Page 1: Raw Water Reservoir - SCRD...Raw Water Reservoir Project - Next Steps Regulatory permitting, land acquisition, stakeholder engagement Preliminary design Preliminary cost estimates
Page 2: Raw Water Reservoir - SCRD...Raw Water Reservoir Project - Next Steps Regulatory permitting, land acquisition, stakeholder engagement Preliminary design Preliminary cost estimates

Presentation Outline

Integrated Sustainability corporate profile and experience

Reservoir design and construction

SCRD Raw Water Reservoir Project

Project Drivers

Design Concepts

Site Selection and Desktop Study Results

Next Steps

Questions

Page 3: Raw Water Reservoir - SCRD...Raw Water Reservoir Project - Next Steps Regulatory permitting, land acquisition, stakeholder engagement Preliminary design Preliminary cost estimates

Sustainability Data Management

Environmental and Regulatory

WasteWaste Management,

Wastewater

Renewable EnergySolar, Wind,

Geothermal, Efficiency

Water Source, Containment,

Distribution, Infrastructure

WasteWaste Management,

Wastewater

Environmental and Regulatoryry Was

Renewable EnergySolar, Wind,

Geothermal, Efficiencyt,

Re

Geo

Sustainability Data Managementnt

EnanMa

Water Source, Containment,

Distribution, Infrastructurt,

ture

Integrated Sustainability Services

Page 4: Raw Water Reservoir - SCRD...Raw Water Reservoir Project - Next Steps Regulatory permitting, land acquisition, stakeholder engagement Preliminary design Preliminary cost estimates

Water Storage Infrastructure

Services

Our team has designed more than 70 water storage reservoirs in western Canada, and have completed full design and construction of more than 35 water storage reservoir projects

• Desktop studies and siting

• Regulatory and environmental support

• Engineering design

• Construction

Page 5: Raw Water Reservoir - SCRD...Raw Water Reservoir Project - Next Steps Regulatory permitting, land acquisition, stakeholder engagement Preliminary design Preliminary cost estimates

Reservoir Design Examples

Page 6: Raw Water Reservoir - SCRD...Raw Water Reservoir Project - Next Steps Regulatory permitting, land acquisition, stakeholder engagement Preliminary design Preliminary cost estimates

Reservoir Project Examples

Page 7: Raw Water Reservoir - SCRD...Raw Water Reservoir Project - Next Steps Regulatory permitting, land acquisition, stakeholder engagement Preliminary design Preliminary cost estimates

Reservoir Project Examples

Page 8: Raw Water Reservoir - SCRD...Raw Water Reservoir Project - Next Steps Regulatory permitting, land acquisition, stakeholder engagement Preliminary design Preliminary cost estimates

Reservoir Project Examples

Page 9: Raw Water Reservoir - SCRD...Raw Water Reservoir Project - Next Steps Regulatory permitting, land acquisition, stakeholder engagement Preliminary design Preliminary cost estimates

Reservoir Project Examples

Page 10: Raw Water Reservoir - SCRD...Raw Water Reservoir Project - Next Steps Regulatory permitting, land acquisition, stakeholder engagement Preliminary design Preliminary cost estimates

Reservoir Project Examples

Page 11: Raw Water Reservoir - SCRD...Raw Water Reservoir Project - Next Steps Regulatory permitting, land acquisition, stakeholder engagement Preliminary design Preliminary cost estimates

SCRD Raw Water Reservoir Project

Page 12: Raw Water Reservoir - SCRD...Raw Water Reservoir Project - Next Steps Regulatory permitting, land acquisition, stakeholder engagement Preliminary design Preliminary cost estimates

Project Drivers

§ Diversion of water to a reservoir during periods of high precipitation and high creek flow (wet season)

§ Use of reservoir water during periods of low precipitation (dry season)

Sunshine Coast Tourism 2014

Page 13: Raw Water Reservoir - SCRD...Raw Water Reservoir Project - Next Steps Regulatory permitting, land acquisition, stakeholder engagement Preliminary design Preliminary cost estimates

Project Stages

Phase 1:

§ Water Demand Analysis

§ Site identification and preliminary desktop evaluation

§ Preliminary Multi-Criteria Analysis (MCA)

Phase 2:

§ Detailed site evaluation (desktop and field assessment)

§ Conceptual design

§ Class D cost estimates

§ Detailed MCA Completed to date

Page 14: Raw Water Reservoir - SCRD...Raw Water Reservoir Project - Next Steps Regulatory permitting, land acquisition, stakeholder engagement Preliminary design Preliminary cost estimates

Water Demand Analysis

Demand Reduction Factor from 2010 Supply Deficit (m3)

Demand Reduction 2025 2035 2050

Population 26,000 32,000 43,000

0% (zero reduction) 2,454,000 3,392,000 5,114,000

10% (minimal reduction) 2,002,000 2,837,000 4,366,000

20% (moderate reduction) 1,640,000 2,391,000 3,770,000

33% (high reduction) 1,245,000 1,811,000 2,988,000

Target reservoir volume: 900,000 m3 - 1,300,000 m3

Page 15: Raw Water Reservoir - SCRD...Raw Water Reservoir Project - Next Steps Regulatory permitting, land acquisition, stakeholder engagement Preliminary design Preliminary cost estimates

Study Areas for Site Selection

Low elevation reservoirs

High elevation reservoirs

Reservoirs created by enlarging existing alpine lake

Page 16: Raw Water Reservoir - SCRD...Raw Water Reservoir Project - Next Steps Regulatory permitting, land acquisition, stakeholder engagement Preliminary design Preliminary cost estimates

Desktop Study Results - Site Options

Sites A and B

Sites C3 and C4

Site C1 (eliminated during desktop)

Page 17: Raw Water Reservoir - SCRD...Raw Water Reservoir Project - Next Steps Regulatory permitting, land acquisition, stakeholder engagement Preliminary design Preliminary cost estimates

Site A Conceptual Design

Excavation Stockpiles

Reservoir

Page 18: Raw Water Reservoir - SCRD...Raw Water Reservoir Project - Next Steps Regulatory permitting, land acquisition, stakeholder engagement Preliminary design Preliminary cost estimates

Site B Conceptual Design

Excavation Stockpiles

Reservoir

Page 19: Raw Water Reservoir - SCRD...Raw Water Reservoir Project - Next Steps Regulatory permitting, land acquisition, stakeholder engagement Preliminary design Preliminary cost estimates

Sites C3 and C4 Conceptual Designs

Site C3 Site C4

Reservoir

Reservoir

Dam

Dam

Page 20: Raw Water Reservoir - SCRD...Raw Water Reservoir Project - Next Steps Regulatory permitting, land acquisition, stakeholder engagement Preliminary design Preliminary cost estimates

Estimated Reservoir Costs

Site Volume (m3) Site Area (ha.)

Total Installed Cost (incl. Contingency)

($ CAD)

Total Estimated Construction

Duration (months)

A 1,180,300 45 $ 23,764,000 15

B 1,291,600 46 $ 23,575,000 15

C3 781,900 41 $ 9,411,000 5

C4 856,000 35 $ 8,698,000 5

Class D Cost Estimate (+/- 50% accuracy):

Page 21: Raw Water Reservoir - SCRD...Raw Water Reservoir Project - Next Steps Regulatory permitting, land acquisition, stakeholder engagement Preliminary design Preliminary cost estimates

Raw Water Reservoir Project - Next Steps

§ Regulatory permitting, land acquisition, stakeholder engagement

§ Preliminary design

§ Preliminary cost estimates (Class C)

§ Detailed design

§ Detailed cost estimates (Class B, Class A)

§ Reservoir construction and commissioning