STARRED/UNSTARRED Dairy No: S225
(a)Whether the National Highways Authority of India (NHAI), State Governments and the Toll Collectors
are responsible for maintenance and proper functioning of Highway patrol Squads;
(b) If so, the details of facilities created during the last three years
(c)
Whether the NHAI has provided 24/7 patrolling squads with latest surveillance and security gadgets
all along the national highways to cater the emergency needs in time of accidents or any terrorist
related crisis; and
(d) If so, the amount spend on this during the last three years
(a)Whether it is fact that due to industrialization, traffic growth is taking place at the rate of 80% to 10%
per annum;
(b)
If so, whether government has been able to augment the capacity of National Highways(NHs) to
match the volume of traffic growth; and
(c)If Government is augmenting the capacity to match traffic growth, the details of capacity
augmentation made during the last five years?
(a)
Whether it is a fact that number of flaws have come to the light with regard to the quality of highways
constructed in the country and these flaws involve faulty tender process and the construction of roads
with Bitumen and other substanded material which has resulted in their pre-nature decay;
(b) the details there of;(c) the estimated annual loss suffered due to the roads constructed with substandard material; and
(d) the details there of;
(a)whether proposals have been received from all states including Telangana for upgradation works on
various highways;
Name of the Project
STARRED/UNSTARRED Dairy No: S95
Capacity augmentation of NH's to match traffic growth
STARRED/UNSTARRED Dairy No: U382
STARRED/UNSTARRED Dairy No: S1
Upgradation of National Highways
Irregularities in connection of Highways
Highway Patrol Squads
-
8/11/2019 rajya sabha questions
2/6
(b) if so, the details thereof and whether government has sanctioned these proposals
(c) if not, the reasons there for; and
(d) the present status of the works under taken on the above highways
(a) whether government has sanctioned all the proposals submitted by states including Telangana duringthe last three years
(b) if not, the reasons there for; and
(c)the length of road covered and expenditure incurred for development of NHs in each state including
telangana for the last three years including current year, NH wise?
(a)
The details of the projects pending with the ministry and since when these projects have been
pending
(b) the steps government is going to take fast track to these projects
(c)
what has been cost over to run of these projects and how may projects are pending due to want of
environment clearence along with the steps government has taken to expidite environmental
clearences of these projects and the number of such pending projects from Maharastra
(a)whether the ministry has received a praposal from govt of andhrapradesh to declare Proddatur-
Jammalamadugu-Gooty state highway/road/stretch as new national highway(NH)(b) whether it has been declared as NH
(c) if so, when it was so declared
(d) the progress of work made on the above stretch; and
(e) by when the work is going tobe completed what is the initial projected cost and final estimated cost
(a)the details of road projects under the ministry awarded to each of the company/contractor for
execution and the last five years, year wise and project wise
(b)whether many companies have withdrawn from contracts valueing morte than Rs.50 crores in the
midway of the execution of the projects
(c) if so, the details of each of such companies and the reasons for leaving the project in the midway
(d) whether it is not in violation of the tender contract; and
(e) if so, what action the ministry has taken on each of such contractor/company
Pending Projects
STARRED/UNSTARRED Dairy No: S2
Sanctioning of projects
STARRED/UNSTARRED Dairy No: S87
STARRED/UNSTARRED Dairy No: S93
Declaration of Proddatur-Jammalamadugu-Gooty state highway as national highway
STARRED/UNSTARRED Dairy No: S94
Non-Execution of road projects by contractors/companies
-
8/11/2019 rajya sabha questions
3/6
(a)whether the planing commission and the ministry of finance are causing delay in the NHAI Projects to
revive the virtually-stalled road sector
(b)if so, to what extent varioue projects have been delayed due to delay in settlement of disputes and
amicable resolution worth around Rs 5000 crore and blocking the exit policy
(c) the contempleted to streamline the whole system so that the projects do nto suffer for want of inter-ministerial coordination and cooperation
(d)whether the meeting of secretaries of the concerned department would be convened to iron out the
differences and to give go-ahead for the pending projects; and
(e) the details there of;
(a)whether several narrow bridges exist on various national highways in the country causing traffic jam
and accidents;
(b) if so, the number of such spots identified and action taken to widen such bridged in the countryduring the last three years and the current year, state wise particularly telangana; and
(c)the details of action taken/being taken to include such widening of bridges in the estimate itself in the
beginning ?
(a)whether Govt has approved/proposes to approve some projects for upgradation of national highways
under the different phases of the National highways development programme(NHDP)
(b) if so, the details there of during each of the last three years and the current year along with theestimated cost state wise and project wise particularly telangana
(c)whether various state govt's have submitted praposals for upgradation of state highways to national
highways during the above period, of so the details there of; and
(d) the follow up action taken there on
(a)whether the Govt proposes to speed up construction of highways at the rate of 30 km per day for the
coming two years;
(b)
whether the Govt is seriously considering to ease norms for revival of Rs. 60,000 cr of worht highway
projects that are now stuck for last two years
(c)whether the Govt has decided not to entrust highway contracts to Border road organisation, in view
of its dismal work record in the past; and
(d) the details there of;
STARRED/UNSTARRED Dairy No: U259
speeding up construction of highways
Roadblocks in NHAI's projects
STARRED/UNSTARRED Dairy No: U3
Widening of bridges on national highways
STARRED/UNSTARRED Dairy No: U4
Upgradation of national highways
STARRED/UNSTARRED Dairy No: S106, S100
-
8/11/2019 rajya sabha questions
4/6
YES
As per the Concessioniare agreement
one Route Patrol Vehicle is available at
each plaza i.e. Bollapalli, Tangutur &
Musunur with required Staff.
YES
Only Surveillance is provided to
prevent accidents on NH in our stretch.
Approx 1.5 Core for the last 30 months
NA
NA
NA
NA
Our project is under Construction
-
8/11/2019 rajya sabha questions
5/6
NA
NA
NA
Our project work is under
constructions and incurred a cost of Rs.
1560 crores From COD to till date
NA
NA
NA
The work was awarded on 15.07.2010
to SEL as a Concessioniare, Project: Chk-
Nlr
NA
NA
NA
NA
NA
NA
-
8/11/2019 rajya sabha questions
6/6
NA
NA
NA
NA
NA
NA
NA
NA
YES
To be given by NHAI
NA
NA
NA