Page 1: RAVI _ppt[1].ppt

A A Project PresentationProject Presentation

Prepared by:-Kalotra Ravi N. (10PGME004)

Faculty Guide :- Industrial Guide :- Mr. Gajanan Patange Mr. V.S. NaikAsst. Professor Mr. RavichandranDept. of Mech. Engg.CHARUSAT, CHANGA

Page 2: RAVI _ppt[1].ppt

1. COMPANY PROFILE 1. COMPANY PROFILE

2. BACKGROUND OF THE PROJECT 2. BACKGROUND OF THE PROJECT

3. OBJECTIVE OF PROJECT3. OBJECTIVE OF PROJECT 4. SCOPE OF PROJECT SCOPE OF PROJECT

5. PROBLEM STATEMENT5. PROBLEM STATEMENT

6. 6. PROJECT PLANPROJECT PLAN

INDEX

Page 3: RAVI _ppt[1].ppt

COMPANY PROFILE :-COMPANY PROFILE :-

Prayas Engg. Ltd. (PEL) established in 1964 which is mostly preferred name in steel and non ferrous casting industry. Its parent company of Elecon Group of Companies.

It has masterly in casting used for core sector like , cement plant , sugar plant , valve industries , Mining equipment , material handling equipment , power transmission equipment.

Page 4: RAVI _ppt[1].ppt

BACKGROUND OF THE PROJECT :-BACKGROUND OF THE PROJECT :-

In Prayas Casting Ltd. There is Non-ferrous alloy casting dept. there is use ALSI8ZN10 ALLOY. For making of casing, impeller. Casing is use in hydraulic fluid coupling. Casing have different size. There is a defect in casting of model no. 480 CASING. Like,

Porosity Sand inclusion

Page 5: RAVI _ppt[1].ppt

OBJECTIVE OF PROJECT :-

 To find out the defects causes and remedies.

Page 6: RAVI _ppt[1].ppt

SCOPE OF PROJECT :-SCOPE OF PROJECT :-

Scope of the project is to make defect free casing and minimize the rejected piece.

Page 7: RAVI _ppt[1].ppt

PROBLEM STATEMENT :-PROBLEM STATEMENT :-

This problem solved by using ansys 11.0, Pro-cast software.

Page 8: RAVI _ppt[1].ppt

DISSERTATION YEAR PLAN

No. ACTIVITY MONTH

1 Topic Selection JULY-AUG

2 Literature Review & Project Preliminary SEPT-OCT

3 Software Study NOV-DEC

4 Using software ansys11.0 & pro-cast JAN-FEB

5 Testing MAR-APR

6 Thesis Writing MAY-JUN

Page 9: RAVI _ppt[1].ppt

Thank YouThank You