

40

30

0

Design Life

Design Life

Design Life

APR-12

APR-12

APR-12

Updated

Updated

Updated

Replace 6 Seized Gate Valves and 3 Strainers

Replace Hot Water Distribution System Serving aGross Floor Area of 2802m2

Replace three exhaust fans

Repair

Lifecycle Replacement

Lifecycle Replacement

2012

2015

2015

$7,700

$260,600

$5,300

Medium

Unassigned

Unassigned

Approximately 6 gate isolation valves have seized. Strainersappear to be in similar condition. Three-way valve nearboilers requires replacement.

Concern:

Replace all seized gate valves and strainers..Recommendation:

Calgary - Lake Bonavista Elementary School (B2697A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

APR-12

APR-12

APR-12

Heating distribution is through original cast iron piping to convectors, fan coil units, and unit heaters throughout thebuilding (approximately 210m). Approximately 6 gate isolation valves are installed complete with 3 strainers. Three inline pumps (two supply and one backup, 3/4 HP) circulate heating hot water through the building (estimatedinstall on pumps 1980).

Washroom and gymnasium exhaust is provided by three roof mounted exhaust fans.

Sheet metal, uninsulated ductwork connects the exhaust grilles to various exhaust fans throughout the school.

Consequences of Deferral:Failure of equipment can increase operational costs and canprevent the system from being shut down in emergencysituations.

Page 23: RECAPP Facility Evaluation Report - AlbertaOverall the mechanical systems in the building are in marginal condition. Electrical Summary: The building has an original 600 Amp, 120/208

Report run on: April 4, 2012 3:05 PM Page 23 of 38

D3040.04.05 Air Outlets and Inlets: Exhaust*

D3050.01.02 Packaged Rooftop Air Conditioning Units (& Heating Units)**

D3050.05.01 Convectors**

D3050.05.02 Fan Coil Units**

4 - Acceptable

5 - Good

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1969

1999

1969

1969

Installed

Installed

Installed

Installed

0

30

40

30

Design Life

Design Life

Design Life

Design Life

APR-12

APR-12

APR-12

APR-12

Updated

Updated

Updated

Updated

Replace Make-up Air Unit

Replace approximately 5 convectors

Replace 1 Fan Coil Unit

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2029

2015

2015

$61,900

$3,500

$5,100

Unassigned

Unassigned

Unassigned

Calgary - Lake Bonavista Elementary School (B2697A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

APR-12

APR-12

APR-12

Ceiling and wall mounted metal exhaust grills are connected to the exhaust ductwork.

An Engineered Air indirect fired make up air unit (DJ-60-0) provides ventilation air to the gymnasium.

Auxilliary heating is provided at most entrances by wall mounted convectors.

Auxiliary heating at the northwest entrance is provided by one recessed fan coil unit.

Page 24: RECAPP Facility Evaluation Report - AlbertaOverall the mechanical systems in the building are in marginal condition. Electrical Summary: The building has an original 600 Amp, 120/208

Report run on: April 4, 2012 3:05 PM Page 24 of 38

D3050.05.03 Finned Tube Radiation**

3 - MarginalRating

1969Installed

40Design Life

APR-12Updated

Replace Finned Tube Radiation Serving a GrossFloor Area of 2802m2

Upgrade Finned Tube Radiation for more HeatingControl

Failure Replacement

Program Functional Upgrade

2012

2012

$130,500

$12,900

Low

Low

Finned tube radiation has exceeded recommended lifespan.Couplers to copper piping are beginning to fail.

Only one hot water supply loop for entire building. Rooms 7and 8 (rooms 131 and 132 on CBE drawing) experienceunder/overheating due to presence of south facing windows.

Concern:

Concern:

Replace finned tubed radiation.

Provide bypass loop for these two classrooms and athermostat for control. Approximately 30m of pipe will need tobe installed with control valve and isolation valve.

Recommendation:

Recommendation:

Calgary - Lake Bonavista Elementary School (B2697A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-12

APR-12

Primary heating for the building is provided by finned tube radiation.

Consequences of Deferral:

Consequences of Deferral:

Insufficient heating may lead to uncomfortable temperaturesthat impair students learning potential. Leaking may causewater damage.

Occupants in room will continue to experience uncomfortabletemperatures. Overheating can lead to drowsiness andreduce learning potential in students.

Page 25: RECAPP Facility Evaluation Report - AlbertaOverall the mechanical systems in the building are in marginal condition. Electrical Summary: The building has an original 600 Amp, 120/208

Report run on: April 4, 2012 3:05 PM Page 25 of 38

D3050.05.06 Unit Heaters**

D3060.02.02 Pneumatic Controls**

4 - Acceptable

4 - Acceptable

Rating

Rating

1969

1969

Installed

Installed

30

40

Design Life

Design Life

APR-12

APR-12

Updated

Updated

Replace two unit heaters

Replace Pneumatic Control System Serving aGross Floor Area of 2802m2

Lifecycle Replacement

Lifecycle Replacement

2015

2015

$6,300

$16,400

Unassigned

Unassigned

Calgary - Lake Bonavista Elementary School (B2697A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-12

APR-12

Auxiliary heating in utility rooms is provided by hot water unit heaters.

Honeywell air compressor estimated original to the building.

Page 26: RECAPP Facility Evaluation Report - AlbertaOverall the mechanical systems in the building are in marginal condition. Electrical Summary: The building has an original 600 Amp, 120/208

Report run on: April 4, 2012 3:05 PM Page 26 of 38

D3060.02.05 Building Systems Controls (BMCS, EMCS)**

D4010 Sprinklers: Fire Protection*

D4020 Standpipes*

3 - Marginal

4 - Acceptable

5 - Good

Rating

Rating

Rating

2008

1969

2010

Installed

Installed

Installed

20

0

0

Design Life

Design Life

Design Life

APR-12

APR-12

APR-12

Updated

Updated

Updated

Replace BMCS Serving a Gross Floor Area of1401m2

Upgrade Building to Full BMCS Control to Serve anAdditional Gross Floor Area of 1401m2

Lifecycle Replacement

Program Functional Upgrade

2028

2012

$30,600

$30,600

Unassigned

Medium

Building operator has commented that interface/conversionbetween pneumatic and BMCS controls has led to difficulties.Particularly, exhaust fans are running even when they shouldnot be.

Concern:

Building should be operated completely by BMCS to eliminateinterface issues. Price calculated assuming building alreadyhalf upgraded.

Recommendation:

Calgary - Lake Bonavista Elementary School (B2697A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-12

APR-12

Honeywell BMCS control system (XL50, externally monitored) installed for 5 exhaust fans.

The stage in the gymnasium is protected by a wet-pipe sprinkler system.

Wet Standpipe (aluminum) replaced during fire alarm upgrade.

Consequences of Deferral:Energy will be wasted by venting more tempered air thanrequired.

Page 27: RECAPP Facility Evaluation Report - AlbertaOverall the mechanical systems in the building are in marginal condition. Electrical Summary: The building has an original 600 Amp, 120/208

Report run on: April 4, 2012 3:05 PM Page 27 of 38

D4030.01 Fire Extinguisher, Cabinets and Accessories*

4 - AcceptableRating

1990Installed

0Design Life

APR-12Updated

Calgary - Lake Bonavista Elementary School (B2697A)

Fire extinguishers are located at fire hose stations and other locations throughout the building. Fire extinguishers have anestimated average installation date of 1990.

Page 28: RECAPP Facility Evaluation Report - AlbertaOverall the mechanical systems in the building are in marginal condition. Electrical Summary: The building has an original 600 Amp, 120/208

Report run on: April 4, 2012 3:05 PM Page 28 of 38

D5010.01.02 Main Electrical Transformers (Utility Owned)*

D5010.03 Main Electrical Switchboards (Main Distribution)**

D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)** - 1969

D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)** - 2001

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

2003

1969

1969

2001

Installed

Installed

Installed

Installed

0

40

30

30

Design Life

Design Life

Design Life

Design Life

APR-12

APR-12

APR-12

APR-12

Updated

Updated

Updated

Updated

Replace main electrical switchboard

Replace 4 Electrical Sub-Panels

Replace 1 Electrical Sub-Panel

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2015

2015

2031

$29,100

$18,100

$4,600

Unassigned

Unassigned

Unassigned

Calgary - Lake Bonavista Elementary School (B2697A)S5 ELECTRICAL

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

APR-12

APR-12

APR-12

Transformer on site.

The main electrical switchboard is manufactured by Westinghouse and is rated at 600A, 120/208 V, 3 phase, 4 wires.

Electrical sub-panels and circuit breakers are generally original. The majority of the electrical distribution equipment ismanufactured by Westinghouse.

A new sub-panel was installed in 2001 to increase the available capacity.

150Capacity Size

kVACapacity Unit

Page 29: RECAPP Facility Evaluation Report - AlbertaOverall the mechanical systems in the building are in marginal condition. Electrical Summary: The building has an original 600 Amp, 120/208

Report run on: April 4, 2012 3:05 PM Page 29 of 38

D5010.07.02 Motor Starters and Accessories**

D5020.01 Electrical Branch Wiring*

D5020.02.01 Lighting Accessories: Interior (Lighting Controls)*

D5020.02.02.01 Interior Incandescent Fixtures*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1969

1969

1969

1969

Installed

Installed

Installed

Installed

30

0

0

0

Design Life

Design Life

Design Life

Design Life

APR-12

APR-12

APR-12

APR-12

Updated

Updated

Updated

Updated

Replace seven motor starters

Lifecycle Replacement 2015 $9,700 Unassigned

Calgary - Lake Bonavista Elementary School (B2697A)

Event:

Type Year Cost Priority

Updated: APR-12

Westinghouse motor starters are provided for fans and pumps in the building.

The electrical wiring in the building is standard wire in conduit. Flexible conduit and cabling is provided to motors andother mechanical equipment.

The lighting controls in the school are line voltage throughout.

Incandescent fixtures are generally located in the storage, service, utility, and mechanical rooms.

Page 30: RECAPP Facility Evaluation Report - AlbertaOverall the mechanical systems in the building are in marginal condition. Electrical Summary: The building has an original 600 Amp, 120/208

Report run on: April 4, 2012 3:05 PM Page 30 of 38

D5020.02.02.02 Interior Fluorescent Fixtures**

3 - MarginalRating

2000Installed

30Design Life

APR-12Updated

Investigate premature failure of T-8 light tubes

Repair T8 Fluorescent Lighting Serving a GrossFloor Area of 2500m2

Replace 2500m2 T8 Fixtures

Study

Repair

Lifecycle Replacement

2012

2013

2030

$2,000

$50,000

$654,700

Low

Low

Unassigned

Ballasts and lamps are experiencing failure at a significantrate well before expected lifespan. Relatively new lightingsystems should not have this issue.

The T8 fluorescent lighting is experiencing premature failures.

Concern:

Concern:

Perform a study on the incoming power to determine if 'dirty'energy is responsible for the burn outs.

Repair T8 fluorescent lighting based on the results of thestudy.

Recommendation:

Recommendation:

Calgary - Lake Bonavista Elementary School (B2697A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

APR-12

APR-12

APR-12

Fluorescent fixtures are used throughout the school and consist of recessed and surface mounted T8 fixtures withelectronic ballasts.

Consequences of Deferral:

Consequences of Deferral:

Continually replacing ballasts and lamps increase operationaland maintenance costs.

Higher than normal operational and maintenance costs.

Page 31: RECAPP Facility Evaluation Report - AlbertaOverall the mechanical systems in the building are in marginal condition. Electrical Summary: The building has an original 600 Amp, 120/208

Report run on: April 4, 2012 3:05 PM Page 31 of 38

D5020.02.03.02 Emergency Lighting Battery Packs**

D5020.02.03.03 Exit Signs*

D5020.03.01.01 Exterior Incandescent Fixtures*

D5020.03.02 Lighting Accessories: Exterior (Lighting Controls)*

D5030.01 Detection and Fire Alarm**

4 - Acceptable

5 - Good

4 - Acceptable

4 - Acceptable

5 - Good

Rating

Rating

Rating

Rating

Rating

2010

2010

1969

2000

2010

Installed

Installed

Installed

Installed

Installed

20

0

0

0

25

Design Life

Design Life

Design Life

Design Life

Design Life

APR-12

APR-12

APR-12

APR-12

APR-12

Updated

Updated

Updated

Updated

Updated

Replace 4 battery packs

Replace Detection and Fire Alarm System Servinga Gross Floor Area of 2802m2

Lifecycle Replacement

Lifecycle Replacement

2030

2035

$4,400

$81,600

Unassigned

Unassigned

Calgary - Lake Bonavista Elementary School (B2697A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-12

APR-12

Emergency lighting is provided by a variety of emergency lighting fixtures installed at various times since the constructionof the building. Significant upgrades were conducted in 2010 along with fire alarm system.

The building is equipped with LED Exit signs. Signs were upgraded in 2010 along with fire alarm system.

Exterior incandescent lighting fixtures are provided at building entrances and in the parking area.

Exterior lighting is controlled by a time clock.

The building is equipped with a Honeywell fire protection control panel (NFS-320c), manual pull stations, heat detectorsand smoke detectors.

Page 32: RECAPP Facility Evaluation Report - AlbertaOverall the mechanical systems in the building are in marginal condition. Electrical Summary: The building has an original 600 Amp, 120/208

Report run on: April 4, 2012 3:05 PM Page 32 of 38

D5030.02.02 Intrusion Detection**

D5030.03 Clock and Program Systems*

D5030.04.01 Telephone Systems*

D5030.04.04 Data Systems*

5 - Good

4 - Acceptable

4 - Acceptable

5 - Good

Rating

Rating

Rating

Rating

2000

1969

1993

2000

Installed

Installed

Installed

Installed

25

0

0

0

Design Life

Design Life

Design Life

Design Life

APR-12

APR-12

APR-12

APR-12

Updated

Updated

Updated

Updated

Enhance motion sensor coverage in library

Replace Intrusion Detection System Serving aGross Floor Area of 2802m2

Program Functional Upgrade

Lifecycle Replacement

2012

2025

$1,000

$81,600

Low

Unassigned

Only one small motion sensor overlooking library.Concern:

Either supplement or replace small motion sensor with larger,more sensitive sensor.

Recommendation:

Calgary - Lake Bonavista Elementary School (B2697A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-12

APR-12

The building is equipped with a Silent Knight security system, complete with motion detectors throughout the building. Thesystem is externally monitored.

The building is equipped with a Simplex master clock system that controls the bells. Clocks observed in the classroomswere not part of the system.

The building is equipped with a Nortel Meridian telephone system.

The building is serviced by a Bell fiberoptic internet system. The school has Category 5 data wiring and wirelessconnectivity throughout the building.

Page 33: RECAPP Facility Evaluation Report - AlbertaOverall the mechanical systems in the building are in marginal condition. Electrical Summary: The building has an original 600 Amp, 120/208

Report run on: April 4, 2012 3:05 PM Page 33 of 38

D5030.04.05 Local Area Network Systems*

D5030.05 Public Address and Music Systems**

5 - Good

4 - Acceptable

Rating

Rating

2000

1985

Installed

Installed

0

20

Design Life

Design Life

APR-12

APR-12

Updated

Updated

Replace central PA unit

Lifecycle Replacement 2015 $5,000 Unassigned

Calgary - Lake Bonavista Elementary School (B2697A)

Event:

Type Year Cost Priority

Updated: APR-12

The computer system on-site has Category 5 data wiring throughout the building. The building also contains wirelesslocal area network antennas.

The building is equipped with a Bogen PA system. The public address function also uses the phone system. Thebuilding operator has requested school bell be replaced with music to announce beginning and ending of classes. Musicis less intrusive and disrupting.

Page 34: RECAPP Facility Evaluation Report - AlbertaOverall the mechanical systems in the building are in marginal condition. Electrical Summary: The building has an original 600 Amp, 120/208

Report run on: April 4, 2012 3:05 PM Page 34 of 38

E1020.02 Library Equipment*

E1020.03 Theatre and Stage Equipment*

E1090.04 Residential Equipment*

E1090.07 Athletic, Recreational, and Therapeutic Equipment*

E2010.02 Fixed Casework**

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

1969

1969

1969

1969

1969

Installed

Installed

Installed

Installed

Installed

0

0

0

0

35

Design Life

Design Life

Design Life

Design Life

Design Life

APR-12

APR-12

APR-12

APR-12

APR-12

Updated

Updated

Updated

Updated

Updated

Replace approximately 12 units

Lifecycle Replacement 2015 $40,000 Unassigned

Calgary - Lake Bonavista Elementary School (B2697A)S6 EQUIPMENT, FURNISHINGS AND SPECIAL CONSTRUCTION

Event:

Type Year Cost Priority

Updated: APR-12

Computerized library equipment for filing, stocking, and tracking materials as well as moveable shelves, tables, chairs,desks, and casework is located in the library.

Manually-operated curtains are provided on the gymnasium stage.

The staff room contains residential kitchen appliances, including a range, coffee maker, microwave, and toaster.

The gymnasium has wall-mounted climbing equipment and wall-mounted basketball backboards.

Fixed wooden casework complete with laminated countertops and wall mounted cabinets are typically provided in eachclassroom in the school.

Page 35: RECAPP Facility Evaluation Report - AlbertaOverall the mechanical systems in the building are in marginal condition. Electrical Summary: The building has an original 600 Amp, 120/208

Report run on: April 4, 2012 3:05 PM Page 35 of 38

E2010.03.01 Blinds**

E2020.02.04 Furnishings and Accessories*

E2020.03 Moveable Rugs and Mats*

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1995

1990

2000

Installed

Installed

Installed

30

0

0

Design Life

Design Life

Design Life

APR-12

APR-12

APR-12

Updated

Updated

Updated

Replace 30 blinds

Lifecycle Replacement 2025 $15,000 Unassigned

Calgary - Lake Bonavista Elementary School (B2697A)

Event:

Type Year Cost Priority

Updated: APR-12

Frame-mounted operable blinds are typically present in each classroom and office area.

Tables, desks, wooden bookshelves, and chairs are typically provided in every classroom. The main office and library.

Recessed rubber mats are provided at entrances.

Page 36: RECAPP Facility Evaluation Report - AlbertaOverall the mechanical systems in the building are in marginal condition. Electrical Summary: The building has an original 600 Amp, 120/208

Report run on: April 4, 2012 3:05 PM Page 36 of 38

K4010.01 Barrier Free Route: Parking to Entrance*

K4010.02 Barrier Free Entrances*

3 - Marginal

2 - Poor

Rating

Rating

1969

1969

Installed

Installed

0

0

Design Life

Design Life

APR-12

APR-12

Updated

Updated

Provide one barrier-free parking stall in parking lot

Install Automated Door-Openers

Barrier Free Access Upgrade

Barrier Free Access Upgrade

2012

2012

$1,000

$5,000

Low

Medium

Only standard parking stalls are provided in the west parkingarea for student and staff usage. No curb cut-outs areprovided along municipal sidewalks.

All entrances to the school are manually-operated and providepoor accessibility for handicapped users.

Concern:

Concern:

Provide one barrier-free parking stall closest to the northwestcorner of the school.

Install automated door-openers at the building's west entranceand corresponding vestibule entrance.

Recommendation:

Recommendation:

Calgary - Lake Bonavista Elementary School (B2697A)S8 SPECIAL ASSESSMENT

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-12

APR-12

Handicapped parking and signage is provided in front of the school. There is no curb cut-out for the parking. There areno handicapped parking stalls provided in the paved parking area west of the building.

None of the school entrances have automatic openers.

Consequences of Deferral:

Consequences of Deferral:

Non-compliance with current barrier-free standards and pooraccessibility for handicapped persons.

Non-compliance with current barrier-free standards and pooraccessibility for handicapped persons.

Page 37: RECAPP Facility Evaluation Report - AlbertaOverall the mechanical systems in the building are in marginal condition. Electrical Summary: The building has an original 600 Amp, 120/208

Report run on: April 4, 2012 3:05 PM Page 37 of 38

K4010.03 Barrier Free Interior Circulation*

K4010.04 Barrier Free Washrooms*

K4030.01 Asbestos*

K4030.02 PCBs*

K4030.04 Mould*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

1969

1969

1969

0

1969

Installed

Installed

Installed

Installed

Installed

0

0

0

0

0

Design Life

Design Life

Design Life

Design Life

Design Life

APR-12

APR-12

APR-12

MAR-07

MAR-07

Updated

Updated

Updated

Updated

Updated

Add wheelchair lidt to east gym stairs

Barrier Free Access Upgrade 2012 $23,000 Medium

There is only access by stairs into the gymnasium.Concern:

Add a wheelchair lift to the east gymnasium stairs; the eaststairs are also the exit stairs closest to the nearest exit doorsin case of a fire.

Recommendation:

Calgary - Lake Bonavista Elementary School (B2697A)

Event:

Type Year Cost Priority

Updated: APR-12

The building's interior layout allows for barrier-free access to all areas except the gymnasium, which only has stairaccess.

A wheelchair accessible washroom stall is provided in both the boys' and girls' washroom on the east side of the building.

The site contact indicated that all asbestos-containing materials had been removed from the building.

Suspected PCB-containing equipment identified within the building include fluorescent light ballasts and otherelectrical/transformer equipment.

No visible signs of suspected mould growth were observed in the building during the site visit.

Page 38: RECAPP Facility Evaluation Report - AlbertaOverall the mechanical systems in the building are in marginal condition. Electrical Summary: The building has an original 600 Amp, 120/208

Report run on: April 4, 2012 3:05 PM Page 38 of 38

K5010.01 Site Documentation*

K5010.02 Building Documentation*

4 - Acceptable

4 - Acceptable

Rating

Rating

1998

1998

Installed

Installed

0

0

Design Life

Design Life

APR-12

APR-12

Updated

Updated

Calgary - Lake Bonavista Elementary School (B2697A)

Date of evaluation: 9/21/2011 Prime Consultant: Karina Edelmuth, Stantec Consulting

Date of evaluation: 9/21/2011 Prime Consultant: Karina Edelmuth, Stantec Consulting