  • EFFICIENT, RELIABLE,HONEST & PROFESSIONAL

    with aCompetitive Edge

    Rapid Steel Decking Brochure_Rapid Steel Decking Brochure 05/08/2012 19:33 Page 2

  • For supply or technical information please call 01245 8614902

    We also stock:

    Sales and Information

    VARIOUS SHEAR STUDS, EXPANDA FOAM ALL FIXINGS,CLOSURE PLATES, BLOCKERS OUR OWN FLEET OF

    VEHICLES FOR COST EFFECTIVE DELIVERY

    Please see from the following pagesexamples of our work and illustrationsshowing how flexible and efficient MetalDecking is. Metal Decking is used in variousapplications from high rise buildings to abasement floor, Rapid Steel Decking haveinstalled the Metfloor product in a wide rangeof applications. Our design team haveimplemented specifications to achieve spansof up to 7.5 mtrs and supported StructuralEngineers/ Architects in making the rightchoice when it comes to a Composite Floor orSacrificial Formwork design. Flexibility is key to our service and we striveto meet client demands successfully since weestablished in 2009. Rapid Steel Decking isproud to have been established byexperienced individuals from different areaswithin the Metal Decking Industry eachbringing various skills and ideas to the groupwhich makes for a quality recipe to oursuccess so far.Not only do we supply and fix Metal Deckingand offer the full package from putting the

    Metal Decking down, to laying mash, bar, toConcrete and finish, we also Supply Only toour clients all profiles and gauges withassociating products very efficiently from ourStockyard in Chelmsford Essex. We also offersupport with our easy to follow install guidesor advice over the phone, our office personnelcan produce calculations swiftly to respond toany spanning requirements or design youmay need carrying out. We can also provideyou with site specific drawings to enable yourpersonnel on site to identify pack locationswith tips featured on the drawings as part ofthe service.

    We deliver your material on various vehiclesfor example our 3.5 tonne specially adaptedvehicles that can carry up to 8mtr long sheetsof deck and pay load of 1.8 tonne, which hasproved very popular in London and other Citycentres due to their size to our Hi-Hab lorriescapable of 20mtr reach proving very popularfor contractors wishing to save money onplant hire. We cover the UK at verycompetitive rates and efficient service.

    Rapid Steel Decking Brochure_Rapid Steel Decking Brochure 05/08/2012 19:33 Page 3

  • www.rapidsteeldecking.co.uk 3

    Supply and Install of Metal Decking,whatever the profile, our experiencedfully trained installation team are themost skilled and highest certificatedinstall team in the country.

    Studwelding services are offered as apackage or as a single service asrequired, we have generators and rigsmounted upon specially adaptedtrailers to offer our clients a compactand efficient package popular withlimited site access and space.

    Safety Netting services are offeredwith our package or as a dedicatedservice with our FASET registered rigteams and array of nets prepared tonet from 5m2 to thousands of m2 atany time required, as all our servicescompetitively priced and efficientlyimplemented.

    Air Mat fall arrest systems offered aspart of our package or at individualdemands with many size cubesavailable to install by our fully trainedand certificated personnel.

    Many size cranes available with orwithout Banksman again offered aspart of our package or a dedicatedservice.

    Scaffolding Services only associatedwith the decking installation as edgeprotection is required for personnelfixing the system.

    Concreting supply and installation tofinish only relating to the MetalDecking area of works.

    Mesh and Bar laying only or Meshand Bar supply only, to supply andfixing.

    Our Services include . . .

    Rapid Steel Decking Brochure_Rapid Steel Decking Brochure 05/08/2012 19:33 Page 6

  • For supply or technical information please call 01245 8614904

    Rapid Steel Decking havesuccessfully carried out many projectsto date with no accidents from 2009,our health and safety record istestament to how serious we are inconsidering our environment on sitewith ultimate consideration toindividuals on site or passingpedestrians.

    A small example of our Projectscompleted successfully well withintime, budget and very happy clients!

    Trafford ParkArena infills.

    Stepstile MeadowSwimming Pool adaptations.

    Canon Street, LondonHigh rise offices.

    Polegate Railway StationPlatform Adaptations.

    Riverside Bowl, NorwichConstruction of the Riverside Bowl.

    The Lounge, Leeds Road, LeedsConstruction of a small Shishi lounge floor.

    Attention toSmall Worksprojects toProjects runninginto thousands of Square Metres . . .

    Rapid Steel Decking Brochure_Rapid Steel Decking Brochure 05/08/2012 19:34 Page 7

  • www.rapidsteeldecking.co.uk 5

    54 Camden StreetSupply only decking efficiently in phases to our client.

    The Pits, Coventry & Telford ManufacturersPit infills at Stadco Ltd.

    Primark, YeovilSupply only typically within 3 days from order.

    Harris City Academy, Crystal PalaceFirst Floor and Roof Decking.

    Homebase, AylesfordConstruction of first floor.

    Orbis Consumer ProductsSupply of decking.

    Sainsburys NantwichLoading dock floor.

    307-309 Kentish Road,LondonConstruction of first floor.

    Yoga Centre, Riverpoint, BathConstruction of a first floor studio.

    St Marys Church, WendoverSupply only delivery on specialist vehicle as access was a challenge.

    Co-op Development,Wickham MarketConstruction of first floor and plant room.

    Medix Centre, Isle of WightComplete floor solution for the entire building and construction ofnew medical centre floor andatrium.

    Factory Floor, LeicesterAchieved typical spans of 7.2mtrs working closely with the structuralengineer.

    Rapid Steel Decking Brochure_Rapid Steel Decking Brochure 05/08/2012 19:34 Page 10

  • For supply or technical information please call 01245 8614906

    Typical end cantilever

    Typical side detail

    Typical side detail

    Unsupported edge detail

    Edge TrimYou should use edge trim to main maintain thewet concrete at the correct level at the deckingperimeters.

    Fix it to the supports in the same manner asthe deck and restrain the top by straps at 600mcentres fixed to the top of the deck profile withsteel pop rivets or self drilling screws.

    Please browse the next few pages for further examplesof edge trim installation, deck fixing and propping.

    For supply or technical information please call 01245 861490

    Rapid Steel Decking

    Cut, Packed & Delivered Fast

    Metfloor 80

    Metfloor 80

    Metfloor 80

    Cut, Packed & Delivered Fast

    Rapid Steel Decking Brochure_Rapid Steel Decking Brochure 05/08/2012 19:34 Page 11

  • www.rapidsteeldecking.co.uk 7

    Below and Right you can see typical examples of side details incorporating trim or not as the case maybe.Edge trim can be fabricated to any dimension required to suit individual requirements.We do stock a large range of sizes off the shelf to accommodate urgent supply and popular slab depths.

    Beam at perimeter wall Typical wall end detail

    Typical side detailTypical wall side detail

    Metfloor 80 Metfloor 80

    Metfloor 80Metfloor 55

    Rapid Steel Decking Brochure_Rapid Steel Decking Brochure 05/08/2012 19:35 Page 14

  • For supply or technical information please call 01245 8614908

    End detail alternative 1 End detail alternative 2

    Typical edge with plateSide cantilever with stub bracket

    Metfloor 80

    Metfloor 55 Metfloor 55

    Metfloor 80

    Rapid Steel Decking Brochure_Rapid Steel Decking Brochure 05/08/2012 19:35 Page 15

  • www.rapidsteeldecking.co.uk 9

    Sitework openings for shallow composite floor decksWhere openings are greater than 300mm, the engineer must design them and provide extra reinforcement around the opening. Openings can be accommodated up to 700mmin composite slabs by boxing out before pouring concrete and cutting out the deck after the concrete has cured.

    Larger openings require support-trimming steel and theremust be installed prior to the decking.

    Cut the decking away immediately and treat the openingedges like any other perimeter with edge trim.

    Do not cut the opening in the steel deck before concreting or before the concrete has cured.

    Temporary supportsThe contractor or designated sub-contractor is responsible for the safe design and installation of temporary props. Where the design calls for temporary supports, these mustprovide continuous support to the profiled sheeting. Spreader beams (timbers) should be used and supported bytemporary props at one metre centres.

    The timbers and props must be of adequate strength andconstruction.

    The temporary supports are placed at midspan or at othersuitable centres if more supports per span are required.

    The spreaders beams or timbers should provide a minimumbearing width of 100mm the spreaders must not deflect morethan 10mm and should be placed narrow edge up, see diagram.

    The propping structure is not to be removed until theconcrete has reached at least 70% of its characteristicstrength. The horizontal bearer timbers must be at least100mm wide and should be propped at no more than 1m centres. Sometimes the specification may call for 150mmwide bearers, as determined by the structural engineers or concreting contractor.

    Temporary support using and Acrow type prop

    Temporary Props

    Timber Shutter Dense polystyrene block

    The props should be stable without relying on frictionwith the deck for laterial stability. The end props in arow should be self supporting, and braced to the internal props.

    Percussive DrillingWe do not recommend percussive drilling into composite concrete slabs although small-scale rotaty hammer drills are fine.

    Please see in Bearing illustrations Belowthe minimum required for a continuous and sharedbearing scenario. Note the different requirements for Masonary and Steel Sections.

    End bearing and shared bearing (min) Continuous bearing (min)

    Rapid Steel Decking Brochure_Rapid Steel Decking Brochure 05/08/2012 19:35 Page 16

  • For supply or technical information please call 01245 86149010

    Rapid Steel Decking Brochure_Rapid Steel Decking Brochure 05/08/2012 19:34 Page 13

  • www.rapidsteeldecking.co.uk 11

    0.9 55 130mm slab, C35 concrete 4.5 spanSingle Span One prop A252 8mm bar Imposed Loading 3kn/m260 mins Fire rating

    0.9 55 150 slab C35 concrete 5.45 spanSingle Span One prop A252 10mm bar Imosed Loading 3kn/m260 mins fire rating

    0.9 55 175 slab C35 Concrete 6.2 spanSingle Span Two props A393 16mm bar imposed loading 3kn/m260 mins fire rating

    1.2 55 130 slab C30 Concrete 5.0 spanSingle Span One prop A252 10mm bar Imposed loading 3kn/m260 mins fire rating

    1.2 55 150 slab C30 Concrete 5.850 spanSingle Span One prop A252 12mm bar Imposed loading 3kn/m260 mins fire rating

    1.2 55 175 slab C30 Concrete 6.300 spanSingle Span two props A252 12mm bar Imposed loading 3kn/m260 mins fire rating

    These are examples of the most common deck type in design using additionalreinforcement and various slab thicknesses.We can assist with any special requirements you have. These examples are ideal for oursmall work clients perfoming infills or renovations in tight spaces as the deck is readilyavailable and easy to amend at short notice with Rapid Steel Decking.

    Special Spanning Conditions

    Rapid Steel Decking Brochure_Rapid Steel Decking Brochure 05/08/2012 19:34 Page 12

  • For supply or technical information please call 01245 86149012

    Fire Slab Mesh 0.9 1 1.2Rating Depth Total Applied Load (kN/m2)(mm)

    3.5 5.0 10.0 3.5 5.0 10.0 3.5 5.0 10.01 hr 120 A142 2.8a 2.8a 2.8a 3a 3a 2.9m 3.4a 3.4a 3.2m1.5 hr 130 A142 2.8a 2.8a 2.3m 3a 3a 2.3m 3.3a 3.3a 2.6m2 hr 140 A193 2.5m 2.2m 1.8m 2.7m 2.4m 1.9m 2.9m 2.6m 2m1 hr 120 A142 3.4a 3.4a 2.9m 3.5a 3.5a 3m 4a 4a 3.2m1.5 hr 130 A142 3.3a 3.3a 2.6m 3.4a 3.4a 2.6m 3.7a 3.7a 2.8m2 hr 200 A393 2.8a 2.8a 2.8a 3a 3a 3a 3.4a 3.4a 3.4a1 hr 120 A252 3.7m 3.4m 2.7m 3.7m 3.4m 2.7m 4m 3.7m 2.9m1.5hr 130 A393 3.5m 3.1m 2.5m 3.5m 3.1m 2.5m 3.6m 3.3m 2.6m2 hr 200 A393 2.8m 2.6m 2.2m 2.8m 2.6m 2.2m 3m 2.8m 2.3m1 hr 120 A252 4.2m 4m 3.2m 4.4m 4m 3.2m 4.6m 4.2m 3.4m1.5 hr 130 A393 4.5m 4.1m 3.2m 4.5m 4.1m 3.3m 4.5m 4.1m 3.3m2 hr 200 A393 4.4m 4.1m 3.3m 4.4m 4.1m 3.3m 4.5m 4.1m 3.4m

    Single Span

    Double Span

    Single Span

    Double Span

    No

    Te

    mpo

    rary

    pro

    psPr

    ops

    @

    Mid

    -Sp

    an o

    nly

    Props Span**

    Maximum Span (m) with no additional reinforcements Deck Thickness (mm)

    MetFloor 55 - span table - Normal weight concrete using mesh

    Single Span

    Double Span

    Fire Slab Mesh 0.9 1 1.2Rating Depth Total Applied Load (kN/m2)(mm)

    3.5 5.0 10.0 3.5 5.0 10.0 3.5 5.0 10.01 hr 120 A142 3.0a 3.0a 2.8m 3.2a 3.2a 2.9m 3.6a 3.6a 3.2m1.5 hr 130 A142 3.0a 3.0a 2.3m 3.2a 3.2a 2.4m 3.5a 3.5a 2.6m2 hr 140 A193 2.9a 2.5m 1.9m 2.9m 2.5m 1.9m 3.1m 2.7m 2.0m1 hr 120 A142 3.6a 3.6a 3.0m 3.7a 3.7a 3.1m 4.2a 4.2a 3.3m1.5 hr 130 A142 3.5a 3.5a 2.7m 3.7a 3.7m 2.8m 4.1a 3.9m 2.9m2 hr 140 A193 3.4a 3.3m 2.5m 3.6a 3.4m 2.5m 3.9m 3.5m 2.6m2 hr 200 A252 3.0a 3.0a 3.0a 3.3a 3.3a 3.2m 3.7a 3.7a 3.3m1 hr 120 A252 3.9m 3.5m 2.7m 4.0m 3.6m 2.8m 4.3m 3.9m 3.0m1.5 hr 130 A393 3.6m 3.2m 2.5m 3.7m 3.3m 2.6m 3.9m 3.5m 2.7m2 hr 200 A393 3.0m 2.8m 2.2m 3.1m 2.8m 2.3m 3.2m 2.9m 2.4m1 hr 120 A252 4.7m 4.2m 3.2m 4.7m 4.3m 3.3m 5.0m 4.5m 3.5m1.5 hr 130 A393 4.8m 4.3m 3.4m 4.9m 4.4m 3.4m 5.1m 4.5m 3.5m2 hr 200 A393 4.7m 4.3m 3.5m 4.8m 4.4m 3.5m 4.9m 4.5m 3.6m

    Single Span

    Double Span

    Single Span

    Double Span

    No

    Te

    mpo

    rary

    pro

    psPr

    ops

    @

    Mid

    -Sp

    an o

    nly

    Props Span**

    Maximum Span (m) with no additional reinforcements Deck Thickness (mm)

    MetFloor 55 - span table - Lightweight concrete using mesh

    MetFloor 55 Design Information www.rapidsteeldecking.co.uk Contact tel: 01223 654549

    The load span tables above are examples only, Rapid Steel Decking will provide specific calculations based on your requirements or specification.

    The calculations will show detailed analysis and provide accurate information to enable you to make a confident decision on slab design.

    The load span tables above are examples only, Rapid Steel Decking will provide specific calculations based on your requirements or specification.

    The calculations will show detailed analysis and provide accurate information to enable you to make a confident decision on slab design.

    Rapid Steel Decking Brochure_Rapid Steel Decking Brochure 05/08/2012 19:34 Page 9

  • www.rapidsteeldecking.co.uk 13

    Fire Slab Mesh 0.9 1 1.2Rating Depth Total Applied Load (kN/m2)(mm)

    3.5 5.0 10.0 3.5 5.0 10.0 3.5 5.0 10.01 hr 130 A193 3.5i 3.5i 2.4m 3.6i 3.6i 2.4m 3.8i 3.8i 2.6m

    1.5 hr 160 A252 3.2i 3.2i 2.4m 3.3i 3.3i 2.4m 3.5i 3.5i 2.5m

    2 hr 180 A252 3.1i 3.1i 2.2m 3.2i 3.2i 2.1m 3.4i 3.4i 2.1m

    1 hr 130 A142 3.9e 3.9e 2.8m 4.1m 3.9m 2.8m 4.4m 3.9m 3.0m

    1 hr 150 A252 3.7e 3.7e 3.6m 4.0e 4.0e 3.5m 4.4e 4.4e 3.7m

    1.5 hr 150 A252 3.7e 3.7e 3.1m 3.9e 3.9e 3.2m 4.4e 4.4e 3.3m

    2 hr 180 A393 3.5e 3.5e 3.5e 3.7e 3.7e 3.7e 4.1a 4.1a 3.7m

    1 hr 130 A393 5.0k 4.5m 3.5m 5.0m 4.7k 3.7m 5.1k 4.8m 3.7m

    1.5 hr 160 A393 5.0m 4.6m 3.6m 5.0m 4.6m 3.6m 5.1m 4.6m 3.7m

    2 hr 180 A393 4.7m 4.3m 3.4m 4.6m 4.4m 3.6m 4.7m 4.3m 3.6m

    Single Span

    Double Span

    Double Span

    No

    Te

    mpo

    rary

    pro

    psPr

    ops

    @

    Mid

    -Sp

    an

    on

    ly

    Props Span**

    Maximum Span (m) with no additional reinforcements Deck Thickness (mm)

    MetFloor 60 - span table - Normal weight concrete using mesh

    MetFloor 60 Design Information www.rapidsteeldecking.co.uk Contact tel: 01223 654549

    Fire Slab Mesh 0.9 1 1.2Rating Depth Total Applied Load (kN/m2)(mm)

    3.5 5.0 10.0 3.5 5.0 10.0 3.5 5.0 10.0

    1 hr 130 A193 3.7i 3.7i 2.4m 3.8i 3.8m 2.4m 4.0i 4.0i 2.6m

    1.5 hr 160 A252 3.4i 3.4i 2.4m 3.5i 3.5i 2.4m 3.7i 3.7i 2.5m

    2 hr 180 A252 3.1i 3.3m 2.1m 3.4i 3.3m 2.1m 3.5m 3.2m 2.1m

    1 hr 130 A142 4.1a 4.0m 2.9m 4.3m 4.0m 2.9m 4.5m 4.1m 2.9m

    1 hr 150 A252 4.0e 4.0e 3.6m 4.2e 4.2e 3.6m 4.7i 4.7i 3.7m

    1.5 hr 150 A252 4.0e 4.0e 3.5m 4.2e 4.2e 3.5m 4.7i 4.7i 3.5m

    2 hr 180 A393 3.8e 3.8e 3.8e 4.0a 4.0a 4.0m 4.5e 4.5e 4.4m

    1 hr 130 A393 5.0m 4.5m 3.5m 5.0m 4.5j 3.6j 5.0k 4.6k 3.7j1.5 hr 160 A393 5.0m 4.8m 3.7m 5.1m 4.8m 3.7m 5.2m 4.9m 3.7m

    2 hr 180 A393 5.0m 4.7m 3.9m 5.1m 4.7m 3.7m 5.2m 4.8m 3.7m

    Single Span

    Double Span

    Double Span

    No

    Te

    mpo

    rary

    pro

    psPr

    ops

    @

    Mid

    -Sp

    an

    on

    ly

    Props Span**

    Maximum Span (m) with no additional reinforcements Deck Thickness (mm)

    MetFloor 60 - span table - Lightweight concrete using mesh

    The load span tables above are examples only, Rapid Steel Decking will provide specific calculations based on your requirements or specification.

    The calculations will show detailed analysis and provide accurate information to enable you to make a confident decision on slab design.

    The load span tables above are examples only, Rapid Steel Decking will provide specific calculations based on your requirements or specification.

    The calculations will show detailed analysis and provide accurate information to enable you to make a confident decision on slab design.

    Rapid Steel Decking Brochure_Rapid Steel Decking Brochure 05/08/2012 19:34 Page 8

  • For supply or technical information please call 01245 86149014

    Fire Slab Mesh 0.9 1 1.2Rating Depth Total Applied Load (kN/m2)(mm)

    3.5 5.0 10.0 3.5 5.0 10.0 3.5 5.0 10.01 hr 140 A393 4.1a 4.1a 2.8m 4.2i 4.2i 2.9m 4.3i 4.3i 3.0m1.5 hr 180 A393 3.8a 3.8a 2.8m 4.0i 4.0i 2.8m 4.1i 4.1i 3.0m2 hr 180 A393 3.7a 3.7a 2.6m 4.0i 4.0i 2.6m 4.1i 4.1i 2.6m1 hr 140 A252 4.5e 4.3m 3.3m 4.6m 4.6m 3.3m 5.1m 4.7m 3.5m1 hr 160 A252 4.4e 4.4e 3.5m 4.6e 4.6e 3.5m 5.1e 5.1m 3.6m1.5 hr 160 A393 4.4e 4.4e 3.7m 4.5e 4.5e 3.8m 5.1e 5.1e 3.9m2 hr 190 A393 4.0e 4.0e 3.7m 4.3e 4.3e 3.8m 4.8e 4.8e 3.9m1 hr 140 A393 5.2m 4.7m 3.4g 5.2m 4.7m 3.5g 5.2m 4.7m 3.7m1.5 hr 160 A393 5.1m 4.6m 3.5m 5.1m 4.6m 3.6m 5.2m 4.7m 3.7m2 hr 190 A393 5.0m 4.5m 3.5m 5.0m 4.5m 3.5m 5.0m 4.5m 3.5m

    Single Span

    Double Span

    Double Span

    No

    Te

    mpo

    rary

    pro

    psPr

    ops

    @

    Mid

    -Sp

    an

    on

    ly

    Props Span**

    Maximum Span (m) with no additional reinforcements Deck Thickness (mm)

    MetFloor 80 - span table - Normal weight concrete using mesh

    MetFloor 80 Design Information www.rapidsteeldecking.co.uk Contact tel: 01223 654549

    Fire Slab Mesh 0.9 1 1.2Rating Depth Total Applied Load (kN/m2)(mm)

    3.5 5.0 10.0 3.5 5.0 10.0 3.5 5.0 10.01 hr 140 A393 4.3a 4.3a 2.9m 4.4i 4.4i 2.9m 4.6i 4.6i 3.0m1.5 hr 180 A393 4.0a 4.0a 2.8m 4.2i 4.2i 2.8m 4.3i 4.3i 2.9m2 hr 180 A393 4.0a 3.9m 2.4m 4.0m 3.7m 2.4m 4.0m 3.6m 2.4m1 hr 140 A252 4.8e 4.8e 3.5m 5.1e 4.8m 3.5m 5.5j 5.0m 3.6m1 hr 160 A252 4.6e 4.6e 3.5m 4.9e 4.9e 3.6m 5.5i 5.2m 3.7m1.5 hr 160 A393 4.6e 4.6e 3.8m 4.9e 4.9e 3.9m 5.5e 5.5e 4.0m2 hr 190 A393 4.4e 4.4e 3.9m 4.7e 4.7e 4.0m 5.2e 5.2e 4.1m1 hr 140 A393 5.2k 4.8k 3.8m 5.2k 4.8k 3.8m 5.3k 4.8k 3.8m1.5 hr 160 A393 5.4m 4.9m 3.9m 5.4m 4.9m 3.9m 5.4m 4.9m 3.9m2 hr 190 A393 5.2m 4.8m 3.8m 5.2m 4.8m 3.8m 5.2m 4.8m 3.8m

    Single Span

    Double Span

    Double Span

    No

    Te

    mpo

    rary

    pro

    psPr

    ops

    @

    Mid

    -Sp

    an

    on

    ly

    Props Span**

    Maximum Span (m) with no additional reinforcements Deck Thickness (mm)

    MetFloor 80 - span table - Lightweight concrete using mesh

    The load span tables above are examples only, Rapid Steel Decking will provide specific calculations based on your requirements or specification.

    The calculations will show detailed analysis and provide accurate information to enable you to make a confident decision on slab design.

    The load span tables above are examples only, Rapid Steel Decking will provide specific calculations based on your requirements or specification.

    The calculations will show detailed analysis and provide accurate information to enable you to make a confident decision on slab design.

    Rapid Steel Decking Brochure_Rapid Steel Decking Brochure 05/08/2012 19:33 Page 5

  • www.rapidsteeldecking.co.uk 15

    Frequently Asked QuestionsIs Metfloor the same as Holorib, Ribdeck80, & Ribdeck E60?Metfloor is a better than equivalent to theHolorib, Ribdeck 80 & Ribdeck E60 productrange, we can say this confidently as theMetfloor product range has been rigorouslytested independently and jointly designed byCMF Ltd and the SCI to maximise the designspecification to out perform all other similarproducts on the market with superior firerating results, acoustic and spanning abilities.

    Which Metfloor is the direct equivalent toHolorib?The Metfloor 55 is the direct equivalent, thesheet gives you a cover width of 600mm, thesame as Holorib, and the profile shape is asimilar re-entrant design to Holorib, thestiffner design within the Metfloor profile iswhat distinguishes the difference between thetwo profiles giving it a slightly differentappearance.

    What significants does the numberassociated with the profile name have onthe profile type?The number generally signifies the profiledepth and across the product range thesenumbers represent the depth of the profile,the shallow profiles are 50, 51, or 55mmwhich are all re-entrant profiles, the 60 and 80are trapezoidal profiles which are all

    alternatives for one another only the spanningabilities vary due to stiffner design on theprofile, Metfloor is now the market leader inperformance so this is used as alternative toall deck on the market.

    Which Metfloor profile is a directequivalent to the Ribdeck 80?The Metfloor 80 is the direct equivalent to theRibdeck 80 product range and is also 600mmcover width and spans further than any otherequivalent on the market.

    Which Metfloor is the equivalent toRibdeck E60?The Metfloor 60 is the direct equivalent, to theRibdeck E60 product range, the onlydifference here is that our Metfloor profile is aeasy to handle 600mm cover width as opposeto the Ribdeck E60 being a 1000 cover widthprofile, however as previously stated theMetfloor is a better performing deck.

    How do you supply the decking soquickly?Metfloor has been on the market since 2005,the profile is manufactured from state of theart modern facilities and delivered out tosatellite stockyards from Wales to ChelmsfordEssex where we prepare material to sitespecific lengths and deliver efficiently on ourown specially adapted vehicles.

    Rapid Steel Decking Brochure_Rapid Steel Decking Brochure 05/08/2012 19:33 Page 4

  • Sheraton House, Castle Park, Cambridge CB3 0AXTel: 01223 654549 Fax: 01223 654429

    Boyton Hall Farmhouse, Boyton Cross, Chelmsford, Essex CM1 4LNTel: 01245 861490

    E-mail: [email protected]: www.rapidsteeldecking.co.uk

    Head Office:

    Essex Stockyard:

    Just a few reasons why to useComposite Flooring fromRapid Steel Decking

    Sustainability benefits of composite floor constructionComposite flooring systems offer clients and designers a number of benefits which addressthe social, environmental and economic dimensions of sustainable construction.

    Speed of constructionComposite flooring systems facilitate fast track construction; up to 400m2 of deckingcan be installed by one team in a day! Speed, simplicity of design and affinity forsteel-framed buildings make composite floors the system of choice where time, and hencespeed of construction, are key drivers. Steel decking can be ordered from us and deliveredto order, efficiently stacked on lorries that can carry many square metres of decking in asingle load.Rapid construction minimises plant hire costs, in particular cranage. The use of the deckingas a safe working platform during construction, speeds up the work of others and follow-ontrades and offers logistical benefits on congested sites. The minimal steel reinforcementrequired can be fixed quickly and large areas of floor poured using pumped concrete.By shortening the construction programme, the impacts on neighbours and the publicwithin the vicinity of the construction site, such as noise, dust and traffic congestion areminimised.Resource efficiency Composite flooring systems are structurally efficient, therebyminimising the resources used in constructing the building (particularly concrete) andreducing the waste generated when it is necessary to deconstruct it. Less concrete meansfewer site deliveries and less localised traffic congestion.Composite floor systems are stiffer, stronger and lighter than many other floor systems.This means that the weight and size of the primary structure and the foundations can oftenbe reduced again minimising resource consumption and end-of-life waste generation.