Page 1: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

RAISED ACCESSFLOOR SYSTEMS

Data Centers

Page 2: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

90million sq. ft.of workspaces transformed

15,000+clientsacross the globe

25yearsof leadership and legacy

growing with 40+ partners

450+Unitilers

annual production capacity

3million sq. ft.

across India

8offices

ChooseWhatMattersTo Your Business

Page 3: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

CERTIFICATIONS

WorldClass

Quality

Certified byBureau Veritas,France

Excellenceguaranteed with

third partytested at

TÜV SÜD PSB, Singapore

Environmental Conscientiousness

Health And Safety

Measures

SingaporeGreen

BuildingCouncil(SGBC)

Page 4: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

COMMON CHALLENGESin Data Center environment

Small field cut panels below 200mm around the perimeterand PAC/crack units.

Stability of raised floor system.

Heavy Rolling Loads during movement of equipments.

Damage of panel edges.

Detachment of PVC edge beeding.

Dust generation & limitations in drilling pretension slabs for drilling of pedestals.

Integration of data center airflow solutions and accessories.

Air Leakage through cable & service cutouts.

Low air capture by the server racks.

Installation and handover timelines.

Obstruction of understructure system with large width services.

Page 5: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

SPECIALSOLUTIONS

FOR DATA CENTERS

01Conventional Flange v/s Unitile’s Low flange panel

02Conventional PVC edge beeding v/sIntegral Trim High Pressure Laminate

03Multilayer Underfloor Cable Tray& Seismic Compliant system

04Long span Bridge solutions for wider underfloor services

05Integration of airflow solutions and accessories

Page 6: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

CONVENTIONAL FLANGE PANEL

v/s

UNITILE’S LOW FLANGE PANEL

Page 7: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

LIMITATIONS OF THE

CONVENTIONAL STEEL CEMENTITIOUS PANEL

Current design of raised access floor system with bolted stringers in existence for the last 15 to 20 years.

Very minor improvisations made in the design & engineering of the product, for better technical performance & benefits during time of installation.

Unitile has successfully done value engineering & re-designing of the conventional access floor system.

The new system designed by Unitile addresses all the common customer complaints associated with conventional access floor systems.

Unitile’s Low Flange Panel design and re-engineered understructure system enhances the technical performance of the system while ensuring ease of installation at site.

Page 8: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

Flange Width:

12.50 mm

Flange Width:

8.00 mm

Conventional Flange PanelOLD Low Flange PanelNEW

Drawbacks of a higher flange width Cantilever Panel are:

• The unsupported cantilever edges of the panel are vulnerable to damage due to site accidents during installation and frequent handling of the panel to handle underfloor services.

• Higher flange cantilever panels are often exposed to more risks of damage at site.

Advantages of a low flange width Cantilever Panel are:

• 36% decrease in cantilever edge.• Reduced and low cantilever edges of the panel provides

higher strength to the unsupported edge thus leading to reduced risks of damage due to accidents and frequent access of the panel at site.

• A low flange width panel of the same grade will perform better on all technical parameters as compared to a standard flange panel of the same grade.

*Numbers are a close representation of worldwide panel manufacturers.

36%Decrease in Cantilever

Edge

Page 9: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

The narrow beam limits the overall stability ofthe system, often leading to common customer

complaints such as instability and rocking ofthe panels.

Beam Width:

16.50 mm

Beam Width:

19.50 mm

A wider beam width increases the overallstability of the system and enhances its

technical performance.

*Numbers are a close representation of worldwide panel manufacturers.

Conventional Flange PanelOLD Low Flange PanelNEW

Page 10: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

Foot Print Area resting on the

Pedestal Head:427.88 sq. mm

Foot Print Area resting on the

Pedestal Head:730.35 sq. mm

71%Increase in Foot Print

Area

Lower foot print area leads to instability and rocking of panel incase of overlapping or play

in the system.

Increased footprint area leads to better stability of the system and also eliminates overlapping

and rocking of the panels to a large extent.

*Numbers are a close representation of worldwide panel manufacturers.

Conventional Flange PanelOLD Low Flange PanelNEW

Page 11: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

Cantilever unsupported edge of steel flange at the

corner:30.10 mm

Reduced Cantilever of the

steel flange at the corner:

19.60 mm

Higher radius (30 mm) leads to increased cantilever of the unsupported flanges at the diagonal corner of the panel.

Lower radius (15 mm) decreases the cantilever of theunsupported flanges at the diagonal corner of the panel.

*Numbers are a close representation of worldwide panel manufacturers.

Conventional Flange PanelOLD Low Flange PanelNEW

Page 12: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

The draw backs of the above visible gaps between the panel& stringer:

• Floating Panels: The panels are floating with gaps all around the perimeters.

• Misalignment problems: Misalignment issues hampers the floor leveling at site

• Overlapping panels: Overlapping of panels hampers the floor leveling at site and leads to uneven floors.

• Edge Beading Damage: Overlapping of panels leads to the abuse of the edge beading and the possibility of permanent detachment from the panel perimeters.

GAP between the Panel and Stringer

The advantages of no visible gaps between the panel & stringer:

• Tightly fitted Panels: The panels are snug fit to the under structure grid system.

• No Misalignment: Early warning to installer to take corrective action fast since the system perfectly fitted at right angle and panels do not fit in case of misaligned grid.

• No Overlapping of Panels: The system design prevents the lateral movement of the panels, hence the chances of panels overlapping are almost negligible.

NO GAP between the Panel and Stringer

Conventional Flange PanelOLD Low Flange PanelNEW

Page 13: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

Due to the unstability of the system, squareness of grid is not 100% and hence panels do not fit in

full alignment with the understructure system during and post installation access.

Improves load carrying capacity as the stringers are box type instead of open “C” type stringer

previously used.

Unsupported Area of the Panel Flanges at

the Diagonal Edge

Fully supported Area of the Panel Flanges at the Diagonal Edge

Conventional Flange PanelOLD

Understructure system

Low Flange PanelNEW

Understructure system

Page 14: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

PVC EDGE BEEDING INTEGRAL TRIMv/s

Edges slightly unstable dueto lack of support

Edges more stable.

STABILITY

PVC edges tend to peel offwhen frequently accessed.

Edges are an integral part of laminate and hence eliminates the risk of peeling.

PANEL EDGE

PVC beeding tends to rub against the adjacent panel and generates a

creaking sound.

As there is no PVC, there is no friction generated leading to a noise neutral floor.

SOUND

Panel joint is 10 mm wide. Sleeker joint width of 6 mm

AESTHETICS

Page 15: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

RAISED ACCESSFLOOR SYSTEMS

Nex - Gen

Page 16: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

COMMON CHALLENGES FACED IN DATA CENTERS & CONTROL ROOMS

The 600mm center-to- center distance in

a conventional Raised Access floor system causes the

followingchallenges:

Reduced plenum space

below the floor.

Obstruction of larger services

running beneath the

floor.Fouling of the

cable tray systems with the

pedestals.

Limited space available for work during maintenance of the facility.

Heavy density of cables in data centers makes cable management challenging

Page 17: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

NEX-GEN RAISED ACCESS FLOOR SYSTEM

Unitile has reengineered the conventional

raised floor system design to overcome the

challenges faced in the Data Centers and

Control Room environments.

Our all new Nex-Gen access floor system

has been designed to provide a wider

span for cable management during the

construction and ease of maintenance

post-handover of your facility!

Page 18: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

NEX-GEN SYSTEM DESIGN FEATURES:

Center to center distance of 1200mm

Surface Area: 2400 SQ. MM.

Page 19: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

Unitile Nex-Gen Access floor system having a center to center distance of 1200mm and with a surface area of 2400 sq.mm provides the following advantages:

A 1200 mm wide plenum space below

the floor enables

convenience of cable routing.

Lesser obstruction to larger services running below

the floor (above 500 mm).

The wider span prevents fouling

of cable tray systems with the pedestals.

Ease of maintenance

during construction

program.

Ease of maintenance

post-handover for the life

cycle of your facility.

Lesser number of pedestals required.

Faster installations at

site due to lesser

pedestal.

Page 20: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

Can integrate with Unitile –

Multilayer underfloor grid

system to provide the

benefit of elevated cable

tray:-

Elevated cable tray prevents

the contact of the cables and

trays with floor water /

dampness.

The unique feature prevents

fouling of cable tray with

pedestal.

Path for cable trays are

predefined and hence

supports the contractor for

doing a neat and clean

installation.

Page 21: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

Lesser number of

pedestals required due

to center to center

distance of 1200mm as

compared to center to

center distance of

600mm built in a

conventional raised floor

system

Lesser number of pedestals required

Page 22: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

Advantages due to lesser

number of pedestals

required :–

Lesser holes drilled in the slab

hence maintaining the structural

integrity of the slab.

Lesser drilled holes also leads to

lesser generation of dust on the

floor (3.30 pedestal x 4 holes per

pedestals x area in sq.mt is the no

of holes that have to be drilled in

the mother slab to get correct

anchorage of the pedestal to the

slab for stability of the system).

Faster installation compared to

conventional raised floor system.

Page 23: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

Major challenges offield-cut panels of width200mm & below

Rocking of the panels

Unstable system

Panels not fitting properly

Poor structural performance

Cement and dust generationon loading

</=200 mm

Page 24: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

ALL-NEW SOLUTIONFOR DATA CENTERS

With usage of 600 x 800 mmpanels, the under floor space canbe used to accommodate wider services (restricted load carrying capacity upto USF 1250 only).

With the earlier panel size of 600 x600 mm, the additional 200 mm small cut panels would have to be cut and used along the periphery or near racks for data centers, now with the availability of 600 x 800 mm panel, need for smaller size cut panels is eliminated.

600mm x 800mm panels

Page 25: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

600MM X 800MMPANEL FOR PERIMETER

Page 26: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

Modular and flexible solution to brace the raised floor pedestal which can house the cable trays and power sockets directly fitted on it.

Since the system is adequately braced in all direction, it eliminates the anchoring (drilling the floor slab) of the pedestals and reduces dust generation within the facility. However, these pedestals are secured with the glue to the subfloor.

Multiple layers can be accommodated to suit the requirement at sites wherever necessary.

Improves the dynamic stability of the system.

By virtue of anchoring all the understructure grid with cable management system, the system is also seismic compliant to Zone 4 (highest in its class).

MULTILAYER CABLE TRAY MANAGEMENT

SEISMIC COMPLIANT SYSTEM

Page 27: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

MULTILAYER CABLE TRAY MANAGEMENT SYSTEM

Page 28: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

BRIDGE IN RAISEDACCESS FLOOR SYSTEM

Bridge is used whenever the pedestalsare fouling with cable trays or any other underfloor services which are wider than 600mm and yet maintain the raised floor panel configuration to 600mm – 600mm.

Available in two sizes:1200mm width1800mm width

Page 29: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

ADVANTAGES OF BRIDGE

Gives aclear span of

1200/ 1800 mmfor services above

600mm

Ease of integrationof under floor services

Takes therequired live

loading

Pre engineered& designed to

accommodate theRaised floor PVC cap &screws to be directly

fixed on thebridge

Takes careof curve cable trayswithout fouling with

the raised floorpedestals

Page 30: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

U-FLEXACCESSORIES

Page 31: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

STANDARD AIRFLOW GRILLS

27% | 46% OPENINGS

Page 32: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

DIRECTIONAL AIRFLOW GRILLS

55% | 65% | 80% OPENINGS

Page 33: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

INTEGRATED RAISED FLOOR GROMMETS

Page 34: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

SPLIT INTEGRATED RAISED FLOOR GROMMETS

Page 35: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

EXTENDED RAISED FLOOR GROMMETS

Page 36: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

CIRCULAR & SPLIT CIRCULARBRUSH GROMMETS

Page 37: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

RAISED FLOOR ACCESSORIES

Vision Panel Panel Lifter

Desk Grommets

Electroflex

Multiplyair

Page 38: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

INSTALLATIONTOOLS

Page 39: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

BAND-SAW MACHINE MAGNETIC CORE DRILL MACHINE LASER LEVELLER

APPLICATION:To identify the level of floor

undulation. Prior to starting the execution of the project, site

survey needs to be carried out with the help of this laser leveling

machine.

APPLICATION:For making core cut outson cementitious panel for

pulling cables.

APPLICATION:To cut peripheral

cementitious tiles duringexecution.

Page 40: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

CHOPSAW MACHINE JIGSAW MACHINE

APPLICATION:Used for core cutting cementitious panelsare per requirement

APPLICATION:Used to customize the

pedestal, stringers,shoe ramp as per

site requirement for installation

ANGLE GRINDER

APPLICATION:Grinding and chipping of

concrete lumps on the slab to ensure the pedestals are mounted on a flat surface to eliminate the threat of rocking/instability of

access floor panels

DRILL MACHINE

APPLICATION:Used for fixing machine

screws to the panelsand understructure

Page 41: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

KEY PROJECTREFERENCES

Page 42: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

Brahma Shah Data center

UIDData Centre

Trimax IDC

DATA CENTERS

Page 43: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

KEY CLIENTS

Page 44: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

And many more...

KEY CLIENTS

Page 45: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

CLIENT SPEAKS

Page 46: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

“Good Projects Team. Project was executed seamless without any escalation.”

“Completed supply and installation as per site requirement and committed time line 1 week for 30,000 sq. ft area.”

“Very satisfied with the product, good workmanship by the coordinator.”

“Excellent material management & flawless execution throughout the construction stage. Good work by entire team.”

“Material delivery on time and execution also excellent. Superb supervision during work.”

“Good team work.Always supporting.”

Page 47: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

“Dedicated Team!! Terrific Product!! Excellent Overall Experience!! Looking forward to working with you in future.”

“All deliveries as per project requirement, installation works satisfactory.”

“Delivery on time as committed & supported for installation works to meet the project timelines. Good work done by Ajit and team.”

“Workmanship is very good. Quality of Product is good. Vendor support is excellent.”

“Good experience and timely delivery, fast execution.”

“Product is very good and fulfills all requirement.“

Page 48: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

“Overall performance and experience is satisfied, Service provided by United Access is excellent.”

“We are very pleased with the overall performance of your product. The structure & surface finish resulted in a highly stable and almost noise neutral floor. The pedestals, tools and on-site cutting process made installations simple and quick. We are already seeing its advantages in quick work stations layout adjustments. In short,Unitile is performing as promised.”

“I am extremely happy with the service provided which helped complete the project on time.”

“The execution was flawless and commitment level is highly satisfactory.”

“Timely delivery, good execution, people were cooperative.”

Page 49: RAISED ACCESS FLOOR SYSTEMS...Dust generation & limitations in drilling pretension slabs for drilling of pedestals. Integration of data center airflow solutions and accessories. Air

INDIAAhmedabad | Ankleshwar | Aurangabad | Bareilly | Bengaluru |

Chandigarh | Chennai | Cuttack | Goa | Gurugram | Guwahati |

Hyderabad | Indore | Jaipur | Kanpur | Kolkata | Lucknow |

Mumbai | Nagpur | New Delhi | Pune | Raipur | Thane | Vadodara

INTERNATIONALAzerbaijan | Bahrain | Bangladesh | Egypt | Hong Kong | Indonesia | Kenya |

Nepal | Oman | Philippines | Qatar | Saudi Arabia | Singapore | Sri Lanka |

Tanzania | Turkey | UAE | Vietnam I Maldives I Nigeria I Bhutan

www.unitileindia.com

OUR PRESENCE