eco refurbishment

15

Upload: monsa-publications

Post on 08-Mar-2016

239 views

Category:

Documents


3 download

DESCRIPTION

ISBN 978-84-96823-85-3 / Layout: 20,3 x 20,5 cm / Pages: 96 / Cover: Softcover / Innovate and reinvent the existing architecture to adapt it to the climate change that is suffering our environment, and solving the problems of living space that generates the movement of people is one of the concerns of the authorities of the planet. The land for construction of new buildings is increasingly scarce and therefore seeks the rehabilitation, renovation or conversion of existing buildings into new and more sustainable, greener, ultimately more environmentally friendly.

TRANSCRIPT

Page 1: ECO REFURBISHMENT
Page 2: ECO REFURBISHMENT
Page 3: ECO REFURBISHMENT

9

ho

rno

De

an

ento

La recuperación del Horno de Anento surge como unimpulso vital de regeneración de este bellomunicipio zaragozano, rico en patrimonio cultural ynatural, proporcionándole una importanteinfraestructura de apoyo a la hostelería y al fuertefomento del turismo en la zona. El edificio se insertaen un casco urbano medieval, en cuyo límite seencontraba un pequeño horno panadero en torno alcual se construyó un cobertizo que posteriormentese ampliaría como club social añadiéndole otraplanta más. La estrategia de intervención actual hatrabajado en dos líneas diferentes, encaminadas agenerar la apertura espacial del edificio existente,hasta ahora encerrado en sí mismo, hacia la bellezadel lugar que lo rodea, y a dignificar el antiguo hornotradicional exhibiéndolo como una pieza deecomuseo viva, todo ello proporcionando una imagenrepresentativa, icónica y contemporánea al conjunto.

Recovery Furnace Anento emerges as a vital boostfor the regeneration of this beautiful city Zaragoza,rich in cultural and natural heritage, providing animportant infrastructure to support the stronghospitality and tourism development in the area. Thebuilding is inserted into a medieval village, in whichlimit was a small bread ovens around which we builta shed which was later expanded as a social club byadding another plant more. The current interventionstrategy has worked in two different lines, designedto generate open space of the existing building, sofar confined itself to the local beauty that surroundsit, and to dignify the old traditional oven displaying itas a piece of eco-museum alive, all providing a re-presentative picture, iconic and contemporary at all.

serg

io s

eb

ast

ián

fra

nc

o y

fe

rna

nd

o m

oz

me

z

project _ proyectoowen refurbishment

rehabilitación hornocollaborators _ colaboradores

natacha fernÁnDeZ ramosmiriam tambo santos

Pablo sebastiÁn franco year _ año2008-2009

area _ superficie250 m2

location _ localizaciónanento, esP

photographs _ fotografías:sergio sebastiÁn

Page 4: ECO REFURBISHMENT

10 HORNO DE ANENTO

Sitemap plan.Plano de situación.

Page 5: ECO REFURBISHMENT

HORNO DE ANENTO 11

Constructive proccess.

Proceso constructivo.

Page 6: ECO REFURBISHMENT

12 HORNO DE ANENTO

This will create large openings in the existingbuilding to the outside, empty double-height spacenext to the furnace, and introducing two pieces thatcontain the essential programs through the initialvolume to melt inside and outside of a clear andresounding . Both pieces are understood as majorviewpoints on the natural and urban landscape.

Para ello se generan grandes aperturas en el edificioexistente hacia el exterior, se vacía un espacio endoble altura junto al horno, y se introducen dos piezasque contendrán los programas fundamentalesatravesando el volumen inicial para fundir interior yexterior de una manera clara y rotunda. Ambas piezasson entendidas como grandes miradores sobre elpaisaje natural y urbano.

Page 7: ECO REFURBISHMENT

HORNO DE ANENTO 13

Main section.Sección general.

Page 8: ECO REFURBISHMENT

14 HORNO DE ANENTO

GROUND FLOOR

0. Oven.1. Bar cafeteria.2. Kitchen.3. Pantry / House.4. Dumbwaiters.5. Salon oven / Activities.6. Patio.7. Cafe lounge / dining room.8. Terrace solana access.9. Toilets.

PLANTA BAJA

0. Horno.1. Bar cafetería.2. Cocina.3. Despensa / Cámara.4. Montaplatos.5. Salón horno / Actividades.6. Patio.7. Salón cibercafé / Comedor.8. Terraza acceso solanar.9. Aseos.

FIRST FLOOR

1. Dining room 1.2. Dining room 2.3. Living room 3.4. Dumbwaiters.5. Cupboard-officio.6. Services.7. Clean.8. Reception.9. Double height.

PLANTA PRIMERA

1. Salón comedor 1.2. Salón comedor 2.3. Salón comedor 3.4. Montaplatos.5. Alacena-oficio.6. Servicios.7. Limpieza.8. Recepción.9. Doble altura.

Page 9: ECO REFURBISHMENT

HORNO DE ANENTO 15

B. OPENINg SPACE

B. APERTuRA ESPACIAL

VOL2. RESTAuRANTLevel 1 / 75m2

VOL2. RESTAuRANTEPlanta 1 / 75m2

C. DRILLINg WITh NEW VOLumES.

C. PERFORACIÓN CON NuEVOS VOLÚmENES

VOL1. BAR-COFFEELevel 0 / 20m2

VOL1. BAR-CAFETERÍAPlanta 0 / 20m2

A. INITIAL

1. Enclosed courtyard.2. Rambla.3. Volume expanded.4. Original volume.5. Water tank.

A. ESTADO INICIAL

1. Patio cerrado.2. Rambla.3. Volumen ampliado.4. Volumen original.5. Depósito de agua.

1

2

4

5

3

Page 10: ECO REFURBISHMENT

16 HORNO DE ANENTO

Restaurant section.

Sección restaurante.

Page 11: ECO REFURBISHMENT

Stair section.

Sección escalera.

Page 12: ECO REFURBISHMENT

18 HORNO DE ANENTO

GROUND FLOOR

WINTER spatial structure.

PLANTA BAJA

estructura espacial_ INVIERNO.

INTERIOR SPACE BAR CAFETERIA.

ESPACIO BAR CAFETERIA INTERIOR.

OUTER SPACE BAR CAFETERIA.

ESPACIO BAR CAFETERIA EXTERIOR.

Page 13: ECO REFURBISHMENT

HORNO DE ANENTO 19

GROUND FLOOR

SUMMER spatial structure.

PLANTA BAJA

estructura espacial_ VERANO.

INTERIOR SPACE BAR CAFETERIA.

ESPACIO BAR CAFETERIA INTERIOR.

OUTER SPACE BAR CAFETERIA.

ESPACIO BAR CAFETERIA EXTERIOR.

Page 14: ECO REFURBISHMENT

20 HORNO DE ANENTO

Page 15: ECO REFURBISHMENT

HORNO DE ANENTO 21

La primera contiene el bar y la entrada principal y serealiza íntegramente en piedra negra de Calatorao.La segunda atraviesa el edificio en dirección este-oeste en la planta primera, y se realiza en maderade iroko en el exterior generando una fachada ycubierta ventiladas, y de bambú en el interior en uncurioso sistema flotante de pavimento queaprovecha todo el calor que genera el hornoconduciéndolo por la cámara que envuelve lacarcasa interna de bambú proporcionando unagradable y homogéneo sistema de calefacción de lagran sala del restaurante. Ambas buscan generar unespacio que envuelva al visitante enriqueciendo lassensaciones que proporciona el lugar y de acuerdoal uso que en cada una de ellas se plantea.El concepto de apertura espacial promueve a su vezla dignificación del antiguo horno como corazón ynúcleo del edificio, desarrollando la sección en unespacio en doble altura en torno al cual gira todo, yal cual abre a su vez una tercera entrada desde lacalle trasera hacia una liviana escalera de vidrioque lo envuelve y que da acceso al comedor en laplanta superior.

The first contains the bar and the main entrance andis made entirely of black stone Calatorao. Thesecond through the building in an east-west on thefirst floor, and is made of iroko wood on the outsidecreating a ventilated façade and roof, and bambooindoors in a strange floating floor system that takesall the heat generated by driving through the ovenchamber surrounding the inner shell bambooproviding a pleasant and uniform heating of thegreat hall of the restaurant. Both seek to create aspace that involves enriching the visitor the feelingthat gives the place and according to the use towhich each arises. The concept of open space in turnpromotes the dignity of the old furnace as the heartand core of the building, developing the section on adouble-height space around which everythingrevolves, and which in turn opens third streetentrance step back into a glass light that envelopsand gives access to the dining room on the top floor.