Social Monitoring Report Semestral Report March 2014 IND: Railway Sector Investment Program Prepared by Ministry of Railways for the Government of India and the Asian Development Bank. This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Upload: others

Post on 19-Jul-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Railway Sector Investment Program · ADB Loans No. 0060-IND / 2793-IND, 3108-IND Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes 2 1. Back

Social Monitoring Report

Semestral Report

March 2014

IND: Railway Sector Investment Program

Prepared by Ministry of Railways for the Government of India and the Asian Development Bank. This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Page 2: Railway Sector Investment Program · ADB Loans No. 0060-IND / 2793-IND, 3108-IND Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes 2 1. Back

Indian Government

Ministry of Railways

Asian Development Bank

Multitranche Financing Facility No. 0060-IND

Loan No. 2793-IND, 3108-IND

Railway Sector Investment Program

Track Doubling and Electrification on Critical Routes

Resettlement and Rehabilitation Implementation Status

Semi Annual Report October 2013 – March 2014

Page 3: Railway Sector Investment Program · ADB Loans No. 0060-IND / 2793-IND, 3108-IND Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes 2 1. Back

Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 3 March 2014

ADB Loans No. 0060-IND / 2793-IND, 3108-IND Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

i

Document Identification

Project Name : Railway Sector Investment Program

ADB MFF no. 0060-IND

ADB Loan no. 2793-IND, 3108-IND

Track Doubling and Electrification on Critical Routes

Report Name : GENERAL CONSULTANT Half yearly R&R Report No.3, March 2014

Reference R&R_ March 2014

Preparation, Review and Authorisation

Prepared by : Dr. Sudesh Kaul Signature :

Organisation : General Consultant

Position : Resettlement Expert Date :

Checked by : Prem Narayan Shukla / Jean-Francois Pinet Signature :

Organisation : General Consultant

Position : Dy. Team Leader / Team Leader Date :

Reviewed by : Dimpy Garg Signature :

Organisation : RVNL

Position : General Manager Coordination Date :

Approved by : Vijay Anand Signature :

Organisation : RVNL

Position : Director Projects Date :

Revision, Preparation, Review Issue

Revision Date Subject Prepared by Reviewed by

Page 4: Railway Sector Investment Program · ADB Loans No. 0060-IND / 2793-IND, 3108-IND Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes 2 1. Back

Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 3 March 2014

ADB Loans No. 0060-IND / 2793-IND, 3108-IND Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

ii

Contents Executive Summary ................................................................................................................................ 1

1. Back Ground ................................................................................................................................... 2

2. Evolution during the relevant period ............................................................................................ 3

3. Status of Current Issues under Social Development ..................................................................... 4

3.1 Sambalpur–Titlagarh project .......................................................................................................... 4

3.2 Raipur – Titlagarh project ............................................................................................................... 4

3.3 Doubling of Daund-Gulbarga project .............................................................................................. 4

3.4 Hospet – Tinaighat project ............................................................................................................. 4

3.5 Electrification of Pune-Wadi Guntakal project ............................................................................... 5

4. Summary Status of Land Acquisition ............................................................................................. 6

Page 5: Railway Sector Investment Program · ADB Loans No. 0060-IND / 2793-IND, 3108-IND Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes 2 1. Back

Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 3 March 2014

ADB Loans No. 0060-IND / 2793-IND, 3108-IND Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

iii

Abbreviation

ADB Asian Development Bank

BPL Below Poverty Line

CDM Clean Development Mechanism

CPM Chief Project Manager

CRS Commissioner of Railway Safety

DG Daund – Gulbarga

DM District Magistrate

DPs Displaced Persons

EA Executing Agency

FFA Framework Financing Agreement

FHH Female Headed Household

FIDIC Fédération Internationale Des Ingénieurs Conseils

FY Fiscal Year

GAD General Arrangement Drawing

GC General Consultant

GCC General Conditions of Contract

GRC Grievance Redressal Cell

HT Hospet – Tinaighat

HHs House Holders

IA Implementing Agency

India Indian Government

INR Indian Rupees

IP Indigenous People

IPP Indigenous Peoples Plan

IPPF Indigenous Peoples Planning Framework

IR Inception Report

LAO Land Acquisition Officer

MFF Multitranche Financing Facility

MOR Ministry of Railways

MPR Monthly Progress Report

NGO Non-Governmental Organisation

NHAI National Highways Authority of India

NTH Non-Title Holder

PAP/APs Project Affected Persons

PFR Periodic Financing Request

PG Pune – Guntakal

PMC Project Management Consultant

PWD Public Works Department

QPR Quarterly Progress Report

RAP Resettlement Action Plan

R&R Resettlement and Rehabilitation

Page 6: Railway Sector Investment Program · ADB Loans No. 0060-IND / 2793-IND, 3108-IND Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes 2 1. Back

Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 3 March 2014

ADB Loans No. 0060-IND / 2793-IND, 3108-IND Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

iv

RO Resettlement Officer

ROB Road Over Bridge

ROW Right Of Way

RSIP Railway Sector Investment Program

RT Raipur – Titlagarh

RVNL Rail Vikas Nigam Limited

SC Scheduled Caste

ST Scheduled Tribe

ST Sambalpur – Titlagarh

TH Title Holder

USD United States Dollars

Page 7: Railway Sector Investment Program · ADB Loans No. 0060-IND / 2793-IND, 3108-IND Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes 2 1. Back

Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 3 March 2014

ADB Loans No. 0060-IND / 2793-IND, 3108-IND Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

1

Executive Summary

This consolidated report on implementation of Resettlement and Rehabilitation(R&R) plan including

status of land acquisition undertaken from October 2013 to March 2014 has been prepared in

compliance with ADB policies.

During the period, the following Resettlement activities have taken place:

Detailed assessment and verification of the micro plan

Preparation of the Identity cards

Disbursement

The land acquisition is limited to two projects only namely Hospet-Tinaighat (HT) and Sambalpur –

Titlagarh (ST) projects.

Field work for Land acquisition is going on although at slow pace.

The NGO incharge of implementation of the Resettlement and Rehabilitation work has requested

RVNL for extension of their contract with price escalation as their agreement ended on 22 January

2014. It is expected that RVNL will soon take a decision on it to complete the unfinished work of Land

acquisition and implementation of Resettlement and Rehabilitation plan.

The global progress of R&R activities at end of March 2014 of the projects is estimated as under:

Name of Project % rated progress for R&R

DG 90%

HT 70%

ST 70%

RT 70%

PG N/A

Page 8: Railway Sector Investment Program · ADB Loans No. 0060-IND / 2793-IND, 3108-IND Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes 2 1. Back

Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 3 March 2014

ADB Loans No. 0060-IND / 2793-IND, 3108-IND Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

2

1. Back Ground

In general, the resettlement planning documents were disclosed in March 2011. Besides two

projects requiring land acquisition, four projects will affect non-titleholders only.

S. No Project Name Length (in Km.)

Location (State) Project

components

1 Daund-Gulbarga 225 Maharashtra, and Karnataka Doubling

2 Sambalpur-Titlagarh 182 Odisha Doubling

3 Raipur-Titlagarh 203 Chhattisgarh and Odisha Doubling

4 Hospet-Tinaighat 245 Karnataka Doubling

5 Pune-Guntakal 641 Maharashtra, Karnataka, and Andhra Pradesh

Electrification

Table 1: Detail of Projects

The location of the projects is shown as red and blue in the map (Figure 1) here under:

Figure 1: Map of India showing Track Doubling and Electrification Projects

Page 9: Railway Sector Investment Program · ADB Loans No. 0060-IND / 2793-IND, 3108-IND Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes 2 1. Back

Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 3 March 2014

ADB Loans No. 0060-IND / 2793-IND, 3108-IND Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

3

2. Evolution during the relevant period

This half Yearly report up to March 2014 is earmarked with the detailed assessment and

verification of the micro plan, preparation of the Identity card, disbursement containing details of

approved Affected Persons (APs), as per the approved Micro Plan.

The land acquisition is limited to two projects only namely Hospet-Tinaighat (HT) and Sambalpur

–Titlagarh (ST) projects. Field work for Land acquisition is going on although at slow pace.

A letter regarding the proposal for extension of time for completion of R & R works by Sugam

International Sansthan (SIS), NGO has been forwarded to RVNL on 26th Feb 2014 for extension of

their contract with price escalation as their agreement ended on 22 January 2014. A number of

balance activities related to R&R are pending with NGO that are essentially required for projects.

NGO has clarified that they have attempted extra efforts to achieve the targets given, but due to

delay in Land Acquisition, the huge part of R&R works is still pending. Further, they clarified that

delay in land acquisition is not on the account of NGO. The NGO has requested for extra time with

financial implications. They have demanded extra time for 18 Months with and extra financial

implication of Rs. 15, 60,000. RVNL should take decision to these pending issues very soon.

Page 10: Railway Sector Investment Program · ADB Loans No. 0060-IND / 2793-IND, 3108-IND Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes 2 1. Back

Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 3 March 2014

ADB Loans No. 0060-IND / 2793-IND, 3108-IND Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

4

3. Status of Current Issues under Social Development

The current status on each project is as follows:-

3.1 Sambalpur–Titlagarh project

This project passes through four districts namely Sambalpur, Sonepur/Subarnapur, Bargarh &

Bolangir in state of Odisha.

The total land acquisition is about 108 acres (Private Land to be acquired: 67 acres, Forest Land:

13 acres, Govt. Land: 28 acres).

The survey details of the Title holders are under process. NGO has completed the verification of

Non-title holders (NTHs) in this stretch. The analysis of unit rate on the basis of Schedule of Rates

(SOR) of the state of Odisha has been clarified by the Evaluator.

3.2 Raipur – Titlagarh project

This project passes through two states: Chhattisgarh and Odisha. In Chhattisgarh section there are

three districts namely Raipur, Mahasamund and Nawapada.

There is no land acquisition in this project.

There are some changes in the proposed alignment of Railway track in Raipur due to fly over at

Parwati Nagar between chainage 3+500 to 13+500, resulting in large deviation of number of

affected persons habiting in the Chhattisgarh section. A joint survey by the NGO and Rail Vikas

Nigam Limited along with General Consultant was carried out to assess the total affected NTH in

the project, the valuation of structures and Micro Plan has been submitted by NGO.

The tentative date for disbursement originally proposed for February 2014 has been changed to

May 2014.

3.3 Doubling of Daund-Gulbarga project

This project passes through two states: Karnataka and Maharashtra.

No land acquisition in this project.

In Karnataka section there is no presence of Title Holders (THs) & and Non-Title Holders (NTHs).

NGO has completed the Verification of NTHs in Maharashtra section. Micro plan has been

approved for NTH and 100% amount has been disbursed. Grievance Redressal (GRC) letters have

been issued by District Magistrate (DM) concerned.

3.4 Hospet – Tinaighat project

The total land acquisition is about 32.525 acre in this project.

Out of 32.55 acres, 51.15% land is already acquired after 6(1) notification, for 6.98% 4(1)

notification has been issued on 09-01-2014 (Talabala, Koppal district), for 0.230% 6(1) notification

has been issued in the month of February 2014 for balance land of 3 guntha1 (Annigeri, Dharwad

district). Balance land of 41.6 % is under process for 4(1) notification. Private land to be acquired:

27.200 acres, Govt. Land: 5.325 acres.

1 1 guntha = 121 Sq. yard = 101.1Sqm.

Page 11: Railway Sector Investment Program · ADB Loans No. 0060-IND / 2793-IND, 3108-IND Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes 2 1. Back

Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 3 March 2014

ADB Loans No. 0060-IND / 2793-IND, 3108-IND Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

5

No NTH were found in this section. The Micro plan approved for 50% of the Title Holders for INR.

4, 32,000 for 28 House Holders (HHs). Cheques are under preparation. Grievance Redressal (GRC)

letters have been issued by DM concerned.

3.5 Electrification of Pune-Guntakal project

There is no Land Acquisition, Title Holders (TH) & Non-Title Holders (NTH) in this section.

Page 12: Railway Sector Investment Program · ADB Loans No. 0060-IND / 2793-IND, 3108-IND Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes 2 1. Back

Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 3 March 2014

ADB Loans No. 0060-IND / 2793-IND, 3108-IND Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

6

4. Summary Status of Land Acquisition Table 1- Status of Land Acquisition of different projects is as follows:

Item No

Indicators

Section

Raipur-Titlagarh Doubling Project (Odisha Section)

Raipur-Titlagarh Doubling Project (Chhattisgarh Section)

Sambalpur–Titlagarh Doubling Project

Hospet–Tinaighat Doubling Project (Karnataka Section)

Daund–Gulbarga Doubling Project (Karnataka Section)

Daund–Gulbarga Doubling Project (Maharashtra Section)

1 Appointment of the RP implementation NGO

Sugam International Sansthan(SIS)

Sugam International Sansthan(SIS)

Sugam International Sansthan(SIS)

Sugam International Sansthan(SIS)

Sugam International Sansthan(SIS)

Sugam International Sansthan(SIS)

2 No. of displaced households

16 249 644(38NTH) 43 NIL 05

3 No. of displaced persons

65 1004 2251(176 NTH) 173 NIL 12

4 No. of physically displaced households

16 113 37 NTH - NIL NIL

5 No. of physically displaced persons

65 476 170 NTH NIL NIL NIL

6 No. of economically displaced households

NA 136 1 NTH

644 TH 43 NIL NIL

7 No. of economically displaced persons

NA 528 6 NTH

2251 TH 173 NIL NIL

Page 13: Railway Sector Investment Program · ADB Loans No. 0060-IND / 2793-IND, 3108-IND Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes 2 1. Back

Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 3 March 2014

ADB Loans No. 0060-IND / 2793-IND, 3108-IND Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

7

8 Total number of Titleholders being displaced

NA NA 644 TH 43 NIL NIL

9 Total number of non titleholders being displaced

16 249 38 NTH NIL NIL 05

10 Entitlement matrix disclosed

Yes Yes Yes Yes Yes Yes

11 Number of identity cards issued to the displaced persons

Not Yet. Not Yet.. Not Yet.

Identity Card distributed to PAPs of 5 villages.

NA 05

12 Micro plans prepared for Titleholders

Nil Nil

After award by DLAO.

Revised corrected Micro plan has been prepared

and approved in June 2013.

NA NA

13 Micro plans prepared for non Titleholders

Completed and

submitted (16 NTH)

Completed and submitted

(249 NTH)

Prepared and submitted by SIS to

RVNL. NIL NA Yes

14 Micro plans prepared for CPRs

NIL NIL NIL NIL NA NA

15 Micro plans approved for TH

NIL NIL

Not yet, Requisition for private land are submitted to State

Government. Identity cards can be issued only after 6.1

notification.

Approved NA NA

Page 14: Railway Sector Investment Program · ADB Loans No. 0060-IND / 2793-IND, 3108-IND Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes 2 1. Back

Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 3 March 2014

ADB Loans No. 0060-IND / 2793-IND, 3108-IND Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

8

16 Micro plans approved for NTH

Approved Approved Micro Plan

submitted to RVNL for approval.

NIL NA Yes

17 Micro plans approved for CPRs

Not yet Not yet NIL NIL NA NA

18 Quantum of private land to be acquired

NIL NIL 62.271 Acre

Private Land to be acquired: 27.200 acres.

Govt. Land: 5.325 acres.

TOTAL 32.525 acres.

NIL NIL

19 Progress on LA NA NA

Requisition for L.A. submitted &

completed for SBP Govt. & Pvt. Land-

Sonepur Distt.

Requisition for L.A. submitted for Govt.

land for Bargargh Distt. ,for Pvt. Land

yet to be submitted.

Requisition for L.A. yet to be submitted

for Govt. & Pvt. Land for Balangir Distt.

Out of 32.55 acres, 51.15% land is already

acquired after 6(1) notification, for 6.98%

4(1) notification is issued on 09-01-2014( Talabala,

Koppal district), for 0.230% 6(1) notification issued in the month of

February 2014 for balance land of

3guntas(Annigeri,Dharwad district)

Balance land of 41.6 % is under process for 4(1)

notification.

NIL NIL

20 Compensation NA NA Tentative date to After award to start NA Yes

Page 15: Railway Sector Investment Program · ADB Loans No. 0060-IND / 2793-IND, 3108-IND Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes 2 1. Back

Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 3 March 2014

ADB Loans No. 0060-IND / 2793-IND, 3108-IND Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

9

distributed to DPs start distribution in May 2014

distribution.

21 Assistance distributed to DPs

Tentative date to start distribution

of Assistance May,2014.

Tentative date to start

distribution of Assistance May,.2014

Tentative date to start distribution

May 2014.

Assistance distributed to 12 PAPs under Phase-I in 3rd week of Dec. 2013.

NA No

22 GRC formed GRC formed

(1) GRC formed

(3) GRC formed in all 4

District.

Letter issue to District Administration for

nomination of member of GRC. Spl. Land acquisition

Officer cum Asstt. Commissioner has been

nominated as Chairman of GRC & DGM/RVNL as

Member of GRC from PIU.

SLAO Dharwad decided to go for general award.

NA

Yes

1st installment of assistance has

been distributed on 24.12.12.

2nd / final installment of assistance has

also been distributed on

24.08.13.

23

Complaints to GRC received/ resolved

Not yet Not yet Not yet Not yet NA No

24

Consultations held with DPs

03 places 06 places 2 places 13 places NA Yes

Page 16: Railway Sector Investment Program · ADB Loans No. 0060-IND / 2793-IND, 3108-IND Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes 2 1. Back

Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 3 March 2014

ADB Loans No. 0060-IND / 2793-IND, 3108-IND Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

10

25 Relocation

Yet to start

Tentative date to start Relocation 10.06.2014

Yet to start

Tentative date to start

Relocation 10.06.2014

Yet to start Tentative date to start re

location

25.06.2014

- NA No

26 Inventory of Losses of Displaced Persons (DPs)

Completed Completed Completed - - Completed

27

Impact on Indigenous People/STs with kind of impact

Completed Completed Completed

(STs not found) NA NA

Completed

(STs not found)