reakt strategies and tools for real time earthquake risk reduction wp8: dissemination sandra...
DESCRIPTION
REAKT - 1st Annual Meeting, Potsdam, D8.1 Project web portal / data repository system (AMRA – Month 3) Public part > 100 project related articles and links Reserved area > 30 documentsTRANSCRIPT
REAKTStrategies and tools for
Real Time Earthquake Risk Reduction
WP8: Dissemination
Sandra Laskowski, Friedemann Wenzel (KIT)
REAKT - 1st Annual Meeting, Potsdam, 10.-12.10.2012
REAKT - 1st Annual Meeting, Potsdam, 10.-12.10.2012
Task 8.1 Dissemination, processes, products and web portal (KIT, BRGM, AMRA)
Task 8.2 European Reference Reports (KIT, AMRA)
Task 8.3 Development of Knowledge Base (KIT, AMRA, BRGM, GFZ, EMSC)
Task 8.4 Developing and maintaining contacts outside the EU (AMRA, KIT, GFZ)
Task 8.5 Training and direct Knowledge Base dissemination (AMRA, KIT, BRGM, INGV)
Task 8.6 Raising public awareness and engaging with Citizens through the use of social networks
(EMSC)
REAKT - 1st Annual Meeting, Potsdam, 10.-12.10.2012
D8.1 Project web portal / data repository system (AMRA – Month 3)
Public part
> 100 project related articles and links
Reserved area
> 30 documents
http://www.reaktproject.eu/
REAKT - 1st Annual Meeting, Potsdam, 10.-12.10.2012
D8.2 Communication strategies / promotional material (KIT – Month 6)
REAKT - 1st Annual Meeting, Potsdam, 10.-12.10.2012
D8.3 Automatic publication on Twitter / connection to social networks(EMSC – Month 6)
http://www.facebook.com/EMSC.CSEM?sk=info
Followers
01/2012 - 93110/2012 - 4,853
REAKT news
04/201205/201206/2012 (2x)08/2012
REAKT - 1st Annual Meeting, Potsdam, 10.-12.10.2012
D8.3 Automatic publication on Twitter / connection to social networks(EMSC – Month 6)
https://twitter.com/lastquake
Followers
11/2011 - 1,00510/2012 - 2,132
Online chat
“Let‘s talk aboutQuakes“ (2x)
REAKT - 1st Annual Meeting, Potsdam, 10.-12.10.2012
D8.4 Guidelines for REAKT Reference Reports
(KIT – Month 12)