ray fassett adsc wcc past president condon-johnson & assoc. inc west coast chapter

17
IMPORTANT ITEMS OF SECTION 49-3: CAST-IN-PLACE CONCRETE PILING (And How the ADSC WCC and Caltrans has worked together to improve these Specifications!) Ray Fassett ADSC WCC PAST PRESIDENT Condon-Johnson & Assoc. Inc WEST COAST CHAPTER

Upload: imogen-garrett

Post on 01-Jan-2016

217 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Ray Fassett ADSC WCC PAST PRESIDENT Condon-Johnson & Assoc. Inc WEST COAST CHAPTER

IMPORTANT ITEMS OF SECTION 49-3: CAST-IN-PLACE CONCRETE PILING(And How the ADSC WCC and Caltrans has worked together to improve these

Specifications!)

Ray Fassett

ADSC WCC PAST PRESIDENT

Condon-Johnson & Assoc. Inc

WEST COAST CHAPTER

Page 2: Ray Fassett ADSC WCC PAST PRESIDENT Condon-Johnson & Assoc. Inc WEST COAST CHAPTER

WEST COAST CHAPTER

For Your Information:• 49-3.02 CAST-IN-DRILLED-HOLE (CIDH) PILE

– Caltrans is the only DOT that uses this description for a Drilled Shaft.

Page 3: Ray Fassett ADSC WCC PAST PRESIDENT Condon-Johnson & Assoc. Inc WEST COAST CHAPTER

WEST COAST CHAPTER

• Special Provisions will update the 2010 Standards.

• Amendments to the Standards also exist. Remember to stay current!

• These specifications describe how the work is to be built. They still require clarifications prior to and during construction.

Page 4: Ray Fassett ADSC WCC PAST PRESIDENT Condon-Johnson & Assoc. Inc WEST COAST CHAPTER

WEST COAST CHAPTER

• 49-3.02A(3)(b) Pile Installation Plan– Most Important Submittal for CIDH work.– Defines the Installation Process.– Should cover all aspects of the work.– Should be reviewed based on the required

content.• But is it necessary to cover things that don’t apply?• List is redundant, should it be covered multiple times?• Is it easier to follow a Submittal that follows the list?

Page 5: Ray Fassett ADSC WCC PAST PRESIDENT Condon-Johnson & Assoc. Inc WEST COAST CHAPTER

WEST COAST CHAPTER

• 49-3.02A(4)(b) Preconstruction Meeting– Needs to be held after the Pile Installation Plan

has been submitted and reviewed.– Provides an opportunity for the Inspection Staff to

discuss with the contractor how the work will be performed.

– Should include most people listed in BCM 130-20.0

Page 6: Ray Fassett ADSC WCC PAST PRESIDENT Condon-Johnson & Assoc. Inc WEST COAST CHAPTER

WEST COAST CHAPTER

• 49-3.02A(4)(b) Preconstruction Meeting (Cont.)– Should discuss shaft entry procedures.– Should discuss tie-off procedures and access to

the shaft for Inspection Personnel. – Will Caltrans log the shaft?

Page 7: Ray Fassett ADSC WCC PAST PRESIDENT Condon-Johnson & Assoc. Inc WEST COAST CHAPTER

WEST COAST CHAPTER

• 49-3.02A(3)(c)(g) Mitigation Plan– ADSC Standard Mitigation Plan

• Came out of ADSC WCC’s and Caltrans’ Substructure Committee as a way to mitigate the time it takes to review a repair procedure. Over 90% of all Anomalies can be mitigated with this Plan.

• Began in 2005, published in 2007.

Page 8: Ray Fassett ADSC WCC PAST PRESIDENT Condon-Johnson & Assoc. Inc WEST COAST CHAPTER

WEST COAST CHAPTER

• 49-3.02C(2) Drilled Hole– Amended 7-19-13 to provide a horizontal

tolerance. • This is a product of the Caltrans ADSC WCC

Substructure Committee.• Allows the larger of 1/24 of pile diameter or 3” in a pile

group.• Provides tolerance in a Type II pile by way of minimum

clearances between column and CIDH reinforcing.• For Type I pile, needs to be accurately placed or need to

use the tolerance in the concrete cover.

Page 9: Ray Fassett ADSC WCC PAST PRESIDENT Condon-Johnson & Assoc. Inc WEST COAST CHAPTER

WEST COAST CHAPTER

• 49-3.02C(4) Reinforcement– Amended 1-20-12 to require minimum of 3”

concrete cover.• This is a product of the Caltrans ADSC WCC

Substructure Committee.• Is a compromise to allow for the larger cover to be used

to align the CIDH reinforcing cage into the correct location.

Page 10: Ray Fassett ADSC WCC PAST PRESIDENT Condon-Johnson & Assoc. Inc WEST COAST CHAPTER

WEST COAST CHAPTER

• SIDE NOTE ON REINFORCEMENT: – not everything that pertains to this work is in Sect. 49.

• California Amendments to AASHTO LRFD: Rebar Spacing

• 52-1.03D Placing– Section entitled “For column and pile bar reinforcing cages

measuring 4 feet in diameter and larger”• These Tie requirements were a product of an ADSC WCC / AGC /

CRSI and Caltrans meeting held back in 2009 to discuss the safe handling of rebar cages.

• Later confirmed by the UNR Research on Column Stability

Page 11: Ray Fassett ADSC WCC PAST PRESIDENT Condon-Johnson & Assoc. Inc WEST COAST CHAPTER

WEST COAST CHAPTER

• 49-3.02B(8) Spacers– Amended 1-20-12 to allow the use of plastic

spacers.– Product of a request from the ADSC WCC

Page 12: Ray Fassett ADSC WCC PAST PRESIDENT Condon-Johnson & Assoc. Inc WEST COAST CHAPTER

WEST COAST CHAPTER

• 49-3.02A(4)(d) Acceptance Testing– (i) General:

• Is water allowed in the tubes during testing?

– (ii) Vertical Inspection Tubes: • Standardized by the Substructure Committee.• Requires reinforcing to be installed non-uniform but still

symmetrical (provided equal number of tubes to the number of vertical bars) to provide proper clearances to pvc.

– (iv) Rejected Piles, Anomaly Deduction• ADSC WCC and Caltrans partnered on the “new” deduction

table.

Page 13: Ray Fassett ADSC WCC PAST PRESIDENT Condon-Johnson & Assoc. Inc WEST COAST CHAPTER

WEST COAST CHAPTER

• 49-3.02B(4) Permanent Steel Casing• 49-3.02C(5) Permanent Steel Casing

Installation• 49-3.02C(6) Construction Joint

– When is CMP Casing Acceptable?• When used in conjunction with a Construction Joint?• Why are construction Joints for Type II piles

mandatory?

Page 14: Ray Fassett ADSC WCC PAST PRESIDENT Condon-Johnson & Assoc. Inc WEST COAST CHAPTER

WEST COAST CHAPTER

• 49-3.02B(4) Permanent Steel Casing• 49-3.02C(5) Permanent Steel Casing Installation• 49-3.02C(6) Construction Joint

– (Cont.)– 49-3.02B(5) Grout

• Is lean concrete an acceptable backfill around permanent casing?

• Amended 7-19-13 to allow neat cement grout as backfill.

– this works for a small annulus around casing.

Page 15: Ray Fassett ADSC WCC PAST PRESIDENT Condon-Johnson & Assoc. Inc WEST COAST CHAPTER

WEST COAST CHAPTER

• 49-3.02A(2) Definitions– 1-20-12 Amendment Defines a “dry hole”

• Product of a request from the ADSC WCC

Page 16: Ray Fassett ADSC WCC PAST PRESIDENT Condon-Johnson & Assoc. Inc WEST COAST CHAPTER

WEST COAST CHAPTER

• 49-3.02B(6) Slurry– Know the difference between “recirculated” and

“replaced” and why one might be better than the other.

– Caltrans requires the use of slurry when you cannot dewater a shaft.

• When is it ok to use water as a slurry?– Full Length Casing?– Non-Slacking Rock?– What will the Specifications allow?

Page 17: Ray Fassett ADSC WCC PAST PRESIDENT Condon-Johnson & Assoc. Inc WEST COAST CHAPTER

WEST COAST CHAPTER

QUESTIONS?

COMMENTS?