Points and Crossings:The arrangements by which different routes, diverging from the first track, are connected to faciliate the diversion of trains from one track to another track without any obstruction are known as points and crossings.
05/0
3/20
23
2
Points and Crossings:
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
3
Turn out:
A complete set of points and crossings provides for diverting the trains from a main track to a branch track is known as turn out.
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
4
Turn out:
Right Hand Turn out:
Animated diagram of a right-hand railroad switch, rail track A divides into two track B (the straight track) and track C (the diverging track)
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
5
Turn out:
Right Hand Turn out: K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
6
Turn out:
Left Hand Turn out: K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
7
Turn out:
Component parts and Functions :
1) A pair of Points (Switches):
A switch, turnout or [set of] points is a mechanical installation enabling railway trains to be guided from one track to another.
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
8
Turn out:
Switches
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
9
Turn out:
Component parts and Functions :
2) A pair of Stock rails:
Stock rails along with their respective tongue rails from a pair of switches or points.
Function of stock rails is to facilitate smooth working of tongue rails.
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
10
Turn out:
Stock rails
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
11
Turn out:
Component parts and Functions :
3) V Crossing:
The function of V crossing is to provide gaps between the rails tobe crossed so that wheel flanges can pass through the gaps without any obstruction.
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
12
Turn out:
V Crossing
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
13
Turn out:
Component parts and Functions :
4) Two check rails:
Function of these rails is to check the tendency of wheels to climb over the crossing.
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
14
Turn out:
Two check rails
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
15
Turn out:
Component parts and Functions :
5) Four lead rails:
Function of these rails is to Lead the track from heel of switches to the toe of crossing.
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
16
Turn out:
lead rails
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
17
Turn out:
Component parts and Functions :
6) Switch tie plate:
Function of switch tie plate is to maintain gauge distance at front of switch.
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
18
Turn out:
Component parts and Functions :
7) Stud(Stop):
A Bent plate which is jointed to stock rail is called stop.
Function of stop is to maintain the alignment.
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
19
Turn out:
Component parts and Functions :
8) Side Chairs:
Function of Side chair is to support the tongue rails throughout their length.
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
20
Turn out:
Component parts and Functions :
9) Stretcher bar:
Function of Stretcher bar is to connects toes of both the tongue rails so that each tongue rail moves through same distance.
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
21
Turn out:
Component parts and Functions :
10) Rods,Cranks,Lever:
Function of Rods,Cranks,Lever is to operate the points.
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
22
Turn out:
Rods,Cranks,Lever
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
23
Turn out:
Component parts and Functions :
11) Locking System:
Function of Locking System is to Maintain timing between signal and tong rails.
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
24
Turn out:
Locking System
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
25
Crossings:
Crossing:The arrangements by which different routes, are connected without any obstructions is called crossings.
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
26
Crossings:
Crossing Types:
According to Angle
According to
Diversion
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
27
Crossings:
Acute Angle
Obtuse Angle
According to Angle
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
28
Crossings:According to Diversion
Spring
Gathering Lines
DiamondScissors
Crossover
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
29
Crossings:
Acute angleWhen angle of crossing rails become acute angle then this crossing is called Acute crossing or V crossing or Frog.
According to Angle
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
30
Crossings:
V crossing
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
31
Crossings:
V crossing
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
32
Crossings:
Obtuse AngleWhen angle of crossing rails become Obtuse angle then this crossing is called Obtuse crossing.
According to Angle
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
33
Crossings:
Obtuse crossing
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
34
Crossings:
Right angle or SquareWhen angle of crossing rails become Right angle then this crossing is called Right angle crossing or Square crossing.
According to Angle
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
35
Crossings:
Right angle crossing
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
36
Crossings:
Spring Crossing:In this crossing wing rail is strongly connected to V part by
helical spring so that’s why this crosssing is called spring crossing.
These crossings used in USA but not in INDIA.
According to Diversion
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
37
Crossings:
Spring Crossing
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
38
Crossings:
Crossover CrossingFunction of this crossing is to connect two parallel or diverging tracks.
According to Diversion
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
39
Crossings:
CrossoverCrossing
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
40
Crossings:
Scissors Crossing(Double cross):This type of crossing consists 4 pair of switch6 Acute crossings2 Obtuse crossingscheck railsAnd this type is use at goods yard.
According to Diversion
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
41
Crossings:
Double cross
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
42
Crossings:
Diamond CrossingWhen two tracks crosses each other at less than 90 angle then it forms diamond shape so it is called Diamond Crossing
According to Diversion
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
43
Crossings:
Diamond Crossing
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
44
Crossings:
Diamond Crossing
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
45
Crossings:
Gathering Lines:When there is more than two track divert from one line then it is called Gathering lines.
According to Diversion
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
46
Crossings:
Gathering Lines
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
47
Crossings:
Gathering Lines
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
48
Ash pit:
Functions of Ash pit :
To collect ash which are produced from steam engine.Depth of ash pit varies from 0.76m to1.20m and constructed from concrete.
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
49Ash pit
Ash pit:
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
50
Turn Table:
Function of Turn Table:To Turn the engine.
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
51Turn Table
Turn Table:
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
52Turn Table
Turn Table:
K.R.
THAN
KI
(BE
Civi
l)
05/0
3/20
23
53
K.R.
THAN
KI
(BE
Civi
l)
THANK YOU………FOR ANY OTHER INFORMATION PLEASE CONTECT ME TO
Email : [email protected]