CRONOGRAMA DE ACTIVIDADES

ALTERNATIVA I Construccion de Sala de uso multiple en la I.E.S "JULIO C. TELLO"

ACCIONES ANUAL

U.M.

0 1 2 3 4....7 8 9 10

MESUAL 1 2 3 4 5 6 7 8 9 10 11 12Elabracion de Expediente Técnico Doc. ***

Construccion de las Infraestructuras M2 *** *** ***

impacto ambintal gbl. *** *** ***

Mantenimiento y conservacion **** **** **** **** **** **** ****

ALTERNATIVA II Construccion de Auditorium, cerco perimetrico,ambiente para la direccion, sala

Page 3: Julio C Tello

CONSTRUCCION Y EQUIPAMIENTO DE LA SALA DE USO MULTIPLE EN LA I.E. JULIO C. TELLO, ICA CON MATERIAL NOBLE

ALTERNATIVA UNICA

SIN IMPUESTOS DESCRIPCION HORIZONTE DEL PROYECTO

0 1 2 3 4 5 6 7 8 9 10A. INVERSION 481,365.92 Constr. Infraestruc Fisíca y Equipa 296,787.71 Estudios 24,930.17 Gastos Generales 141,840.78 Supervision 17,807.26B. COSTO DE OPERATIVOS 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 Remuneración Administrativa 2,134.45 18,957.98 18,957.98 18,957.98 18,957.98 18,957.98 18,957.98 18,957.98 18,957.98 18,957.98 18,957.98 Remuneración de Docentes 56,386.55 177,478.99 177,478.99 177,478.99 177,478.99 177,478.99 177,478.99 177,478.99 177,478.99 177,478.99 177,478.99 Remuneración Personal de Limpiez 907.56 10,890.76 10,890.76 10,890.76 10,890.76 10,890.76 10,890.76 10,890.76 10,890.76 10,890.76 10,890.76 Material de Limpieza 126.05 504.20 504.20 504.20 504.20 504.20 504.20 504.20 504.20 504.20 504.20 Material de Escritorio 168.07 504.20 504.20 504.20 504.20 504.20 504.20 504.20 504.20 504.20 504.20 Mantenimiento y Conservación 100.84 100.84 100.84 100.84 100.84 100.84 100.84 100.84 100.84 100.84 100.84

FLUJO DE COSTOS 59,823.53 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97

DESCRIPCION HORIZONTE DEL PROYECTO

10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00 20.00A. INVERSION 481,365.92 Construc. Infraestructura Fisíca 296,787.71 Estudios 24,930.17 Gastos Generales 141,840.78supervision 17,807.26Valor residual -24,068.30B. COSTO DE OPERATIVOS 59,823.53 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 Remuneración Administrativa 2,134.45 18,957.98 18,957.98 18,957.98 18,957.98 18,957.98 18,957.98 18,957.98 18,957.98 18,957.98 18,957.98 Remuneración de Docentes 56,386.55 177,478.99 177,478.99 177,478.99 177,478.99 177,478.99 177,478.99 177,478.99 177,478.99 177,478.99 177,478.99 Remuneración Personal de Limpiez 907.56 10,890.76 10,890.76 10,890.76 10,890.76 10,890.76 10,890.76 10,890.76 10,890.76 10,890.76 10,890.76 Material de Limpieza 126.05 504.20 504.20 504.20 504.20 504.20 504.20 504.20 504.20 504.20 504.20 Material de Escritorio 168.07 504.20 504.20 504.20 504.20 504.20 504.20 504.20 504.20 504.20 504.20 Mantenimiento y Conservación 100.84 100.84 100.84 100.84 100.84 100.84 100.84 100.84 100.84 100.84 100.84

FLUJO DE COSTOS 59,823.53 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 184,368.68

Page 4: Julio C Tello

COSTO EN SITUACION CON PROYECTO PARA LOS 20 AÑOS DE DURACIÓN

CON IMPUESTO

DESCRIPCION HORIZONTE DEL PROYECTO

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00A. INVERSION 555,404.24 Construc. Infraestructura Fisíca 350,209.49 Estudios 29,417.60 Gastos Generales 154,764.58supervision 21,012.57B. COSTO DE OPERATIVOS 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 Remuneración Administrativa 2,540.00 22,560.00 22,560.00 22,560.00 22,560.00 22,560.00 22,560.00 22,560.00 22,560.00 22,560.00 22,560.00 Remuneración de Docentes 67,100.00 211,200.00 211,200.00 211,200.00 211,200.00 211,200.00 211,200.00 211,200.00 211,200.00 211,200.00 211,200.00 Remuneración Personal de Limpiez 1,080.00 12,960.00 12,960.00 12,960.00 12,960.00 12,960.00 12,960.00 12,960.00 12,960.00 12,960.00 12,960.00 Material de Limpieza 150.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 Material de Escritorio 200.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 Mantenimiento y Conservación 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00

FLUJO DE COSTOS 555,404.24 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00

DESCRIPCION HORIZONTE DEL PROYECTO

10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00 20.00A. INVERSION 555,404.24 Construc. Infraestructura Fisíca 350,209.49 Estudios 29,417.60 Gastos Generales 154,764.58Supervision 21,012.57 Valor residual -27,770.21B. COSTO DE OPERATIVOS 71,190.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 Remuneración Administrativa 2,540.00 22,560.00 22,560.00 22,560.00 22,560.00 22,560.00 22,560.00 22,560.00 22,560.00 22,560.00 22,560.00 Remuneración de Docentes 67,100.00 211,200.00 211,200.00 211,200.00 211,200.00 211,200.00 211,200.00 211,200.00 211,200.00 211,200.00 211,200.00 Remuneración Personal de Limpiez 1,080.00 12,960.00 12,960.00 12,960.00 12,960.00 12,960.00 12,960.00 12,960.00 12,960.00 12,960.00 12,960.00 Material de Limpieza 150.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 Material de Escritorio 200.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 Mantenimiento y Conservación 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00

FLUJO DE COSTOS 71,190.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 220,269.79

Page 5: Julio C Tello

COSTO EN SITUACION SIN PROYECTO PARA LOS 20 AÑOS DE DURACIÓN

SIN IMPUESTO

DESCRIPCIONHORIZONTE DEL PROYECTO

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00A. INVERSION 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

B. COSTO DE OPERATIVOS 59,823.53 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 Remuneración Administrativa 2,134.45 18,957.98 18,957.98 18,957.98 18,957.98 18,957.98 18,957.98 18,957.98 18,957.98 18,957.98 18,957.98 Remuneración de Docentes 56,386.55 177,478.99 177,478.99 177,478.99 177,478.99 177,478.99 177,478.99 177,478.99 177,478.99 177,478.99 177,478.99 Remuneración Personal de Limpiez 907.56 10,890.76 10,890.76 10,890.76 10,890.76 10,890.76 10,890.76 10,890.76 10,890.76 10,890.76 10,890.76 Material de Limpieza 126.05 504.20 504.20 504.20 504.20 504.20 504.20 504.20 504.20 504.20 504.20 Material de Escritorio 168.07 504.20 504.20 504.20 504.20 504.20 504.20 504.20 504.20 504.20 504.20 Mantenimiento y Conservación 100.84 100.84 100.84 100.84 100.84 100.84 100.84 100.84 100.84 100.84 100.84

FLUJO DE COSTOS SIN PROY 0.00 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97

DESCRIPCION HORIZONTE DEL PROYECTO

10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00 20.00A. INVERSION 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

B. COSTO DE OPERATIVOS 59,823.53 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 Remuneración Administrativa 2,134.45 18,957.98 18,957.98 18,957.98 18,957.98 18,957.98 18,957.98 18,957.98 18,957.98 18,957.98 18,957.98 Remuneración de Docentes 56,386.55 177,478.99 177,478.99 177,478.99 177,478.99 177,478.99 177,478.99 177,478.99 177,478.99 177,478.99 177,478.99 Remuneración Personal de Limpiez 907.56 10,890.76 10,890.76 10,890.76 10,890.76 10,890.76 10,890.76 10,890.76 10,890.76 10,890.76 10,890.76 Material de Limpieza 126.05 504.20 504.20 504.20 504.20 504.20 504.20 504.20 504.20 504.20 504.20 Material de Escritorio 168.07 504.20 504.20 504.20 504.20 504.20 504.20 504.20 504.20 504.20 504.20 Mantenimiento y Conservación 100.84 100.84 100.84 100.84 100.84 100.84 100.84 100.84 100.84 100.84 100.84

FLUJO DE COSTOS SIN PROY 59,823.53 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97

Page 6: Julio C Tello

COSTO EN SITUACION SIN PROYECTO PARA LOS 20 AÑOS DE DURACIÓN CON IMPUESTO

DESCRIPCION HORIZONTE DEL PROYECTO

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00A. INVERSION 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

B. COSTO DE OPERATIVOS 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 Remuneración Administrativa 2,540.00 22,560.00 22,560.00 22,560.00 22,560.00 22,560.00 22,560.00 22,560.00 22,560.00 22,560.00 22,560.00 Remuneración de Docentes 67,100.00 211,200.00 211,200.00 211,200.00 211,200.00 211,200.00 211,200.00 211,200.00 211,200.00 211,200.00 211,200.00 Remuneración Personal de Limpiez 1,080.00 12,960.00 12,960.00 12,960.00 12,960.00 12,960.00 12,960.00 12,960.00 12,960.00 12,960.00 12,960.00 Material de Limpieza 150.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 Material de Escritorio 200.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 Mantenimiento y Conservación 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00

FLUJO DE COSTOS SIN PROY 71,190.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00

DESCRIPCION HORIZONTE DEL PROYECTO

10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00 20.00A. INVERSION 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

B. COSTO DE OPERATIVOS 71,190.00 247,640.00 247,640.00 247,640.00 247,640.00 247,640.00 247,640.00 247,640.00 247,640.00 247,640.00 247,640.00 Remuneración Administrativa 2,540.00 22,560.00 22,560.00 22,560.00 22,560.00 22,560.00 22,560.00 22,560.00 22,560.00 22,560.00 22,560.00 Remuneración de Docentes 67,100.00 211,200.00 211,200.00 211,200.00 211,200.00 211,200.00 211,200.00 211,200.00 211,200.00 211,200.00 211,200.00 Remuneración Personal de Limpiez 1,080.00 12,960.00 12,960.00 12,960.00 12,960.00 12,960.00 12,960.00 12,960.00 12,960.00 12,960.00 12,960.00 Material de Limpieza 150.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 Material de Escritorio 200.00 200.00 200.00 200.00 200.00 200.00 200.00 200.00 200.00 200.00 200.00 Mantenimiento y Conservación 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00

FLUJO DE COSTOS SIN PROY 71,190.00 247,640.00 247,640.00 247,640.00 247,640.00 247,640.00 247,640.00 247,640.00 247,640.00 247,640.00 247,640.00

Page 7: Julio C Tello

FLUJO NETO INCREMENTAL

DESCRIPCION HORIZONTE DEL PROYECTO

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00SIN IMPUESTO 59,823.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00CON IMPUESTO 484,214.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

DESCRIPCION HORIZONTE DEL PROYECTO

10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00 20.00SIN IMPUESTO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -24,068.30CON IMPUESTO 0.00 400.00 400.00 400.00 400.00 400.00 400.00 400.00 400.00 400.00 -27,370.21

ANALISIS DEL VACT AL 12%

DESCRIPCION HORIZONTE DEL PROYECTO

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00SIN IMPUESTO 59,823.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00CON IMPUESTO 484,214.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

DESCRIPCION HORIZONTE DEL PROYECTO

10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00 20.00SIN IMPUESTO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -2,495.08CON IMPUESTO 0.00 114.99 102.67 91.67 81.85 73.08 65.25 58.26 52.02 46.44 -2,837.38

VACT VACT2 AL 11%SIN IMPUESTO 57,328.45CON IMPUESTO 482,063.08

ANALSIS DEL VAE AL 11%

VAE AL 11% -1.00VAE = VACT x 1 - (1+Cok)^ -n

Cok

VAE(Coef) = 0.13VALOR ACTUAL ECONOMICOSIN IMPUESTO 7,199.06CON IMPUESTO 60,535.38

Page 8: Julio C Tello

ANEXOSANALISIS DE SENCIBILIDADSI LA INVERSION INCREMENTA AL 20%FLUJO NETO INCREMENTAL

DESCRIPCION HORIZONTE DEL PROYECTO

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00SIN IMPUESTO 71,788.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00CON IMPUESTO 581,057.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

DESCRIPCION HORIZONTE DEL PROYECTO

10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00 20.00SIN IMPUESTO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -24,068.30CON IMPUESTO 0.00 400.00 400.00 400.00 400.00 400.00 400.00 400.00 400.00 400.00 -27,370.21

ANALISIS DEL VACT AL 11%

DESCRIPCION HORIZONTE DEL PROYECTO

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00SIN IMPUESTO 71,788.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00CON IMPUESTO 581,057.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

DESCRIPCION HORIZONTE DEL PROYECTO

10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00 20.00SIN IMPUESTO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -2,495.08CON IMPUESTO 0.00 114.99 102.67 91.67 81.85 73.08 65.25 58.26 52.02 46.44 -2,837.38

VACT VACT2 AL 11%SIN IMPUESTO 69,293.15

CON IMPUESTO 578,905.93

ANALSIS DEL VAE AL 11%

VAE AL 11% -1.00VAE = VACT x 1 - (1+Cok)^ -n

Cok

VAE(Coef) = 0.13

VALOR ACTUAL ECONOMICOSIN IMPUESTO 8,701.53

CON IMPUESTO 72,696.48

Page 9: Julio C Tello
Page 10: Julio C Tello

SI LA INVERSION SE INCREMENTA AL 10% Y LOS BENEF SE REDUCEN AL 10%FLUJO NETO INCREMENTAL

DESCRIPCION HORIZONTE DEL PROYECTO

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00SIN IMPUESTO 65,805.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00CON IMPUESTO 532,635.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

DESCRIPCION HORIZONTE DEL PROYECTO

10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00 20.00SIN IMPUESTO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -24,068.30CON IMPUESTO 0.00 400.00 400.00 400.00 400.00 400.00 400.00 400.00 400.00 400.00 -27,370.21

ANALISIS DEL VACT AL 11%

DESCRIPCION HORIZONTE DEL PROYECTO

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00SIN IMPUESTO 65,805.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00CON IMPUESTO 532,635.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

DESCRIPCION HORIZONTE DEL PROYECTO

10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00 20.00SIN IMPUESTO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -2,495.08CON IMPUESTO 0.00 114.99 102.67 91.67 81.85 73.08 65.25 58.26 52.02 46.44 -2,837.38

VACT VACT2 AL 11%SIN IMPUESTO 63,310.80

CON IMPUESTO 530,484.50

ANALSIS DEL VAE AL 14%

VAE AL 11% -1.00VAE = VACT x 1 - (1+Cok)^ -n

Cok

VAE(Coef) = 0.13

VALOR ACTUAL ECONOMICOSIN IMPUESTO 7,950.29

CON IMPUESTO 66,615.93

Page 11: Julio C Tello

318158.61 269625.9407

Page 12: Julio C Tello
Page 13: Julio C Tello
Page 14: Julio C Tello
Page 15: Julio C Tello
Page 16: Julio C Tello
Page 17: Julio C Tello
Page 18: Julio C Tello
Page 19: Julio C Tello

Presupuesto

ClienteCOLEGIO JULIO C. TELLO Costo12/2010

Lugar ICA - ICA - ICA

Item Descripción Und. Metr Pre S/. Parcial S/.CONSTRUCCION DE UNA SALA DE USO MULTIPLE

01 TRABAJOS PROVISIONALES 800.00

01.01 INSTALACION DE OFICINA Y ALMACEN glb 1.00 800.00 800.00

02 TRABAJOS PRELIMINARES 2,318.49

02.01 LIMPIEZA MANUAL DE TERRENO m2 515.22 2.58 1,329.27

02.02 TRAZO Y REPLANTEO PRELIMINAR SALA USO Mm2 515.22 1.92 989.22

03 MOVIMIENTO DE TIERRAS ###

03.01 CORTE SUPERFICIAL HASTA H=0.10 ML m2 351.21 2.56 899.10

03.01 EXCAVACION PARA CIMIENTO HASTA 1 M TERR m2 141.71 20.40 2,890.88

03.02 ACARREO DE MATERIAL EXCEDENTE HASTA D m3 141.71 17.07 2,418.99

03.03 RELLENO CON MATERIAL PROPIO m3 43.75 12.20 533.75

03.04 REFINE, NIVELACION Y COMPACTACION m2 590.20 1.79 1,056.46

03.05 ELIMINACION DE DESMONTE A MAQUINA 20% m3 170.05 13.99 2,379.00

04 CONCRETO SIMPLE ###

04.01 CONCRETO CICLOPEO 1:10+30 PG m3 196.81 133.99 ###

04.02 SOLADO PARA ZAPATAS E = 4" m2 45.23 21.12 955.26

05 CONCRETO ARMADO ###

05.01 CONCRETO PARA ZAPATAS f'c=210 kg/cm2 m3 22.62 262.76 5,943.63

05.02 ZAPATAS ACERO Fy= 210 kg/cm2 fierro de 1/2 m3 674.68 4.33 2,921.36

05.03 CONCRETO VIGAS DE CIMENTACION Fc=210 k m3 10.33 255.86 2,643.03

05.04 ENCOFRADO Y DESENCOFRADO DE VIGAS DE m2 35.93 40.22 1,445.10

05.05 VIGA DE CIMENTACION ACERO Fy = 4200 kg/ kg ### 4.33 5,642.73

Page 20: Julio C Tello

05.06 CONCRETO SOBRECIMIENTO ARMADO Fy= 210m3 16.52 203.62 3,363.80

05.07 ENCOFRADO Y DESENCOFRADO DE SOBRECIMm2 134.38 30.46 4,093.21

05.08 SOBRECIMIENTO ARMADO ACERO Fy = 4200 kkg 394.00 4.33 1,706.02

05.09 CONCRETO EN COLUMNAS f'y=210 kg/cm2 m3 18.13 335.13 6,075.91

05.10 ENCOFRADO Y DESENCOFRADO DE COLUMNASm2 297.34 38.48 ###

05.11 COLUMNAS ACERO FY= 4200 KG /CM2 kg ### 4.33 ###

05.12 CONCRETO EN VIGAS Fc = 210 kg /cm2 kg 23.07 272.33 6,282.65

05.13 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 160.81 52.52 8,445.74

05.14 VIGA ACERO Fy =4200 kg/cm2 kg ### 4.33 ###

05.15 CONCRETO LOSA ALIGERADO Fc =210 kg/cm2m3 47.63 262.01 ###

05.16 ENCOFRADO Y DESENCOFRADO DE LA LOSA Am2 422.06 41.29 ###

05.17 LOSA ALIGERADO ALERO Fy = 4200 kg/m2 kg ### 4.33 6,437.24

05.18 LADRILLO DE TECHO DE 15X30X30 FABRICA u ### 0.87 2,580.78

06 MURO Y TABIQUES ###

06.01 MUROS DE LADRILLO KK DE FABRICA m2 230.99 89.16 ###

06.02 ACERO DE REFUERZO HORIZONTAL ALAMBRE Nkg 43.75 4.33 189.44

07 REVOQUES Y ENLUCIDOS ###

07.01 TARRAJEO DE MUROS INTERIORES Y EXTERIORm2 486.97 19.68 9,583.57

07.02 TARRAJEO DE VIGAS m2 106.10 19.68 2,088.05

07.03 TARRAJEO DE COLUMNAS m2 116.86 19.68 2,299.80

07.04 DERRAMES ESPESOR DE 15 CM m 19.35 11.21 216.91

07.05 BRUÑAS 1.00 CM m 40.00 6.18 247.20

08 CIELORRASOS ###

08.01 TARRAJEO DE CIELO RASO CON MEZCLA 1:3 m2 679.12 19.68 ###

09 PISOS Y PAVIMENTOS ###

09.01 FALSO PISO E = 4" MEZCLA 1:10 m2 397.70 22.05 8,769.29

Page 21: Julio C Tello

09.02 PISO DE CEMENTO PULIDO SIN COLOREAR E= m2 397.70 4.36 1,733.97

09.03 PISO CERAMICA Y MAYOLICA VENECIANA m2 52.07 43.39 2,259.32

09.04 VEREDA DE CONCRETO E=4" /FRONTAL m2 120.44 46.97 5,657.07

09.05 ENCOFRADO Y DESENCOFRADO DE VEREDAS Em2 30.56 30.46 930.86

09.06 CONTRAPISO E= 40 MM m2 52.07 4.19 218.17

10 ZOCALOS Y CONTRAZOCALOS ###

10.01 CONTRAZOCALO DE CEMENTO SIN COLOREADOm 150.98 30.53 4,609.42

10.02 CONTRAZOCALO DE CEMENTO SIN COLOREAR m 90.64 30.53 2,767.24

10.03 ZOCALO CERAMICA DE 0.20 ML X 0.20 ML m2 79.54 39.42 3,135.47

11 CUBIERTAS ###

11.01 CUBIERTA CON LADRILLO PASTELERA Y MEZCLm2 463.83 41.17 ###

12 CARPINTERIA DE MADERA 1,898.58

12.01 PUERTA DE APANELADO DE MADERA TORNILLOm2 23.94 58.24 1,394.27

12.02 VENTANAS DE MADERA TORNILLO E=11/4" m2 5.40 93.39 504.31

13 CARPINTERIA METALICA 240.01

13.01 VENTANA METALICA CON ACCESORIOS m2 2.57 93.39 240.01

14 CERRAJERIA 681.90

14.01 BISAGRA CAPUCHINA u 36.00 5.44 195.84

14.02 CERRADURA ALPHA PARA PUERTA EXTERIOR u 7.00 46.11 322.77

14.03 CERRADURA DE PERILLA LIVIANA PARA BAÑO u 2.00 39.56 79.12

14.04 MANIJA DE BRONCE PARA PUERTAS u 11.00 3.55 39.05

14.05 MANIJA DE BRONCE PARA PORTAÑUELAS u 12.00 3.76 45.12

15 VIDRIOS, CRISTALES Y SIMILARES 135.74

15.01 VIDRIOS SEMIDOBLE p2 40.64 3.34 135.74

16 PINTURA ###

16.01 PINTURA EN CIELO RASO AL LATEX m2 617.38 6.91 4,266.10

16.02 PINTURA EN MUROS INTERIORES Y EXTERIOREm2 442.70 4.97 2,200.22

Page 22: Julio C Tello

16.03 PINTURA EN COLUMNAS A LATEX m2 100.24 4.79 480.15

16.04 PINTURA EN PUERTAS Y VENTANAS DE MADER m2 96.45 14.01 1,351.26

16.05 PUERTAS APANELADAS DE MADERA TORNILLO m2 23.94 113.07 2,706.90

16.06 VENTANAS DE MADERA TORNILLO E = 11/4" m2 5.40 9.74 52.60

16.07 PINTURA PARA CARPINTERIA METALICA V-1 ( m2 25.68 16.93 434.76

16.08 PINTURA DE CONTRAZOCALO CON ESMALTE SINm 137.25 4.64 636.84

16.09 PINTURA DE CONTRAZOCALO CON ESMALTE SIm 82.40 3.95 325.48

17 APARATOS SANITARIOS Y ACCESORIOS 8,076.64

17.01 INODORO TANQUE BAJO COLOR BLANCO pza 10.00 339.09 3,390.90

17.02 LAVATORIO DE PARED DE COLOR BLANCO pza 8.00 446.08 3,568.64

17.03 ORINARIO DE LOSA BLANCO pza 3.00 230.60 691.80

17.04 PAPELERA DE LOSA BLANCO pza 10.00 33.96 339.60

17.05 DUCHA CROMADA 1 LLAVE INCLUYE ACCESOR u 1.00 85.70 85.70

18 INSTALACIONES SANITARIOS ###

18.01 SALIDA DE DESAGUE PVC SAL ( PROMEDIO) pto 21.00 249.32 5,235.72

18.02 TUBERIAS DESAGUE PVC SAL 4" m 20.00 180.69 3,613.80

18.03 TUBERIA DESAGUE PVC SAL 2" m 50.00 157.35 7,867.50

18.04 SOMBRERO VENTILACION PVC SAL 2" u 10.00 10.20 102.00

18.05 REGISTRO DE BRONCE 4" u 3.00 32.27 96.81

18.06 CAJA DE REGISTRO DE 12" x 24" TAPA DE CO u 2.00 102.35 204.70

19 SISTEMA DE AGUA FRIA 1,816.37

19.01 SALIDA DE AGUA FRIA CON TUBERIAS PVC - SApto 21.00 52.17 1,095.57

19.02 VALVULA COMPUERTA DE BRONCE DE 1/2" pza 8.00 66.35 530.80

19.03 RED DE DISTRIBUCION DE TUBERIA 1/2" PVC m 40.00 4.75 190.00

20 INSTALACIONES ELECTRICAS 2,396.88

20.01 SALIDA PARA CENTRO DE LUZ pto 26.00 56.52 1,469.52

Page 23: Julio C Tello

20.02 SALIDA PARA TOMACORRIENTE PVC pto 16.00 57.96 927.36

21 CANALIZACIONES Y TUBERIAS 414.60

21.01 TUBERIA PVC SAL DE 20 MM PARA CENTRO DEm 60.00 6.91 414.60

22 CONDUCTORES DE TUBERIAS 1,342.00

22.01 ALIMENTADOR TW - 26 MM m 200.00 6.71 1,342.00

23 TABLEROS DE DISTRIBUCION 938.50

23.01 TABLERO GENERAL 2 x 15 A, 2 x 20 A , 2 x 30 u 1.00 213.48 213.48

23.02 INTERRUPTOR THERMOMAGNETICO 2 x 30 A u 3.00 102.98 308.94

23.03 INTERRUPTOR THERMOMAGNETICO 2 x 20 A u 4.00 72.18 288.72

23.04 INTERRUPTOR THERMOMAGNETICO 2 x 15 A u 2.00 63.68 127.36

24 VARIOS 242.88

24.01 JUNTA DE DILATACION CON RC-250 m 66.00 3.68 242.88

25 ARTEFACTOS ELECTRICOS 1,877.98

25.01 ARTEFACTOS PARA ILUMINACION u 26.00 72.23 1,877.98

COSTO DIRECTO DE CONTRUCCION ###

Item Descripción Und. Metr Pre S/. Parcial S/.EQUIPAMIENTO DE SALA DE USO MULTIPLE

02 EQUIPAMIENTO ###

02.01 ESCRITORIO DE OFICINA TIPO "L" UND 1.00 500.00 500.00

02.02 MUEBLE PARA COMPUTADORA UND 1.00 250.00 250.00

03.01 EQUIPO MULTIMEDIA UND 1.00 ### 1,600.00

03.02 ECRANS UND 1.00 500.00 500.00

03.03 SILLON GIRATORIO UND 1.00 210.00 210.00

03.04 GUARDAROPA UND 2.00 300.00 600.00

03.05 SILLAS NEGRAS UND 200.00 115.00 ###

04 EQUIPO DE SONIDO UND 1 2500 2,500.00 COSTO DIRECTO DE EQUIPAMIENTO ###

Page 24: Julio C Tello

RESUMENCOSTO DIRECTO DE CONSTRUCCION Y EQUPAMIENTO 350,209.49 GASTOS GENERALES 35020.9494UTILIDAD 35020.9494SUB TOTAL 420,251.39

ESTUDIOS 29417.60SUPERVISION 21012.57SUB TOTAL DEL PROYECTO 470,681.56 IGV 18% 84,722.68

COSTO TOTAL DEL PROYECTO 555,404.24

Page 25: Julio C Tello
Page 26: Julio C Tello
Page 27: Julio C Tello
Page 28: Julio C Tello
Page 29: Julio C Tello

319750.51

427.892327215362.620616284

Page 30: Julio C Tello
Page 31: Julio C Tello

EVALUACIÓN DE ALTERNATIVAS

ALTERNATIVA I Construccion de SALON DE USO MULTIPLE

con material de Ladrillo en la I.E.S "Julio C. Tello"

Periodo de Diseño: 20 años

Tasa de Descuento anual 11%

Sin Impuetos Con Impuestos

408,528.03 482,063.08

51,301.17 60,535.38

ALTERNATIVA II Construccion de Auditorium, Cerco Perimetrico,Ambiente para la direccion, sala de computo,biblioteca, Laboratorio

COSTO EFECTIVIDADVAC 482,063.08

BENEFICIARIOS 1298

COSTO/EFECTIVIDAD 371

VACT = S/.

VAE = S/.

Page 32: Julio C Tello

ALTERNATIVA 1COSTO DE OPERACION SIN PROYECTO - CON PROYECTO

GASTOS DE OPERACIÓNITEM ACTIVIDAD UNIDAD CANTIDAD COSTO COSTO

UNITARIO PARCIAL TOTAL

1.00 Profesores1.01 NOMBRADOS (PRIMARIA Y SECUNDARIA) UND. 50.00 1100.00 55000.001.02 CONTRATADOS (PRIMARIA Y SECUDARIA) UND. 11.00 1100.00 12100.001.03 67100.00

2.00 Peronal administrativo2.01 DIRECTOR UND. 1.00 2000.00 2000.00

SECRETARIO UND. 1.00 540.00 540.00AUXILIAR DE LABORATORIO UND. 1.00 540.00 540.00AUXILIAR EN EDUCACION UND. 1.00 800.00 800.00PERSONAL DE SERVICIO UND. 2.00 540.00 1080.00

2.02 OTROS.

otros (pago de luz, agua, baja policia , etc.) gbl 1.00 250.00 250.00Material de limpieza gbl. 1.00 150.00 150.00Material de Escritorio gbl 1.00 200.00 200.00 5560.00

COSTO TOTAL. 72660.00

ALTERNATIVA 1COSTO DE MANTENIMIENTO RUTINARIO SIN PROYECTO

GASTOS DE MANTENIMIENTO SIN PROYECTO

ITEM ACTIVIDAD UNIDAD CANTIDAD COSTO COSTO

UNITARIO PARCIAL TOTAL

1.00 MANTENIMIENTO DE INFRAESTRUCTURA1.01 LIMPIEZA GENERAL M2 0.00 0.97 0.001.02 REPARACION DE VIDRIOS P2 0.00 4.19 0.001.03 PINTADO M2 0.00 5.00 0.00 0.00

2.02 OTROS GBL. 0.00 1.00 0.00 0.00COSTO DIRECTO 0.00GASTOS GENERALES (7%) 0.00TOTAL 0.00

COSTOS DE MANTENIMIENTO RUTINARIO

COSTO RUTINARIO CON PROYECTOGASTOS DE MANTENIMIENTO CON PROYECTO

ITEM ACTIVIDAD UNIDAD CANTIDAD COSTO COSTO

UNITARIO PARCIAL TOTAL

1.00 MANTENIMIENTO DE INFRAESTRUCTURA1.01 LIMPIEZA GENERAL M2 515.10 0.97 499.651.02 REPARACION DE VIDRIOS P2 4.07 4.19 17.061.03 PINTADO M2 98.00 5.00 490.00 1006.71

2.02 OTROS GBL. 3000.00 1.00 3000.00 3000.00COSTO DIRECTO 4006.71GASTOS GENERALES (7%) 280.47TOTAL 4287.18

Page 33: Julio C Tello

72060.00

Page 34: Julio C Tello

15.1.2 Costos de inversión de la alternativa seleccionada (a precios sociales) (*)

Principales Rubros

Expediente Técnico 29417.60 0.79 23239.902Costo Directo

Resultado 01 321049.494Insumo de origen nacional 192629.696 0.84 161808.945Insumo de origen importado 0Remuneraciones 128419.798 0.66 84757.0664

Resultado 02 29160Insumo de origen nacional 29160 0.79 23036.4Insumo de origen importado 0Remuneraciones 0 0 0

Supervisión 21012.57 0.9 18911.3127Gastos Generales 154764.58 0.84 130002.247Total 555404.24 441755.873

Costo total a precios

de mercado

Factor de corrección

Costo a precios

sociales