Report run on: July 23, 2008 1:35 PM RECAPP Facility Evaluation Report St. Mark Elementary School B2813A Calgary Calgary RCSSD #1

Upload: lamkhuong

Post on 11-May-2018

217 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: RECAPP Facility Evaluation Report - Alberta · current heating zones are too large and will result in poor temperature control. ... Reinforced cast in place concrete foundation

Report run on: July 23, 2008 1:35 PM

RECAPP Facility Evaluation Report

St. Mark Elementary School

B2813ACalgary

Calgary RCSSD #1

Page 2: RECAPP Facility Evaluation Report - Alberta · current heating zones are too large and will result in poor temperature control. ... Reinforced cast in place concrete foundation

Report run on: July 23, 2008 1:35 PM Page 2 of 33

B2813ABuilding Id:

St. Mark Elementary SchoolBuilding Name:

CalgaryLocation:4589 Marbank Drive N. E. Address:

2,286.70Gross Area (sq. m): $5,232,990Replacement Cost:1974Construction Year:

Evaluation Date: September 26 2007

BCW ArchitectsEvaluation Company:

Roger LeBlancEvaluator Name:

St. Mark is an elementary school constructed in the year 1974. It is a single story structure with a gross area of2286m^2. This includes a portable section attached to the south side of the building.

General Summary:

Structural Summary:This building was constructed in 1974. The building is sitting on concrete foundation walls with load bearing masonry wallsrunning up to an OWSJ roof construction. This building is a single story structure and it is in an overall acceptablecondition.

Envelope Summary:The exterior walls are constructed with concrete block, painted. With similar type of concrete block accent pillar plow outto deviate the long wall. Siding for the canopy and articulation at the window area. Windows are older version of dark bronze anodized aluminum frame 2 pane vented windows with expanded metal meshin front. Roofing observed as two ply modified bituminous membrane system. Exterior envelope is failing (single wythe concrete block) and requires upgrading, windows and doors require upgrading .The envelope is in need of some repairs, but it is overall in acceptable condition.

Interior Summary:Floors in common areas and classroom are vinyl and sheet flooring. The administration area is carpeted. Quarry mosaictile in washroom areas. Walls are painted concrete block and gypsum board wall. In some area with fabric finished wallpanels. Replacement of some interior finishes required, some work required to address code issues. Overall the interiorsare in an acceptable condition.

Mechanical Summary:Heating is provided by 8 gas fired boilers feeding perimeter radiation and a heating coil within the single Air Handling Unitserving the site. The control system is pneumatic. Classrooms have been altered from original heating zones. Thecurrent heating zones are too large and will result in poor temperature control. Domestic hot water is provided by a gas fired DHWH installed within the last 5 years. Plumbing, sanitary and domesticwater lines are in satisfactory condition. Mechanical systems are generally in reasonable condition however the building doesn't meet current code requirementsin regards to sprinklers, fire extinguishers, gas pipe identification and Boiler room ventilation. Overall the Mechanical System is in Acceptable condition

Electrical Summary:This school has a 400 Amp 120/208 Volt Westinghouse electrical service that feeds five branch circuit panels throughoutthe building. Electrical switchboards and branch circuit panels are in good condition. New interior florescent fixtureswith T8 lamps & electronic ballasts are recommended. Exterior parking receptacles have been damaged and should berepaired in the near future. Emergency battery packs and exit lightings should be upgraded. Over all the electricalsystems are in acceptable condition for this particular school.

46.62%5 year Facility Condition Index (FCI):

Facility Details Evaluation Details

Total Maintenance Events Next 5 years: $2,439,637

Calgary - St. Mark Elementary School (B2813A)

Page 3: RECAPP Facility Evaluation Report - Alberta · current heating zones are too large and will result in poor temperature control. ... Reinforced cast in place concrete foundation

Report run on: July 23, 2008 1:35 PM Page 3 of 33

Calgary - St. Mark Elementary School (B2813A)

Condition Rating Performance1 - Critical Unsafe, high risk of injury or critical system failure.2 - Poor Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs.

3 - Marginal Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs.4 - Acceptable Meets present requirements, minor deficiencies. Average operating/maintenance costs.

Rating Guide

5 - Good Meets all present requirements. No deficiencies.6 - Excellent As new/state of the art, meets present and foreseeable requirements.

Page 4: RECAPP Facility Evaluation Report - Alberta · current heating zones are too large and will result in poor temperature control. ... Reinforced cast in place concrete foundation

Report run on: July 23, 2008 1:35 PM Page 4 of 33

A1010 Standard Foundations*

A1030 Slab on Grade*

B1010.01 Floor Structural Frame (Building Frame)*

B1010.02 Structural Interior Walls Supporting Floors (or Roof)*

B1010.03 Floor Decks, Slabs, and Toppings*

B1010.05 Mezzanine Construction*

B1010.06 Ramps: Exterior*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

Rating

Rating

0

0

0

0

0

0

0

Installed

Installed

Installed

Installed

Installed

Installed

Installed

100

100

100

100

100

100

40

Design Life

Design Life

Design Life

Design Life

Design Life

Design Life

Design Life

FEB-08

FEB-08

FEB-08

FEB-08

FEB-08

FEB-08

FEB-08

Updated

Updated

Updated

Updated

Updated

Updated

Updated

Calgary - St. Mark Elementary School (B2813A)

S1 STRUCTURAL

Reinforced cast in place concrete foundation walls.

Reinforced cast in place concrete Slabs.

No signs of major cracking or settlement.

Interior block wall.

Reinforced cast in place concrete slabs.

Steel/Concrete mezzanine shows no signs of problems.

Reinforced cast in place concrete ramps at main entrance, small cracks in this area.

Page 5: RECAPP Facility Evaluation Report - Alberta · current heating zones are too large and will result in poor temperature control. ... Reinforced cast in place concrete foundation

Report run on: July 23, 2008 1:35 PM Page 5 of 33

B1010.07 Exterior Stairs*

B1010.09 Floor Construction Fireproofing*

B1010.10 Floor Construction Firestopping*

B1020.01 Roof Structural Frame*

B1020.04 Canopies*

B1020.06 Roof Construction Fireproofing*

B1020.07 Roof Construction Firestopping*

4 - Acceptable

4 - Acceptable

4 - Acceptable

5 - Good

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

Rating

Rating

0

0

0

0

0

0

0

Installed

Installed

Installed

Installed

Installed

Installed

Installed

40

50

50

100

50

50

0

Design Life

Design Life

Design Life

Design Life

Design Life

Design Life

Design Life

FEB-08

FEB-08

FEB-08

FEB-08

FEB-08

FEB-08

FEB-08

Updated

Updated

Updated

Updated

Updated

Updated

Updated

Calgary - St. Mark Elementary School (B2813A)

Steel/Wood stairs on portable.

No signs of unprotected locations.

No signs of unprotected penetrations.

Steel Joist.

Wood clad canopies on exterior east side of the school.

No signs of unprotected locations.

No signs of unprotected penetrations.

Page 6: RECAPP Facility Evaluation Report - Alberta · current heating zones are too large and will result in poor temperature control. ... Reinforced cast in place concrete foundation

Report run on: July 23, 2008 1:35 PM Page 6 of 33

B2010.01.06.04 Wood Siding**

B2010.01.11 Joint Sealers (caulking): Ext. Wall**

B2010.01.13 Paints (& Stains): Exterior Wall**

3 - Marginal

3 - Marginal

2 - Poor

Rating

Rating

Rating

1974

1974

1974

Installed

Installed

Installed

40

20

15

Design Life

Design Life

Design Life

FEB-08

FEB-08

FEB-08

Updated

Updated

Updated

Replace Siding Panels

Repair Joint Sealers

Repair Paints

Lifecycle Replacement

Repair

Repair

2008

2008

2008

$133,167

$35,464

$23,681

Low

Medium

Medium

Calgary - St. Mark Elementary School (B2813A)

S2 ENVELOPE

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

FEB-08

FEB-08

FEB-08

The wood siding panels are showing serious signs of failure and may actually pose a safety problem if hit with objects suchas balls etc.

Most joints appear to be adequate, however, at the time of siding retrofit or window replacement new caulking should beprovided

Damaged wood siding should be replaced and a new paint/stain finish applied as soon as possible

Page 7: RECAPP Facility Evaluation Report - Alberta · current heating zones are too large and will result in poor temperature control. ... Reinforced cast in place concrete foundation

Report run on: July 23, 2008 1:35 PM Page 7 of 33

B2020.01.01.01 Steel Windows (Glass & Frame)**

B2020.01.01.02 Aluminum Windows (Glass & Frame)**

B2030.02 Exterior Utility Doors**

4 - Acceptable

3 - Marginal

3 - Marginal

Rating

Rating

Rating

0

1974

1974

Installed

Installed

Installed

30

40

40

Design Life

Design Life

Design Life

FEB-08

FEB-08

FEB-08

Updated

Updated

Updated

Replace Steel-Framed Storefronts

Replace Exterior Standard Windows

Replace Exterior Utility Doors

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2012

2008

2008

$81,910

$204,776

$23,452

Low

Medium

Medium

Calgary - St. Mark Elementary School (B2813A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

FEB-08

FEB-08

FEB-08

Pressed Steel Frame

Aluminum frames with several windows showing signs of failure and should be replaced as moisture damage is evident atthe head and sills of the units. The potential for mould and structural damage from moisture infiltration is possible.

Several exterior doors are showing signs of weakness at the hinges.

Page 8: RECAPP Facility Evaluation Report - Alberta · current heating zones are too large and will result in poor temperature control. ... Reinforced cast in place concrete foundation

Report run on: July 23, 2008 1:35 PM Page 8 of 33

B3010.04.01 Built-up Bituminous Roofing (Asphalt & Gravel)**

B3010.08.02 Metal Gutters and Downspouts**

3 - Marginal

4 - Acceptable

Rating

Rating

1974

1974

Installed

Installed

25

30

Design Life

Design Life

FEB-08

FEB-08

Updated

Updated

Repair Membrane

Replace Membrane Roofing

Replace Metal Gutters and Downspouts

Repair

Lifecycle Replacement

Lifecycle Replacement

2008

2012

2012

$2,288

$635,149

$59,030

High

Medium

Low

Immediate repair of south facing lap joints up the parapets isrequired where there are opening of 12mm which could allowwater to penetrate the roof system.

Concern:

Repair membrane in this area.Recommendation:

Calgary - St. Mark Elementary School (B2813A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

FEB-08

APR-08

APR-08

In general the roof is sound.

Metal scuppers and downspouts.

Consequences of Deferral:Water will penetrate the school and cause further damage tothe interior of the building.

Page 9: RECAPP Facility Evaluation Report - Alberta · current heating zones are too large and will result in poor temperature control. ... Reinforced cast in place concrete foundation

Report run on: July 23, 2008 1:35 PM Page 9 of 33

C1010.03 Interior Operable Folding Panel Partitions**

C1030.01 Visual Display Boards**

C1030.02 Fabricated Compartments(Toilets/Showers)**

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1974

1974

1974

Installed

Installed

Installed

30

20

30

Design Life

Design Life

Design Life

FEB-08

FEB-08

FEB-08

Updated

Updated

Updated

Replace Interior Panel Partitions

Replace Visual Display Boards

Replace Fabricated Compartments

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2012

2012

2012

$21,850

$77,334

$19,105

Low

Low

Low

Calgary - St. Mark Elementary School (B2813A)

S3 INTERIOR

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

APR-08

APR-08

APR-08

Recessed track prefinished folding panels.

Wood and tack display boards.

Toilet partitions are showing wear and are ending their lifespan Shower stalls are not applicable as they are not used by programs and are used for gym storage

Page 10: RECAPP Facility Evaluation Report - Alberta · current heating zones are too large and will result in poor temperature control. ... Reinforced cast in place concrete foundation

Report run on: July 23, 2008 1:35 PM Page 10 of 33

C1030.10 Lockers**

C1030.14.01 Toilet Accessories

C3010.02 Wall Paneling**

C3010.06 Tile Wall Finishes**

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1974

1974

1974

1974

Installed

Installed

Installed

Installed

30

0

30

40

Design Life

Design Life

Design Life

Design Life

FEB-08

FEB-08

FEB-08

FEB-08

Updated

Updated

Updated

Updated

Replace Lockers

Replace Wall Paneling

Replace Tile Wall Finishes

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2012

2012

2014

$109,938

$58,678

$35,685

Low

Low

Low

Calgary - St. Mark Elementary School (B2813A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

APR-08

APR-08

APR-08

Metal lockers.

Accessories include paper towel dispenser, soap dispenser, and toilet paper dispenser.

Prefinished and fabric wall paneling with plastic trim at joints.

Some areas of broken tiles and missing tiles in wash rooms and shower rooms. Otherwise sound

Page 11: RECAPP Facility Evaluation Report - Alberta · current heating zones are too large and will result in poor temperature control. ... Reinforced cast in place concrete foundation

Report run on: July 23, 2008 1:35 PM Page 11 of 33

C3010.09 Acoustical Wall Treatment**

C3020.02 Tile Floor Finishes**

C3020.07 Resilient Flooring**

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1974

1974

1974

Installed

Installed

Installed

20

50

20

Design Life

Design Life

Design Life

FEB-08

FEB-08

FEB-08

Updated

Updated

Updated

Replace Acoustical Wall Treatment

Replace Tile Floor Finishes

Replace Resilient Flooring

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2012

2024

2012

$50,970

$11,274

$69,575

Low

Low

Medium

Calgary - St. Mark Elementary School (B2813A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

APR-08

APR-08

APR-08

Spray on acoustic treatment.

This is for ceramic floor tile finishes

In general resilient floor tiles are intact.

Page 12: RECAPP Facility Evaluation Report - Alberta · current heating zones are too large and will result in poor temperature control. ... Reinforced cast in place concrete foundation

Report run on: July 23, 2008 1:35 PM Page 12 of 33

C3020.08 Carpet Flooring**

C3030.06 Acoustic Ceiling Treatment (Susp.T-Bar)**

4 - Acceptable

4 - Acceptable

Rating

Rating

1974

1974

Installed

Installed

15

25

Design Life

Design Life

FEB-08

FEB-08

Updated

Updated

Replace Carpet Flooring

Replace Susp.T-Bar

Lifecycle Replacement

Lifecycle Replacement

2012

2012

$7,821

$42,861

Medium

Medium

Calgary - St. Mark Elementary School (B2813A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-08

APR-08

Carpeting in the Library is rolling in places and could cause a trip hazard shortly, the cost would be $1000 to repair this.

A study should be undertaken to determine if the ceiling tiles contain hazardous material before any material is altered.

Page 13: RECAPP Facility Evaluation Report - Alberta · current heating zones are too large and will result in poor temperature control. ... Reinforced cast in place concrete foundation

Report run on: July 23, 2008 1:35 PM Page 13 of 33

D2010.04 Sinks - **

D2010.05 Showers - **

D2010.08 Drinking Fountains / Coolers - **

5 - Good

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1974

1974

1974

Installed

Installed

Installed

30

30

35

Design Life

Design Life

Design Life

FEB-08

FEB-08

FEB-08

Updated

Updated

Updated

Replace 5 sinks + 1 Janitors sink

Replace Showers

Replace Drinking Fountains

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2012

2012

2012

$8,373

$8,980

$5,720

Low

Low

Low

Calgary - St. Mark Elementary School (B2813A)

S4 MECHANICAL

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

APR-08

APR-08

APR-08

Typical stainless sinks throughout

Gang showers in Male and Female change rooms. Female also has some showers in cubicles. Showers appear to be usedrarely. Tempered water supply

Wall hung non-refrigerated drinking fountains throughout.

Page 14: RECAPP Facility Evaluation Report - Alberta · current heating zones are too large and will result in poor temperature control. ... Reinforced cast in place concrete foundation

Report run on: July 23, 2008 1:35 PM Page 14 of 33

D2010.10 Washroom Fixtures (WC, Lav, Urnl) - **

D2020.01.01 Pipes and Tubes: Domestic Water - *

D2020.01.02 Valves: Domestic Water - **

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1974

1974

1974

Installed

Installed

Installed

30

0

40

Design Life

Design Life

Design Life

FEB-08

FEB-08

FEB-08

Updated

Updated

Updated

Replace 18 WC, 17 Lavs, 4 Urnl

Replace original valves

Lifecycle Replacement

Lifecycle Replacement

2012

2012

$51,480

$17,366

Low

Low

Original valves (1974 vintage) are not reliable, may leak or maynot be operable.

Concern:

Replace remaining valves original to buildingRecommendation:

Calgary - St. Mark Elementary School (B2813A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-08

APR-08

Combination of American Standard floor mounted and Mansfield wall mounted urinals. Generally in good condition Floor mounted, open front seat, flush valve WC generally in good condition. Porcelain Lavs also generally in acceptable condition. Some replaced as required in 2006.

4" domestic water service. 1 1/2" domestic water meter. 1 1/2" Irrigation with meter. 2" fire line. Copper tubing. Majority is original. New piping added as required

Majority original to building. Some replaced as required

Page 15: RECAPP Facility Evaluation Report - Alberta · current heating zones are too large and will result in poor temperature control. ... Reinforced cast in place concrete foundation

Report run on: July 23, 2008 1:35 PM Page 15 of 33

D2020.01.03 Piping Specialties (Backflow Preventors) - **

D2020.02.02 Plumbing Pumps: Domestic Water - **

D2020.02.06 Domestic Water Heaters - **

4 - Acceptable

4 - Acceptable

5 - Good

Rating

Rating

Rating

1990

1974

2002

Installed

Installed

Installed

20

20

20

Design Life

Design Life

Design Life

FEB-08

FEB-08

FEB-08

Updated

Updated

Updated

Replace Backflow Preventers

Replace DHWR pump

Replace DHWH

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2012

2012

2020

$10,294

$2,497

$6,818

Medium

Low

Low

Failure resulting in contamination of building or city watersupplies

Concern:

Continue routine inspection and replace as requiredRecommendation:

Calgary - St. Mark Elementary School (B2813A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

APR-08

APR-08

APR-08

Installed on irrigation line, DCW line and Fire line. All regularly inspected and replaced as required

In-line domestic hot water recirc pump

Single AO Smith "master Fit" model "BTRC 180" DHWH located in Mechanical Mezzanine. 179,100 BTU Input, Storage288 liters, Recovery 173 gal/hr (659 l/hr). Installed within the last 5 years

52Capacity Size

kWCapacity Unit

Page 16: RECAPP Facility Evaluation Report - Alberta · current heating zones are too large and will result in poor temperature control. ... Reinforced cast in place concrete foundation

Report run on: July 23, 2008 1:35 PM Page 16 of 33

D2020.03 Water Supply Insulation: Domestic - *

D2030.01 Waste and Vent Piping - *

D2040.01 Rain Water Drainage Piping Systems - *

D2040.02.04 Roof Drains - *

3 - Marginal

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1974

1974

1974

1974

Installed

Installed

Installed

Installed

0

0

0

40

Design Life

Design Life

Design Life

Design Life

FEB-08

FEB-08

FEB-08

FEB-08

Updated

Updated

Updated

Updated

Insulate DHW pipe around DHWH

Operating Efficiency Upgrade 2008 $1,144 Medium

DHW Piping not insulated for a few meters either side ofDHWH

Concern:

Insulate pipingRecommendation:

Calgary - St. Mark Elementary School (B2813A)

Event:

Type Year Cost Priority

Updated: MAR-08

Pipe insulation generally appears acceptable. DHW piping is not insulated for short length to and from DHWH. This shouldbe added under maintenance.

Tied to city sewer

Tied to city storm water

Full flow roof drains installed throughout

Consequences of Deferral:Possible scalding risk and small loss of efficiency

Page 17: RECAPP Facility Evaluation Report - Alberta · current heating zones are too large and will result in poor temperature control. ... Reinforced cast in place concrete foundation

Report run on: July 23, 2008 1:35 PM Page 17 of 33

D3010.02 Gas Supply Systems - *

D3020.02.01 Heating Boilers and Accessories: H.W. - **

4 - Acceptable

4 - Acceptable

Rating

Rating

1974

1974

Installed

Installed

60

35

Design Life

Design Life

FEB-08

FEB-08

Updated

Updated

Paint or Band gas pipes

Replace Heating Boilers and Accessories

Code Upgrade

Lifecycle Replacement

2011

2012

$2,860

$63,740

Medium

Low

Natural Gas pipping is not painted or banded in yellow. Thisdoes not comply with current gas code requirements. ReferNatural Gas and Propane installation code - B149.1 section6.17.

Boilers are outdated and less efficient than current models.Poor chemical treatment in the past may have resulted ininternal corrosion and could lead to further system failures.Boilers will be at the end of their economic lives.

Concern:

Concern:

Paint or band piping to comply with current codes

Replace 7 original boilers and accessories

Recommendation:

Recommendation:

Calgary - St. Mark Elementary School (B2813A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-08

FEB-08

Gas distribution piping to DHWH and Boilers

Main heating plant consists of 8 "multi temp" atmospheric, gas fired modular boilers, model MR-2400. 7 of the modules areoriginal to building with 1 replaced approximately 15 years ago. Total input 2400 MBH, output approx. 1920 MBH.

Consequences of Deferral:Gas piping could potentially be wrongly identified and breached

560Capacity Size

kWCapacity Unit

Page 18: RECAPP Facility Evaluation Report - Alberta · current heating zones are too large and will result in poor temperature control. ... Reinforced cast in place concrete foundation

Report run on: July 23, 2008 1:35 PM Page 18 of 33

D3020.02.02 Chimneys (&Comb. Air): H.W. Boiler - **

D3020.02.03 Water Treatment: H. W. Boiler - *

D3040.01.01 Air Handling Units: Air Distribution - **

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1974

1974

1974

Installed

Installed

Installed

30

0

30

Design Life

Design Life

Design Life

FEB-08

FEB-08

FEB-08

Updated

Updated

Updated

Provide High Level ventilation

Replace Flues

Replace AHU

Code Upgrade

Lifecycle Replacement

Lifecycle Replacement

2011

2012

2012

$5,720

$13,665

$202,734

Medium

Low

Low

Boiler room doesn't have high level ventilation opening inaccordance with current gas code. Refer Natural Gas andPropane Installation code - B149.1 section 8.4.1

Concern:

Provide high level ventilation opening in accordance with gascode

Recommendation:

Calgary - St. Mark Elementary School (B2813A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

APR-08

APR-08

APR-08

Flues in acceptable condition. Combustion air ducted to low level frost box.

Chemical pot feeder installed, treatment added as required. 3/4" micron filter.

A single AHU original to the building provides all ventilation air, heated through hot water coil and 3 way valve. Trane model 731-HF-LP-THD

Consequences of Deferral:Potential for contaminants to build up in boiler room. Possiblyleading to adverse health effects and potential for explosion.

Page 19: RECAPP Facility Evaluation Report - Alberta · current heating zones are too large and will result in poor temperature control. ... Reinforced cast in place concrete foundation

Report run on: July 23, 2008 1:35 PM Page 19 of 33

D3040.01.03 Air Cleaning Devices:Air Distribution - *

D3040.01.04 Ducts: Air Distribution - *

D3040.01.07 Air Outlets & Inlets:Air Distribution - *

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1974

1974

1974

Installed

Installed

Installed

0

0

0

Design Life

Design Life

Design Life

FEB-08

FEB-08

FEB-08

Updated

Updated

Updated

Calgary - St. Mark Elementary School (B2813A)

AHU provided with panel filters.

S/A fed via a combination of square cone diffusers and side blow. Corridors and some other areas such as the infirmaryhave no S/A (ventilation) ducted directly to them. They appear to rely on leakage (unused O/A) from adjacent spaces.

Page 20: RECAPP Facility Evaluation Report - Alberta · current heating zones are too large and will result in poor temperature control. ... Reinforced cast in place concrete foundation

Report run on: July 23, 2008 1:35 PM Page 20 of 33

D3040.03.01 Hot Water Distribution Systems - **

D3040.04.01 Fans: Exhaust - **

D3040.04.03 Ducts: Exhaust - *

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1974

1974

1974

Installed

Installed

Installed

40

30

0

Design Life

Design Life

Design Life

FEB-08

FEB-08

FEB-08

Updated

Updated

Updated

Heating system pipe samples

Replace Hot Water Distribution systems

Replace Roof mounted Exhaust Fans

Study

Lifecycle Replacement

Lifecycle Replacement

2009

2014

2012

$5,720

$215,042

$11,440

Medium

Low

Low

Piping is of an age where continuous, quality chemicaltreatment could not be guaranteed. Piping may have internalcorrosion reducing heating efficiencies and leading to potentialfailures.

Concern:

Piping samples should be taken to determine the level ofcorrosion within the piping. Results of samples may warrantreplacement of all heating water distribution pipework, radiationand heating coils.

Recommendation:

Calgary - St. Mark Elementary School (B2813A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

APR-08

APR-08

APR-08

Duplex parallel pumps provide heating water distribution through steel piping to AHU heating coil and perimeter radiation.Piping is of an age where continuous, quality chemical treatment could not be guaranteed. Pipe samples may be necessaryto determine the extent of corrosion within the piping.

Roof mounted washroom and kitchen exhaust fans generally in acceptable condition

Page 21: RECAPP Facility Evaluation Report - Alberta · current heating zones are too large and will result in poor temperature control. ... Reinforced cast in place concrete foundation

Report run on: July 23, 2008 1:35 PM Page 21 of 33

D3040.04.05 Air Outlets and Inlets: Exhaust - *

D3050.05.03 Finned Tube Radiation - **

D3060.02.02 Pneumatic Controls**

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1974

1974

1974

Installed

Installed

Installed

0

40

40

Design Life

Design Life

Design Life

FEB-08

FEB-08

FEB-08

Updated

Updated

Updated

Provide additional heating zones and controls

Replace Finned Tube Radiation

Replace pneumatic controls

Program Functional Upgrade

Lifecycle Replacement

Lifecycle Replacement

2011

2014

2012

$17,160

$102,500

$34,320

Low

Low

Low

Modifications to the building layout have resulted in perimeterradiation zones too large to maintain suitable spacetemperatures. The lack of air conditioning (cooling) means thatzone temperatures cant be trimmed in this manner. Areas atthe start of the heating zone will be too hot, or areas at the endof the zone will be too cold.

Concern:

Provide additional zoneingRecommendation:

Calgary - St. Mark Elementary School (B2813A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

FEB-08

APR-08

APR-08

Exhaust and return typically via eggcrate grille in ceiling. Relief air is typically not provided for exhausted areas, it appearsthat leakage around doors is relied upon.

HVAC pneumatic controls with low voltage wiring. Paragon system for energy management. Filter drier appears to haverecently been replaced. Webster brand air Compressor appears in reasonable condition. Compressor "run" light notoperational and should be repaired under maintenance. Honeywell thermostats throughout.

Page 22: RECAPP Facility Evaluation Report - Alberta · current heating zones are too large and will result in poor temperature control. ... Reinforced cast in place concrete foundation

Report run on: July 23, 2008 1:35 PM Page 22 of 33

D4010 Sprinklers: Fire Protection - *

D4020 Standpipes - *

4 - Acceptable

4 - Acceptable

Rating

Rating

1974

1974

Installed

Installed

60

60

Design Life

Design Life

FEB-08

FEB-08

Updated

Updated

Install Sprinklers throughout

Study 2011 $9,152 Medium

The Building is not Sprinklered. Current code may requiresprinklers to be installed.

Concern:

Propose study to determine requirement for sprinklers undercurrent code

Recommendation:

Calgary - St. Mark Elementary School (B2813A)

Event:

Type Year Cost Priority

Updated: APR-08

The building is not sprinklered. Current Code would require sprinklers to be installed.

Standpipe feeding fire hose cabinets.

Page 23: RECAPP Facility Evaluation Report - Alberta · current heating zones are too large and will result in poor temperature control. ... Reinforced cast in place concrete foundation

Report run on: July 23, 2008 1:35 PM Page 23 of 33

D4030.01 Fire Extinguisher, Cabinets and Accessories - *

4 - AcceptableRating

1974Installed

30Design Life

FEB-08Updated

Provide ABC rated Fire Extinguishers

Code Upgrade 2008 $5,720 High

Portable extinguishers don't meet current code requirements.Currently the building has compressed water typeextinguishers installed in Fire Hose Cabinets with fewadditional type ABC and Type K extinguishers. Compressedwater extinguishers are suitable for Class A fires (ordinarycombustible materials) but not for class C fires (whereenergized equipment may be encountered). The additionalextinguishers appear insufficiently located to meet the traveldistances for a class C fire. Refer NFPA 10 section 6.4"Installations for class C fires"

Concern:

Either replace the compressed water extinguishers with typeABC extinguishers, or provide additional type BC extinguishers.

Recommendation:

Calgary - St. Mark Elementary School (B2813A)

Event:

Type Year Cost Priority

Updated: APR-08

Consequences of Deferral:Potential for electrocution during electrical fire.

Page 24: RECAPP Facility Evaluation Report - Alberta · current heating zones are too large and will result in poor temperature control. ... Reinforced cast in place concrete foundation

Report run on: July 23, 2008 1:35 PM Page 24 of 33

D5010.03 Main Electrical Switchboards (Main Distribution) - **

D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution) - **

5 - Good

5 - Good

Rating

Rating

1974

1974

Installed

Installed

40

30

Design Life

Design Life

FEB-08

FEB-08

Updated

Updated

Replace Main Distribution

Replace Branch Circuit Panel Boards

Lifecycle Replacement

Lifecycle Replacement

2014

2012

$47,042

$23,671

Low

Low

The main distribution is in good operating condition.

The branch circuit panels have exceeded the theoreticaldesign life but are in good operating condition and according tothe maintenance staff they have not had any issues withbreakers tripping.

Concern:

Concern:

Calgary - St. Mark Elementary School (B2813A)

S5 ELECTRICAL

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-08

APR-08

The main electrical distribution for this building is a Westinghouse 400 Amp 120/208 Volt 3 Phase 4 Wire CDP. In the CDPthere are five breakers feeding branch circuit panels throughout the building. One breaker and panel has been recentlyadded that supplies power to the computers in the library. There is also one breaker in the CDP that feeds the fire alarmpanel. The electrical distribution was last inspected in 2002

The branch circuit panel boards are Westinghouse 225 Amp 120/208 Volt and a Cutler Hammer labeled panel "D" wasadded in 2002 to accommodate power for the computers that are located in the library.

Page 25: RECAPP Facility Evaluation Report - Alberta · current heating zones are too large and will result in poor temperature control. ... Reinforced cast in place concrete foundation

Report run on: July 23, 2008 1:35 PM Page 25 of 33

D5010.07.02 Motor Starters and Accessories - **

D5020.01 Electrical Branch Wiring - *

D5020.02.01 Lighting Accessories (Lighting Controls) - *

D5020.02.02.01 Interior Incandescent Fixtures - *

5 - Good

3 - Marginal

5 - Good

5 - Good

Rating

Rating

Rating

Rating

1974

1974

1974

1974

Installed

Installed

Installed

Installed

30

0

0

30

Design Life

Design Life

Design Life

Design Life

FEB-08

FEB-08

FEB-08

FEB-08

Updated

Updated

Updated

Updated

Replace Motor Starters

Repair Pack Poles

Lifecycle Replacement

Repair

2012

2008

$4,081

$1,144

Low

Medium

The majority of the motor starters have exceeded theretheoretical design life but are in good operating condition.

Pack poles that are being utilized throughout the building andare not secured properly if at all.

Concern:

Concern:

Secure pack poles either to the floor or the walls wherepossible.

Recommendation:

Calgary - St. Mark Elementary School (B2813A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-08

APR-08

Cutler Hammer motor starters are located in both the electrical room and mechanical rooms. They operate various motorsand pumps throughout the building.

Branch circuit wiring consists of EMT, armored flexible cable and pack poles throughout the building. Two of the parking lotreceptacle pedestals have been damaged, see site report for event.

Lighting is controlled throughout the building with line voltage switching.

Incandescent fixtures have had the lamps changed out to compact florescent.

Page 26: RECAPP Facility Evaluation Report - Alberta · current heating zones are too large and will result in poor temperature control. ... Reinforced cast in place concrete foundation

Report run on: July 23, 2008 1:35 PM Page 26 of 33

D5020.02.02.02 Interior Florescent Fixtures - **

D5020.02.02.03 Interior Metal Halide Fixture - *

D5020.02.03.02 Emergency Lighting Battery Packs - **

4 - Acceptable

5 - Good

4 - Acceptable

Rating

Rating

Rating

1974

1974

1974

Installed

Installed

Installed

30

0

20

Design Life

Design Life

Design Life

FEB-08

FEB-08

FEB-08

Updated

Updated

Updated

Replace Interior Florescent Fixtures

Replace Emergency Lighting Battery Packs

Lifecycle Replacement

Lifecycle Replacement

2012

2012

$54,912

$6,292

Low

Medium

It appears that some of the fixtures in the hallways have beenreplaced with new T8 fixtures but the majority are still T-12which are inefficient.

The emergency battery packs have exceeded there theoreticaldesign life and should be replaced in the near future but theyare in good operating condition.

Concern:

Concern:

Either replace florescent fixtures or have a ballast/lamp retrofitcompleted to increase light output and efficiency.

Recommendation:

Calgary - St. Mark Elementary School (B2813A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-08

APR-08

Florescent fixtures are utilized throughout the hallways, classrooms and storage rooms and have T-12 lamps throughout.

In the gymnasium there are 12 Metal Halide HID fixtures located throughout the ceiling space.

Emergency lighting is provided by 12 Volt DC Lumacell battery packs and remote heads located throughout the building.

Page 27: RECAPP Facility Evaluation Report - Alberta · current heating zones are too large and will result in poor temperature control. ... Reinforced cast in place concrete foundation

Report run on: July 23, 2008 1:35 PM Page 27 of 33

D5020.02.03.03 Exit Signs - *

D5020.03.01.04 Exterior H.P. Sodium Fixtures - *

D5020.03.02 Lighting Accessories: Exterior (Lighting Controls) - *

4 - Acceptable

3 - Marginal

5 - Good

Rating

Rating

Rating

1974

1974

1974

Installed

Installed

Installed

0

0

0

Design Life

Design Life

Design Life

FEB-08

FEB-08

FEB-08

Updated

Updated

Updated

Install Upgraded Exit Signs

Replacement of exterior HPS lights

Energy Efficiency Upgrade

Failure Replacement

2011

2011

$2,059

$3,432

Low

Low

Although the exit signs do not have a theoretical design lifelisted they should be upgraded to LED. A few of the lampshave burnt out in the exit signs.

Two of the exterior light fixtures look to be in rough shape andshould be replaced. It also appears that two of the exteriorlights that are mounted on the building, one on the south andone on the west side, do not have any cages around them toprevent damage like the other fixtures do.

Concern:

Concern:

Replace remainder of exterior light fixtures and provide cages toprotect them.

Recommendation:

Calgary - St. Mark Elementary School (B2813A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

FEB-08

FEB-08

Lumacell exit signs are utilized throughout the building but have not been upgraded to LED.

Exterior lighting is provided by various HPS HID wall packs located on the east, west and south walls.

Exterior lighting is controlled by a photo cell that controls an Allen Bradley contactor that has an override switch located inthe electrical room.

Page 28: RECAPP Facility Evaluation Report - Alberta · current heating zones are too large and will result in poor temperature control. ... Reinforced cast in place concrete foundation

Report run on: July 23, 2008 1:35 PM Page 28 of 33

D5030.01 Detection and Fire Alarm - **

3 - MarginalRating

1974Installed

25Design Life

FEB-08Updated

Install monitor module on fire standpipe

Replace Fire Alarm System

Code Upgrade

Lifecycle Replacement

2008

2008

$1,716

$28,600

Low

High

Isolation valves each side of fire line backflow preventer do nothave tamper switches installed. Master control valve at base ofwater main supply header does not have tamper switchinstalled. This does not comply with current Alberta Fire Coderequirements. Refer NFPA 24, section 6 "identifying andsecuring valves

The fire alarm panel is working fine but the concern is that ifthere were problems with the panel would the parts that arerequired be available considering the age of the panel. Thepanel has now exceeded its theoretical design life by 8 years.

Concern:

Concern:

Provide tamper switches and a monitor module on firestandpipe that will send a supervisory signal to the fire alarmpanel if the valves on the fire standpipe has been shut off.

Replace the fire alarm panel.

Recommendation:

Recommendation:

Calgary - St. Mark Elementary School (B2813A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

MAR-08

APR-08

This school is protected by an Edwards 6616 fire alarm panel complete with a graphic annunciator panel located at the frontentrance. System was tested in January of 2007 and is monitored by Altex security systems.

Page 29: RECAPP Facility Evaluation Report - Alberta · current heating zones are too large and will result in poor temperature control. ... Reinforced cast in place concrete foundation

Report run on: July 23, 2008 1:35 PM Page 29 of 33

D5030.02.02 Intrusion Detection - **

D5030.04.01 Telephone Systems - *

D5030.04.05 Local Area Network Systems - *

D5030.05 Public Address and Music Systems - **

5 - Good

5 - Good

5 - Good

5 - Good

Rating

Rating

Rating

Rating

2000

1974

1974

1974

Installed

Installed

Installed

Installed

25

25

0

20

Design Life

Design Life

Design Life

Design Life

FEB-08

FEB-08

FEB-08

FEB-08

Updated

Updated

Updated

Updated

Completed Replacement of Intrusion Detection

Replace Public Address System

Lifecycle Replacement

Lifecycle Replacement

2025

2012

$9,152

$17,160

Unassigned

Low

The intrusion detection has either been replaced or upgradedin the year 2000.

Public address system is in good operation but could beupgraded.

Concern:

Concern:

Calgary - St. Mark Elementary School (B2813A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-08

APR-08

This building is protected by a Silent Knight security panel and associated devices and is monitored by Altex security.

The data rack is located in the electrical/storage room and consists of a server with UPS back up. A fiber link has beeninstalled.

The public address system is a Rauland communications system and has speakers throughout the school. A Sony CDchanger has been added to the system.

Page 30: RECAPP Facility Evaluation Report - Alberta · current heating zones are too large and will result in poor temperature control. ... Reinforced cast in place concrete foundation

Report run on: July 23, 2008 1:35 PM Page 30 of 33

D5030.06 Television Systems - *

5 - GoodRating

1974Installed

0Design Life

FEB-08Updated

Calgary - St. Mark Elementary School (B2813A)

Shaw cable has been supplied to the building.

Page 31: RECAPP Facility Evaluation Report - Alberta · current heating zones are too large and will result in poor temperature control. ... Reinforced cast in place concrete foundation

Report run on: July 23, 2008 1:35 PM Page 31 of 33

E2010.02.99 Other Casework - **

E2010.03.01 Blinds - **

F1010.02.04 Portable and Mobile Buildings*

5 - Good

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1974

1974

0

Installed

Installed

Installed

35

30

30

Design Life

Design Life

Design Life

FEB-08

FEB-08

FEB-08

Updated

Updated

Updated

Replace Fixed Casework

Replace Blinds

Lifecycle Replacement

Lifecycle Replacement

2012

2012

$156,913

$23,970

Low

Low

Calgary - St. Mark Elementary School (B2813A)

S6 EQUIPMENT, FURNISHINGS AND SPECIAL CONSTRUCTION

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-08

APR-08

Wood cabinets and shelves.

Venetian blinds

Architectural: wood framed construction bearing on concrete pads. Envelope includes metal cladding, 2 ply SBS roofmembrane and aluminum framed field glazed windows complete with wire mesh security grilles. Interior components includevinyl tile solid core wood doors, press steel frames, acoustic tile ceiling, painted gypsum board, painted/clear finish millworkand white boards / tack boards. Electrical: Power for the single phase 120/208 Volt panels in each portable is fed from the main CDP located in theelectrical room. Communications and paging is connected to the main building systems. The smoke detectors and pullstations have there own zone in the schools fire alarm panel. Emergency lighting is tested on a regular basis and isoperational. Lighting consists of surface mount fluorescent fixtures with T-12 lamps. Mechanical: Heating and Ventilation provided via self contained, natural gas fired furnace unit c/w stainless steel heatexchanger, wall louvre, supply fan and 25 mm disposable filters. Refer D3020.03.01 "Furnaces", for capacity and modelnumbers. Sprinkler system not installed. Fire extinguishers installed throughout.

Page 32: RECAPP Facility Evaluation Report - Alberta · current heating zones are too large and will result in poor temperature control. ... Reinforced cast in place concrete foundation

Report run on: July 23, 2008 1:35 PM Page 32 of 33

F2020.01 Asbestos*

F2020.04 Mould*

F2020.09 Other Hazardous Materials*

3 - Marginal

5 - Good

5 - Good

Rating

Rating

Rating

0

0

0

Installed

Installed

Installed

0

0

0

Design Life

Design Life

Design Life

FEB-08

FEB-08

FEB-08

Updated

Updated

Updated

Repair Tiles

Study Asbestos

Repair

Study

2008

2008

$29,744

$4,576

Medium

Low

Some specific tiles are damaged and should be replaced.

Asbestos floor tile is in some locations.

Concern:

Concern:

A inspection should be performed on the tiles which aredamaged to ensure that they are not tiles composed ofasbestos before they are replaced!

Composition of tiles should be verified before any are removed.

Recommendation:

Recommendation:

Calgary - St. Mark Elementary School (B2813A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

FEB-08

FEB-08

Vinyl asbestos floor tile appears in some rooms.

No findings at the time of the review.

No hazardous materials found at the time of the review.

Consequences of Deferral:

Consequences of Deferral:

Further deterioration of the flooring.

Continued damage to possibly hazardous material.

Page 33: RECAPP Facility Evaluation Report - Alberta · current heating zones are too large and will result in poor temperature control. ... Reinforced cast in place concrete foundation

Report run on: July 23, 2008 1:35 PM Page 33 of 33

K4010.01 Barrier Free Route: Parking to Entrance*

K4010.02 Barrier Free Entrances*

K4010.03 Barrier Free Interior Circulation*

K4010.04 Barrier Free Washrooms*

5 - Good

2 - Poor

2 - Poor

5 - Good

Rating

Rating

Rating

Rating

0

0

0

0

Installed

Installed

Installed

Installed

0

0

0

0

Design Life

Design Life

Design Life

Design Life

FEB-08

FEB-08

FEB-08

FEB-08

Updated

Updated

Updated

Updated

Install Door Operators

Repair Railing

Barrier Free Access Upgrade

Code Repair

2008

2008

$5,720

$2,059

High

High

Proper railing is not present on ramp.Concern:

Install proper railingRecommendation:

Calgary - St. Mark Elementary School (B2813A)

S8 FUNCTIONAL ASSESSMENT

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

FEB-08

FEB-08

Paved parking stalls with Handicap markings.

No power door operators.

Ramp without a proper railing. Cylinder locks on doors.

Handicap stall with correct grab bars.

Consequences of Deferral:Safety hazard for students.

Page 34: RECAPP Facility Evaluation Report - Alberta · current heating zones are too large and will result in poor temperature control. ... Reinforced cast in place concrete foundation

Report run on: July 24, 2008 2:17 PM

RECAPP Facility Evaluation Report

St. Mark Elementary School

S2813Calgary

Page 35: RECAPP Facility Evaluation Report - Alberta · current heating zones are too large and will result in poor temperature control. ... Reinforced cast in place concrete foundation

Report run on: July 24, 2008 2:17 PM Page 2 of 7

S2813Building Id:

St. Mark Elementary SchoolBuilding Name:

CalgaryLocation:Address:

0.00Gross Area (sq. m): $0Replacement Cost:0Construction Year:

Evaluation Date: September 26 2007

Celtic Project Services Ltd.Evaluation Company:

Bob Cotterall / Jay RobertsonEvaluator Name:

St. Mark is an elementary school. It is a single story structure with a gross area of 2286m^2. This includes a portablesection attached to the south side of the building. There is an asphalt paved parking lot on the east edge of the schoolwith grass fields located on the south side of the school, activity centre is on west side the site, basketball courts on thewest side of the school. There are some minor repairs required for the Car Plug-ins and parts of the Chain Link Fence.Overall the site is in good condition.

General Summary:

Structural Summary:

Envelope Summary:

Interior Summary:

Mechanical Summary:

Electrical Summary:

0%5 year Facility Condition Index (FCI):

Facility Details Evaluation Details

Total Maintenance Events Next 5 years: $70,411

Calgary - St. Mark Elementary School (S2813)

Condition Rating Performance1 - Critical Unsafe, high risk of injury or critical system failure.2 - Poor Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs.

3 - Marginal Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs.4 - Acceptable Meets present requirements, minor deficiencies. Average operating/maintenance costs.

Rating Guide

5 - Good Meets all present requirements. No deficiencies.6 - Excellent As new/state of the art, meets present and foreseeable requirements.

Page 36: RECAPP Facility Evaluation Report - Alberta · current heating zones are too large and will result in poor temperature control. ... Reinforced cast in place concrete foundation

Report run on: July 24, 2008 2:17 PM Page 3 of 7

G2010.02.02 Flexible Pavement Roadway (Asphalt) - **

G2010.05 Roadway Curbs and Gutters - *

G2020.02.02 Flexible Paving Parking Lots(Asphalt) - **

G2020.06.02 Parking Bumpers - *

G2020.06.03 Parking Lot Signs - *

5 - Good

5 - Good

5 - Good

5 - Good

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

1974

1974

1974

1974

1974

Installed

Installed

Installed

Installed

Installed

25

0

25

0

0

Design Life

Design Life

Design Life

Design Life

Design Life

FEB-08

FEB-08

FEB-08

FEB-08

FEB-08

Updated

Updated

Updated

Updated

Updated

Replace Roadway

Replace Parking Lot

Lifecycle Replacement

Lifecycle Replacement

2012

2012

$19,536

$22,689

Low

Low

Calgary - St. Mark Elementary School (S2813)

S7 SITE

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-08

APR-08

Bus drop off area on north side of school.

Concrete curb and gutter on north side of school.

Asphalt paved parking lot on east edge of site for 24 vehicles(+2 handicap)

Pre-cast parking concrete bumpers in visitor / staff parking lot.

Metal parking lot sign has damage. Sign has been bent over, $350 to fix.

Page 37: RECAPP Facility Evaluation Report - Alberta · current heating zones are too large and will result in poor temperature control. ... Reinforced cast in place concrete foundation

Report run on: July 24, 2008 2:17 PM Page 4 of 7

G2020.06.04 Pavement Markings - *

G2030.04 Rigid Pedestrian Pavement (Concrete) - **

G2030.06 Exterior Steps and Ramps - *

G2040.02.01 Chain Link Fences and Gates*

4 - Acceptable

4 - Acceptable

4 - Acceptable

3 - Marginal

Rating

Rating

Rating

Rating

1974

1974

1974

0

Installed

Installed

Installed

Installed

0

25

0

30

Design Life

Design Life

Design Life

Design Life

FEB-08

FEB-08

FEB-08

FEB-08

Updated

Updated

Updated

Updated

Replace Pedestrian Concrete

Repair Chain Link Fence

Lifecycle Replacement

Repair

2012

2008

$17,923

$5,148

Low

High

A couple of settlement cracks are located near the mainentrance and may continue to deteriorate over time.

Fence is damaged along north side of site.

Concern:

Concern:

Replace / Repair fence to avoid possible injury.Recommendation:

Calgary - St. Mark Elementary School (S2813)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-08

APR-08

Concrete sidewalk running along the North side of the site, with a pathway leading to the main entrance.

Ramp at main entrance of school in good condition. Ramp on south side of school (portable) needs to be adjusted toremove a 4" step, $750 to fix.

Chain Link fence on west side in good condition, fence along north side needs repair.

Consequences of Deferral:Possibility if injury with catching on fence.

Page 38: RECAPP Facility Evaluation Report - Alberta · current heating zones are too large and will result in poor temperature control. ... Reinforced cast in place concrete foundation

Report run on: July 24, 2008 2:17 PM Page 5 of 7

G2040.02.04 Wire Fences and Gates*

G2040.03 Athletic and Recreational Surfaces - **

G2040.04.01.02 Playground Equipment*

G2040.05 Site and Street Furnishings - *

G2040.06 Exterior Signs - *

G2040.08 Flagpoles - *

5 - Good

4 - Acceptable

4 - Acceptable

5 - Good

5 - Good

5 - Good

Rating

Rating

Rating

Rating

Rating

Rating

0

1974

0

1974

1974

1974

Installed

Installed

Installed

Installed

Installed

Installed

0

25

10

0

0

0

Design Life

Design Life

Design Life

Design Life

Design Life

Design Life

FEB-08

FEB-08

FEB-08

FEB-08

FEB-08

FEB-08

Updated

Updated

Updated

Updated

Updated

Updated

Replace Recreational Surfaces

Lifecycle Replacement 2012 $5,114 Low

Calgary - St. Mark Elementary School (S2813)

Event:

Type Year Cost Priority

Updated: APR-08

Post and cable fence along east and west side of the property.

Asphalt along west side of school for basketball courts, pea gravel playgrounds, rough grasses in balance.

Activity center located on the west side of the school.

Basketball nets located on the west side of the site.

Steel signage fixed to building over main entrance.

One flagpole at main entrance.

Page 39: RECAPP Facility Evaluation Report - Alberta · current heating zones are too large and will result in poor temperature control. ... Reinforced cast in place concrete foundation

Report run on: July 24, 2008 2:17 PM Page 6 of 7

G2050.04 Lawns and Grasses - *

G2050.05 Trees, Plants and Ground Covers - *

G3010.02 Site Domestic Water Distribution - *

G3010.03 Site Fire Protection Water Distribution - *

G3020.01 Sanitary Sewage Collection - *

G3030.01 Storm Water Collection - *

G3060.01 Gas Distribution - *

5 - Good

4 - Acceptable

5 - Good

5 - Good

5 - Good

5 - Good

5 - Good

Rating

Rating

Rating

Rating

Rating

Rating

Rating

1974

1974

1974

1974

1974

1974

1974

Installed

Installed

Installed

Installed

Installed

Installed

Installed

0

0

0

0

0

0

0

Design Life

Design Life

Design Life

Design Life

Design Life

Design Life

Design Life

FEB-08

FEB-08

FEB-08

FEB-08

FEB-08

FEB-08

FEB-08

Updated

Updated

Updated

Updated

Updated

Updated

Updated

Calgary - St. Mark Elementary School (S2813)

Lawn areas at north and south edges of site.

Mature trees along north side of school. Roots visible from mature trees.

Fire hydrant located on north side of school.

Storm sewer located in east parking lot.

Gas Meter upgraded.

Page 40: RECAPP Facility Evaluation Report - Alberta · current heating zones are too large and will result in poor temperature control. ... Reinforced cast in place concrete foundation

Report run on: July 24, 2008 2:17 PM Page 7 of 7

G4010.03 Electrical Power Distribution Equipment - *

G4010.04 Car Plugs-ins - *

G4020.01 Area Lighting - *

5 - Good

4 - Acceptable

5 - Good

Rating

Rating

Rating

1974

1974

1974

Installed

Installed

Installed

0

0

0

Design Life

Design Life

Design Life

FEB-08

FEB-08

FEB-08

Updated

Updated

Updated

Calgary - St. Mark Elementary School (S2813)

Site electrical power and communications services enter the site underground. Primary electrical service runs to padmounttransformer.Secondary electrical service continues to building below grade.

12 provided for staff / visitor. Damaged electrical boxes need to be replaced(4 at a cost of $800.00).

Streetlights on north side of school.