realty glimpse - avenuehq · realty glimpse february 28th, 2019 holiday inn, grande prairie ......

13
Realty Glimpse February 28 th , 2019 Holiday Inn, Grande Prairie Annie Arsenault –Operations Manager, Inspection Services

Upload: others

Post on 21-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Realty Glimpse - AvenueHQ · Realty Glimpse February 28th, 2019 Holiday Inn, Grande Prairie ... -Expedite Process-Existing Work-mostly exposed -Life Safety-’Big’ picture taken

Realty Glimpse

February 28th, 2019

Holiday Inn, Grande Prairie

Annie Arsenault –Operations Manager, Inspection Services

Page 2: Realty Glimpse - AvenueHQ · Realty Glimpse February 28th, 2019 Holiday Inn, Grande Prairie ... -Expedite Process-Existing Work-mostly exposed -Life Safety-’Big’ picture taken

Agenda

• 2 Common Questions

• Legislation

• Inspection Services vs Development Permitting

• Permit Requirements

• Types of Permits

• Permit Holder Responsibilities

• Compliance Inspections

• Secondary Suites

• Questions

Page 3: Realty Glimpse - AvenueHQ · Realty Glimpse February 28th, 2019 Holiday Inn, Grande Prairie ... -Expedite Process-Existing Work-mostly exposed -Life Safety-’Big’ picture taken

What is a permit and why do I need one?

“PERMIT” means permission or authorization in writing to commence the use, occupancy, relocation, construction or demolition of any building. –Alberta Building Code

• We ensure a minimum standard is met• Safety requirements are met

• Seller, Buyer and Occupants advantage

Page 4: Realty Glimpse - AvenueHQ · Realty Glimpse February 28th, 2019 Holiday Inn, Grande Prairie ... -Expedite Process-Existing Work-mostly exposed -Life Safety-’Big’ picture taken

Why do I need one? Part 2

• Provincial Legislation • Municipal Affairs & Safety Codes Council

• Provincial Code• Alberta Building Code

• National: Electric, Plumbing and Gas Code

• Municipal• Quality Management Plan

• Building Bylaw

Page 5: Realty Glimpse - AvenueHQ · Realty Glimpse February 28th, 2019 Holiday Inn, Grande Prairie ... -Expedite Process-Existing Work-mostly exposed -Life Safety-’Big’ picture taken

Final Approval Final Approval

Land Use Compliance Occupancy (usually)

Who does what?Development Permitting Inspection Services

Land Use Building Safety

Zoning & Permitted Use Building, Electrical, Plumbing and

Gas Code

Set Backs & Easements Occupancy

Driveways Compliance

Cheat* Physical footprint Cheat* Physical building

Page 6: Realty Glimpse - AvenueHQ · Realty Glimpse February 28th, 2019 Holiday Inn, Grande Prairie ... -Expedite Process-Existing Work-mostly exposed -Life Safety-’Big’ picture taken

Permits Required For:

Residential Properties

• *Decks (over 24” from grade to walking surface)

• Basement Developments

• *Sheds/Garages over 108 SF

• Alterations: Effecting Structure or Creating a Room

• *Additions

• *Secondary Suites

Development and/or Lot Grading may be required

Page 7: Realty Glimpse - AvenueHQ · Realty Glimpse February 28th, 2019 Holiday Inn, Grande Prairie ... -Expedite Process-Existing Work-mostly exposed -Life Safety-’Big’ picture taken

Building Permits Required For:

Commercial Properties

• Tenant Improvements• New Base Building or Existing and Developed

• Change of Use • May only require a Building Permit

• Verifies Life Safety

Page 8: Realty Glimpse - AvenueHQ · Realty Glimpse February 28th, 2019 Holiday Inn, Grande Prairie ... -Expedite Process-Existing Work-mostly exposed -Life Safety-’Big’ picture taken

Subtrade Permits Required For:

• If installing an electrical, plumbing or gas system

• If altering an electrical, plumbing or gas system

• If adding to an electrical, plumbing or gas system

Page 9: Realty Glimpse - AvenueHQ · Realty Glimpse February 28th, 2019 Holiday Inn, Grande Prairie ... -Expedite Process-Existing Work-mostly exposed -Life Safety-’Big’ picture taken

Permit Types and Life

Home Owner

• Rough In and Finals Available

Contractors

• Finals Only

Permit Holders Responsible for Ensuring:

• Work Start

• Work Continued

• Inspections Required

Page 10: Realty Glimpse - AvenueHQ · Realty Glimpse February 28th, 2019 Holiday Inn, Grande Prairie ... -Expedite Process-Existing Work-mostly exposed -Life Safety-’Big’ picture taken

Compliance InspectionsDecks and Sheds

-Application & Fee

-Expedite Process

-Existing Work

- mostly exposed

-Life Safety

-’Big’ picture taken into account (age/original construction)

-Current Owner is Notified

Page 11: Realty Glimpse - AvenueHQ · Realty Glimpse February 28th, 2019 Holiday Inn, Grande Prairie ... -Expedite Process-Existing Work-mostly exposed -Life Safety-’Big’ picture taken

Secondary SuitesSituation #1: Existed prior to 2006, with proof:

- falls under fire authority

- fire inspection

Situation #2: Existed prior to 2006, with no proof:

- falls under building authority.

- assessment inspection

Situation #3: Constructed after 2006:

- meets building code of today

**All situations require a Development Permit

Page 12: Realty Glimpse - AvenueHQ · Realty Glimpse February 28th, 2019 Holiday Inn, Grande Prairie ... -Expedite Process-Existing Work-mostly exposed -Life Safety-’Big’ picture taken

Secondary Suites

Typical Code Items:

- Interconnected smoke detectors

- Dry walled mechanical room, smoke sealed

- Separate heat sources

- Direct exit

- Self contained

- One hot water tank and electrical panel is acceptable

Page 13: Realty Glimpse - AvenueHQ · Realty Glimpse February 28th, 2019 Holiday Inn, Grande Prairie ... -Expedite Process-Existing Work-mostly exposed -Life Safety-’Big’ picture taken

Questions