traffic engineering lab record · department of civil engineering, iit bombay ce 740: traffic...

136
Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Upload: others

Post on 01-Feb-2020

17 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering

TRAFFIC ENGINEERING LAB

RECORD AUTUMN, 2015

Page 2: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 1 CE 740 Lab Record: Autumn, 2015

CE 740: TRAFFIC ENGINEERING LAB

July – December, 2015

Name: _____________________________________ Roll No: ___________________

Other Group Members:

No Tests Page Date Marks Signature of

TA

1 Study of Driver Testing Unit 2

2 Study of Driver Vision Screen Tester 6

3 Spot Speed Study 10

4 Moving Observer Method 29

5 Measurement of Travel Time and

Delay for Congested Corridor 39

6 Parking Usage Study 43

7 Intersection Volume Study 49

8 Saturation Flow Measurement 67

9 Intersection Delay Measurement 85

10 License Plate Method of OD Survey 96

11 Gap Acceptance Study of Uncontrolled

Intersection 108

12 Pedestrian Behaviour Study 124

13 Traffic Noise Study 129

14 Road Safety Audit 132

End Semester Exam -

Marks for the lab by TAS (out of 50) : . . . . . . .

Marks for the lab viva/exam by Instructor (out of 50): . . . . . . .

Total marks (out of 100) : . . . . . . .

Signature of the Student Signature of the Instructor

Page 3: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 2 CE 740 Lab Record: Autumn, 2015

1. DRIVER VISION TESTING

Aim:

Equipment:

Theory:

Page 4: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 3 CE 740 Lab Record: Autumn, 2015

Procedure:

Page 5: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 4 CE 740 Lab Record: Autumn, 2015

Observations:

Page 6: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 5 CE 740 Lab Record: Autumn, 2015

Result:

Inference:

Date: Signature of TA

Page 7: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 6 CE 740 Lab Record: Autumn, 2015

2. DRIVER VISION TESTING

Aim:

Equipment:

Theory:

Page 8: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 7 CE 740 Lab Record: Autumn, 2015

Procedure:

Page 9: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 8 CE 740 Lab Record: Autumn, 2015

Observations:

Page 10: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 9 CE 740 Lab Record: Autumn, 2015

Result:

Inference:

Date: Signature of TA

Page 11: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 10 CE 740 Lab Record: Autumn, 2015

3. SPOT SPEED STUDY

Aim:

Equipment:

Theory:

Page 12: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 11 CE 740 Lab Record: Autumn, 2015

Procedure:

Page 13: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 12 CE 740 Lab Record: Autumn, 2015

Observations:

Location: Date:

Name of Road: Trap Length:

Direction: Weather: (Sunny/Rainy/Windy)

Title:

Sl.

No.

Two Wheeler Three Wheeler Car LCV HCV

Time Speed Time Speed Time Speed Time Speed Time Speed

Page 14: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 13 CE 740 Lab Record: Autumn, 2015

Location: Date:

Name of Road: Trap Length:

Direction: Weather: (Sunny/Rainy/Windy)

Title:

Sl.

No.

Two Wheeler Three Wheeler Car LCV HCV

Time Speed Time Speed Time Speed Time Speed Time Speed

Page 15: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 14 CE 740 Lab Record: Autumn, 2015

Location: Date:

Name of Road: Name of Observer:

Direction: Weather: (Sunny/Rainy/Windy)

Title:

Sl.

No.

Two Wheeler Three Wheeler Car LCV HCV

Time Speed Time Speed Time Speed Time Speed Time Speed

Page 16: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 15 CE 740 Lab Record : Autumn, 2015

Analysis:

Title:

Speed

Range

Mid-

Speed

Two Wheeler Three Wheeler Car LCV HCV

Fre

qu

ency

% F

req

uen

cy

Cu

mu

lati

ve

%

Fre

qu

ency

Fre

qu

ency

% F

req

uen

cy

Cu

mu

lati

ve

%

Fre

qu

ency

Fre

qu

ency

% F

req

uen

cy

Cu

mu

lati

ve

%

Fre

qu

ency

Fre

qu

ency

% F

req

uen

cy

Cu

mu

lati

ve

%

Fre

qu

ency

Fre

qu

ency

% F

req

uen

cy

Cu

mu

lati

ve

%

Fre

qu

ency

Page 17: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 16 CE 740 Lab Record : Autumn, 2015

Graph Title:

Page 18: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 17 CE 740 Lab Record : Autumn, 2015

Graph Title:

Page 19: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 18 CE 740 Lab Record : Autumn, 2015

Graph Title:

Page 20: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 19 CE 740 Lab Record : Autumn, 2015

Graph Title:

Page 21: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 20 CE 740 Lab Record : Autumn, 2015

Graph Title:

Page 22: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 21 CE 740 Lab Record : Autumn, 2015

Graph Title:

Page 23: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 22 CE 740 Lab Record : Autumn, 2015

Graph Title:

Page 24: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 23 CE 740 Lab Record : Autumn, 2015

Graph Title:

Page 25: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 24 CE 740 Lab Record : Autumn, 2015

Graph Title:

Page 26: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 25 CE 740 Lab Record : Autumn, 2015

Graph Title:

Page 27: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 26 CE 740 Lab Record : Autumn, 2015

Graph Title:

Page 28: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 27 CE 740 Lab Record : Autumn, 2015

Sample Calculations:

Vehicle Class: ___________

1. Mean =

2. Mode =

3. 15th

Percentile Speed =

4. 85th

Percentile Speed =

5. 95th

Percentile Speed =

6. Standard deviation =

7. Standard Error of Mean =

8. Required Sample Size (for 95% Confidence Level)=

Page 29: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 28 CE 740 Lab Record : Autumn, 2015

Result:

Two

Wheeler

Three

Wheeler Car LCV HCV

Mean

(kmph)

Median

(kmph)

15th

Percentile

Speed

85th

Percentile

Speed

95th

Percentile

Speed

Standard

Error of

Mean

Sample Size

Required

(95%

confidence

level)

Inference:

Date: Signature of TA

Page 30: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 29 CE 740 Lab Record : Autumn, 2015

4. MOVING OBSERVER METHOD

Aim:

Equipment:

Theory:

Page 31: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 30 CE 740 Lab Record : Autumn, 2015

Procedure:

Page 32: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 31 CE 740 Lab Record : Autumn, 2015

Observations:

Moving Observer Method Datasheet

Location: Date:

Name of Road: Name of Observer:

Direction: Weather: (Sunny/Rainy/Windy)

Sl.

No.

ma mo mp ta tw

2W 3W Car LCV HCV 2W 3W Car LCV HCV 2W 3W Car LCV HCV

Page 33: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 32 CE 740 Lab Record : Autumn, 2015

Location: Date:

Name of Road: Name of Observer:

Direction: Weather: (Sunny/Rainy/Windy)

Sl.

No.

ma mo mp ta tw

2W 3W Car LCV HCV 2W 3W Car LCV HCV 2W 3W Car LCV HCV

Page 34: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 33 CE 740 Lab Record : Autumn, 2015

Calculations:

Vehicle Class 2W 3W Car LCV HCV

PCU

Direction:

Sample

No. ma mo mp ma = (mo − mo) ta tw q v k

Direction:

Sample

No. ma mo mp ma = (mo − mo) ta tw q v k

Page 35: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 34 CE 740 Lab Record : Autumn, 2015

Graph Title:

Page 36: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 35 CE 740 Lab Record : Autumn, 2015

Graph Title:

Page 37: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 36 CE 740 Lab Record : Autumn, 2015

Sample Calculation:

Calibration of Greenshield’s Model:

a) Direction:

Page 38: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 37 CE 740 Lab Record : Autumn, 2015

b) Direction:

Page 39: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 38 CE 740 Lab Record : Autumn, 2015

Results:

Direction Jam Density, kj Free Flow Speed, vf Maximum Flow, Qmax

Inference:

Page 40: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 39 CE 740 Lab Record : Autumn, 2015

Date: Signature of TA

5. MEASUREMENT OF TRAVEL TIME AND

DELAY FOR CONGESTED CORRIDOR

Aim:

Equipment:

Theory:

Procedure:

Page 41: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 40 CE 740 Lab Record : Autumn, 2015

Calculations:

Page 42: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 41 CE 740 Lab Record : Autumn, 2015

Observations:

Travel Time and Delay Measurement Study for a corridor

Location: Date:

Name of Road: Name of Observer:

Length of Road

stretch:

Weather: (Sunny/Rainy/Windy)

Starting Point: End Point:

Starting Time: End Time:

No. of stop Duration (sec) Cause (code) Type of Intersection (M/N)

Codes:

TS: Traffic Signal P: Parking LT: Left Turn UC: Uncontrolled Intersection

PC: Pedestrian IN: Incident B: Bus stop C: Congestion

O: Other M: Major N: Normal

Page 43: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 42 CE 740 Lab Record : Autumn, 2015

Result:

Sl. No.

1. Total delay

2. Delay due to Traffic Signals

3. Congestion Delay

4. Travel Time

5. Average Speed

6. Running Speed

7. LOS (HCM 2000)

Inference:

Date: Signature of TA

Page 44: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 43 CE 740 Lab Record : Autumn, 2015

6. PARKING USAGE STUDY

Aim:

Equipment:

Theory:

Page 45: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 44 CE 740 Lab Record : Autumn, 2015

Procedure:

Sketch of Study Area:

Page 46: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 45 CE 740 Lab Record : Autumn, 2015

Observations:

Data Sheet for Parking Usage Study

Location: Date:

Time: Name of Observer:

Type of Parking: Weather: (Sunny/Rainy/Windy)

Type of Vehicles

Parked:

Frequency of Patrol:

Bay

No.

Registration Number of Vehicles Parked at the Time of Patrol

Page 47: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 46 CE 740 Lab Record : Autumn, 2015

Calculations:

Page 48: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 47 CE 740 Lab Record : Autumn, 2015

Graph Title:

Page 49: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 48 CE 740 Lab Record : Autumn, 2015

Result:

1. Parking Volume =

2. Parking Load =

3. Parking Index =

4. Parking Turnover =

5. Average Occupancy =

Inference:

Date: Signature of TA

Page 50: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 49 CE 740 Lab Record : Autumn, 2015

7. INTERSECTION VOLUME STUDY

Aim:

Equipment:

Theory:

Procedure:

Page 51: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 50 CE 740 Lab Record : Autumn, 2015

Sketch of Study Area:

Page 52: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 51 CE 740 Lab Record : Autumn, 2015

Observations:

Name of Intersection: Date:

Name of Approach: Name of Observer:

Direction: Weather: (Sunny/Rainy/Windy)

Time Two Wheeler Three Wheeler Car LCV HCV

From To

Page 53: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 52 CE 740 Lab Record : Autumn, 2015

Time Two Wheeler Three Wheeler Car LCV HCV

From To

Page 54: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 53 CE 740 Lab Record : Autumn, 2015

Time Two Wheeler Three Wheeler Car LCV HCV

From To

Page 55: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 54 CE 740 Lab Record : Autumn, 2015

Name of Intersection: Date:

Name of Approach: Name of Observer:

Direction: Weather: (Sunny/Rainy/Windy)

Time Two Wheeler Three Wheeler Car LCV HCV

From To

Page 56: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 55 CE 740 Lab Record : Autumn, 2015

Time Two Wheeler Three Wheeler Car LCV HCV

From To

Page 57: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 56 CE 740 Lab Record : Autumn, 2015

Time Two Wheeler Three Wheeler Car LCV HCV

From To

Page 58: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 57 CE 740 Lab Record : Autumn, 2015

Name of Intersection: Date:

Name of Approach: Name of Observer:

Direction: Weather: (Sunny/Rainy/Windy)

Time Two Wheeler Three Wheeler Car LCV HCV

From To

Page 59: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 58 CE 740 Lab Record : Autumn, 2015

Time Two Wheeler Three Wheeler Car LCV HCV

From To

Page 60: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 59 CE 740 Lab Record : Autumn, 2015

Time Two Wheeler Three Wheeler Car LCV HCV

From To

Page 61: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 60 CE 740 Lab Record : Autumn, 2015

Observation Table for PCU Estimation:

Title: Clearance Time in seconds for Various Vehicles Types

Sl. No. Two

Wheeler

Three

Wheeler Car LCV HCV

1

2

3

4

5

Average Clearance

Time

Average Area 1.2 4.48 5.39 12.81 17.62

PCU

Calculations:

a) Sample Calculations for PCU Estimation:

b) PHF Estimation:

Time Interval Volume Hourly Volume PHF Calculations

From To

Peak Volume for ____ min

Interval, Vn =

Peak Volume in 1 Hour, V60 =

Number of intervals in I hour,

n =

PHF =

Page 62: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 61 CE 740 Lab Record : Autumn, 2015

Traffic Volume for the Selected Approach:

Location: Date:

Name of Intersection: Name of Observer:

Name of Approach: Weather: (Sunny/Rainy/Windy)

Direction:

Time Two Wheeler Three Wheeler Car LCV HCV Total PCU

From To

Page 63: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 62 CE 740 Lab Record : Autumn, 2015

Direction:

Time Two Wheeler Three Wheeler Car LCV HCV Total PCU

From To

Page 64: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 63 CE 740 Lab Record : Autumn, 2015

Direction:

Time Two Wheeler Three Wheeler Car LCV HCV Total PCU

From To

Page 65: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 64 CE 740 Lab Record : Autumn, 2015

Traffic Volume on the Observed Intersection in PCU:

Volume in Each Direction Total

Intersection

Volume Time

From To Left Straight Right Left Straight Right Left Straight Right Left Straight Right

Page 66: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 65 CE 740 Lab Record : Autumn, 2015

Graph Title:

Page 67: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 66 CE 740 Lab Record : Autumn, 2015

Result:

Inference:

Date: Signature of TA

Page 68: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 67 CE 740 Lab Record : Autumn, 2015

8. SATURATION FLOW MEASUREMENT

Aim:

Equipment:

Theory:

Page 69: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 68 CE 740 Lab Record : Autumn, 2015

Procedure:

Page 70: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 69 CE 740 Lab Record : Autumn, 2015

Observations:

1. Saturation Flow by HCM Method:

Name of Intersection: Date:

Name of Approach: Name of Observer:

Direction: Weather: (Sunny/Rainy/Windy)

Cycle

Time

Two

Wheeler

Three

Wheeler Car HCV LCV

Time

when

4th

vehicle

crosses

Time

when

8th

vehicle

crosses

Time

when

last

vehicle

crosses

1

2

3

4

Page 71: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 70 CE 740 Lab Record : Autumn, 2015

5

6

7

8

9

10

Page 72: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 71 CE 740 Lab Record : Autumn, 2015

2. Saturation Flow by TRL Method:

Name of Intersection: Date:

Name of Approach: Name of Observer:

Direction: Weather: (Sunny/Rainy/Windy)

Cycle

No.

Time (sec) 2W 3W Car LCV HCV

From To

Page 73: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 72 CE 740 Lab Record : Autumn, 2015

Cycle

No.

Time (sec) 2W 3W Car LCV HCV

From To

Page 74: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 73 CE 740 Lab Record : Autumn, 2015

Cycle

No.

Time (sec) 2W 3W Car LCV HCV

From To

Page 75: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 74 CE 740 Lab Record : Autumn, 2015

Cycle

No.

Time (sec) 2W 3W Car LCV HCV

From To

Page 76: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 75 CE 740 Lab Record : Autumn, 2015

Cycle

No.

Time (sec) 2W 3W Car LCV HCV

From To

Page 77: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 76 CE 740 Lab Record : Autumn, 2015

Cycle

No.

Time (sec) 2W 3W Car LCV HCV

From To

Page 78: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 77 CE 740 Lab Record : Autumn, 2015

Cycle

No.

Time (sec) 2W 3W Car LCV HCV

From To

Page 79: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 78 CE 740 Lab Record : Autumn, 2015

Cycle

No.

Time (sec) 2W 3W Car LCV HCV

From To

Page 80: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 79 CE 740 Lab Record : Autumn, 2015

Cycle

No.

Time (sec) 2W 3W Car LCV HCV

From To

Page 81: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 80 CE 740 Lab Record : Autumn, 2015

Cycle

No.

Time (sec) 2W 3W Car LCV HCV

From To

Page 82: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 81 CE 740 Lab Record : Autumn, 2015

Sample Calculations:

1. HCM 2010 Method:

2. TRL Method:

Page 83: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 82 CE 740 Lab Record : Autumn, 2015

Analysis:

Title: Average Flow Values (TRL Method)

Time (sec) 2W 3W Car LCV HCV PCU

From To

Page 84: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 83 CE 740 Lab Record : Autumn, 2015

Graph Title:

Page 85: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 84 CE 740 Lab Record : Autumn, 2015

Results:

1. HCM 2010 Method:

2. TRL Method:

Inference:

Date: Signature of TA

Page 86: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 85 CE 740 Lab Record : Autumn, 2015

9. INTERSECTION DELAY MEASUREMENT

Aim:

Equipment:

Theory:

Procedure:

Page 87: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 86 CE 740 Lab Record : Autumn, 2015

Observations:

Site Information General Information

Name of Intersection: Date:

Name of Approach: Name of Observer:

Initial Input parameters

Number of Lanes Cycle length

Free-Flow Speed(km/h) Survey Count Interval(s)

Title:

Time Cycle

No.

Number of vehicles stopped in the approach Number of

stopped

vehicles

Number

of non-

stopped

vehicles

Count Interval

1 2 3 4 5 6 7 8 9 10

Page 88: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 87 CE 740 Lab Record : Autumn, 2015

Title:

Time Cycle

No.

Number of vehicles stopped in the approach Number of

stopped

vehicles

Number

of non-

stopped

vehicles

Count Interval

1 2 3 4 5 6 7 8 9 10

Computation

Total vehicle in queue: Fraction of vehicle stopping:

Time in queue: Acc./Dece. Correction delay:

No. of vehicle stopping per lane per cycle: Control delay/ vehicle for

approach

Acc./Dece. Correction Factor:

Page 89: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 88 CE 740 Lab Record : Autumn, 2015

Observations:

Site Information General Information

Name of Intersection: Date:

Name of Approach: Name of Observer:

Initial Input parameters

Number of Lanes Cycle length

Free-Flow Speed(km/h) Survey Count Interval(s)

Title:

Time Cycle

No.

Number of vehicles stopped in the approach Number of

stopped

vehicles

Number

of non-

stopped

vehicles

Count Interval

1 2 3 4 5 6 7 8 9 10

Page 90: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 89 CE 740 Lab Record : Autumn, 2015

Title:

Time Cycle

No.

Number of vehicles stopped in the approach Number of

stopped

vehicles

Number

of non-

stopped

vehicles

Count Interval

1 2 3 4 5 6 7 8 9 10

Computation

Total vehicle in queue: Fraction of vehicle stopping:

Time in queue: Acc./Dece. Correction delay:

No. of vehicle stopping per lane per cycle: Control delay/ vehicle for

approach

Acc./Dece. Correction Factor:

Page 91: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 90 CE 740 Lab Record : Autumn, 2015

Observations:

Site Information General Information

Name of Intersection: Date:

Name of Approach: Name of Observer:

Initial Input parameters

Number of Lanes Cycle length

Free-Flow Speed(km/h) Survey Count Interval(s)

Title:

Time Cycle

No.

Number of vehicles stopped in the approach Number of

stopped

vehicles

Number

of non-

stopped

vehicles

Count Interval

1 2 3 4 5 6 7 8 9 10

Page 92: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 91 CE 740 Lab Record : Autumn, 2015

Title:

Time Cycle

No.

Number of vehicles stopped in the approach Number of

stopped

vehicles

Number

of non-

stopped

vehicles

Count Interval

1 2 3 4 5 6 7 8 9 10

Computation

Total vehicle in queue: Fraction of vehicle stopping:

Time in queue: Acc./Dece. Correction delay:

No. of vehicle stopping per lane per cycle: Control delay/ vehicle for

approach

Acc./Dece. Correction Factor:

Page 93: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 92 CE 740 Lab Record : Autumn, 2015

Observations:

Site Information General Information

Name of Intersection: Date:

Name of Approach: Name of Observer:

Initial Input parameters

Number of Lanes Cycle length

Free-Flow Speed(km/h) Survey Count Interval(s)

Title:

Time Cycle

No.

Number of vehicles stopped in the approach Number of

stopped

vehicles

Number

of non-

stopped

vehicles

Count Interval

1 2 3 4 5 6 7 8 9 10

Page 94: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 93 CE 740 Lab Record : Autumn, 2015

Title:

Time Cycle

No.

Number of vehicles stopped in the approach Number of

stopped

vehicles

Number

of non-

stopped

vehicles

Count Interval

1 2 3 4 5 6 7 8 9 10

Computation

Total vehicle in queue: Fraction of vehicle stopping:

Time in queue: Acc./Dece. Correction delay:

No. of vehicle stopping per lane per cycle: Control delay/ vehicle for

approach

Acc./Dece. Correction Factor:

Page 95: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 94 CE 740 Lab Record : Autumn, 2015

Calculations:

Control Delay as per HCM 2010 for each approach:

Total intersection delay:

Page 96: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 95 CE 740 Lab Record : Autumn, 2015

Result:

Inference:

Date: Signature of TA

Page 97: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 96 CE 740 Lab Record : Autumn, 2015

10. LICENSE PLATE METHOD OF OD SURVEY

Aim:

Equipment:

Theory:

Page 98: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 97 CE 740 Lab Record : Autumn, 2015

Procedure:

Page 99: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 98 CE 740 Lab Record : Autumn, 2015

Sketch of Study Area:

Zone

No. Name

Observations:

Name of Loaction: Date:

Name of Observer: Weather: (Sunny/Rainy/Windy)

Sketch of location:

Page 100: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 99 CE 740 Lab Record : Autumn, 2015

Zone Number: Zone Name:

Direction: Direction:

Time License Plate Number Time License Plate Number

Page 101: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 100 CE 740 Lab Record : Autumn, 2015

Zone Number: Zone Name:

Direction: Direction:

Time License Plate Number Time License Plate Number

Page 102: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 101 CE 740 Lab Record : Autumn, 2015

Zone Number: Zone Name:

Direction: Direction:

Time License Plate Number Time License Plate Number

Page 103: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 102 CE 740 Lab Record : Autumn, 2015

Zone Number: Zone Name:

Direction: Direction:

Time License Plate Number Time License Plate Number

Page 104: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 103 CE 740 Lab Record : Autumn, 2015

Zone Number: Zone Name:

Direction: Direction:

Time License Plate Number Time License Plate Number

Page 105: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 104 CE 740 Lab Record : Autumn, 2015

Zone Number: Zone Name:

Direction: Direction:

Time License Plate Number Time License Plate Number

Page 106: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 105 CE 740 Lab Record : Autumn, 2015

Zone Number: Zone Name:

Direction: Direction:

Time License Plate Number Time License Plate Number

Page 107: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 106 CE 740 Lab Record : Autumn, 2015

Zone Number: Zone Name:

Direction: Direction:

Time License Plate Number Time License Plate Number

Page 108: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 107 CE 740 Lab Record : Autumn, 2015

Result:

OD Matrix of Study Area:

Inference:

Date: Signature of TA

Page 109: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 108 CE 740 Lab Record : Autumn, 2015

11. GAP ACCEPTANCE STUDY AT

UNCONTROLLED INTERSECTION

Aim:

Equipment:

Theory:

Page 110: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 109 CE 740 Lab Record : Autumn, 2015

Procedure:

Page 111: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 110 CE 740 Lab Record : Autumn, 2015

Observations:

Name of Intersection: Date:

Name of Approach: Name of Observer:

Direction: Weather: (Sunny/Rainy/Windy)

Title: Observed Accepted (A) and Rejected (R) gaps in seconds

2W 3W Car LCV HCV

A R A R A R A R A R

Page 112: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 111 CE 740 Lab Record : Autumn, 2015

Calculations:

Vehicle Type:

Range Gap

Number of

Gaps

Accepted

Cumulative

Gaps (<t)

Number of

Gaps

Rejected

Cumulative

Gaps (>t) From To

Critical Gap by Raff’s Method:

Page 113: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 112 CE 740 Lab Record : Autumn, 2015

Vehicle Type:

Range Gap

Number of

Gaps

Accepted

Cumulative

Gaps (<t)

Number of

Gaps

Rejected

Cumulative

Gaps (>t) From To

Critical Gap by Raff’s Method:

Page 114: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 113 CE 740 Lab Record : Autumn, 2015

Vehicle Type:

Range Gap

Number of

Gaps

Accepted

Cumulative

Gaps (<t)

Number of

Gaps

Rejected

Cumulative

Gaps (>t) From To

Critical Gap by Raff’s Method:

Page 115: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 114 CE 740 Lab Record : Autumn, 2015

Vehicle Type:

Range Gap

Number of

Gaps

Accepted

Cumulative

Gaps (<t)

Number of

Gaps

Rejected

Cumulative

Gaps (>t) From To

Critical Gap by Raff’s Method:

Page 116: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 115 CE 740 Lab Record : Autumn, 2015

Vehicle Type:

Range Gap

Number of

Gaps

Accepted

Cumulative

Gaps (<t)

Number of

Gaps

Rejected

Cumulative

Gaps (>t) From To

Critical Gap by Raff’s Method:

Page 117: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 116 CE 740 Lab Record : Autumn, 2015

Vehicle Type: Total Vehicles

Range Gap

Number of

Gaps

Accepted

Cumulative

Gaps (<t)

Number of

Gaps

Rejected

Cumulative

Gaps (>t) From To

Critical Gap by Raff’s Method:

Page 118: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 117 CE 740 Lab Record : Autumn, 2015

Graph Title:

Page 119: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 118 CE 740 Lab Record : Autumn, 2015

Graph Title:

Page 120: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 119 CE 740 Lab Record : Autumn, 2015

Graph Title:

Page 121: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 120 CE 740 Lab Record : Autumn, 2015

Graph Title:

Page 122: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 121 CE 740 Lab Record : Autumn, 2015

Graph Title:

Page 123: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 122 CE 740 Lab Record : Autumn, 2015

Graph Title:

Page 124: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 123 CE 740 Lab Record : Autumn, 2015

Result:

Vehicle Type Critical Gap

Raff’s Method From Graph

Two Wheeler

Three Wheeler

Car

LCV

HCV

Total Vehicles

Inference:

Date: Signature of TA

Page 125: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 124 CE 740 Lab Record : Autumn, 2015

12. PEDESTRIAN BEHAVIOUR STUDY

Aim:

Equipment:

Theory:

Page 126: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 125 CE 740 Lab Record : Autumn, 2015

Procedure:

Page 127: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 126 CE 740 Lab Record : Autumn, 2015

Observations:

Name of Intersection: Date:

Name of Observer: Weather: (Sunny/Rainy/Windy)

Title: Walking Time of Pedestrians (Distance______________)

Group Crossing time in seconds for______________direction

1 2 3 4 5 6

1 person

Group of 3

Group of 5

Above 5

Group Crossing Time in seconds for _____________direction

1 2 3 4 5 6

1 person

Group of 3

Group of 5

Above 5

Title: Pedestrian volume

Time (in

minutes)

Pedestrian Volume

Up Down

10

20

30

40

50

60

Page 128: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 127 CE 740 Lab Record : Autumn, 2015

Graph Title:

Page 129: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 128 CE 740 Lab Record : Autumn, 2015

Sample Calculation:

Result:

Inference:

Page 130: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 129 CE 740 Lab Record : Autumn, 2015

13. TRAFFIC NOISE STUDY

Page 131: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 130 CE 740 Lab Record : Autumn, 2015

Page 132: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 131 CE 740 Lab Record : Autumn, 2015

Date: Signature of TA

Page 133: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 132 CE 740 Lab Record : Autumn, 2015

14. ROAD SAFETY AUDIT

Page 134: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 133 CE 740 Lab Record : Autumn, 2015

Page 135: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 134 CE 740 Lab Record : Autumn, 2015

Date: Signature of TA

Page 136: Traffic Engineering Lab Record · Department of Civil Engineering, IIT Bombay CE 740: Traffic Engineering TRAFFIC ENGINEERING LAB RECORD AUTUMN, 2015

Page | 135 CE 740 Lab Record : Autumn, 2015

References