www.rosenergoatom.ru NPP UNITS DECOMMISSIONING Nikita Konstantinov CEO adviser, ROSENERGOATOM CONCERN JSC ROSENERGOATOM ELECTRIC POWER DIVISION OF ROSATOM

Upload: buinhu

Post on 11-Apr-2018

228 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: NPP UNITS DECOMMISSIONING - 日本コンベンショ … NPP UNIT No. 1 RBMK‐1000 KURSK NPP UNIT No. 2 RBMK‐1000 LENINGRAD NPP UNIT No. 3 RBMK‐1000 LENINGRAD NPP UNIT No. 4 RBMK‐1000

www.rosenergoatom.ru

NPP UNITS DECOMMISSIONING

Nikita Konstantinov

CEO adviser,ROSENERGOATOM CONCERN JSC

ROSENERGOATOMELECTRIC POWER DIVISION OF ROSATOM

Page 2: NPP UNITS DECOMMISSIONING - 日本コンベンショ … NPP UNIT No. 1 RBMK‐1000 KURSK NPP UNIT No. 2 RBMK‐1000 LENINGRAD NPP UNIT No. 3 RBMK‐1000 LENINGRAD NPP UNIT No. 4 RBMK‐1000

www.rosenergoatom.ru

2

Existing NPP units and units and under construction in Russian Federation

Leningrad NPP

Kola NPP

Bilibino NPP

Kalinin NPP

Smolensk NPP

Novovoronezh NPP

Balakovo NPPRostov NPP

Beloyarsk NPP

4 X VVER‐440

Under construction

4 X RBMK‐1000 2 X VVER‐1200

4 X VVER‐1000

3 X RBMK‐1000

Operation

1 X VVER‐1000 1 X VVER‐1200 2 X VVER‐440 1 X VVER‐1200

Decommissioning

2 X VVER (210, 365) 

4 X RBMK‐1000

4 X VVER‐1000

3 X VVER‐1000

1 X VVER‐1000

Shutdown stage

BN 600        BN 8002 X AMB (100, 200)

4 X EGP ‐ 6

In operation: 10 NPPs (34 power units) ‐ 26.3 GWh;2 power units in pilot operation.Over 16% of electricity generated in RussiaUnder construction: 4 large power units and FNPP.

Kursk NPP

Page 3: NPP UNITS DECOMMISSIONING - 日本コンベンショ … NPP UNIT No. 1 RBMK‐1000 KURSK NPP UNIT No. 2 RBMK‐1000 LENINGRAD NPP UNIT No. 3 RBMK‐1000 LENINGRAD NPP UNIT No. 4 RBMK‐1000

www.rosenergoatom.ru

3

2016 ‐ 2 NPP units are shut down, 2 NPP units are being decommissioned

2028 ‐ 13 NPP units are shut down, 4 NPP units are being decommissioned

10 years' readiness for mass‐scale decommissioning of NPP units

Current situation

Page 4: NPP UNITS DECOMMISSIONING - 日本コンベンショ … NPP UNIT No. 1 RBMK‐1000 KURSK NPP UNIT No. 2 RBMK‐1000 LENINGRAD NPP UNIT No. 3 RBMK‐1000 LENINGRAD NPP UNIT No. 4 RBMK‐1000

www.rosenergoatom.ru

4

Planned terms of NPP units shut down

Source:

VVER‐440 EGP‐6 RBMK‐1000 BN‐600

Roadmap as of 06.15.2016, approved by A.M. Lokshin

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

NOVOVORONEZH NPP UNIT No. 3  VVER‐440

LENINGRAD NPP UNIT No. 1RBMK‐1000

BILIBINO NPP UNIT No. 1EGP‐6

LENINGRAD NPP UNIT No. 2RBMK‐1000

KURSK NPP UNIT No. 1RBMK‐1000

KURSK NPP UNIT No. 2RBMK‐1000

LENINGRAD NPP UNIT No. 3RBMK‐1000

LENINGRAD NPP UNIT No. 4RBMK‐1000

BELOYARSK NPP UNIT No. 3BN‐600

SMOLENSK NPP UNIT No. 1RBMK‐1000

417 MW TOTAL 

1,012 MW TOTAL

1,000 MW TOTAL

1,036 MW TOTAL

1,000 MW TOTAL

1,000 MW TOTAL

1,600 MW TOTAL

1,000 MW TOTAL2028

BILIBINO NPP UNITS Nos. 2‐4EGP‐6

Page 5: NPP UNITS DECOMMISSIONING - 日本コンベンショ … NPP UNIT No. 1 RBMK‐1000 KURSK NPP UNIT No. 2 RBMK‐1000 LENINGRAD NPP UNIT No. 3 RBMK‐1000 LENINGRAD NPP UNIT No. 4 RBMK‐1000

www.rosenergoatom.ru

5

≈ 15 years

≈ 5 ‐ 10 years

NPP power unit decommissioning options

Repository operationBurial

REMOVAL OF SPENT NUCLEAR FUEL

DECOMMISSIONING

LiquidationConservation under surveillance

PREPARATION FOR DECOMMISSIONING

Preparation for conservation

LiquidationPreparation for liquidation2

Preparation for burial3

1

Final shutdown

A license for DC

OPERATION

A license to  operate the repository

Release from  regulatory control

LIQUIDATION AFTER CONSERVATION UNDER SURVEILLANCE (deferred dismantling)

LIQUIDATION ‐ IMMEDIATE DISMANTLING

BURIAL

≈ 50 years≈ 5 years

≈ 15 years≈ 5 years

≈ 5 years

or

or

Page 6: NPP UNITS DECOMMISSIONING - 日本コンベンショ … NPP UNIT No. 1 RBMK‐1000 KURSK NPP UNIT No. 2 RBMK‐1000 LENINGRAD NPP UNIT No. 3 RBMK‐1000 LENINGRAD NPP UNIT No. 4 RBMK‐1000

www.rosenergoatom.ru

6

Current concept of NPP power unit preparation for decommissioning

▪ Deferred dismantling is determined for the following NPP'sunits*:

– Novovoronezh NPP, Units Nos. 1, 2

– Kola NPP, Units Nos. 1‐4

– Bilibino NPP, all Units

▪ An approach is adopted to multiunit NPP decommissioning,where the first NNP unit, located on the site, isdecommissioned under deferred dismantling option:

– Balakovo NPP, Unit No. 1

– Kalinin NPP, Unit No. 1

– Rostov NPP, Unit No. 1

▪ For all other units, including RBMK, the concept "immediatedismantling" decommissioning option is adopted.

For the majority of NPP units decommissioning is 

determined under "immediate dismantling" strategy 

*Decommissioning programs

Page 7: NPP UNITS DECOMMISSIONING - 日本コンベンショ … NPP UNIT No. 1 RBMK‐1000 KURSK NPP UNIT No. 2 RBMK‐1000 LENINGRAD NPP UNIT No. 3 RBMK‐1000 LENINGRAD NPP UNIT No. 4 RBMK‐1000

www.rosenergoatom.ru

7

Introduction of measures for preparation and decommissioning of NPP units

Bilibino NPP

Novovoronezh NPP

Beloyarsk NPP

Shutdown year Completed / ongoing activities

Unit 1

Unit 2

Leningrad NPP

Unit 1

Unit 2

Unit 1

Unit 2

Unit 1

Unit 2

Unit 3

Unit 4

‐ construction of diesel fuel base stock of 16.0 thousand tons, including self‐contained powersource (2017)‐ construction of a backup diesel‐generator station with the capacity of 8.9 MW (2017)‐ construction of 110/35/6 kV substation and 6 kV VL‐6 "Bilibino 1. NPP ‐ "Dam" (2017)

‐ implementation of comprehensive engineering and radiation survey of unit 1 (2016)‐ developing a set of supporting documents for obtaining a license to operate unit 1 after the finalshut down (2016)‐ development of decommissioning project for units No. 1, 2 for the period of up to 2019 (2019)‐ removal of leaky spent fuel assemblies from unit No. 1 (2018)

‐ Design documentation has been developed‐ works are carried out to prepare for the removal of spent nuclear fuel and for decommissioning(individual decisions)

‐ dismantling works were carried out in unit 1 turbine building‐ surface decontamination of machine pile drainage montejus boxes' equipment is carried out‐ radioactive waste, produced at gasholder accidents' localization, is removed

‐ Decommissioning project is developed‐ 8 turbine units and 1st unit deaerator stack equipment are dismantled‐ 1 and 2 units of Novovoronezh NPP are signed off to Pilot Demonstration Engineering Center fordecommissioning branch‐ decommissioning works are carried out since 2015, after obtaining a decommissioning license

1984

1990

1981

1989

2019

2021

2019

2022

2022

2022

Page 8: NPP UNITS DECOMMISSIONING - 日本コンベンショ … NPP UNIT No. 1 RBMK‐1000 KURSK NPP UNIT No. 2 RBMK‐1000 LENINGRAD NPP UNIT No. 3 RBMK‐1000 LENINGRAD NPP UNIT No. 4 RBMK‐1000

www.rosenergoatom.ru8

Additional financing sources  Decommissioning financingDECOMMISSIONING  RESERVE 

Decommissioning reserve

3.2% Electricity sales revenue 

2

1

Reimbursable funds Commercial activity

Up to 90% of dismantled equipment should be decontaminatedand returned into economic turnover

The amount of reimbursable funds from metal sales equals up to10% of project cost

Mechanisms for decommissioning financing 

Page 9: NPP UNITS DECOMMISSIONING - 日本コンベンショ … NPP UNIT No. 1 RBMK‐1000 KURSK NPP UNIT No. 2 RBMK‐1000 LENINGRAD NPP UNIT No. 3 RBMK‐1000 LENINGRAD NPP UNIT No. 4 RBMK‐1000

www.rosenergoatom.ru

9

NPP Unit Operation

Ensuring minimum cost of NPPs units decommissioning works

• Implementation of "immediate dismantling" strategy  

• Operational configuration• Start of decommissioning works after unit shutdown under individual technical solutions 

• Regulatory framework improvement 

• Rapid removal of spent nuclear fuel