RAILWAY PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY NETWORK Selen GÜNEL SUSUZ Head of Department 13 June 2017

Upload: others

Post on 21-May-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RAILWAY PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY … country report-TAR WGM-5.pdflines and manufacturing all types of rolling stock in Turkey. Increasing the share of railway transport

RAILWAY PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY NETWORK

Selen GÜNEL SUSUZ Head of Department 13 June 2017

Page 2: RAILWAY PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY … country report-TAR WGM-5.pdflines and manufacturing all types of rolling stock in Turkey. Increasing the share of railway transport

CURRENT STATUS RAILWAY NETWORK

Total Lines, Length of Electrified and Signaled Lines

Total Railway Network 12.532 km

High Speed Lines 1.213 km

Conventional Lines 11.319 km

Signaled Lines (% 44) 5.462 km

Electrified Lines (% 35) 4.350 km

Page 3: RAILWAY PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY … country report-TAR WGM-5.pdflines and manufacturing all types of rolling stock in Turkey. Increasing the share of railway transport

LINES IN OPERATION HST Lines

1.213 km HST line has been constructed and put into operation.

1.906 km is under construction.

İSTANBUL

EDİRNE

ESKİŞEHİR

Polatlı

ANKARA

KONYA

İZMİR

SİVAS

AFYONKARAHİSAR

KAYSERİ

BURSA

ERZİNCAN

ERZURUM

KARS

MERSİN ADANA

GAZİANTEP

DİYARBAKIR

ELAZIĞ

MALATYA

ZONGULDAK

SAMSUN

Bandırma

VAN

MUŞ

BİLECİK

ÇANKIRI

KIRIKKALE

TEKİRDAĞ

İZMİT

BALIKESİR

AYDIN DENİZLİ BURDUR ISPARTA

UŞAK MANİSA

KARAMAN

NİĞDE

OSMANİYE

K.MARAŞ

AMASYA

BATMAN

MARDİN

Yerköy

KARABÜK

Yenişehir

ANTALYA

AKSARAY

ŞANLIURFA

KÜTAHYA KIRŞEHİR

Ulukışla

ÇORUM

Selçuk

İskenderun

SİİRT

Habur Nusaybin

Palu

C.ovası

T.köy Eşme

Gözertepe

KIRKLARELİ

Çandarlı

Nemrut

Karasu

Manavgat

Alanya

Gemlik

Çetinkaya

ADIYAMAN

Bergama

At Projecting phase

Under Construction

Other Survey Projects Studies

Existing Conventional Lines

In operation

At Tendering Phase

F.paşa

NEVŞEHİR

ÇANAKKALE

IĞDIR

Dilucu Aralık

TOKAT Turhal

GÜMÜŞHANE

TRABZON

3

Page 4: RAILWAY PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY … country report-TAR WGM-5.pdflines and manufacturing all types of rolling stock in Turkey. Increasing the share of railway transport

LINES UNDER CONSTRUCTION HSL, RL and CL

1.906 km High Speed Line

1154 km Rapid Line

769 km Conventional Line

3.829 km in total under construction.

İSTANBUL

EDİRNE

ESKİŞEHİR

Polatlı

ANKARA

KONYA

İZMİR

SİVAS

AFYONKARAHİSAR

KAYSERİ

BURSA

ERZİNCAN

ERZURUM

KARS

MERSİN ADANA

GAZİANTEP

DİYARBAKIR

ELAZIĞ

MALATYA

ZONGULDAK

SAMSUN

Bandırma

VAN

MUŞ

BİLECİK

ÇANKIRI

KIRIKKALE

TEKİRDAĞ

İZMİT

BALIKESİR

AYDIN DENİZLİ BURDUR ISPARTA

UŞAK MANİSA

KARAMAN

NİĞDE

OSMANİYE

K.MARAŞ

AMASYA

BATMAN

MARDİN

Yerköy

KARABÜK

Yenişehir

ANTALYA

AKSARAY

ŞANLIURFA

KÜTAHYA KIRŞEHİR

Ulukışla

ÇORUM

Selçuk

İskenderun

SİİRT

Habur Nusaybin

Palu

C.ovası

T.köy Eşme

Gözertepe

KIRKLARELİ

Çandarlı

Nemrut

Karasu

Manavgat

Alanya

Gemlik

Çetinkaya

ADIYAMAN

Bergama

At Projecting Phase

Under Construction

Other Survey and Project Studies

Existing Conventional Lines

In Operation

At Tendering Phase

F.paşa

NEVŞEHİR

ÇANAKKALE

IĞDIR

Dilucu Aralık

TOKAT Turhal

GÜMÜŞHANE

TRABZON

4

Page 5: RAILWAY PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY … country report-TAR WGM-5.pdflines and manufacturing all types of rolling stock in Turkey. Increasing the share of railway transport

OTHER IMPORTANT INVESTMENT PROJECTS Electrification

The works on electrification of 1.947 km conventional line are going on.

İSTANBUL

EDİRNE

ESKİŞEHİR

ANKARA

KONYA

İZMİR

SİVAS

AFYONKARHİSAR

KAYSERİ

BURSA ERZİNCAN

ERZURUM

KARS

MERSİN ADANA

GAZİANTEP

DİYARBAKIR

ELAZIĞ

MALATYA

ZONGULDAK SAMSUN

Bandırma

VAN

MUŞ

BİLECİK

ÇANKIRI

KIRIKKALE

TEKİRDAĞ

İZMİT

BALIKESİR

AYDIN

DENİZLİ BURDUR

ISPARTA

UŞAK MANİSA

NİĞDE

OSMANİYE

K.MARAŞ

AMASYA

BATMAN

MARDİN

KARABÜK

Divriği

T.kale

C.ovası

Aliağa

KÜTAHYA

Tepeköy

Ulukışla

Selçuk

KARAMAN

BAŞKENTRAY

193 km 201 km

52 km 415 km

495 km

303 km

920 km

98 km

Electrified Lines (4.350 km) (% 35)

Under contruction(1.947 km) (% 50)

In projecting phase (1.603 km) (% 63)

214 km

390 km

236 km

33 km

5

Page 6: RAILWAY PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY … country report-TAR WGM-5.pdflines and manufacturing all types of rolling stock in Turkey. Increasing the share of railway transport

OTHER IMPORTANT INVESTMENT PROJECTS Signalling

The installation of signalling on 2.385 km conventional line is going on.

İSTANBUL

EDİRNE

ESKİŞEHİR

ANKARA

KONYA

İZMİR

SİVAS

AFYONKARHİSAR

KAYSERİ

BURSA ERZİNCAN

ERZURUM

KARS

MERSİN ADANA

GAZİANTEP

DİYARBAKIR

ELAZIĞ

MALATYA

ZONGULDAK SAMSUN

Bandırma

VAN

MUŞ

BİLECİK

ÇANKIRI

KIRIKKALE

TEKİRDAĞ

İZMİT

BALIKESİR

AYDIN

DENİZLİ BURDUR

ISPARTA

UŞAK MANİSA

KARAMAN

NİĞDE

OSMANİYE

K.MARAŞ

AMASYA

BATMAN

MARDİN

KARABÜK

Divriği

T.kale

İskenderun

C.ovası

Aliağa

374 km

KÜTAHYA

356 km

Tepeköy

Ulukışla

376 km Selçuk

Ortaklar

176 km

BAŞKENTRAY

507 km

415 km

410 km

ŞANLIURFA

52 km

In projecting phase (805 km) (%69)

Signalled Lines at the end of the year(5.462 km) (%44)

At installation phase(2.385 km) (%63)

390 km

134 km

6

Page 7: RAILWAY PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY … country report-TAR WGM-5.pdflines and manufacturing all types of rolling stock in Turkey. Increasing the share of railway transport

OTHER IMPORTANT INVESTMENT PROJECTS Railway Renewal

10.000 km of the existing conventional network has been renewed.

Renewed Lines (9.965 Km)

Under rehabilitation and renovation (864+490 = 1354 km)

Lines to be renewed during 2018-2019 (150 Km) 7

Page 8: RAILWAY PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY … country report-TAR WGM-5.pdflines and manufacturing all types of rolling stock in Turkey. Increasing the share of railway transport

8

OTHER IMPORTANT INVESTMENT PROJECTS Construction of Logistics Centers

The construction of 7 out of 20 logistics centers have been completed. 7 of them are under

construction. Tendering, projecting and expropriating studies for 6 centers are going on.

Uşak

Köseköy/İzmit Halkalı/İstanbul

Gökköy/Balıkesi

r

Kaklık/Denizli

Gelemen/Samsu

n

Hasanbey/Eskişehir

In Operation Yenice/Mersin

Türkoğlu/Kahramanmaraş

Mardin

Palandöken/Erzurum

Bozüyük/Bilecik

Under Construction

Kemalpaşa/İzmi

r

AYGM

Kayacık/Kony

a

Boğazköprü/Kayseri

Habur

Kars

Sivas

Yeşilbayır/İstanbu

l

Under Projecting and Expropriating Studies

Tatvan/Bitlis

Page 9: RAILWAY PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY … country report-TAR WGM-5.pdflines and manufacturing all types of rolling stock in Turkey. Increasing the share of railway transport

VISION 2023 Targets

Reaching totally 25.000 km railway network in 2023, by building 13.000 km railways which include 3.500 km high speed railway, 8.500 km rapid railway and 1.000 km conventional railway.

Performing the works for complying the existing vehicles with high speed train lines and manufacturing all types of rolling stock in Turkey.

Increasing the share of railway transport by 10% in passenger and by 15% in freight transport.

Ensuring the connection through branch lines with logistics centers, factories, industries, organized industrial zones and ports which have great freight potential.

9

Page 10: RAILWAY PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY … country report-TAR WGM-5.pdflines and manufacturing all types of rolling stock in Turkey. Increasing the share of railway transport

LIBERALIZATION OF TURKISH RAILWAYS

Restructuring of Turkish State Railways (TCDD): «Law on the Liberalization of Railway Transport of Turkey»

No.6461 adopted in 2013

TCDD continues as Infrastructure Manager and the units of TCDD responsible for the operations of trains are separated, as an affiliate of TCDD named «TCDD Transport JSC.».

10

Page 11: RAILWAY PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY … country report-TAR WGM-5.pdflines and manufacturing all types of rolling stock in Turkey. Increasing the share of railway transport

PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY NETWORK

1

1- Baku-Tbilisi-Kars Railway Line Project

11

Page 12: RAILWAY PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY … country report-TAR WGM-5.pdflines and manufacturing all types of rolling stock in Turkey. Increasing the share of railway transport

12

• The foundation of Turkish section was laid on 24th July 2008.

• The realization in the amount of 99 % has been provided.

• The project is planned to be completed in 2017.

Baku-Tbilisi-Kars Railway Line Project

PROJECTS OF TURKEY ON TRANS-ASIA RAILWAY NETWORK

Page 13: RAILWAY PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY … country report-TAR WGM-5.pdflines and manufacturing all types of rolling stock in Turkey. Increasing the share of railway transport

PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY NETWORK

2- Marmaray

1

2

Seamless railway connectivity between Asia and Europe with BTK Project

Total Length: 77 km

14 km is in operation including strait crossing tube tunnel and 5 stations

13

Page 14: RAILWAY PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY … country report-TAR WGM-5.pdflines and manufacturing all types of rolling stock in Turkey. Increasing the share of railway transport

PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY NETWORK

3- Kapıkule-Halkalı Railway Project

1

2

3

Length: 230 km Start and Completion date: 2017-2022 Complementary to Marmaray Will have 2 million passangers and 5 million ton freight capacity

14

Page 15: RAILWAY PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY … country report-TAR WGM-5.pdflines and manufacturing all types of rolling stock in Turkey. Increasing the share of railway transport

PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY NETWORK

4- Ankara-Eskisehir-Istanbul High Speed Train Project

1

2

3

4

Length: 513 km Travel time decreased to 3,5 hours from 7 hours 20,2 million passengers carried Share of passenger transport between Ankara-Eskişehir increased from 8% to 72%

15

Page 16: RAILWAY PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY … country report-TAR WGM-5.pdflines and manufacturing all types of rolling stock in Turkey. Increasing the share of railway transport

PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY NETWORK

5- Ankara-Izmir High Speed Train Project

1

2

3

4

5

Length : 625 km Completion date: 2020 Double track, electrified and signaled line Speed: 250 km/h 6 million passengers per year

16

Page 17: RAILWAY PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY … country report-TAR WGM-5.pdflines and manufacturing all types of rolling stock in Turkey. Increasing the share of railway transport

PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY NETWORK

6- Ankara-Sivas High Speed Train Project

1

2

3

4

5

6

Length: 405 km Completion date: 2018 Double track, electrified and signaled line Physical progress recorded: 57 % Speed: 250 km/h

17

Page 18: RAILWAY PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY … country report-TAR WGM-5.pdflines and manufacturing all types of rolling stock in Turkey. Increasing the share of railway transport

PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY NETWORK

7- Rehabilitation and Signaling of Samsun-Sivas (Kalın) Line

1

2

3

4

5

6

7

Length: 410 km Completion date: 2018 Physical progress: 30%

Increase from 21 to 49 in train capacity per day.

18

Page 19: RAILWAY PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY … country report-TAR WGM-5.pdflines and manufacturing all types of rolling stock in Turkey. Increasing the share of railway transport

PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY NETWORK

8- Sivas (Cetinkaya)-Malatya High Speed Train Project

1

2

3

4

5

6

7

8

Length: 125 km Start and Completion date: 2018-2022 Double track, electrified and signaled line 200 km/h speed

19

Page 20: RAILWAY PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY … country report-TAR WGM-5.pdflines and manufacturing all types of rolling stock in Turkey. Increasing the share of railway transport

PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY NETWORK

9- Sivas-Erzincan Rapid Train Project

1

2

3

4

5

6 7

8

9

Length : 242,5 km Start and Completion date: 2017-2023 Double track, electrified and signaled line Speed: 250 km/h

20

Page 21: RAILWAY PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY … country report-TAR WGM-5.pdflines and manufacturing all types of rolling stock in Turkey. Increasing the share of railway transport

PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY NETWORK

10- Erzincan-Erzurum-Kars Rapid Railway Line Study Project

1

2

3

4

5

6 7

8

9

10

Length : 414 km Start and completion date:2017-2019 Double track, electrified and signaled line Speed: 200 km/h

21

Page 22: RAILWAY PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY … country report-TAR WGM-5.pdflines and manufacturing all types of rolling stock in Turkey. Increasing the share of railway transport

PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY NETWORK

11-Adana-Mersin Rapid Train Line

1

2

3

4

5

6 7

8

9

10

11

Length : 67 km Completion date: 2019 (for construction) Aims to increase the capacity of existing line

22

Page 23: RAILWAY PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY … country report-TAR WGM-5.pdflines and manufacturing all types of rolling stock in Turkey. Increasing the share of railway transport

PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY NETWORK

12-Adana-İncirlik-Osmaniye(Toprakkale) Rapid Train Line (2. line)

1

2

3

4

5

6 7

8

9

10

11 12

Length : 79 km Start and completion date:2016-2019 Double track, electrified and signaled Speed: 160-200 km/h

23

Page 24: RAILWAY PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY … country report-TAR WGM-5.pdflines and manufacturing all types of rolling stock in Turkey. Increasing the share of railway transport

PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY NETWORK

13-Malatya-Elazıg Rapid Railway Line Study Project

1

2

3

4

5

6 7

8

9

10

11 12

13

Length: 121 km Start and completion date: 2017-2019 Double track, signaled and electrified line Speed: 200 km/h

24

Page 25: RAILWAY PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY … country report-TAR WGM-5.pdflines and manufacturing all types of rolling stock in Turkey. Increasing the share of railway transport

UIC 10th World Congress on High Speed Rail

UIC 10th World Congress on High Speed Rail, planned to be held on 11-14 July 2017, will be

organized on

8-11 May 2018 by TCDD, as the host, and with the support of CMS Project, as the official organizer, in

cooperation with UIC in Ankara.

«sharing knowledge for sustainable and competitive operations»

25

Page 26: RAILWAY PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY … country report-TAR WGM-5.pdflines and manufacturing all types of rolling stock in Turkey. Increasing the share of railway transport

26 UDHB 2016 Bütçe

DEMiRYOLU 26

TEŞEKKÜRLER!

THANK YOU FOR YOUR ATTENTION