real-time gas lift optimization 2001 asme/api gas lift workshop - aberdeen tommy white artificial...

26
Real-Time Gas Lift Optimization 2001 ASME/API Gas Lift Workshop - Aberdeen Tommy White Artificial Lift Business Development Mgr.

Upload: stanley-grover

Post on 31-Mar-2015

243 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Real-Time Gas Lift Optimization 2001 ASME/API Gas Lift Workshop - Aberdeen Tommy White Artificial Lift Business Development Mgr

Real-Time Gas Lift Optimization

2001 ASME/API Gas Lift Workshop - Aberdeen

Tommy White

Artificial Lift Business Development Mgr.

Page 2: Real-Time Gas Lift Optimization 2001 ASME/API Gas Lift Workshop - Aberdeen Tommy White Artificial Lift Business Development Mgr

2 TMW

Content

• Gas Lift Optimization – Focused on Service Delivery

• Field trial of a new method – real time optimization

• The added value• New solutions• Conclusions

Page 3: Real-Time Gas Lift Optimization 2001 ASME/API Gas Lift Workshop - Aberdeen Tommy White Artificial Lift Business Development Mgr

Virtuous CircleArtificial lift Artificial lift engineeringengineering

Data Data acquisition acquisition

and and comparisoncomparison

Artificial lift Artificial lift products products

and and servicesservices

Data Data acquisitionacquisition

Page 4: Real-Time Gas Lift Optimization 2001 ASME/API Gas Lift Workshop - Aberdeen Tommy White Artificial Lift Business Development Mgr

4 TMW

Gas Lift Service

A service that optimizes gas lifted wells using multiphase flow-metering technology

This service encompasses– artificial lift engineering expertise– multiphase well testing equipment and

expertise – (real time production measurement)

– implementation products and services– artificial lift products and services.

Page 5: Real-Time Gas Lift Optimization 2001 ASME/API Gas Lift Workshop - Aberdeen Tommy White Artificial Lift Business Development Mgr

5 TMW

Multiphase Metering Benefits leading to Production

Optimization– Real time data

• Extensive data base in short period of time• Quick turn around time for decision making

– Resolution• Accuracy

– Dynamic response• Accurate data and independent of flow

regime

Page 6: Real-Time Gas Lift Optimization 2001 ASME/API Gas Lift Workshop - Aberdeen Tommy White Artificial Lift Business Development Mgr

6 TMW

Gas Lift Service

Field Trial Well application in Venezuela

Page 7: Real-Time Gas Lift Optimization 2001 ASME/API Gas Lift Workshop - Aberdeen Tommy White Artificial Lift Business Development Mgr

7 TMW

Gas Lift Service

Slickline unit performing flowing gradient survey

Page 8: Real-Time Gas Lift Optimization 2001 ASME/API Gas Lift Workshop - Aberdeen Tommy White Artificial Lift Business Development Mgr

8 TMW

Gas Lift Service Portable three-phase tester tied to a gas lift well

production line

Page 9: Real-Time Gas Lift Optimization 2001 ASME/API Gas Lift Workshop - Aberdeen Tommy White Artificial Lift Business Development Mgr

9 TMW

Gas Lift Service

Control bay interprets real time data

Page 10: Real-Time Gas Lift Optimization 2001 ASME/API Gas Lift Workshop - Aberdeen Tommy White Artificial Lift Business Development Mgr

10 TMW

Gas and total fluid result

Gas Lift Analysis

Inside control bay during multi-rate test ongas lift well

0 3 6 9 12 15Time (hr)

Oil and water rate

(BOPD)

800

700

600

500

400

300

200

100

Total fluid

Total gas

Page 11: Real-Time Gas Lift Optimization 2001 ASME/API Gas Lift Workshop - Aberdeen Tommy White Artificial Lift Business Development Mgr

11 TMW

Inside control bay during multi-rate test ongas lift well

Oil and water result

Gas Lift AnalysisTotal oil

Total water

0 3 6 9 12 15Time (hr)

Oil and water rate

(BOPD)

800

700

600

500

400

300

200

100

Page 12: Real-Time Gas Lift Optimization 2001 ASME/API Gas Lift Workshop - Aberdeen Tommy White Artificial Lift Business Development Mgr

12 TMW

Gas Lift Analysis

Flowing gradient survey provides real valve injection points

Stable flow measured by PhaseTester

Flowing gradient survey result

50 75 100 125 150 175 200 225 250

0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

5500

6000

6500

7000

TVD(ft)

Temperature (º F)

Page 13: Real-Time Gas Lift Optimization 2001 ASME/API Gas Lift Workshop - Aberdeen Tommy White Artificial Lift Business Development Mgr

13 TMW

Lift gas performance curves

Gas Lift Diagnosis

Inside artificial lift engineering office during diagnosis

Operatingrate

(STB/D)

Lift gas injection rate (MMscf/D)

0.3 0.375 0.45 0.525 0.6

Page 14: Real-Time Gas Lift Optimization 2001 ASME/API Gas Lift Workshop - Aberdeen Tommy White Artificial Lift Business Development Mgr

14 TMW

Existing gas injection location

Gas Lift Diagnosis

Inside artificial lift engineering office during diagnosis

0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

5500

6000

6500

7000 50 75 100 125 150 175 200 225 250

Temperature (º F)

TVD(ft)

Page 15: Real-Time Gas Lift Optimization 2001 ASME/API Gas Lift Workshop - Aberdeen Tommy White Artificial Lift Business Development Mgr

15 TMW

Gas Lift Diagnosis

Inside artificial lift engineering office during diagnosis

NODAL* production system model match to

real well data

0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

5500

6000

6500

7000

Temperature (º F)

50 75 100 125 150 175 200 225 250

TVD(ft)

Page 16: Real-Time Gas Lift Optimization 2001 ASME/API Gas Lift Workshop - Aberdeen Tommy White Artificial Lift Business Development Mgr

16 TMW

Gas Lift Diagnosis

Artificial lift equipment selection

Venturi gas lift orifice valve• minimizes injected gas• increases well stability by injecting

subcritical gas into tubing• optimizes use of limited gas

supplies• maintains the deepest point of

injection.

Page 17: Real-Time Gas Lift Optimization 2001 ASME/API Gas Lift Workshop - Aberdeen Tommy White Artificial Lift Business Development Mgr

17 TMW

Gas Lift Diagnosis

Inside artificial lift engineering office during diagnosis

Modeled location of Venturi gas lift valve

0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

5500

6000

6500

7000 50 75 100 125 150 175 200 225 250

Temperature (º F)

TVD(ft)

Page 18: Real-Time Gas Lift Optimization 2001 ASME/API Gas Lift Workshop - Aberdeen Tommy White Artificial Lift Business Development Mgr

18 TMW

Gas Lift Implementation

Slickline installation of the Venturi gas lift valve

in the deepest mandrel

Page 19: Real-Time Gas Lift Optimization 2001 ASME/API Gas Lift Workshop - Aberdeen Tommy White Artificial Lift Business Development Mgr

19 TMW

Gas Lift Validation

Inside artificial lift engineering office during validation

Gradient survey validates predictions

0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

5500

6000

6500

7000 50 75 100 125 150 175 200 225 250

Temperature (º F)

TVD(ft)

Page 20: Real-Time Gas Lift Optimization 2001 ASME/API Gas Lift Workshop - Aberdeen Tommy White Artificial Lift Business Development Mgr

20 TMW

Gas Lift Validation

Real-time data acquisition validates production increase and stability

Inside artificial lift engineering office during validation

800

Time (hr)0 1 2 3

700

600

500

400

300

200

100

0

Oil and

water rate

(BOPD)

BeforeBefore Injected Gas Injected Gas RateRate

0.715 MMSCF/d0.715 MMSCF/d

AfterAfter Injected Gas Injected Gas RateRate

0.675 MMSCF/d0.675 MMSCF/d

Page 21: Real-Time Gas Lift Optimization 2001 ASME/API Gas Lift Workshop - Aberdeen Tommy White Artificial Lift Business Development Mgr

21 TMW

Added Value

Field example of Artificial Lift operation

Maximizing productivity through:

– technology– people– process.

Actual gas lift well application results:

– 16% increase in production

– 6% decrease in injected gas

– cost of operation recovered in 20 days

Page 22: Real-Time Gas Lift Optimization 2001 ASME/API Gas Lift Workshop - Aberdeen Tommy White Artificial Lift Business Development Mgr

22 TMW

Gas Lift System OptimizationSEPERATOR Well

Focus

Gas Injection

Well Focus

GL Design

Gas Lift Design Performance

SEPERATOR Well Focus

3-Phase Flow

3-Phase MeasurementAnd Stability Monitor

Well Focus

Page 23: Real-Time Gas Lift Optimization 2001 ASME/API Gas Lift Workshop - Aberdeen Tommy White Artificial Lift Business Development Mgr

23 TMW

Real Time Optimization Benefits• Real gains can be seen very quickly through

– placing a focus on lift optimization – use of real time data acquisition which minimizes

the cycle time for optimum data analysis and solution applications

– application of accepted technology

• Extending product knowledge to add value– identify the right path to take the solution further– implementing a path of long term lift optimization

Page 24: Real-Time Gas Lift Optimization 2001 ASME/API Gas Lift Workshop - Aberdeen Tommy White Artificial Lift Business Development Mgr

24 TMW

The Future of Gas Lift

Page 25: Real-Time Gas Lift Optimization 2001 ASME/API Gas Lift Workshop - Aberdeen Tommy White Artificial Lift Business Development Mgr

25 TMW

Decision Decision MakingMaking

Software ToolsSoftware Tools

InstructionsInstructions

Actuate and ControlActuate and Control

The Optimization Process

Data ManipulationData Manipulationand Storageand Storage

Office

MonitoringMonitoring

Field

SCADASCADATransmissionInterACTInterACT

Page 26: Real-Time Gas Lift Optimization 2001 ASME/API Gas Lift Workshop - Aberdeen Tommy White Artificial Lift Business Development Mgr

Automated AL - The Future